Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Launch Campaign”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Modeling Logistics and Supportability for Crewed Missions Beyond Low Earth Orbit

NASA’s future missions aim to establish a sustained human presence on the lunar surface and send humans to Mars. These missions will send crews farther from home than previous missions, limiting the opportunities for resupply missions. Additionally, the use of multiple launches and reusable elements will increase mission and campaign complexity. Logistics and supportability analysis evaluates the link between mission and system characteristics and key metrics such as logistics and spares mass and volume, crew time, and risk. As missions become increasingly complex and crews are logistically isolated for longer periods of time, logistics and supportability will become more powerful drivers of risk and cost and, therefore, more important considerations during system and mission development. When logistics and supportability are considered from the beginning of system and mission development, opportunities arise to create more efficient, lower-risk systems. Design choices made without detailed consideration of logistics and supportability have the potential to result in greater risks and increased costs as all options may not have been analyzed. This paper provides an overview of a methodology used for space mission logistics and supportability analysis, including key metrics, assumptions, and required inputs. Example applications of this methodology to explore the impacts of system architecture, dormancy, and synergies between lunar and Mars missions are also presented. Conducting these holistic analyses enables informed decision-making for mission planning and system design, which can help mitigate the risk of loss of mission, vehicle, or crew. Using the knowledge of historical missions, experiences gained on the lunar surface, and logistics and supportability analyses, NASA can examine and optimize supportability characteristics for safer and more effective operations for future lunar and Mars missions.

Supportability↗

Technology Development for a Potential Hybrid Mars Ascent Vehicle

With Mars Sample Return mission concepts being considered for launch as early as 2026, technology development to enable this potential campaign is currently underway. One of the critical items in the campaign would be a Mars Ascent Vehicle, which would be responsible for getting the samples from the surface of Mars to orbit around Mars. This would be the first rocket launch from another planet. Therefore, several challenges arise due to the Martian atmosphere and remote location. A technology development program to determine the feasibility of a hybrid rocket for a Mars Ascent Vehicle is entering its fourth year. Highlights and successes of this program will be discussed.

Oglesby, Britt↗

Preliminary measurements of auroral energy deposition and middle atmosphere electrodynamic response during MAC/Epsilon

On the nights of October 21 and 28, 1987 (UT), two Nike Orion payloads (NASA 31.066 and 31.067) were launched from Andoya, Norway, as part of the MAC/Epsilon campaign, to study auroral energetics and their effect on the middle atmosphere. Each payload carried instrumentation to measure relativistic electrons from 0.1 to 1.0 MeV in 12 differential channels, and Bremsstrahlung X-rays from greater than 5 to greater than 80 KeV in 5 integral channels. In addition, instrumentation to measure ion densities and electric fields were also included on these and, in the case of 31.066, on other near simultaneous payloads. The first flight, 31.066, was launched under pre-magnetic midnight conditions during relatively stable auroral conditions. Flight 31.067 was launched during post-breakup conditions at which time pulsations of approx. 100 seconds duration were evident. The measured radiations including their spectral characteristics are compared for these two events, to appraise their effect on the electrodynamic properties of the middle atmosphere as determined by other rocket-borne measurements.

Goldberg, R. A.↗

Advanced Technology Lifecycle Analysis System (ATLAS)

