Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “High Voltage Distribution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

The Role of Metal Substitution in Tuning Anion Redox in Sodium Metal Layered Oxides Revealed by X‐Ray Spectroscopy and Theory

Abstract We investigate high‐valent oxygen redox in the positive Na‐ion electrode P2‐Na 0.67− x [Fe 0.5 Mn 0.5 ]O 2 (NMF) where Fe is partially substituted with Cu (P2‐Na 0.67− x [Mn 0.66 Fe 0.20 Cu 0.14 ]O 2 , NMFC) or Ni (P2‐Na 0.67− x [Mn 0.65 Fe 0.20 Ni 0.15 ]O 2 , NMFN). From combined analysis of resonant inelastic X‐ray scattering and X‐ray near‐edge structure with electrochemical voltage hysteresis and X‐ray pair distribution function profiles, we correlate structural disorder with high‐valent oxygen redox and its improvement by Ni or Cu substitution. Density of states calculations elaborate considerable anionic redox in NMF and NMFC without the widely accepted requirement of an A‐O‐A′ local configuration in the pristine materials (where A=Na and A′=Li, Mg, vacancy, etc.). We also show that the Jahn–Teller nature of Fe 4+ and the stabilization mechanism of anionic redox could determine the extent of structural disorder in the materials. These findings shed light on the design principles in TM and anion redox for positive electrodes to improve the performance of Na‐ion batteries.

Abate, Iwnetim↗

Performance Evaluation of Peer-to-Peer Distributed Microgrids Coordination for Voltage Regulation

This paper presents the performance evaluation of a peer-to-peer microgrids coordination algorithm for sub-transmission systems. As distributed energy resources (DERs) in distribution system start to show negative impact to the bulk power system, a paradigm shift is needed for transmission planning and operation. Because distribution substations are located far from the sub-transmission system, and it is hard to use traditional centralized control for real-time control and coordination. Thus, distributed control is a natural choice because it requires less communication and central computation. In this paper, each distribution substation is treated as a microgrid, and the peer-to-peer distributed microgrids control is formulated as a real-time optimal power flow problem to reduce the negative impact in sub-transmission systems. A distributed primal-dual optimization algorithm is adopted to solve the problem. Validation of the peer-to-peer algorithm is performed through the simulation of a real-world sub-transmission system composing of many distribution systems with high renewable penetration. Simulation results show that the peer-to-peer algorithm can achieve satisfactory performance (e.g., voltage regulation) in sub-transmission system by coordinating and controlling DERs in distribution systems.

distributed control↗

Performance Evaluation of Peer-to-Peer Distributed Microgrids Coordination for Voltage Regulation: Preprint

This paper presents the performance evaluation of a peer-to-peer microgrids coordination algorithm for sub-transmission systems. As distributed energy resources (DERs) in distribution system start to show negative impact to the bulk power system, a paradigm shift is needed for transmission planning and operation. Because distribution substations are located far from the sub-transmission system, and it is hard to use traditional centralized control for real-time control and coordination. Thus, distributed control is a natural choice because it requires less communication and central computation. In this paper, each distribution substation is treated as a microgrid, and the peer-to-peer distributed microgrids control is formulated as a real-time optimal power flow problem to reduce the negative impact in sub-transmission systems. A distributed primal-dual optimization algorithm is adopted to solve the problem. Validation of the peer-to-peer algorithm is performed through the simulation of a real-world sub-transmission system composing of many distribution systems with high renewable penetration. Simulation results show that the peer-to-peer algorithm can achieve satisfactory performance (e.g., voltage regulation) in sub-transmission system by coordinating and controlling DERs in distribution systems.

distributed control↗

Parametric analysis of hollow conductor parallel and coaxial transmission lines for high frequency space power distribution

A parametric analysis was performed of transmission cables for transmitting electrical power at high voltage (up to 1000 V) and high frequency (10 to 30 kHz) for high power (100 kW or more) space missions. Large diameter (5 to 30 mm) hollow conductors were considered in closely spaced coaxial configurations and in parallel lines. Formulas were derived to calculate inductance and resistance for these conductors. Curves of cable conductance, mass, inductance, capacitance, resistance, power loss, and temperature were plotted for various conductor diameters, conductor thickness, and alternating current frequencies. An example 5 mm diameter coaxial cable with 0.5 mm conductor thickness was calculated to transmit 100 kW at 1000 Vac, 50 m with a power loss of 1900 W, an inductance of 1.45 micron and a capacitance of 0.07 micron-F. The computer programs written for this analysis are listed in the appendix.

