Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FINANCIAL PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Re-thinking incentives and penalties: Economic aspects of waste management in Italy

Highlights: • We focused on the dynamics the formation of operational costs of waste management. • We provide the basic elements to compose a picture of economic management. • We present a reflection on the last hidden costs associated with the consumption of goods and packaging. • Reduction of waste production. - Abstract: This paper focuses on the dynamics the formation of operational costs of waste management in Italy and the effect of economic measures. Currently incentives and penalties have been internalized by the system no differently from other cost items and revenues. This has greatly influenced the system directing it towards solutions that are often distant from the real environmental objectives. Based on an analysis of disaggregated costs of collection treatment and recovery, we provide the basic elements to compose a picture of economic management in various technical–organizational scenarios. In the light of the considerations contained in the paper it is proposed, e.g. for controlled landfills, that the ecotax, currently based on weight, could be replaced by one based on the volume consumption. Likewise, for tax reduction on disposal system, instead a pre-treatment might ask an environmental balance of the overall system. The article presents a reflection on the last hidden costs associated with the consumption of goods and packaging, and how to reduce waste production is the necessary path to be followed in ecological and economic perspectives.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

White Paper on Transforming District Heating in Ukraine: Assessment and Recommendations

The purpose of this White Paper is to provide evidence-based guidance on reform approaches that are feasible in Ukraine and well-tested internationally. Based on experience in Europe, consistent, well-planned reforms can lead to significant improvements in DH services, transparency and financial stability. The White Paper describes key challenges faced by Ukraine’s DH sector and provides recommendations on developing and implementing a comprehensive 10-year-strategy.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Accelerated Energy Storage Deployment in RELAC Countries

"Renewables in Latin America and the Caribbean" or RELAC is a regional initiative across Latin America and the Caribbean (LAC) that was created at the end of 2019, within the framework of the United Nations Climate Action Summit, with the objective of reaching at least 70% of renewable energy installed capacity, and 80% of the region's total electricity generation from renewables by 2030. 16 countries are members (Barbados, Bolivia, Chile, Colombia, Costa Rica, Dominican Republic, Ecuador, El Salvador, Guatemala, Haiti, Honduras, Nicaragua, Panama, Paraguay, Peru, and Uruguay), and others are in discussions to join. RELAC provides these countries with support in addressing technical and financial needs to increase renewable energy penetration, matchmaking with financial resources to support capacity building needs and implementation of RE expansion plans, and knowledge exchange via peer-learning, and best practices in renewable energy integration to the electrical grid.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Implementación acelerada del almacenamiento de energía en los países de RELAC [Accelerated Energy Storage Deployment in RELAC Countries]

"Renewables in Latin America and the Caribbean" or RELAC is a regional initiative across Latin America and the Caribbean (LAC) that was created at the end of 2019, within the framework of the United Nations Climate Action Summit, with the objective of reaching at least 70% of renewable energy installed capacity, and 80% of the region's total electricity generation from renewables by 2030. 16 countries are members (Barbados, Bolivia, Chile, Colombia, Costa Rica, Dominican Republic, Ecuador, El Salvador, Guatemala, Haiti, Honduras, Nicaragua, Panama, Paraguay, Peru, and Uruguay), and others are in discussions to join. RELAC provides these countries with support in addressing technical and financial needs to increase renewable energy penetration, matchmaking with financial resources to support capacity building needs and implementation of RE expansion plans, and knowledge exchange via peer-learning, and best practices in renewable energy integration to the electrical grid. This is the Spanish translation of NREL/TP-7A40-89643.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SMART Task 6: Evaluation of the Costs of Geologic CO2 Storage for the Illinois Basin Decatur Project Site Using the NRAP/SMART Technoeconomic and Liability Evaluation for Storage (TALES) Model