Developing credible mass and cost estimates for space exploration and development architectures require multidisciplinary analysis based on physics calculations, and parametric estimates derived from historical systems. Within the National Aeronautics and Space Administration (NASA), concurrent engineering environment (CEE) activities integrate discipline oriented analysis tools through a computer network and accumulate the results of a multidisciplinary analysis team via a centralized database or spreadsheet Each minute of a design and analysis study within a concurrent engineering environment is expensive due the size of the team and supporting equipment The Advanced Technology Lifecycle Analysis System (ATLAS) reduces the cost of architecture analysis by capturing the knowledge of discipline experts into system oriented spreadsheet models. A framework with a user interface presents a library of system models to an architecture analyst. The analyst selects models of launchers, in-space transportation systems, and excursion vehicles, as well as space and surface infrastructure such as propellant depots, habitats, and solar power satellites. After assembling the architecture from the selected models, the analyst can create a campaign comprised of missions spanning several years. The ATLAS controller passes analyst specified parameters to the models and data among the models. An integrator workbook calls a history based parametric analysis cost model to determine the costs. Also, the integrator estimates the flight rates, launched masses, and architecture benefits over the years of the campaign. An accumulator workbook presents the analytical results in a series of bar graphs. In no way does ATLAS compete with a CEE; instead, ATLAS complements a CEE by ensuring that the time of the experts is well spent Using ATLAS, an architecture analyst can perform technology sensitivity analysis, study many scenarios, and see the impact of design decisions. When the analyst is satisfied with the system configurations, technology portfolios, and deployment strategies, he or she can present the concepts to a team, which will conduct a detailed, discipline-oriented analysis within a CEE. An analog to this approach is the music industry where a songwriter creates the lyrics and music before entering a recording studio.

O'Neil, Daniel A.↗

NASA’s Moon to Mars (M2M) Transit Habitat (TH) Refinement Point of Departure (PoD) Design

As NASA prepares for the next human footsteps on the lunar surface, the Agency is already looking ahead to systems that will enable a sustained human presence on the lunar surface and mission to Mars, including a lunar Surface Habitat and Mars Transit Habitat (TH). This paper describes the latest NASA government reference design for the TH and how it will support NASA's Moon to Mars human exploration architecture. First, it will serve as a test and demonstration platform in lunar orbit, demonstrating capabilities required for long-duration microgravity human spaceflight as part of the lunar-Mars analog missions. Then, the TH will also serve as a major Mars habitation exploration element to support the crew during their transit from the lunar orbit to Mars and returning them safely to lunar orbit. This paper will cover several considerations contributing to the latest habitat design refinement, including data on the TH's concept of operations, system functional definition, subsystem assumptions, notional interior layouts, a detailed mass and volume breakdown, and trade studies and analyses required to close identified technology/ development/architecture gaps. In addition to a technical description of the TH, this paper describes how the current TH government reference design will achieve many of the current lunar and Mars mission goals. Additionally, there are many assumed technological advances needed to support the prescribed mission phases leading up to the crewed mission to Mars in the late 2030s. The paper will describe many of the TH systems requiring further technology development and identify architectural solutions to achieve these mass, reliability, autonomy, and crew health targets. As a whole, the data in the paper shows that a TH meeting the 43 metric tons launch mass/trans-Mars injection burn limits specified by the Evolvable Mars Campaign is achievable near the desired timeframe with moderate strategic investments including maintainable life support systems, re-purposable structures and packaging, and lightweight exercise modalities. It also identifies operational and technological options to reduce this mass to less than 41 metric tons, including staging of launch structure/packaging and alternate structural materials. The resulting design detail and data contained in this paper are intended to help teams across NASA and potential commercial, academic, or international partners understand the current performance targets of the Transit Habitat and vehicle interface considerations imposed by the latest Moon to Mars mission scope.