Jeffries, K. S.↗

Proposal and Development of a High Voltage Variable Frequency Alternating Current Power System for Hybrid Electric Aircraft

The development of ultra-efficient commercial vehicles and the transition to low-carbon emission propulsion are seen as strategic thrust paths within NASA Aeronautics. A critical enabler to these paths comes in the form of hybrid electric propulsion systems. For megawatt-class systems, the best power system topology for these hybrid electric propulsion systems is debatable. Current proposals within NASA and the Aero community suggest using a combination of alternating current (AC) and direct current (DC) for power generation, transmission, and distribution. This paper proposes an alternative to the current thought model through the use of a primarily high voltage AC power system, supported by the Convergent Aeronautics Solutions (CAS) Project. This system relies heavily on the use of doubly-fed induction machines (DFIMs), which provide high power densities, minimal power conversion, and variable speed operation. The paper presents background on the activity along with the system architecture, development status, and preliminary results.

Sadey, David J.↗

Grid-Connected Modular Soft-Switching Solid State Transformers (M-S4T)

The objective of this project is to develop and verify the concept of a flexible and modular soft-switching solid-state transformer (M-S4T) for direct grid-connected applications. The ability to directly connect power electronics converters to the medium voltage grid (4 kV – 13 kV), and to potentially replace the passive and bulky, but ubiquitous 60 hertz service transformer in the 25 kVA to 100 kVA range, with a more flexible and controllable device, has been regarded as the ‘holy grail’ in grid control. However, this has proven to be extremely difficult. This project has developed the solutions to several key challenges of the direct grid-connected power electronics and realized a 7.2 kV M-S4T prototype. First, a protection method to protect the M-S4T from the high voltages (110 kV for the 13 kV system) that occur on the grid due to transients and lightning strikes have been developed and experimentally verified. Second, the realization and the operation of the M-S4T based on high-voltage SiC devices (>3.3 kV) and a medium-frequency medium-voltage low-leakage transformer in a single-stage solid-state transformer with zero-voltage switching, low dv/dt, and low electromagnetic interference has been successfully demonstrated up to 7.5 kV peak. Third, an oil-cooling system and stable communication and distributed control system for converter module voltage sharing have been developed and experimentally verified. The developed M-S4T has realized a modular universal high-performance power conversion system. This conversion system is scalable to different voltage and power levels and adaptable to four-quadrant bidirectional operation. Moreover, the use of passive cooling techniques meets the equipment life requirements, and the lightning protection scheme fulfills the basic insulation level specifications for direct grid connection. Such power conversion system opens up near-term opportunities, including energy storage, solar PV, or electric vehicle charging with significant cost and footprint savings. In the longer term, the possibility of replacing the utility distribution transformer with an M-S4T will be transformative for future distribution grids with a compact footprint and full controllability to enable high renewable energy and storage penetration. In addition to the main project, this report expands on the Plus-Up projected including as part of the main award. This project developed and demonstrated the technology for autonomous collaborative inverters that can be connected in an ad hoc manner to the grid. The aim of the project was to: (1) evaluate the existing techniques for grid-connected inverters and find their limitations; (2) develop detailed requirements for grid-connected inverters in the modern grid with millions of active nodes; (3) design a unified control strategy that brings more autonomy and intelligence to grid-connected inverters, and addresses parts of the issues with the existing techniques. The proposed technique, called UniCon, enables inverters to 1) connect/disconnect to/from the grid in an ad hoc manner; (2) work based on local sensing. Slow communication could be used for a more optimized behavior; (3) work automatically in both grid-forming/grid-following mode; (4) handle large disturbances, e.g., big load step and fault, in an oscillation-free manner; (5) work collaboratively with other inverters in steady-state and during transients. UniCon can be implemented in the middle-level control; hence it is agnostic to the vendor and to the implementation of the inner voltage/current and protection loops. Furthermore, a new synchronization scheme, based on deep learning, was developed that can extract the grid voltage phase and amplitude in a stable manner. The method is cheap to implement can improve the dynamic performance of the grid-connected inverters during fast transients, e.g., fault. The proposed control scheme was validated by (1) MATLAB/Simulink; (2) hardware-in-the-loop results, and; (3) experimental results using three inverters that form a microgrid in a down-scaled feeder. Lastly, both the M-S4T and UniCon have achieved promising tangible paths to markets. In the case of the M-S4T, the underlying technology — the Soft Switching Solid State Transformer (S4T) developed at the Georgia Tech Center for Distributed Energy (GT-CDE) has been licensed by GridBlock from the Georgia Tech Research Corporation, and GridBlock has been working with manufacturing partner Jabil (one of the largest US-based contract manufacturers) and system integrator Power Secure (largest deployer of microgrids in the US with 4.7 GW under management), to meet the strong initial demand. Similarly, GridBlock has an exclusive license to the UniCon technology, developed under this award by GT-CDE. The UniCon provides an intermediate control layer that enables the implementation of the higher-level ‘transactive’ control commands for the system. The architecture of the system - slow communications with the cloud for system optimization and setpoints, and the use of locally measured quantities for real-time control, provide a very robust and secure way of implementing a real-time must-run grid that is also secure and stable. This is a brand-new functionality that is critical for the future grid and key to GridBlock’s business model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Automation in the Space Station module power management and distribution Breadboard