This is a presentation featuring an analysis related to SMART Task 6 in which CO2 storage costs are presented. The National Energy Technology Laboratory has developed the NRAP/SMART Technoeconomic and Liability Evaluation for Storage (TALES) model to provide quantitative cost-based insights to support developers planning CO2 injection and storage projects. TALES calculates the revenues, costs, and financial performance of candidate CO2 saline storage project based on site-specific activity costs and financial parameters. TALES is being integrated as a module pertaining to storage cost as part of the broader SMART Visualization and Decision Support Platform (SVDSP). In this study, the TALES model was applied using real activity cost data associated with the development and operations at the Illinois Basin Decatur Project (IBDP) CO2 storage project site. Scenario analysis was implemented in which crucial operational and cost attributes were varied and the associated cost implications observed. Key results data and project cost summary metrics like first-year breakeven price of CO2 ($/tonne) and net present value (NPV) are presented in similar fashion to how they will appear in the SVDSP.

Vikara, Derek↗

Special Report on Review of "The Department of Energy's Quality Assurance Process for Prime Recipients' Reporting for the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was established to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in health and science, and invest in the Nation's energy future. The Department of Energy (Department) will receive an unprecedented $37 billion in Recovery Act funding to support a variety of science, energy, and environmental initiatives. The majority of the funding received by the Department will be allocated to various recipients through grants, cooperative agreements, contracts, and other financial instruments. To ensure transparency and accountability, the Office of Management and Budget (OMB) requires that recipients report on their receipt and use of Recovery Act funds on a quarterly basis to FederalReporting.gov. OMB also specifies that Federal agencies should develop and implement formal procedures to help ensure the quality of recipient reported information. Data that must be reported by recipients includes total funding received; funds expended or obligated; projects or activities for which funds were obligated or expended; and the number of jobs created and/or retained. OMB requires that Federal agencies perform limited data quality reviews of recipient data to identify material omissions and/or significant reporting errors and notify the recipients of the need to make appropriate and timely changes to erroneous reports. As part of a larger audit of recipient Recovery Act reporting and performance measurement and in support of a Government-wide review sponsored by the Recovery Accountability and Transparency Board, we completed an interim review to determine whether the Department had established a process to ensure the quality and accuracy of recipient reports. Our review revealed that the Department had developed a quality assurance process to facilitate the quarterly reviews of recipient data. The process included procedures to compare existing information from the Department's financial information systems with that reported to FederalReporting.gov by recipients. In addition, plans were in place to notify recipients of anomalies and/or errors exposed by the quality assurance process. While the Department has made a good deal of progress in this area, we did, however, identify several issues which could, if not addressed, impact the effectiveness of the quality assurance process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Implementing a Sleep Health Education and Sleep Disorders Screening Program in Fire Departments

The lost productivity from fatigue adds something like $2,000 per worker per year to an organization's overall costs. The human and financial burden of fatigue has prompted specialists to develop fatigue risk management plans, which have been implemented with success in industries like aviation, manufacturing, and first responders. We'll explore the common risk factors for fatigue and delve into successful programs from major players in the American marketplace, and provide actionable recommendations for change within your organization to prevent fatigue and encourage greater holistic wellness among your workers. Learning Objectives - Explain the causes and effects of the fatigue problem - Illustrate the difference between physical and chronic sleep-related fatigue - Explore fatigue management case studies from aviation, manufacturing, and warehousing - Demonstrate fatigue conclusions from research conducted at NASA - Answer common questions on fatigue management - Share recommendations from our experts on creating a fatigue management plan.

alertness↗

Solar Ready Vets Curriculum Design

The 5-week SRV program includes four sets of program learning goals aligned around (1) the NABCEP Entry Level body of knowledge; (2) gaining hands-on experience with solar system site analysis, design, installation, commissioning, operation, maintenance and financial considerations; (3) Safety issues unique to solar + OSHA 30; (4) Transition planning and individual support of entry into the solar industry. These goals, and the learning objectives associate with each, are pursued in parallel during the course.