Habitation Systems↗

BioSentinel Deep Space CubeSat Mission

The BioSentinel mission was recently launched aboard the SLS launch vehicle (LV) as part of the Artemis-1 campaign. This 6U CubeSat carries yeast cells to analyze the effects of radiation at large distances from Earth, becoming the first biological payload in Deep Space. Prelaunch activities included mission design updates, orbit determination rehearsals and the development of a tracking schedule in coordination with the Artemis-1 payload office and the Deep Space Network (DSN). An important influence on the trajectories of Artemis I secondaries was the uncertainty associated with deployment from the Interim Cryogenic Propulsion System (ICPS), the upper stage of the SLS LV. The ICPS was rotating at a rate of 1 rpm; there was also uncertainty in the spin axis attitude, which translated into an unknown clock angle of deployment. The variability in this angle and magnitude of deployment implied the existence of a non-negligible risk of a lunar impact, which was evaluated for various potential launch dates. On November 16 th 2022 BioSentinel successfully deployed from ICPS and the navigation team started to receive tracking data from the DSN and ESA antennas. Soon after deployment, the spacecraft was tumbling and entered safe mode. The mission team recovered the spacecraft and after four tracking passes, we solved for a first ephemeris that was sent to the DSN for better tracking of the spacecraft. After propagating this first ephemeris solution, we determined that we avoided impact with a margin of a few hundred km from the lunar surface. More tracking data over the next few days allowed for a more refined orbit solution predicting a periselene altitude of 406 km and a lunar eclipse lasting 36.5 minutes. Therefore, BioSentinel operators avoided any correction maneuvers on the trajectory and successfully tracked and guide the spacecraft. The spacecraft performed a nominal lunar flyby which provided the pertinent energy to achieve a final Earth-trailing heliocentric orbit. Over the course of two weeks, the mission operators corroborated that the subsystems were functioning as expected after the lunar eclipse and the large ΔV incurred. Science operations started once the mission achieved the nominal orbit in Deep Space. This paper discusses in detail the BioSentinel flight performance, as well as the challenges and lessons learned prior to and during this CubeSat mission.

Andres Dono Perez↗

Navigation Performance of the BioSentinel Deep Space CubeSat Mission

The BioSentinel mission was recently launched aboard the SLS launch vehicle (LV) as part of the Artemis- 1 campaign. The BioSentinel navigation team successfully tracked and guided the spacecraft through a lunar gravity assist to its destination Earth-trailing heliocentric orbit. This 6U CubeSat carries live yeast cells to analyze the effects of radiation at large distances from Earth, becoming the first biological payload in Deep Space. Prelaunch activities included mission design updates, orbit determination rehearsals and the development of a tracking schedule in coordination with the Artemis-1 payload office and the Deep Space Network (DSN). An important influence on the trajectories of Artemis I secondaries was the uncertainty associated with deployment from the Interim Cryogenic Propulsion System (ICPS), the upper stage of the SLS LV. The ICPS was rotating at a rate of 1 rpm; there was also an uncertainty in the spin axis attitude, which translated into an unknown clock angle of deployment. The variability in this angle and magnitude of deployment implied the existence of a non-negligible risk of a lunar impact, which was evaluated for various potential launch dates. We present the results of Monte Carlo analyses and compute the pertinent maneuvers to avoid it. In addition, we present a comparison with the actual deployment once the mission launched by reconstructing our trajectory with tracking data. On November 16th 2022 BioSentinel successfully deployed from ICPS and the navigation team started to receive 2-way Doppler and Sequential Ranging data from the DSN. We processed early data to try to obtain a first ephemeris using Initial Orbit Determination (IOD) methods such as the least squares. Soon after deployment, the spacecraft was tumbling and entered safe mode, creating a period where the tracking data were sparse. The mission team recovered the spacecraft and after four tracking passes, we solved for a first ephemeris that was sent to the DSN for better tracking of the spacecraft. After propagating this first ephemeris solution, we determined that we avoided impact with a margin of a few hundred km from the lunar surface. More tracking data over the next few days (from DSN as well as ESA antennas) allowed for a more refined orbit solution predicting a periselene altitude of 406 km and a lunar eclipse lasting 36.5 minutes. Therefore, BioSentinel operators aborted any correction maneuvers. This periselene altitude also gave us the necessary energy to achieve a heliocentric orbit. The next challenge was due to the necessary adjustments in our orbit determination method due to the large energy boost resulting from the lunar flyby. After a series of tracking passes we were able to get a nominal solution that resulted into a stable trajectory. This paper discusses in detail the navigation performance using the X-band IRIS transponder, as well as the challenges and lessons learned prior to and during this deep space, CubeSat mission.

