Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Dynamic scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Dynamic force and stability prediction for milling using feed rate scheduling software and time-domain simulation

This paper describes: 1) the use of feed rate scheduling software to predict the radial depth of cut variation for three-axis milling toolpaths and; 2) the use of the radial depth profile in a time-domain simulation to predict dynamic cutting forces. The time-domain simulation, which also includes the tool tip frequency response functions and force model (which relates the cutting force components to the chip geometry) as inputs, enables dynamic force profiles to be predicted and parameter combinations that cause chatter to be identified. A ramp geometry is selected that provides constantly varying radial depth and force predictions are completed at multiple axial depths for comparison to measured forces. Both stable and unstable (chatter) milling conditions were observed with good agreement between time-domain simulation and measurement results. The value of combining the feed rate scheduling software and time-domain simulation is demonstrated.

42 ENGINEERING↗

A Study of Parallel Scalability and Dynamic Workload Balancing in GlennICE

The Glenn Icing Computational Environment (GlennICE) is a computational tool designed to calculate ice growth on complex three-dimensional geometries. It utilizes user-supplied computational fluid dynamics solutions for the geometry of interest. Key developments include advancements in convergence of collection efficiency, trajectory optimization, and refinement methodology. These improvements have significantly enhanced GlennICE’s efficiency for practical engineering applications. A recent study focused on benchmarking GlennICE’s scalability in a parallel environment using static scheduling. Findings indicated a potential twofold increase in efficiency through workload balance enhancements. This paper presents an analysis of the solver’s new workload balancing improvements, incorporating shared memory and dynamic scheduling routines. Results demonstrate a highly efficient and consistent algorithm across high-performance computing clusters.

Computational Icing↗

A Study of Parallel Scalability and Dynamic Workload Balancing in GlennICE

The Glenn Icing Computational Environment (GlennICE) is a computational tool designed to calculate ice growth on complex three-dimensional geometries. It utilizes user-supplied computational fluid dynamics solutions for the geometry of interest. Key developments include advancements in convergence of collection efficiency, trajectory optimization, and refinement methodology. These improvements have significantly enhanced GlennICE’s efficiency for practical engineering applications. A recent study focused on benchmarking GlennICE’s scalability in a parallel environment using static scheduling. Findings indicated a potential twofold increase in efficiency through workload balance enhancements. This paper presents an analysis of the solver’s new workload balancing improvements, incorporating shared memory and dynamic scheduling routines. Results demonstrate a highly efficient and consistent algorithm across high-performance computing clusters.

Computational Icing↗

Quantification of Dynamic Model Validation Metrics Using Uncertainty Propagation from Requirements

The Space Launch System, NASA's new large launch vehicle for long range space exploration, is presently in the final design and construction phases, with the first launch scheduled for 2019. A dynamic model of the system has been created and is critical for calculation of interface loads and natural frequencies and mode shapes for guidance, navigation, and control (GNC). Because of the program and schedule constraints, a single modal test of the SLS will be performed while bolted down to the Mobile Launch Pad just before the first launch. A Monte Carlo and optimization scheme will be performed to create thousands of possible models based on given dispersions in model properties and to determine which model best fits the natural frequencies and mode shapes from modal test. However, the question still remains as to whether this model is acceptable for the loads and GNC requirements. An uncertainty propagation and quantification (UP and UQ) technique to develop a quantitative set of validation metrics that is based on the flight requirements has therefore been developed and is discussed in this paper. There has been considerable research on UQ and UP and validation in the literature, but very little on propagating the uncertainties from requirements, so most validation metrics are "rules-of-thumb;" this research seeks to come up with more reason-based metrics. One of the main assumptions used to achieve this task is that the uncertainty in the modeling of the fixed boundary condition is accurate, so therefore that same uncertainty can be used in propagating the fixed-test configuration to the free-free actual configuration. The second main technique applied here is the usage of the limit-state formulation to quantify the final probabilistic parameters and to compare them with the requirements. These techniques are explored with a simple lumped spring-mass system and a simplified SLS model. When completed, it is anticipated that this requirements-based validation metric will provide a quantified confidence and probability of success for the final SLS dynamics model, which will be critical for a successful launch program, and can be applied in the many other industries where an accurate dynamic model is required.

