Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FEET”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Digital control of high-intensity acoustic testing

A high intensity acoustic test system is reported that consists of a reverberation room measuring 18 feet wide by 21 feet long by 26 feet high, with an internal volume of 10,900 cubic feet. The room is rectangular in shape. Acoustic energy is supplied through two 50-Hz cutoff exponential horns about 12 feet long. Each of the two horns has two transducers rated at 4000 acoustic watts each. A gaseous nitrogen supply is used to supply the energy. The equalized electrical signal is corrected by a circuit designed to compensate for the transducer nonlinearity, then fed into one channel of a phase linear power amplifier, then into the transducer. The amplifiers have been modified to increase their reliability. The acoustic energy in the room is monitored by six B and K 1/2-inch condenser microphones. The electrical signal from each microphone is fed into a six channel real time averager to give a spatial average of the signals.

Slusser, R. A.↗

Implementation and flight tests for the Digital Integrated Automatic Landing System (DIALS). Part 1: Flight software equations, flight test description and selected flight test data

Five flight tests of the Digital Automated Landing System (DIALS) were conducted on the Advanced Transport Operating Systems (ATOPS) Transportation Research Vehicle (TSRV) -- a modified Boeing 737 aircraft for advanced controls and displays research. These flight tests were conducted at NASA's Wallops Flight Center using the microwave landing system (MLS) installation on runway 22. This report describes the flight software equations of the DIALS which was designed using modern control theory direct-digital design methods and employed a constant gain Kalman filter. Selected flight test performance data is presented for localizer (runway centerline) capture and track at various intercept angles, for glideslope capture and track of 3, 4.5, and 5 degree glideslopes, for the decrab maneuver, and for the flare maneuver. Data is also presented to illustrate the system performance in the presence of cross, gust, and shear winds. The mean and standard deviation of the peak position errors for localizer capture were, respectively, 24 feet and 26 feet. For mild wind conditions, glideslope and localizer tracking position errors did not exceed, respectively, 5 and 20 feet. For gusty wind conditions (8 to 10 knots), these errors were, respectively, 10 and 30 feet. Ten hands off automatic lands were performed. The standard deviation of the touchdown position and velocity errors from the mean values were, respectively, 244 feet and 0.7 feet/sec.

Hueschen, R. M.↗

Plasma wave evidence for reflected ions in front of subcritical shocks - ISEE 1 and 2 observations

Plasma wave profiles of bow shock crossings at ion acoustic frequencies exhibit 'feet' or 'pedestals', just as magnetic field profiles do. These ion-acoustic feet, consisting of increases in ion wave amplitude over background, are observed in front of virtually all quasi-perpendicular shocks, regardless of Mach number, but are closely associated with magnetic feet and reflected ions circulating around the ambient upstream field at supercritical shocks. Observed gyroradii of the reflected ions have been found to be commensurate with the thicknesses of the magnetic feet, which consist of increases in average field magnitude just outside the main shock ramps in front of supercritical shocks. Estimated scale lengths (gyroradii) of reflected protons are proportional to the thicknesses of acoustic wave feet in all cases, indicating that such protons are probably universally present at subcritical as well as supercritical shocks, although the protons are observed only sporadically because of instrumental limitations. The mere presence or absence of reflected ions in front of a shock may therefore be an insufficient diagnostic of the shock's status with respect to criticality and ion dissipation.

Greenstadt, E. W.↗

Altitude Performance and Operational Characteristics of an XT38-A-2 Turboprop Engine

The overall engine performance and the starting and windmilling characteristics of an XT38-A-2 turboprop engine have been investigated in the NACA Lewis altitude wind tunnel. The simulated flight conditions ranged from altitudes of 5000 to 45,000 feet at a flight Mach number of 0.30 and from Mach numbers of 0.301 to 0.557 at an altitude of 35,000 feet. The engine, equipped with a standard-area exhaust nozzle, was operated with independent control of fuel flow and propeller pitch; operation was thereby allowed over a wide range of engine conditions. Windmilling characteristics were obtained at altitudes of 15,000 feet and 35,000 feet. Analysis of the performance maps obtained at each flight condition revealed that both altitude and flight Mach number had a major effect on corrected engine variables. The large reductions in corrected shaft horsepower occurring when the altitude was increased were the result of decreases in compressor and turbine efficiencies. Windmilling engine starts were made at altitudes as high as 35,000 feet at an engine speed of 2000 rpm.