Andres Dono Perez↗

Delving into the depths of NGC 3783 with XRISM

The 2024 X-ray/UV observation campaign of NGC 3783, led by XRISM, revealed the launch of an ultrafast outflow (UFO) with a radial velocity of 0.19c (57 000 km s −1 ). This event is synchronized with the sharp decay, within less than half a day, of a prominent soft X-ray/UV flare. Accounting for the look-elsewhere effect, the XRISM Resolve data alone indicate a low probability of 2 × 10 −5 that this UFO detection is due to random chance. The UFO features narrow H-like and He-like Fe lines with a velocity dispersion of ∼1000 km s −1 , suggesting that it originates from a dense clump. Beyond this primary detection, there are hints of weaker outflow signatures throughout the rise and fall phases of the soft flare. Their velocities increase from 0.05c to 0.3c over approximately three days, and they may be associated with a larger stream in which the clump is embedded. The radiation pressure is insufficient to drive the acceleration of this rapidly evolving outflow. The observed evolution of the outflow kinematics instead closely resembles that of solar coronal mass ejections, implying magnetic driving and, conceivably, reconnection near the accretion disk as the likely mechanisms behind both the UFO launch and the associated soft flare.

Astronomy and AstroPhysics↗

Search for lightning-induced electron precipitation with rocket-borne photometers

Photometers at 3914 A and 5577 A and an optical imager were part of an experimental package launched on a sounding rocket in the 1987 Wave Induced Particle Precipitation campaign at Wallops Island, Virginia. The objective was to measure lightning-induced electron precipitation (LEP) by means of its optical signature. This was the first attempt to measure LEP using rocket-borne optical instrumentation. Launch criteria included nearby thunderstorm activity and ground-based observations of Trimpi events. Lightning flashes are clearly discernible in the data. The photometer data was also characterized by large spin and precession modulations in the photon count rate, consistent with elevated steady particle fluxes in the northern portion of the instrument field of view. No evidence of LEP was observed by the photometers or onboard particle detectors (Arnoldy and Kintner, 1989). Analysis of the data has made it possible to place an upper limit of 0.0008 ergs/sq cm per sec on any burst precipitation energy flux that may have occurred during the rocket flight in the regions explored by the photometers.

Massey, R. D.↗

Investigating On-Orbit Attitude Determination Anomalies for the Solar Dynamics Observatory Mission

The Solar Dynamics Observatory (SDO) was launched on February 11, 2010 from Kennedy Space Center on an Atlas V launch vehicle into a geosynchronous transfer orbit. SDO carries a suite of three scientific instruments, whose observations are intended to promote a more complete understanding of the Sun and its effects on the Earth's environment. After a successful launch, separation, and initial Sun acquisition, the launch and flight operations teams dove into a commissioning campaign that included, among other things, checkout and calibration of the fine attitude sensors and checkout of the Kalman filter (KF) and the spacecraft s inertial pointing and science control modes. In addition, initial calibration of the science instruments was also accomplished. During that process of KF and controller checkout, several interesting observations were noticed and investigated. The SDO fine attitude sensors consist of one Adcole Digital Sun Sensor (DSS), two Galileo Avionica (GA) quaternion-output Star Trackers (STs), and three Kearfott Two-Axis Rate Assemblies (hereafter called inertial reference units, or IRUs). Initial checkout of the fine attitude sensors indicated that all sensors appeared to be functioning properly. Initial calibration maneuvers were planned and executed to update scale factors, drift rate biases, and alignments of the IRUs. After updating the IRU parameters, the KF was initialized and quickly reached convergence. Over the next few hours, it became apparent that there was an oscillation in the sensor residuals and the KF estimation of the IRU bias. A concentrated investigation ensued to determine the cause of the oscillations, their effect on mission requirements, and how to mitigate them. The ensuing analysis determined that the oscillations seen were, in fact, due to an oscillation in the IRU biases. The low frequencies of the oscillations passed through the KF, were well within the controller bandwidth, and therefore the spacecraft was actually following the oscillating biases, resulting in movement of the spacecraft on the order of plus or minus 20 arcsec. Though this level of error met the ACS attitude knowledge requirement of [35, 70, 70] arcsec, 3 sigma, the desire of the ACS and instrument teams was to remove as much of the oscillation as possible. The Kearfott IRUs have an internal temperature controller, designed to maintain the IRU temperature at a constant temperature of approximately 70 C, thus minimizing the change in the bias drift and scale factors of the mechanical gyros. During ground testing of the observatory, it was discovered that the 83-Hz control cycle of the IRU heaters put a tremendous amount of stress on the spacecraft battery. Analysis by the power systems team indicated that the constant charge/discharge on the battery due to the IRU thermal control cycle could potentially limit the life of the battery. After much analysis, the decision was made not to run the internal IRU heaters. Analysis of on orbit data revealed that the oscillations in the IRU bias had a connection to the temperature of the IRU; changes in IRU temperature resulted in changes in the amplitude and period of the IRU biases. Several mitigating solutions were investigated, the result of which was to tune the KF with larger IRU noise assumptions which allows the KF to follow and correct for the time-varying IRU biases.