Brown, Andrew M.↗

Potential Fifty Percent Reduction in Saturation Diving Decompression Time Using a Combination of Intermittent Recompression and Exercise

Conventional saturation decompression protocols use linear decompression rates that become progressively slower at shallower depths, consistent with free gas phase control vs. dissolved gas elimination kinetics. If decompression is limited by control of free gas phase, linear decompression is an inefficient strategy. The NASA prebreathe reduction program demonstrated that exercise during O2 prebreathe resulted in a 50% reduction (2 h vs. 4 h) in the saturation decompression time from 14.7 to 4.3 psi and a significant reduction in decompression sickness (DCS: 0 vs. 23.7%). Combining exercise with intermittent recompression, which controls gas phase growth and eliminates supersaturation before exercising, may enable more efficient saturation decompression schedules. A tissue bubble dynamics model (TBDM) was used in conjunction with a NASA exercise prebreathe model (NEPM) that relates tissue inert gas exchange rate constants to exercise (ml O2/kg-min), to develop a schedule for decompression from helium saturation at 400 fsw. The models provide significant prediction (p < 0.001) and goodness of fit with 430 cases of DCS in 6437 laboratory dives for TBDM (p = 0.77) and with 22 cases of DCS in 159 altitude exposures for NEPM (p = 0.70). The models have also been used operationally in over 25,000 dives (TBDM) and 40 spacewalks (NEPM). The standard U.S. Navy (USN) linear saturation decompression schedule from saturation at 400 fsw required 114.5 h with a maximum Bubble Growth Index (BGI(sub max)) of 17.5. Decompression using intermittent recompression combined with two 10 min exercise periods (75% VO2 (sub peak)) per day required 54.25 h (BGI(sub max): 14.7). Combined intermittent recompression and exercise resulted in a theoretical 53% (2.5 day) reduction in decompression time and theoretically lower DCS risk compared to the standard USN decompression schedule. These results warrant future decompression trials to evaluate the efficacy of this approach.

Gernhardt, Michael I.↗

DTS: Building custom, intelligent schedulers

DTS is a decision-theoretic scheduler, built on top of a flexible toolkit -- this paper focuses on how the toolkit might be reused in future NASA mission schedulers. The toolkit includes a user-customizable scheduling interface, and a 'Just-For-You' optimization engine. The customizable interface is built on two metaphors: objects and dynamic graphs. Objects help to structure problem specifications and related data, while dynamic graphs simplify the specification of graphical schedule editors (such as Gantt charts). The interface can be used with any 'back-end' scheduler, through dynamically-loaded code, interprocess communication, or a shared database. The 'Just-For-You' optimization engine includes user-specific utility functions, automatically compiled heuristic evaluations, and a postprocessing facility for enforcing scheduling policies. The optimization engine is based on BPS, the Bayesian Problem-Solver (1,2), which introduced a similar approach to solving single-agent and adversarial graph search problems.

Hansson, Othar↗

Tethered satellite system dynamics and control

The first tethered satellite system, scheduled for launch in May 1991, is reviewed. The system dynamics, dynamics control, and dynamics simulations are discussed. Particular attention is given to in-plane and out-of-plane librations; tether oscillation modes; orbiter and sub-satellite dynamics; deployer control system; the sub-satellite attitude measurement and control system; the Aeritalia Dynamics Model; the Martin-Marietta and NASA-MSFC Dynamics Model; and simulation results.

Musetti, B.↗

Population-based learning of load balancing policies for a distributed computer system

Effective load-balancing policies use dynamic resource information to schedule tasks in a distributed computer system. We present a novel method for automatically learning such policies. At each site in our system, we use a comparator neural network to predict the relative speedup of an incoming task using only the resource-utilization patterns obtained prior to the task's arrival. Outputs of these comparator networks are broadcast periodically over the distributed system, and the resource schedulers at each site use these values to determine the best site for executing an incoming task. The delays incurred in propagating workload information and tasks from one site to another, as well as the dynamic and unpredictable nature of workloads in multiprogrammed multiprocessors, may cause the workload pattern at the time of execution to differ from patterns prevailing at the times of load-index computation and decision making. Our load-balancing policy accommodates this uncertainty by using certain tunable parameters. We present a population-based machine-learning algorithm that adjusts these parameters in order to achieve high average speedups with respect to local execution. Our results show that our load-balancing policy, when combined with the comparator neural network for workload characterization, is effective in exploiting idle resources in a distributed computer system.