14 SOLAR ENERGY↗

Guide de base pour l'energie solaire hors reseau en Haiti: 8. Modelisation financiere pour le solaire hors reseau

Cette formation donne un apercu des informations et des concepts cles de l'energie solaire hors reseau en Haiti, renforcant ainsi les connaissances fondamentales et la capacite de catalyser l'interet pour l'energie solaire hors reseau pour l'electrification rurale en Haiti. Ce cours a rythme libre est offert en anglais et en francais et couvre une variete de sujets lies a l'acces a l'energie en Haiti, notamment les produits solaires hors reseau, le potentiel du marche en Haiti, les considerations liees a l'offre et a la demande, la conception, l'installation et la maintenance du systeme, -modeles commerciaux solaires en reseau, modelisation financiere, genre et acces a l'energie, utilisation productive de l'energie et adaptation au climat. La formation est destinee aux etudiants universitaires, aux partenaires gouvernementaux, aux ONG, aux bailleurs de fonds, aux partenaires de developpement, aux professionnels, etc. Aucune connaissance prealable du solaire hors reseau ou d'Haiti n'est requise pour beneficier de cette formation. See NREL/PR-7A40-89251 for the English translation of this document.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

Triple Effect Economics: How Do Electric Vehicles, Solar Photovoltaics, and Work-from-Home Transform Household Electricity Cost?

Solutions for deep decarbonization need to be affordable as well as sustainable to garner widespread adoption. The past two decades have seen the introduction of new technologies and paradigms such as electric vehicles (EVs), solar photovoltaics (PVs), and increased work-from-home (WFH), which impact a household's overall energy consumption and cost in different ways. However, much attention has not been paid to explore the joint impact these technologies have on a household's electricity cost burden. Leveraging the 2020 Residential Energy Consumption Survey (RECS), this study presents an integrated model to unravel the extent to which the bundled adoption of EV-PV and stay-at-home decisions impact the total electricity cost of households. National level RECS data revealed that, compared to the baseline (i.e., households that did not own any of these technologies), households that own EVs, PVs, and engage in WFH observed a 13.5% decline in their electricity bills, despite a 25% increase in electricity consumption. The model results indicated that bundled adoption of EVs-PVs reduces electricity costs more significantly for a household, compared to the increased costs imposed by more household members staying at home. This holistic assessment presents an opportunity for decision makers to contextualize the changing energy costs and design effective strategies to foster a sustainable and cost saving mechanism. Policies such as bundled incentivization to motivate co-adoption, education about energy-management strategies, and add-on subsidies to adopt energy-efficient appliances, will not only accelerate decarbonization but increase household financial savings.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Annual Technology Baseline: The 2024 Electricity Update

Consistent cost and performance data for various electricity generation technologies can be difficult to find and may change frequently for certain technologies. With the Annual Technology Baseline (ATB), the National Renewable Energy Laboratory annually provides an organized and centralized set of such cost and performance data. The ATB uses the best information from the Department of Energy national laboratories' energy analysts. The ATB has been reviewed by experts and it includes the following electricity generation and storage technologies: land-based wind, offshore wind, distributed wind, utility-scale solar photovoltaics (PV), commercial-scale solar PV, residential-scale solar PV, concentrating solar power, geothermal power, hydropower, utility-scale battery storage, commercial battery storage, residential battery storage, pumped storage hydropower, nuclear, coal, and natural gas. EIA data for conventional biopower are included for reference. This webinar presentation introduces the 2024 update to the ATB Electricity data and documentation.

battery storage↗

Financial sustainability in municipal solid waste management – Costs and revenues in Bahir Dar, Ethiopia