Essig, R H↗

In-Flight Technique for Acquiring Mid- And Far-Field Sonic Boom Signatures

Flight test experiments have been conducted to establish the feasibility of obtaining sonic boom signature measurements below a supersonic aircraft using the NASA Portable Automatic Triggering System (PATS) mounted in the USMC Pioneer Unmanned Aerial Vehicle (UAV). This study forms a part of the NASA sonic boom minimization activities, specifically the demonstration of persistence of modified boom signatures to very large distances in a real atmosphere. The basic objective of the measurement effort was to obtain a qualitative view of the sonic boom signature in terms of its shape, number of shocks, their locations, and their relative strength. Results suggest that the technique may very well provide quantitative information relative to mid-field and far-field boom signatures. The purpose of this presentation is to describe the arrangement and operation of this in-flight system and to present the resulting sonic boom measurements. Adaption and modification of two PATS to the UAV payload section are described and include transducer location, mounting arrangement and recording system isolation. Ground static runup, takeoff and landing, and cruise flight checkouts regarding UAV propeller and flow noise on the PATS automated triggering system and recording mode are discussed. For the proof-of-concept tests, the PATS instrumented UAV was flown under radar control in steady-level flight at the altitude of 8700 feet MSL and at a cruise speed of about 60 knots. The USN F-4N sonic boom generating aircraft was vectored over the UAV on reciprocal headings at altitudes of about 1 1,000 feet MSL and 13,000 feet MSL at about Mach 1. 15. Sonic boom signatures were acquired on both PATS for all six supersonic passes. Although the UAV propeller noise is clearly evident in all the measurements, the F-4 boom signature is clearly distinguishable and is typically N-wave in character with sharply rising shock fronts and with a mid-shock associated with the inlet-wing juncture. Consideration is being given to adapting the PATS/TJAV measurements technique to the NASA Learjet to determine feasibility of acquiring in-flight boom signatures in the altitude range of 10,000 feet to 40,000 feet.

Stansbery, Eugene G.↗

Acceleration Measurements During Landings of a 1/5.5-Size Dynamic Model of the Columbia XJL-1 Amphibian in Smooth Water and in Waves: Langley Tank Model 208M, TED No. NACA 2336

A 1/5.5-size powered dynamic model of the Columbia XJL-1 amphibian was landed in Langley tank no. 1 in smooth water and in oncoming waves of heights from 2.1 feet to 6.4 feet (full-size) and lengths from 50 feet to 264 feet (full-size). The motions and the vertical accelerations of the model were continuously recorded. The greatest vertical acceleration measured during the smooth-water landings was 3.1g. During landings in rough water the greatest vertical acceleration measured was 15.4g, for a landing in 6.4-foot by 165-foot waves. The impact accelerations increased with increase in wave height and, in general, decreased with increase in wave length. During the landings in waves the model bounced into the air at stalled attitudes at speeds below flying speed. The model trimmed up to the mechanical trim stop (20 deg) during landings in waves of heights greater than 2.0 feet. Solid water came over the bow and damaged the propeller during one landing in 6.4-foot waves. The vertical acceleration coefficients at first impact from the tank tests of a 1/5.5-size model were in fair agreement with data obtained at the Langley impact basin during tests of a 1/2-size model of the hull.