Mehra, Pankaj↗

Autonomous power system: Integrated scheduling

The Autonomous Power System (APS) project at NASA Lewis Research Center is designed to demonstrate the abilities of integrated intelligent diagnosis, control and scheduling techniques to space power distribution hardware. The project consists of three elements: the Autonomous Power Expert System (APEX) for fault diagnosis, isolation, and recovery (FDIR), the Autonomous Intelligent Power Scheduler (AIPS) to determine system configuration, and power hardware (Brassboard) to simulate a space-based power system. Faults can be introduced into the Brassboard and in turn, be diagnosed and corrected by APEX and AIPS. The Autonomous Intelligent Power Scheduler controls the execution of loads attached to the Brassboard. Each load must be executed in a manner that efficiently utilizes available power and satisfies all load, resource, and temporal constraints. In the case of a fault situation on the Brassboard, AIPS dynamically modifies the existing schedule in order to resume efficient operation conditions. A database is kept of the power demand, temporal modifiers, priority of each load, and the power level of each source. AIPS uses a set of heuristic rules to assign start times and resources to each load based on load and resource constraints. A simple improvement engine based upon these heuristics is also available to improve the schedule efficiency. This paper describes the operation of the Autonomous Intelligent Power Scheduler as a single entity, as well as its integration with APEX and the Brassboard. Future plans are discussed for the growth of the Autonomous Intelligent Power Scheduler.

Ringer, Mark J.↗

Performance analysis of a large-grain dataflow scheduling paradigm

A paradigm for scheduling computations on a network of multiprocessors using large-grain data flow scheduling at run time is described and analyzed. The computations to be scheduled must follow a static flow graph, while the schedule itself will be dynamic (i.e., determined at run time). Many applications characterized by static flow exist, and they include real-time control and digital signal processing. With the advent of computer-aided software engineering (CASE) tools for capturing software designs in dataflow-like structures, macro-dataflow scheduling becomes increasingly attractive, if not necessary. For parallel implementations, using the macro-dataflow method allows the scheduling to be insulated from the application designer and enables the maximum utilization of available resources. Further, by allowing multitasking, processor utilizations can approach 100 percent while they maintain maximum speedup. Extensive simulation studies are performed on 4-, 8-, and 16-processor architectures that reflect the effects of communication delays, scheduling delays, algorithm class, and multitasking on performance and speedup gains.

Young, Steven D.↗

Learning to improve iterative repair scheduling

This paper presents a general learning method for dynamically selecting between repair heuristics in an iterative repair scheduling system. The system employs a version of explanation-based learning called Plausible Explanation-Based Learning (PEBL) that uses multiple examples to confirm conjectured explanations. The basic approach is to conjecture contradictions between a heuristic and statistics that measure the quality of the heuristic. When these contradictions are confirmed, a different heuristic is selected. To motivate the utility of this approach we present an empirical evaluation of the performance of a scheduling system with respect to two different repair strategies. We show that the scheduler that learns to choose between the heuristics outperforms the same scheduler with any one of two heuristics alone.

Zweben, Monte↗

DP-Based Optimization of BESS to Substitute RICE Reserves for Improved Economic Benefits

In regions with a significant proportion of renewable energy sources, reciprocating internal combustion engines (RICE or IC) are frequently employed as grid reserve solutions. This study suggests a scheduling technique for battery energy storage systems (BESS) that utilizes dynamic programming (DP) to replace IC units, adding versatility to the total reserve capacity and resulting in higher BESS earnings compared to traditional scheduling approaches. The capacity sweeping approach to optimize BESS’s revenue sometimes leads to operation which is counter intuitive to conventional battery sizing approaches.