The Space Station Module Power Management and Distribution (SSM/PMAD) Breadboard, located at NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama, models the power distribution within a Space Station Freedom Habitation or Laboratory module. Originally designed for 20 kHz ac power, the system is now being converted to high voltage dc power with power levels on a par with those expected for a space station module. In addition to the power distribution hardware, the system includes computer control through a hierarchy of processes. The lowest level process consists of fast, simple (from a computing standpoint) switchgear, capable of quickly safing the system. The next level consists of local load center processors called Lowest Level Processors (LLP's). These LLP's execute load scheduling, perform redundant switching, and shed loads which use more than scheduled power. The level above the LLP's contains a Communication and Algorithmic Controller (CAC) which coordinates communications with the highest level. Finally, at this highest level, three cooperating Artificial Intelligence (AI) systems manage load prioritization, load scheduling, load shedding, and fault recovery and management. The system provides an excellent venue for developing and examining advanced automation techniques. The current system and the plans for its future are examined.

Walls, Bryan↗

Fast-Recovery, High-Voltage Power Diode

New family of fast-recovery high-voltage power diodes compatible with D60T and D7ST transistors developed. Have wide range of applications in spacecraft and aircraft electrical distribution equipment, dc/dc inverters, and ac motor controllers for high-horsepower electric motors operating from 480-volt ac lines. Fast-Recovery 1,200-V Power Diodes use chip of hexagonal geometry to maximize effective silicon area.

Sundberg, G.↗

Resilient Inverter-Driven Black Start with Collective Parallel Grid-Forming Operation

As modern power systems are experiencing exceptional changes with increasing penetrations of inverter-based resources (IBRs), system restoration using IBRs has received attention. Using local grid-forming (GFM) assets near consumers, engineered to establish grid voltages in the absence of a stiff grid, i.e., bottom-up restoration, a distribution system could obtain high system resilience by not relying on the bulk power system restoration, which requires significant human intervention and procedure. This paper studies the technical feasibility of the novel approach with detailed electromagnetic transient (EMT) simulations. To thoroughly evaluate the potential of GFM inverters and the technical challenges in IBR-driven black start, a detailed three-phase inverter model is developed, including negative-sequence control for voltage balance and a phase-by- phase current limiter to sustain momentary overloading during the black start. To examine dynamic aspects of the black-start process, the EMT simulation also models transformer and motor dynamics to emulate their inrush and startup behaviors as well as network dynamics. In addition, active involvement of grid- following distributed energy resources is also studied to facilitate the black-start process. By allowing multiple GFM inverters to collectively black start without leader-follower coordination, we demonstrate that a system can achieve high resilience even with a fraction of assets lost. Two test cases of inverter-driven black start, using two and one GFM inverters, respectively, for a heavily unbalanced 2-MVA distribution feeder are demonstrated. Takeaways for further study and field deployment are provided.