Clement, Eugene P.↗

Self-propelled instrumented deep drilling system

An autonomous subsurface drilling device has spaced-apart forward and rearward feet sections coupled to an axial thruster mechanism between them to operate using an inchworm method of mobility. In one embodiment, forward and rearward drill sections are carried on forward and rearward feet sections for drilling into material in the borehole in both forward and rearward directions, to allow the device to maneuver in any direction underground. In another embodiment, a front drill section has a drill head for cutting into the borehole and conveying cuttings through a center spine tube to an on-board depository for the cuttings. The feet sections of the device employ a foot scroll drive unit to provide radial thrust and synchronous motion to the feet for gripping the borehole wall. The axial thrust mechanism has a tandem set of thrusters in which the second thruster is used to provide the thrust needed for drilling, but not walking. A steering mechanism composed of concentric inner and outer eccentric rings provided with the rearward feet section allow small corrections in both direction and magnitude to the drilling direction as drilling commences.

Myrick, Thomas M.↗

Performance Investigation of TG-180 Combustor: I - Instrumentation, Altitude Operational Limits and Combustion Efficiency

A brief investigation has been made of the performance of a single combustor of the TG-180 turboJet engine to determine (a) the altitude operational limits of the engine for two fuels (AN-F-32 and AN-F-28), (b) combustion efficiencies at various simulated conditions of altitude and engine speeds, (c) combustion-outlet temperature distribution for several altitudes at constant engine speed, and (d) the combustor total pressure drop The limits with AN-83-F-32 fuel were found to be approximately 60,000 feet for an engine speed of 6000 rpm and approximately 38,000 feet for an engine speed of 1000 rpm. The results indicated that the altitude operational limits with AN-F-32 fuel are higher over the largest part of the engine-speed range than with AN-F-28 fuel, A combination efficiency of 22 percent was obtained at rated engine speed (7600 rpm) and an altitude of 20,000 feet with AN-F-32 fuel. A change in altitude from 20,000 tm 60,000 feet showed a 20-percent decrease in combustion efficiency while the engine was operating at 760G rpm whereas, at an engine speed of 4000 rpm a change of altitude from 10,000 to 40,000 feet showed a 52-percent decrease in combustion efficiency .

Zettle, Eugene V.↗

Investigation of the I-40 Jet-Propulsion Engine in the Cleveland Altitude Wind Tunnel. V - Operational Characteristics: Operational Characteristics - 5

An investigation has been conducted in the Cleveland altitude wind tunnel to determine the operational characteristics of the I-40 jet-propulsion engine over a range of pressure altitudes from 10,000 to 50,000 feet and ram-pressure ratios from 1.00 to 1.76. Engine operational data were obtained with the engine in the standard configuration and with various modifications of the fuel system, the electrical system, and the combustion chambers. The effects of altitude and airspeed on operating speed range, starting, windmilli.ng, acceleration, speed regulation, cooling, and vibration of the standard and modified engines were determined, and damage to parts was noted. Maximum engine speed was obtainable at all altitudes and airspeeds wi th each fuel-control system investigated. The minimum idling speed was raised by increases in altitude and airspeed. The lowest minimum stable speeds were obtained with the standard configuration using 40-gallon nozzles with individual metering plugs. The engine was started normally at altitudes as high as 20,000 feet with all of the fuel systems and ignition combinations except one. Ignition at 70,000 feet was difficult and, although successful ignition occurred, acceleration was slow and usually characterized by excessive tail-pipe temperature. During windmilling investigations of the engine equipped with the standard fuel system, the engine could not be started at ram-pressure ratios of 1.1 to 1.7 at altitudes of 10,000, 20,000 and 30,000 feet. When equipped with the production barometric and Monarch 40-gallon nozzles, the engine accelerated in 12 seconds from an engine speed of 6000 rpm to 11,000 rpm at 20,000 feet and an average tail-pipe temperature of 11000 F. At the same altitude and temperature, all the engine configurations had approximately the same rate of acceleration. The Woodward governor produced the safest accelerations, inasmuch as it could be adjusted to automatically prevent acceleration blow out. The engine speed was held constant by the Woodward governor and the Edwards regulator during simulated dives and climbs at constant throttle position. The bearing cooling system was satisfactory at all altitudes and airspeeds. The engines operated without serious failure, although the exhaust cone, the tail pipe, and the airplane fuselage were damaged during altitude starts.