Vess, Melissa F.↗

Development of an Infrared Lamp Array for the Smap Spacecraft Thermal Balance Test

NASA launched the SMAP observatory in January 2015 aboard a Delta II into a sun-synchronous orbit around Earth. The science payload of a radar and a radiometer utilizes a shared rotating six-meter antenna to provide a global map of the Earth's soil moisture content and its freeze/thaw state on a global, high-resolution scale in this three-year mission. An observatory-level thermal balance test conducted in May/June 2014 validated the thermal design and demonstrated launch readiness as part of the planned environmental test campaign. An infrared lamp array was designed and used in the thermal balance test to replicate solar heating on the solar array and sunlit side of the spacecraft that would normally be seen in orbit. The design, implementation, and operation of an infrared lamp array used for this nineteen-day system thermal test are described in this paper. Instrumental to the smooth operation of this lamp array was a characterization test performed in the same chamber two months prior to the observatory test to provide insight into its array operation and flux uniformity. This knowledge was used to identify the lamp array power settings that would provide the worst case predicted on-orbit fluxes during eclipse, cold, and hot cases. It also showed the lamp array variation when adjustments in flux were needed. Calorimeters calibrated prior to testing determined a relationship between calorimeter temperature and lamp array flux. This allowed the team to adjust the lamp output for the desired absorbed flux on the solar array. Flux levels were within 10% of the desired value at the center of the solar array with an ability to maintain these levels within 5% during steady state cases. All tests demonstrated the infrared lamp array functionality and furthered lamp array understanding for modeling purposes. This method contributed to a high-fidelity environmental simulation, which was required to replicate the extreme on-orbit thermal environments.

Miller, Jennifer R.↗

Overview of the Mission Design Reference Trajectory for NASA's Asteroid Redirect Robotic Mission

The National Aeronautics and Space Administration's (NASA's) recently cancelled Asteroid Redirect Mission was proposed to rendezvous with and characterize a 100 m plus class near-Earth asteroid and provide the capability to capture and retrieve a boulder off of the surface of the asteroid and bring the asteroidal material back to cislunar space. Leveraging the best of NASA's science, technology, and human exploration efforts, this mission was originally conceived to support observation campaigns, advanced solar electric propulsion, and NASA's Space Launch System heavy-lift rocket and Orion crew vehicle. The asteroid characterization and capture portion of ARM was referred to as the Asteroid Redirect Robotic Mission (ARRM) and was focused on the robotic capture and then redirection of an asteroidal boulder mass from the reference target, asteroid 2008 EV5, into an orbit near the Moon, referred to as a Near Rectilinear Halo Orbit where astronauts would visit and study it. The purpose of this paper is to document the final reference trajectory of ARRM and the challenges and unique methods employed in the trajectory design of the mission.