Highlights: • Cost-revenue analysis over 2 years revealed insufficient cost-recovery. • Expenses for motorized secondary collection increased by 82% over two years. • Low fee collection rate and reliance on only one revenue stream are problematic. • Different options for cost reduction and enhanced revenue streams are recommended. • Good public–private alliance is crucial to plan and implement improvement measures. - Abstract: Providing good solid waste management (SWM) services while also ensuring financial sustainability of the system continues to be a major challenge in cities of developing countries. Bahir Dar in northwestern Ethiopia outsourced municipal waste services to a private waste company in 2008. While this institutional change has led to substantial improvement in the cleanliness of the city, its financial sustainability remains unclear. Is the private company able to generate sufficient revenues from their activities to offset the costs and generate some profit? This paper presents a cost-revenue analysis, based on data from July 2009 to June 2011. The analysis reveals that overall costs in Bahir Dar’s SWM system increased significantly during this period, mainly due to rising costs related to waste transportation. On the other hand, there is only one major revenue stream in place: the waste collection fee from households, commercial enterprises and institutions. As the efficiency of fee collection from households is only around 50%, the total amount of revenues are not sufficient to cover the running costs. This results in a substantial yearly deficit. The results of the research therefore show that a more detailed cost structure and cost-revenue analysis of this waste management service is important with appropriate measures, either by the privates sector itself or with the support of the local authorities, in order to enhance cost efficiency and balance the cost-revenues towards cost recovery. Delays in mitigating the evident financial deficit could else endanger the public-private partnership (PPP) and lead to failure of this setup in the medium to long term, thus also endangering the now existing improved and currently reliable service. We present four options on how financial sustainability of the SWM system in Bahir Dar might be enhanced: (i) improved fee collection efficiency by linking the fees of solid waste collection to water supply; (ii) increasing the value chain by sales of organic waste recycling products; (iii) diversifying revenue streams and financing mechanisms (polluter-pays-, cross-subsidy- and business-principles); and (iv) cost reduction and improved cost-effectiveness. We argue that in a PPP setup such as in Bahir Dar, a strong alliance between the municipality and private enterprise is important so that appropriate solutions for improved financial sustainability of a SWM system can be sought and implemented.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NASA Performance Plan

The Government Performance and Results Act (GPRA) passed by Congress and signed by the President in 1993 provides a new tool to improve the efficiency of all Federal agencies. The goals of GPRA are to: Improve citizen confidence in Government performance; Improve Federal program management, effectiveness, and public accountability; and Improve congressional decisionmaking on where to commit the Nation's financial and human resources. The Act directs Executive Branch agencies to develop a customer-focused strategic plan that aligns activities with concrete missions and goals. The first plans were submitted in September 1998 as part of the Fiscal Year 1999 (FY99) budget process. These budget submissions were expected to support the goals expressed in the agency strategic plans. The Act also directs agencies to manage and measure results to justify congressional appropriations and authorizations. Six months after the completion of the fiscal year, agencies will report on the degree of success in achieving the goals and evaluation measures defined in the strategic and performance plans. The plans required by GPRA have been submitted to the Office of Management and Budget (OMB) and to Congress. Copies of NASA plans are available from the Office of Policy and Plans at NASA Headquarters and can be accessed on the i nterinet web sites identified in the Appendix.

Source record↗

Oracle accrual plans from requirements to implementation

Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

97 MATHEMATICS AND COMPUTING↗

Policy, Permit, Perform: Using City Benchmarking Data and Building Construction Permit History to Identify Energy Performance Improvements