Golladay, Richard L.↗

Simulated Altitude Performance of Combustors for the 24C Turbojet Engine. III - Performance of Rectangular-Slot Baskets: Performance of Rectangular-Slot Baskets - 3

The performance of an annular combustion chamber from a 24C turbojet engine was investigated over a range of simulated altitudes from 20,000 to 55,000 feet and corrected engine rotor speeds from 6000 to 13,000 rpm at a simulated ram-pressure ratio of 1.04. The purpose of the investigation was to determine the effects on the altitude operational limits, combustor-outlet gas temperature distribution, combustion efficiencies, and combustor inlet-to-outlet total-pressure drops of two changes in the 24C-4B basket air-passage arrangements that were designed to improve combustor-outlet temperature distribution. These changes were: (a) replacement of the downstream secondary air holes with large rectangular slots further upstream (rectangular-slot basket), and (b) enlargement of anticoking holes in the rectangular-slot basket (modified rectangular-slot basket). The results indicate that improved outlet-gas temperature distribution of each succeeding combustor basket investigated was attained at a sacrifice in the altitude limit of operation. The altitude limits of operation of the combustor with the original basket ranged from 34,000 feet at a corrected engine speed of 6000 rpm to a maximum of 52,000 feet at 12 ' 500 rpm. The altitude limits of the rectangular-slot basket were about 2000 feet lower throughout the engine speed range than those of the original basket. The altitude limits of the combustor with the modified rectangular-slot basket were about equivalent to those of the other baskets in the corrected-engine-speed range from 12,000 to 12,500 rpm but were about 10,000 feet lower than those of the original basket in the corrected-engine-speed range from 6000 to 9000 rpm. For the same inlet-air conditions, the combustion efficiencies were highest for the original basket and progressively lower for each of the other two baskets. The combustor inlet-to-outlet pressure drops of all three combustor baskets at the same operating conditions were within +/- 10 percent of the pressure drop of the original basket.

Tischler, Adelbert O.↗

Wilson Corners Solid Waste Management Unit (SWMU) 001: 2021 Annual Long-Term Monitoring Report, Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.

long-term monitoring (LTM)↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Bioremediation of a Large Chlorinated Solvent Plume, Dover AFB, DE