low thrust↗

Lessons Learned During the Transition of SORCE Science Operations to Daylight Only Operations

In July 2013, NASA's Solar Radiation and Climate Experiment experienced a battery anomaly which placed it into safemode halting all science observations. Initial attempts to recover the spacecraft to an operational configuration failed due to the reduced capacity of the battery. As the keystone mission for measuring total solar irradiance, and the cornerstone mission for measuring the solar spectral irradiance there was a strong motivation for developing a new operations concept that would allow SORCE to resume daily measurements of the Sun. The operations team faced many challenges over the next several months. For a five-day period in late 2013 the operations team was able resume science observations to cross-calibrate SORCE data with a new instrument launched in November 2013. After the cross-calibration campaign was completed a new operations concept was deployed which allowed SORCE to perform daylight only operations. In this mode of operations all non-essential components are powered off at each eclipse entry and then turned back on at sunrise. In March 2014 SORCE resumed making daily measurements of the Sun. This paper will review the events and lessons learned from the six-month recovery effort.

Spacecraft Anomaly↗

Flight Dynamics and Navigation Performance of the BioSentinel Mission

BioSentinel was one of ten CubeSats launched by the Space Launch System (SLS) as part of the Artemis I campaign on 16 November 2022. A lunar flyby gave BioSentinel the needed energy to escape the Earth-Moon system into heliocentric space. The biological payload contains yeast cells designed to measure radiation in deep space beyond the reach of Earth’s magnetosphere. This paper discusses in detail the BioSentinel flight performance, as well as challenges and lessons learned prior to, and during the mission.

BioSentinel↗

NASA's Advanced Exploration Systems Mars Transit Habitat Refinement Point of Departure Design

This paper describes the recently developed point of departure design for a long duration, reusable Mars Transit Habitat, which was established during a 2016 NASA habitat design refinement activity supporting the definition of NASA's Evolvable Mars Campaign. As part of its development of sustainable human Mars mission concepts achievable in the 2030s, the Evolvable Mars Campaign has identified desired durations and mass/dimensional limits for long duration Mars habitat designs to enable the currently assumed solar electric and chemical transportation architectures. The Advanced Exploration Systems Mars Transit Habitat Refinement Activity brought together habitat subsystem design expertise from across NASA to develop an increased fidelity, consensus design for a transit habitat within these constraints. The resulting design and data (including a mass equipment list) contained in this paper are intended to help teams across the agency and potential commercial, academic, or international partners understand: 1) the current architecture/habitat guidelines and assumptions, 2) performance targets of such a habitat (particularly in mass, volume, and power), 3) the driving technology/capability developments and architectural solutions which are necessary for achieving these targets, and 4) mass reduction opportunities and research/design needs to inform the development of future research and proposals. Data presented includes: an overview of the habitat refinement activity including motivation and process when informative; full documentation of the baseline design guidelines and assumptions; detailed mass and volume breakdowns; a moderately detailed concept of operations; a preliminary interior layout design with rationale; a list of the required capabilities necessary to enable the desired mass; and identification of any worthwhile trades/analyses which could inform future habitat design efforts. As a whole, the data in the paper show that a transit habitat meeting the 43 metric tons launch mass/trans-Mars injection burn limits specified by the Evolvable Mars Campaign is achievable near the desired timeframe with moderate strategic investments including maintainable life support systems, repurposable structures and packaging, and lightweight exercise modalities. It also identifies operational and technological options to reduce this mass to less than 41 metric tons including staging of launch structure/packaging and alternate structural materials.