The City of Portland (City) and Multnomah County 2015 Climate Action Plan targets a 40 percent reduction in carbon emissions below 1990 levels by 2030. To reach this goal, the plan includes a key objective to reduce the total energy use of existing buildings by 25 percent. Buildings are responsible for one-half of carbon emissions in Portland, Oregon, U.S., and improving their performance is critical to achieving the City’s climate goals. As part of its climate action planning, the City passed an ordinance on April 22, 2015, requiring commercial buildings 20,000 ft2 and larger to benchmark and disclose annual energy performance metrics through ENERGY STAR® Portfolio Manager® (ESPM), including greenhouse gas emissions, building energy use intensity (EUI) and ENERGY STAR scores. Twenty-five cities in the U.S. have adopted similar policies requiring energy benchmarking. These policies are generating a treasure trove of data about the drivers of building performance, but practitioners are only beginning to link benchmarking data to other datasets to produce actionable insight into improving building performance. In 2016, the City received a financial assistance award from the U.S. Department of Energy (DOE) through the Cities Leading through Energy Analysis and Planning project (Award Number DE-0007737). Portland’s project evaluated the application of the DOE Building Energy Asset Score Tool and rating system developed by Pacific Northwest National Laboratory (PNNL) to commercial buildings that report to the City. The City used building construction permit history to develop Asset Scores for a set of office buildings that reported energy performance for 2015 – the first year the City mandated energy benchmarking and reporting for commercial buildings 50,000 ft2 and larger. The primary project objective was to link energy benchmarking data and commercial building permit data to analyze commercial buildings systems that present the best, specific opportunities to improve energy performance. Integrating these datasets from two City departments, the Bureau of Development Services and the Bureau of Planning and Sustainability, could expand Portland’s use of analytics to inform climate policy decisions and strategic targeting of financial incentives for building owners and managers who are best positioned to improve the performance of their buildings. The project began with the commercial benchmarking data received for 340 commercial buildings that submitted calendar year 2015 energy reports. The City retained Research Into Action and Energy 350 (RIA team) to evaluate this self-reported benchmarking data. Based on a survey of 53 building managers, the RIA team found that most respondents used the City’s compliance tools, including a How-to Guide and Help Desk, and found access to utility data to be straightforward. However, almost one-third of the respondents encountered challenges when estimating the gross floor area (GFA), and some experienced confusion regarding the input of property use types and details into ESPM. Based on the RIA team’s recommendations, the City refined its How-to Guide, created online answers to frequently asked questions, and hosted office hour sessions to help building managers accurately characterize their building’s physical characteristics and operations in ESPM. Concurrently with the RIA team’s evaluation, the City worked with PNNL to estimate DOE Asset Score Preview (Preview) scores for 181 of the 340 commercial buildings that submitted ESPM reports to the City. Asset Score Tool is a web-based tool developed by PNNL for DOE to evaluate and rate the as-built energy efficiency of a building. Asset Score Tool’s full analysis capability runs a detailed energy model based on building geometry, age, envelope, lighting and mechanical systems using standard operating assumptions to give the building a score, similar to a miles per gallon rating for a car. Preview, a simplified deployment of the full Asset Score Tool, provides a preliminary score range using only seven data points, six of which are readily available in the ESPM benchmarking data. Analysis of the combined Preview scores and the operational ESPM scores identified buildings with a high potential for energy improvements through either retro-commissioning and retuning of existing operations or capital investments into building systems. The City contracted Whole Building Solutions (WBS) to mine building permit history and develop full Asset Scores for a subset of 26 office buildings that were eligible for both ENERGY STAR scores and Asset Scores. WBS researched permits and building plans to identify mechanical, lighting and envelope systems and other building characteristics necessary to complete Asset Scores. This historical data was recorded using the web-based Asset Score Tool, which evaluates the as designed energy efficiency of existing buildings. Much of this City information was available online after 2010; however, WBS had to search through microfiche files and the City’s database to obtain permit and plan history prior to 2010. Although building geometry, mechanical system type and basic envelope information was consistently identifiable, WBS found permit data gaps that prevented complete and accurate Asset Scores for most of the office buildings. If the City decides to develop Asset Scores based on building permit information in the future, WBS recommended requiring lighting plans, control diagrams and as-built drawings that reflect how the buildings are actually constructed. In addition, WBS recommended uploading plans and permits from microfiche storage into a more comprehensive, searchable database consistent with the City’s current online permit information. To identify the actual lighting types, WBS and City staff conducted site visits of all 26 office buildings. As part of managing the flow of ESPM and Asset Score data for the project, Earth Advantage, a sub-recipient of the Cities-LEAP award, created a DOE Standard Energy Efficiency Data (SEED) (USDOE 2018) instance for the City and used Asset Score’s Application Programming Interface (API) (Asset Score 2018) capabilities to develop two new features in the SEED Platform™: (1) automated Asset Score Preview ranges calculated based on benchmarking data and the City’s estimate of number of building floors; and (2) storage of full Asset Score information. Leveraging the construction permit history and site visit information for the 26 office buildings, The Cadmus Group (Cadmus) analyzed benchmarking data and Asset Score information to identify opportunities and drivers to improve performance. Correlation and regression analysis of the combined dataset was completed to determine whether building operations or specific systems – mechanical, lighting or envelope – present the best opportunities to improve energy performance. The central outcome of this project was Cadmus’ detailed analysis of the richer dataset that was created by combining the City of Portland’s commercial building permit activity and building-specific energy performance information based on metrics from ESPM and Asset Score Tool. Some of their findings collaborate with well-known facts, such as buildings with less efficient lighting systems are good targets for efficiency improvements through lighting upgrades. This analysis also helped identify that individual heating, ventilation, and air conditioning (HVAC) equipment efficiency does not necessarily correlate with building performance. However, overall HVAC system performance, as measured with the Total System Performance Ratio (TSPR) metric, is a better indicator of building performance (Goel et al. 2014). As a metric, TSPR considers whole system performance that includes equipment efficiency and system controls, such as resets for static pressure and chilled water setpoints, which can be more effective and financially feasible options for improving building performance. Given the high cost associated with envelope retrofits, opportunities to upgrade envelope insulation are likely to be limited. However, buildings with single-pane and non-thermal break windows are good candidates for window replacements, such as upgrading to double-pane windows with thermal breaks. This research project determined that developing Asset Scores based on site visits is preferable to mining City building permit data. In addition, the use of benchmarking data to develop Asset Score Preview Scores is recommended as a first step in engaging building managers to develop full Asset Scores. Asset Score Tool outputs can help building managers quickly identify opportunities for improvement and then work with the utility incentive administrator and energy service providers to develop their retrofit plan. Where full Asset Scores are available, analysis using a quadrant matrix with ENERGY STAR scores is recommended to identify buildings that present the best opportunities for operational-behavioral improvements versus ones with opportunities for upgrades to physical building systems. This workflow and the tools will help cities, utility incentive administrators, building portfolio managers and energy service providers develop energy programs and strategies for screening and analysis of buildings with the greatest energy savings potential. This report describes the project approach and research results to inform future coordination of ESPM and Asset Score data, including the use of benchmarking data to generate Preview scores. Given better awareness of energy performance, building managers can make more informed decisions to reduce energy consumption and carbon emissions. With cities, states and jurisdictions adopting benchmarking and auditing ordinances, there are substantial amounts of data submitted to cities that could be used to inform investments in energy efficiency.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Flexible Financial Credit Agreements: NREL Low- and Moderate-Income Solar Flexible Financing Credit Agreement Rubric