Bioremediation of a Large Chlorinated Solvent Plume, Dover AFB, DE Aleisa Bloom, (Oak Ridge National Laboratory, Oak Ridge, Tennessee, USA) Robert Lyon (bob.lyon@aecom.com), Laurie Stenberg, and Holly Brown (AECOM, Germantown, Maryland, USA) ABSTRACT: Past disposal practices at Dover Air Force Base (AFB), Delaware, created a large solvent plume called Area 6 (about 1 mile long, 2,000 feet wide, and 345 acres). The main contaminants are PCE, TCE, and their degradation products. The remedy is in-situ accelerated anaerobic bioremediation (AAB). AAB started in 2006 and is focusing on source areas and downgradient plume cores. Direct-push injections occurred in source areas where contamination is typically between 5 and 20 feet below ground surface. Lower concentration dissolved-phased contamination is present downgradient at 35 and 50 feet below ground surface. Here, permanent injection/extraction wells installed in transects perpendicular to the flow of groundwater are used to apply AAB. The AAB substrate is a mix of sodium lactate, emulsified vegetable oil, and nutrients. After eight years, dissolved contaminant mass within the main 80-acre treatment area has been reduced by over 98 percent. This successful application of AAB has stopped the flux of contaminants to the more distal portions of the plume. While more time is needed for effects to be seen in the distal plume, AAB injections will soon cease, and the remedy will transition to natural attenuation. INTRODUCTION Oak Ridge National Laboratory Environmental Science Division (ORNL) and AECOM (formerly URS Corporation) have successfully implemented in situ accelerated anaerobic bioremediation (AAB) to remediate chlorinated solvent contamination in a large, multi-sourced groundwater plume at Dover Air Force Base (AFB). AAB has resulted in significant reductions of dissolved phase chlorinated solvent concentrations. This plume, called Area 6, was originally over 1 mile in length and over 2,000 feet wide (Figure 1). It originated from at least four separate source areas that comingled in the subsurface to form the large plume. The major contaminants of concern (COCs) are tetrachloroethene (PCE), trichloroethene (TCE), and 1,1,1-trichloroethane (1,1,1-TCA), which were historically used for degreasing operations in the maintenance of aircraft and support vehicles. Relatively small areas of elevated PCE, TCE, and 1,1,1-TCA were delineated in the shallow portion of the water table aquifer by direct-push groundwater sampling. Focused direct-push AAB treatment occurred in March 2006 at these source areas (Figure 1). Downgradient of the these areas and deeper in the aquifer, AAB treatment was implemented using rows of extraction/injection wells oriented perpendicular to groundwater flow to create multiple reductive zones across the plume cores, defined as areas where more than 1,000 micrograms per liter (ug/L) total solvent concentrations were present. Initial indications of successful degradation were observed within 6 months of starting injections. FIGURE 1. Dover AFB Area 6 plume. This paper describes the AAB implementation and progress of remediation after 8 years of treatment and periodic groundwater monitoring. SITE LITHOLOGY Contamination at the site is limited to the surficial aquifer, which consists of 35 to 50 feet (ft) (11 to 15 meters [m]) of unconsolidated Pleistocene deposits of the Columbia Formation. The Columbia Formation consists of fine to coarse sand with silt and clay lenses and less common gravel lenses. Silts and silty sands are generally encountered to a depth of 10 to 12 ft (3.05 to 3.65 m) below ground surface (bgs) and grade to medium- and coarse-grained sands to a depth of 35 to 50 ft (11 to 15 m) bgs. There is a clay and silt unit (part of the Calvert Formation) below the surficial aquifer that acts as an aquitard to the downward migration of contaminants. The depth to the water table varies across the site but usually ranges from 8 to 15 ft (2.4 to 4.5 m) bgs in the treatment area. REMEDIAL APPROACH AND OPERATIONS Because the Columbia Aquifer is used as a source of potable water off base, the remedial goal is to restore the aquifer to usable condition, i.e., reduce all chemicals of concern to below drinking water maximum contaminant levels (MCLs). To achieve this goal, AAB was selected as the best remedial alternative to reduce the solvent contamination. Source areas with high solvent concentrations were present in the shallow portion of the aquifer. From the source areas, dissolved solvents migrated downgradient and deeper in the aquifer with the flow of groundwater. In the deeper portion of the aquifer, the individual plumes comingle to form the larger Area 6 Plume, which covers approximately 345 acres. Types of Substrate. Previous AAB pilot tests at Dover AFB used either sodium lactate or emulsified vegetable oil (EVO) as substrates to stimulate microbial growth. The best results were obtained with...

Bloom, Aleisa C↗

Characterization and Remediation of the Hanford 618-10 Burial Ground Vertical Pipe Units - 17121

