Sub-drain Water Treatment Facility for Reduction of Accumulated Waste Water Amount at the Fukushima NPS Site - 17572
At the Fukushima Daiichi Nuclear Power Station site, water treatment facility special for sub-drain and groundwater drain has been constructed by Tokyo Electric Power Company Holdings, Inc. and Hitachi-GE Nuclear Energy, Ltd., and it has been operated to remove radionuclides from the pumped groundwater. The facility consists of three kinds of equipment for collecting, purifying and transferring. The purification equipment removes radionuclides contained in the pumped groundwater. The purification equipment consists of filters for removal of solids and colloidal particles, and adsorbents for removal of ionic radionuclides. Five adsorption vessels are installed into the equipment; three vessels have adsorbent to remove Cs and Sr simultaneously, the fourth vessel has adsorbent to remove Sb and for the last has adsorbent to remove heavy metals. The vessels for Cs and Sr are operating as a so-called 'merry-go-round'. For the rational operation of the equipment, a simulation code has been developed to calculate the Sr concentration of outlet water which determines the replacement timings of the Cs-Sr adsorption vessels. The simulation code has been applied to planning of vessel replacement during the water treatment facility operation. The facility started operation in September 2015, and treated the pumped groundwater since then. As of October 2016, about 211,000 m{sup 3} of groundwater had been treated. (authors)