Flexible Financial Credit Agreements is a broad term used to describe a suite of solar products with innovative features not currently offered in traditional solar financing programs. The NREL Low- and Moderate-Income Solar Flexible Financing Credit Agreement Rubric brief document is designed to help evaluate innovative strategies for increasing the accessibility of solar and increasing adoption among LMI households. The rubric is modeled after a version developed to support plug-in electric vehicle policy adoption (NASEO and Cadmus).

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

Integrated platform for optimized solar PV system design and engineering plan set generation

The Aurora team has developed software that allows users to quickly generate a three-dimensional model for a building, with a corresponding irradiance map, from any two-dimensional image with associated geo-coordinates. The purpose of this project is to build upon that technology by developing and distributing to solar installers a software platform that automatically retrieves engineering, financial and geographic data for a specific site, and quickly generates an optimal customer proposal and corresponding engineering plans for that site. At the end of the project, Aurora’s optimization platform would have been used to make at least one thousand proposals from at least ten unique solar installation companies, two of whom would sign economically viable contracts to use the software. Furthermore, Aurora’s algorithms would be tested to show that in at least seventy percent of cases, Aurora automatically generated a design equivalent to or better than what a human could have done manually. A ‘better’ design is one that generates more energy for the same cost, or that generates a higher return on investment, while complying with all site-specific aesthetic, electrical and spatial requirements.

14 SOLAR ENERGY↗