25 ENERGY STORAGE↗

XPRESS: eXascale PRogramming Environment and System Software

The XPRESS project is the research and development of a complete software architecture for Exascale computing. The four major R&D thrusts include: 1) an Exascale lightweight kernel operating system (LXK), based on the Kitten operating system (OS), to manage billion way hardware parallelism, management of faults and power, management of global virtual name space, and other features of future system architectures; 2) a runtime system (HPX-5), co-designed with LXK, based on the ParalleX execution model that supports dynamic resource management and task scheduling; 3) system interfaces for interoperability between the runtime system and both the OS and the runtime system (RIOS); 4) compilation strategies and systems to translate MPI and OpenMP legacy codes to a form that can be run with performance at least as good as a native code implementation. The software architecture development has been driven by performance evaluation of mini-applications developed at Department of Energy Co-Design Centers as well as ancillary in-house developed applications and benchmarks. Research on the ParalleX execution model has been driven by the development of formal semantics and model checkers for the execution model. The major components of the software architecture are: ParalleX execution model – guiding principles for co-design of components of the system stack with advances in locality management and task prioritization through introspection; HPX runtime system – support of application dynamic adaptive resource management, task scheduling, and introspective control policies; LXK operating system – lightweight kernel operating system for order-constant scalability and low/no noise to manage resources; RIOS – a realm of Exascale system operation unique in the XPRESS project that includes the relationship between the new generation of lightweight kernel operating systems and runtime system software; XPI advanced programming model – intermediate form and low-level (readable) programming interface reflecting the ParalleX model, providing a target for source-to- source high level parallel language translation, and supporting early direct programming experimentation and measurement; Performance models & metrics – providing parameters and their mutual sensitivities to guide co-design and quantify operational behavior; Legacy migration – ensuring seamless transition of legacy codes and programming methods to the future generation of ParalleX-based Exascale systems; . Experiments and evaluation – critical to determining degree of effectiveness and likelihood of ultimate success as well as guiding corrective design changes to achieve DOE objectives; and Applications – collaborations with Co-Design Centers and other mission critical codes. The exemplar implementation of the ParalleX execution model, HPX-5, has been released along with five fully ported applications (LULESH, HPCG, SSSP, WAMR, and DASHMM) and multiple microbenchmarks. Using these applications, the system architecture demonstrated dynamic load balancing through active migration, legacy code migration, and data-driven approaches to for graph-like applications. Crucially for Exascale and billion way parallelism, the needs and patterns of irregular applications in HPX-5 were addressed using local flow control rather than relying on globally synchronized data structures.

97 MATHEMATICS AND COMPUTING↗

Contracting Quality Early in the Lifecycle Using AS9145 Data Deliverables

Development schedules and a highly dynamic supply chain are a challenge to developers of complex systems produced at low volume. Flaws in designs, parts and materials availability problems, poor manufacturability, and a lack of knowledge about critical items and key process attributes can be realized well before traditional second-party quality assurance activities begin. Supplier audits and product inspections may have little mitigating effect once these foundational problems have been realized. Their impacts can be significant lifecycle disruption, cost overruns, inability to deliver to plan, and even project cancellation. AS9145, Requirements for Advanced Product Quality Planning and Production Part Approval Process, can be used to drive quality engineering practices into early development lifecycles to significantly reduce this late-cycle risk and to reduce the cost of quality overall. Since its initial publication in 2016, it has had very limited adoption by the DoD, no adoption by NASA, and sparse adoption in the aerospace and defense supply chain. A task group within the Aerospace Industries Association's (AIA) Joint Strategic Quality Council (JSQC) identified that both acquirers and suppliers see as AS9145 as a cost-adder and are hesitant to use it as an alternative to late-stage-heavy quality assurance approaches. A lack of prior use creates large capability gaps in request-for-proposal (RFP) teams, proposal teams, suppliers’ quality management systems (QMS), and in experienced personnel executing the early lifecycle approach. To create a more realizable on-ramp for using AS9145 in the space and defense sectors, the AIA JSQC task team created five deliverable requirements descriptions (DRDs) that can be used in a contract to begin to engage both parties in early lifecycle quality engineering and quality assurance activities, that reduce exposure to late-stage cost and schedule collapse due to unidentified risks in design, supply chain, and manufacturability. These DRDs drive the parties to engage in planning and analysis discussions early on to understand what production risks can be known and how they will focus resources based on safety criticality and the key elements of design and construction. The suppliers and acquirers who will produce the data and information required by the DRD will be able to incrementally evolve their QMS and the acquirer will incrementally be able to track and understand the benefits of cost shifting from late to early development phases. A white paper describing this approach and the five recommended DRDs will be published by the AIA in late 2024 or early 2025.

