Inspection and assessment of the H-Canyon ventilation system at the Savannah River Site - 15385
Innovative methods and unique equipment were required to perform the inspection of a large inaccessible sand filter tunnel in an aging facility. Among the singular methods utilized was a specialized robot that addressed the difficulties encountered while performing mandatory structural integrity inspections of the Department of Energy (DOE) Savannah River Site (SRS) H-Canyon Sand Filter Tunnel. There were many unanticipated hazards related to degraded conditions. Novel approaches and support equipment were used, including new measurement techniques, high-strength Kevlar{sup TM} cable, a boom-mounted camera, and a larger, more robust robot. With each evolution, additional analysis mandated requirements and considerations for future inspections. Because this was a visual inspection, many photos were taken to document the mission and lessons learned from the earlier incomplete robotic attempts to inspect these areas. Anyone working with aging facilities that have inaccessible structures, systems and components will find the technical process, with resulting solutions, useful. (authors)