The 618-10 Burial Ground is approximately 148 m by 143 m (485 feet by 470 feet) and consists of 12 trenches and 94 Vertical Pipe Units (VPU's). It is located approximately 8.1 km (5 miles) north of Richland, Washington in the 600 Area of the Hanford Site. The 618-10 Burial Ground received low- to high-activity waste (e.g., fission products and some plutonium-contaminated waste). Most of the waste originated at the 300 Area laboratory facilities. Lower activity radioactive material and shielded drums were disposed in trenches, while laboratory wastes with higher levels of radiation were disposed in Vertical Pipe Units (VPUs). There are different variants of VPUs. Some VPUs are simply corrugated culverts or standard pipes, 36 cm (14 in.) diameter and 3.1 m to 4.6 m (10- to 15-ft) long, buried vertically. Some VPUs are carbon steel pipes 25 to 61 cm (10 to 24 in.) in diameter and up to 4.6 m (15 ft) in length. The final design of the VPUs is 56 cm (22-in) diameter, 4.4 m (14.4 ft) long waste receptacles constructed by welding five 208 L (55-gallon) bottomless drums together end-to-end and burying them vertically, separated by approximately 3.1 m (10 feet) on center in rows approximately 7.6 m (25 feet) apart. The 618-10 Burial Ground contains approximately 94 VPUs. Historical documents indicate that shielding materials (e.g., concrete or soil) may have been added to the VPUs to reduce dose rates over the openings, and that each VPU was backfilled with sand and capped with concrete at the end of its service life. Historical documents also indicate that the VPUs were covered with approximately 0.6 m (2-ft) of soil when they were closed, and an additional 0.6 m (2-ft) of topsoil was later added for surface stabilization. In general, the process for VPU remediation was as follows: - Installed four cone penetrometers (CPTs) around the exterior of each individual VPU and sent radiation detection probes down the interior of the CPTs to get initial radiation data in order to calculate the overall curie content and create maps showing the dose rate distribution throughout the VPU. - Removed the CPTs and installed a 122 cm (48-in) diameter, 1.3 cm (0.5-in) thick steel over-casing using a vibrating hammer suspended from a crane that encompassed the VPU with some surrounding soil. - Using a Bauer BG-30 drill rig with a specifically designed augur bit and a specially designed confinement system the auger process was used to stabilize and size reduce the contents. - Once the auger reached a depth of 8.5 m (28 feet) the BG-30 drill stem was separated and additional characterization was completed by sending a radiation probe down the center of the drill stem to gather radiological data. - Once auguring and characterization was completed the waste was removed using a specially designed extended clamshell retrieval bucket and placed into individual 2.7 m x 1.5 m x 1.2 m (9-ft x 5-ft x 4-ft) metal boxes. - After the waste was placed into the metal waste boxes a low strength grout was added and the grout and waste material was mixed using a large rake device attached to an excavator. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing of graphite thermal neutron scattering law data in support of treat neutronic analysis

The Transient Reactor Test Facility (TREAT) has historically provided the capability for transient fuel performance and safety testing in the United States. The operation of this facility was suspended in 1994. However, in recent years preparations for the restart of TREAT were initiated. TREAT is a graphite moderated and air cooled reactor. Its core is composed of a 19 x 19 array of fuel assemblies that contain UO{sub 2} (HEU) fuel particles dispersed in a graphite matrix, along with reflector assemblies filled with graphite only. Each fuel assembly is 8 feet tall with a fueled region that is 4 feet tall and upper and lower regions of graphite that are 2 feet tall. In addition, a 2 feet thick radial graphite reflector region is present. Finally, a 5 feet thick concrete biological shield surrounds the core. Previous work showed that the graphite thermal scattering cross sections can introduce variations exceeding 2000 pcm in the predicted eigenvalue of the TREAT core. Recognizing that the graphite in the assembly (and thereby the core) is a porous mixture of crystalline and amorphous carbon (with a lower density in comparison to ideal crystalline graphite), it becomes clear that TREAT specific thermal neutron scattering cross section libraries will be needed (at all temperatures of interest) for use within neutronic codes seeking to simulate TREAT. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

University of Illinois Campus Deep Direct-Use Feasibility Study - Bedrock Geology ArcGIS Layers

Bedrock Geology of Champaign County, Illinois, map layers (shapefiles). Layers included: 1) Champaign County bedrock units. 2) Champaign County bedrock surface contours. Contour interval of 25 feet. 3) Colchester coal surface contours. Contour interval of 50 feet. 4) Kimmswick Limestone top contours, in the Mahomet dome area. Contour interval of 20 feet. 5) New Albany shale base contour. Contour interval of 100 feet.