Jeannette Plante↗

E-PVT: enhanced position-velocity-time scheduler for computer-controlled optical finishing with comprehensive considerations of dynamics constraints, continuity and efficiency

Deterministic computer-controlled optical finishing is an essential approach for achieving high-quality optical surfaces. Its determinism and convergence rely heavily on precise and smooth motion control to guide the machine tool over an optical surface to correct residual errors. One widely supported and smooth motion control model is position-velocity-time (PVT), which employs piecewise cubic polynomials to describe positions. Our prior research introduced a PVT-based velocity scheduling method, demonstrating sub-nanometer level convergence in ion beam figuring (IBF) processes. However, three challenges remained. Firstly, this method relies on quadratic programming, resulting in computational intensiveness for dense tool paths. Secondly, the dynamics constraints and velocity and acceleration continuities are not comprehensively considered, limiting the full potential of PVT-based control. Thirdly, no compensation mechanism existed when dynamics constraints are exceeded. In this study, in response to these challenges, we proposed the Enhanced PVT (E-PVT) method, reducing the time complexity from O ( n 3 ) to O ( n ) while fully addressing dynamics constraints and continuities. A novel compensation method utilizing particle swarm optimization was proposed to address situations where dynamics constraints might be exceeded while maintaining the overall processing efficiency. Validation through simulation and experimentation confirmed the improved performance of E-PVT.

36 MATERIALS SCIENCE↗

Net Present Value Optimization of a Natural Gas Combined Cycle Plant with CO 2 Capture using a Water-Lean Solvent Considering Transient Electricity Price for Multiple Regions

Global CO 2 emissions are increasing at about a 1.5% rate per year. Fossil fuel-based plants are one of the main contributors to this rise. In the power generation industry, fossil fuel plants are dominant, and many plants are under development. In this study, a natural gas combined cycle (NGCC) power plant with postcombustion capture using a leading water-lean solvent is considered. For optimal design and operating schedule, large-scale dynamic optimization is undertaken for net present value (NPV) optimization. The first principle dynamic model of NGCC is developed, including a model of the highly efficient H-class gas turbines. For computational tractability of the dynamic optimization problem, a reduced-order model is developed by using the Hankel singular value decomposition. A waterlean solvent, N-(2-ethoxyethyl)-3-morpholinopropan-1-amine, is used for carbon capture. A model of the capture system is developed in Aspen Plus, which is used to develop a reduced-order model by using ALAMO, a machine learning software. In addition, a reduced model of the CO 2 compression system with a dehydration unit is also considered. The integrated system is used for NPV optimization by using the Python-based PYOMO platform. The PCC process is analyzed for three configurations-conventional packed bed, rotating packed bed (RPB), and a combination of RPB and direct contact cooler. The NPV optimization is performed for 14 regional markets by considering year-long clustered and continuous locational marginal price data with a 1 h interval. Optimization results show that the PCC can achieve 90% CO 2 capture with a positive NPV for six regions. Sensitivity studies conducted by using the PCC configurations indicate that the process is economically feasible for 9 regions out of 14 regional electricity markets with NPV values in the range of 33−540 $MM.

cabon capture↗

Deep Reinforcement Learning for Residential HVAC Control with Consideration of Human Occupancy

The Artificial Intelligence (AI) development described herein uses model-free Deep Reinforcement Learning (DRL) to minimize energy cost during residential heating, ventilation, and air conditioning (HVAC) operation. Building cooling loads and HVAC operation are difficult to accurately model due to complexity, lack of measurements and data, and model specific performance, so online machine learning is used to allow for real-time readjustment in performance. Energy costs for the multi-zone cooling unit shown in this work are minimized by scheduling on/off commands around dynamic prices. By taking advantage of precooling events that take place when the price is low, the agent is able to reduce operational cost without violating user comfort. The DRL controller was tested in simulation where the learner achieved a 43.89% cost reduction when compared to traditional, fixed-setpoint operation. The system is now ready for the next phase of testing in a live, real-time home environment.

Mckee, Evan↗

Digital control of high performance aircraft using adaptive estimation techniques

In this paper, an adaptive signal processing algorithm is joined with gain-scheduling for controlling the dynamics of high performance aircraft. A technique is presented for a reduced-order model (the longitudinal dynamics) of a high performance STOL aircraft. The actual controller views the nonlinear behavior of the aircraft as equivalent to a randomly switching sequence of linear models taken from a preliminary piecewise-linear fit of the system nonlinearities. The adaptive nature of the estimator is necessary to select the proper sequence of linear models along the flight trajectory. Nonlinear behavior is approximated by effective switching of the linear models at random times, with durations reflecting aircraft motion in response to pilot commands.

Van Landingham, H. F.↗