grid-forming inverter↗

Resilient Inverter-Driven Black Start with Collective Parallel Grid-Forming Operation: Preprint

As the modern power systems are experiencing exceptional changes with increasing penetration of inverter-based resources (IBRs), system restoration using IBRs has received attention. Using local grid-forming (GFM) assets near consumers, engineered to establish grid voltages in the absence of a stiff grid, i.e., bottom-up restoration, a distribution system would obtain high system resilience, by not relying on the bulk power system restoration requiring significant human intervention and procedure to restore. This paper studies the technical feasibility of the novel approach with detailed electromagnetic transient (EMT) simulations. To thoroughly evaluate the potential of GFM inverters and technical challenges in IBR-driven black start, a detailed three-phase inverter model is developed, including negative-sequence control for voltage balance and a phase-by-phase current limiter to sustain momentary overloading during the black start. To examine dynamic aspects of the black start process, the EMT simulation also models transformer and motor dynamics to emulate their inrush and start-up behaviors as well as network dynamics. In addition, active involvement of grid-following distributed energy resources (DER) is also studied to facilitate the black start process. It is shown that, by allowing multiple GFM inverters to collectively black start without master-slave coordination, a system can achieve high resilience even with a fraction of assets lost. Two test cases of inverter-driven black start using two and one GFM inverters, respectively, for a heavily unbalanced 2-MVA distribution feeder are demonstrated. Takeaways for further study and field deployment are provided.

grid-forming inverter↗

Fast rise breakdown in dielectric filled air gap for surge protection

Electric discharge across an air gap can be self-healing, providing a unique capability for repetitive, fast, high-voltage/current switching applications through arc conduction. Furthermore, incorporating dielectric granules in the air gap stimulates gas ionization, which lowers the breakdown voltage and narrows breakdown voltage distribution, thereby enabling engineered surge protection from multiple lightning strikes on aerospace vehicles and sensitive solid-state electronics in critical systems. This study investigates the effect of the permittivity of dielectric granules, gap filling, surface roughness, and metal work function on fast-rising, high-voltage breakdowns. In addition to the air gap width, these factors play important roles in gas ionization, field concentration, and initiation of electrical discharge and arcing. Therefore, they could potentially be used to control and narrow operational breakdown voltages for practical applications. Additionally, a modified Langevin–Debye model is developed to correlate the breakdown voltage and the permittivity of the dielectric filler. These investigations identify and highlight key underpinning mechanisms governing the gas discharge behavior across a dielectric filled air gap during voltage surge events.

42 ENGINEERING↗

The Role and Value of Interregional Transmission in a Decarbonized U.S. Electricity System

Decarbonizing the U.S. energy system entails a significant expansion of wind and solar power and electrification of end-use applications. Achieving both is more efficient and less costly when interregional transmission capacity is expanded, but the fractured nature of grid planning in the United States is often a barrier to such expansion. Here, we explore the role of interregional transmission under a variety of decarbonization scenarios, using a capacity-expansion model to generate co-optimized portfolios of generation, storage, and transmission that meet decarbonization targets and electrification-driven demand. We explore portfolio and cost differences across 92 scenarios, from scenarios with limited transmission expansion to those that include a meshed high-voltage direct current (HVDC) network. In the core decarbonization scenarios, wind capacity expands by ~10x and solar by ~20x compared to 2020, hundreds of gigawatts of battery storage are deployed, and interregional transmission expands by 3-6x. Transmission expansion occurs nationwide but is concentrated between the central "wind belt" and eastern load centers. The HVDC scenarios result in hundreds of billions of dollars of savings in total system cost, demonstrating the economic benefits of interregional transmission in support of rapid decarbonization.

capacity expansion↗

Coordinated Inverter Control to Increase Dynamic PV Hosting Capacity: A Real-Time Optimal Power Flow Approach

High penetrations of distributed photovoltaics (PV) could cause adverse grid impacts, such as voltage violations. The recent development in inverter technologies provides the opportunity to develop control systems to realize effective PV governance and thus to improve dynamic PV hosting capacity for distribution grids. In this paper, a novel distributed energy resource management system (DERMS) solution is proposed by adopting the real-time optimal power flow (OPF) approach for coordinated control of the distributed PV inverters. The proposed approach eliminates the dependence on load knowledge via measurement feedback correction, and it can be implemented in real time. One challenge is that the technique is sensitive to the data availability and integrity of voltage measurements. Therefore, a decentralized DERMS approach is developed by leveraging the concepts of state estimation. The framework and the effectiveness of the solution approach are numerically demonstrated on a real distribution feeder in Southern California.