15 GEOTHERMAL ENERGY↗

Utah FORGE: Well 16B(78)-32 Drilling Data

This drilling data for Utah FORGE well 16B(78)-32 include a well survey, core summary, mud and mud temperature logs, daily reports of the drilling process, and additional data from the Pason oil and gas company. Well 16B(78)-32 serves as the production well for reservoir creation, fluid circulation, and demonstration of heat extraction for the FORGE project. It has been drilled as a doublet approximately 300 feet parallel to and above the injection well 16A(78)-32. The proposed total depth was 10,658 feet, which was exceeded. Spudding began on April 26th, 2023. As of June 20th, 2023, the total depth measured 10,947 feet and the vertical depth measured 8,357 feet. Drilling included the trial use of insulated drill pipe (IDP) from Eavor Technologies, which was considered a success. IDP restricts counter-current heat transfer between drilling fluid inside the drill string and hotter returning fluid in the annulus, thereby ensuring the bottomhole assembly (BHA) remains submerged in cool fluid. Eavor rented 350 joints of IDP to FORGE which were run in two consecutive BHAs at the well. The results of this trial are included here.

15 GEOTHERMAL ENERGY↗

Wyoming CarbonSAFE: Advancing Commercialization of Low-Carbon Energy Technologies in Fossil-Rich Wyoming

Wyoming’s Powder River Basin (PRB) is the most prolific coal producer and exporter in the United States and the State of Wyoming’s largest oil-producing basin. In addition to being a leading energy producer, the PRB is the site of research programs whose aim is to develop and integrate low-carbon technologies into existing fossil fuel energy industries. Much of the PRB’s low-carbon research is focused around Dry Fork Station (DFS), which is the newest coal-fired power station in the western US. Currently, DFS hosts five carbon capture projects, including pilot-scale capture projects that utilize different capture technologies and a full front-end engineering and design (FEED) study, a commercial CO 2 pipeline for nearby CO 2 -enhanced oil recovery industry, and is also co-located with the Wyoming Integrated Test Center, which is a host facility for unconventional carbon utilization research (i.e. flue gas carbon-to-products innovations). DFS is also the host site for the Wyoming CarbonSAFE project. Wyoming CarbonSAFE, funded by the Department of Energy/National Energy Technology Laboratory, is a multi-phased program (currently in Phase II) whose core objective is developing and validating storage sites within a complex capable of storing 50 million metric tonnes of CO 2 over a 30 year project period using carbon capture, utilization and storage (CCUS). This paper will provide an overview of the project to-date, showing that CarbonSAFE goals are achievable with respect to geologic, environmental, regulatory, CO 2 source and economic conditions, and why the State of Wyoming offers one of the more favorable environments to advance the commercialization studies. In 2019, the project team designed and completed a ~10,000 foot stratigraphic test well just south of DFS. From this well, the team collected over 600 feet of core, fluid samples from target injection zones, and a full petrophysical log suite. In addition, legacy 2D seismic lines were acquired and a 3D seismic survey was acquired in the fall of 2020. The objective of these field activities has been to identify and characterize target storage reservoirs and associated caprock. This complex has several reservoirs that could meet commercial injection goals, and over 4000 feet of associated caprock. Simulations of site performance suggest that stacked injection provides the most effective storage strategy, and would necessitate several sites within the greater complex to meet final project injection goals. Other work within this project includes the development of a business-case around proximal fields with CO 2 -enhanced oil recovery potential and existing tax credits, assessment of regulatory conditions, including pore space ownership and Class VI injection well permitting requirements, implementation of a robust public outreach Electronic copy available at: https://ssrn.com/abstract=3821220 GHGT-15 McLaughlin 2 program, and surface site characterization activities that have focused on environmental factors. In the PRB and at DFS, the State of Wyoming and other entities have made carbon management a priority of its future energy industry by providing a regulatory and business framework that is favorable to advancing these technologies. These endeavors will become more realistic with the successful implementation of Wyoming CarbonSAFE, and its ability to secure and validate commercial-scale CCUS at the center of Wyoming’s premier low-carbon research efforts.

McLaughlin, Fred↗