Simon, Matthew↗

Electromagnetic Compatibility Test and Analysis Campaign of NASA's Mars 2020 Rover

NASA's Mars 2020 Rover—with a launch window opening July 2020, and landing expected February 2021—has mission objectives to look for evidence of habitability, seek biosignatures of past life, collect and cache samples for possible future return to Earth, and prepare for future human missions. The Rover platform is similar to the previous Mars Science Laboratory (MSL) “Curiosity” rover that landed in 2012 but contains a new suite of scientific instruments and upgrades to existing functionality. The scientific payload includes a trio of chemical analysis tools (PIXL, SHERLOC, SuperCam), a ground penetrating radar (RIMFAX), an upgraded weather station (MEDA), upgraded high resolution camera (MastCam-Z), and an oxygen-producing experiment (MOXIE). These changes—along with new efficiency goals to operate more Rover subsystems concurrently and thus collect more science—presented new electromagnetic compatibility (EMC) challenges. In this paper, we will describe the campaign to ensure Mars 2020 mission success from an electromagnetic environment perspective: 1) confirming existing MSL heritage subsystems and EMC requirements were compatible with the new Mars 2020 mission objectives, 2) engaging with engineers and scientists early in the project to identify and evaluate risks before hardware assembly and performing ambitious risk reduction tests, 3) undertaking a comprehensive subsystem qualification test program based on tailored MIL-STD-461F requirements, occasionally leading to redesign, 4) synthesizing the data collected to perform detailed analyses toward the goal of making risk-informed decisions at a system level. The spacecraft has successfully completed all three planned system level tests, demonstrating self-compatibility with minimal impact to operations from electromagnetic interference in all mission phases.

Gonzales, Edward C↗

A Co-Investigator Project for the Cornell University Cleft Accelerated Plasma Experimental Rocket-CAPER

The CAPER rocket campaign was to follow the SCIFER experiment as a detailed study of the ion acceleration processes in the Cleft Ion Fountain (CIF) above 1000 km altitude. The SCIFER rocket demonstrated that the experiment was feasible and that the CIF acceleration processes on the dayside are different from those observed in the discrete aurora on the nightside. The responsibility of the GI/UAF co-investigator project was to provide the real-time acquisition and display of large-and small-scale ground observations, and satellite solar wind data at the launch control center at Longyearbyen, Svalbard for the determination of the launch conditions and the later interpretation of the rocket observations. The rocket campaign was proposed for January of 1998, but was slipped to January of 1999. The rocket was launched on January 21, 1999 at 06 h 13 m 30 s UT. All of the GI/UAF co-investigator systems functioned well, except the narrow-field TV camera which was to follow the 140 km conjugate of the payload on command from GPS tracking data sent from Andoya. The data were not available during the flight, and the camera tracked the nominal conjugate. Unfortunately, the trajectory was well west of nominal, so no useful narrow-field conjugate data were acquired . In addition, the payload missed the region of more intense precipitation, brighter aurora, stronger currents, and likely large fluxes of transverse ion acceleration. On the other hand, good data were acquired across a region of the ionosphere that appears to have had a double convection boundary because of the IMF switching its z component shortly before launch. These data are important for understanding the reaction of the magnetosphere and ionosphere to changes in the IMF.

Deehr, Charles S.↗

Launch and Assembly Reliability Analysis for Human Space Exploration Missions

NASA's future human space exploration strategy includes single and multi-launch missions to various destinations including cis-lunar space, near Earth objects such as asteroids, and ultimately Mars. Each campaign is being defined by Design Reference Missions (DRMs). Many of these missions are complex, requiring multiple launches and assembly of vehicles in orbit. Certain missions also have constrained departure windows to the destination. These factors raise concerns regarding the reliability of launching and assembling all required elements in time to support planned departure. This paper describes an integrated methodology for analyzing launch and assembly reliability in any single DRM or set of DRMs starting with flight hardware manufacturing and ending with final departure to the destination. A discrete event simulation is built for each DRM that includes the pertinent risk factors including, but not limited to: manufacturing completion; ground transportation; ground processing; launch countdown; ascent; rendezvous and docking, assembly, and orbital operations leading up to trans-destination-injection. Each reliability factor can be selectively activated or deactivated so that the most critical risk factors can be identified. This enables NASA to prioritize mitigation actions so as to improve mission success.

Cates, Grant↗