14 SOLAR ENERGY↗

A Data-Driven Approach for High-Impedance Fault Localization in Distribution Systems [SWR-24-13]

This software provides a data-driven approach for efficiently identifying high impedance faults (HIFs) in distribution systems. To tackle the nonlinearity of the voltage current trajectory of HIFs, we first formulate linear least squares problems to approximate the trajectory with piecewise functions. Then we collect the function features of all segments as inputs and use the support vector machine approach to efficiently identify HIFs at different locations.

Zhou, Yuqi↗

Performance testing of a high frequency link converter for Space Station power distribution system

The testing of a brassboard version of a 20-kHz high-frequency ac voltage link prototype converter dynamics for Space Station application is presented. The converter is based on a three-phase six-pulse bridge concept. The testing includes details of the operation of the converter when it is driving an induction machine source/load. By adapting a field orientation controller (FOC) to the converter, four-quadrant operation of the induction machine from the converter has been achieved. Circuit modifications carried out to improve the performance of the converter are described. The performance of two 400-Hz induction machines powered by the converter with simple V/f regulation mode is reported. The testing and performance results for the converter utilizing the FOC, which provides the capability for rapid torque changes, speed reversal, and four-quadrant operation, are reported.

Sul, S. K.↗

Paschen Considerations for High Altitude Airships

Recently, there have been several proposals submitted to funding agencies for long-lived high altitude (about 70,000 feet) airships for communications, surveillance, etc. In order for these airships to remain at altitude, high power, high efficiency, lightweight solar arrays must be used, and high efficiency power management and distribution systems must be employed. The needs for high power and high efficiency imply high voltage systems. However, the air pressure at these extreme altitudes is such that electrical power systems will be near the Paschen discharge minimum over a wide range of electrode separations. In this paper, preliminary calculations are made for acceptable high voltage design practices under ambient, hydrogen and helium gas atmospheres.

Ferguson, D. C.↗

VOLTTRON™ Agent Development for Enabling Reactive Power Support of Non-Utility DERs by Integrating Transactive Energy Approach

To enable better voltage regulation in power systems with high penetration of photovoltaics (PV) and other distributed energy resources (DERs), future inverters are required to provide reactive power support to the grid in addition to providing real power generated by PV panels. This paper develops a framework that coordinates the support from DER-based inverters, which are grid-connected non-utility assets, by using a transactive energy approach. Results of the implementation demonstrate participation of DER-based inverters can be achieved by using the coordination between distributed controllers and a centralized controller. With the transactive energy approach, both the customer and utility can achieve benefits that meet their individual needs.

Kritprajun, Paychuda↗

Integration of Utility Distributed Energy Resource Management System and Aggregators for Evolving Distribution System Operators

With the rapid integration of distributed energy resources (DERs), distribution utilities are faced with new and unprecedented issues. New challenges introduced by high penetration of DERs range from poor observability to overload and reverse power flow problems, under-over-voltages, maloperation of legacy protection systems, and requirements for new planning procedures. Distribution utility personnel are not adequately trained, and legacy control centers are not properly equipped to cope with these issues. Fortunately, distribution energy resource management systems (DERMSs) are emerging software technologies aimed to provide distribution system operators (DSOs) with a specialized set of tools to enable them to overcome the issues caused by DERs and to maximize the benefits of the presence of high penetration of these novel resources. However, as DERMS technology is still emerging, its definition is vague and can refer to very different levels of software hierarchies, spanning from decentralized virtual power plants to DER aggregators and fully centralized enterprise systems (called utility DERMS). Although they are all frequently simply called DERMS, these software technologies have different sets of tools and aim to provide different services to different stakeholders. This paper explores how these different software technologies can complement each other, and how they can provide significant benefits to DSOs in enabling them to successfully manage evolving distribution networks with high penetration of DERs when they are integrated together into the control centers of distribution utilities.

24 POWER TRANSMISSION AND DISTRIBUTION↗