Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Design for Manufacture and Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Design and Analysis of an Integrated Additively Manufactured Test Article for Plasma-Facing Components

Current plasma-facing components (PFCs) used in helium-cooled divertor modules are complex structures with tungsten tile, steel sleeve components, and cartridges, all assembled in a helium-cooled multiple jet (HEMJ) structure. The goal of this project is to simplify the complex PFC design using additive manufacturing techniques to create a single integrated tungsten test article. Apart from the flexibility this opens up in exploring a wide array of geometries for the article, having a single integrated article significantly reduces the number of joints and parts in the article, thus reducing chances of leaks. A process called electron beam melting has shown to produce very high-density samples and unique geometries, enabling HEMJ or similar designs. To validate and optimize this novel design, the model underwent a series of computational fluid dynamics and finite element analysis simulations to replicate steady-state heat flux in the divertors. The simulations presented in this study consider a steady-state base heat flux of 5 MW/m 2 , with water serving as the coolant. Future research will explore the use of helium as a coolant, simulate edge-localized-mode conditions, and include experimental validation. Since 3D-printed tungsten is anisotropic, the build direction versus build plane of the article are taken into consideration for the test article strength. Because of the high operating temperatures and low ductility of tungsten, thermal creep and brittle fracture are important failure mechanisms to consider. In conclusion, the cap is evaluated with various flow velocities and nozzle diameters, and an optimal design choice is made for which this cap will survive the divertor conditions with a conservative safety margin.

Divertor↗

The flexure assembly design for the SIRTF one-meter primary mirror

A titanium flexure assembly for the Space Infrared Telescope Facility (SIRTF) 1-m primary mirror has been designed to accommodate: (1) the cryogenic cool-down effect on the optical performance of the mirror, (2) the Shuttle launch-load environment, and (3) the support-baseplate manufacturing tolerances. Numerous iterations involving a multidimensional design space search led to an assembly design that provides the stiffness and strength in the vertical (optical axis) and tangential directions to accommodate launch loads, but is compliant radially to accommodate cryogenic cool down. A 'folded back' titanium flexure system was required because of the differential thermal contraction of the aluminum telescope baseplate support and the fused-silica mirror. This unique and innovative flexure assembly represents a totally passive mechanism for accommodating the design launch loads, cryogenic cool down, and out-of-plane baseplate effects.

Richard, R. M.↗

Update on Risk Reduction Activities for a Liquid Advanced Booster for NASA's Space Launch System

The stated goals of NASA's Research Announcement for the Space Launch System (SLS) Advanced Booster Engineering Demonstration and/or Risk Reduction (ABEDRR) are to reduce risks leading to an affordable Advanced Booster that meets the evolved capabilities of SLS; and enable competition by mitigating targeted Advanced Booster risks to enhance SLS affordability. Dynetics, Inc. and Aerojet Rocketdyne (AR) formed a team to offer a wide-ranging set of risk reduction activities and full-scale, system-level demonstrations that support NASA's ABEDRR goals. For NASA's SLS ABEDRR procurement, Dynetics and AR formed a team to offer a series of full-scale risk mitigation hardware demonstrations for an affordable booster approach that meets the evolved capabilities of the SLS. To establish a basis for the risk reduction activities, the Dynetics Team developed a booster design that takes advantage of the flight-proven Apollo-Saturn F-1. Using NASA's vehicle assumptions for the SLS Block 2, a two-engine, F-1-based booster design delivers 150 mT (331 klbm) payload to LEO, 20 mT (44 klbm) above NASA's requirements. This enables a low-cost, robust approach to structural design. During the ABEDRR effort, the Dynetics Team has modified proven Apollo-Saturn components and subsystems to improve affordability and reliability (e.g., reduce parts counts, touch labor, or use lower cost manufacturing processes and materials). The team has built hardware to validate production costs and completed tests to demonstrate it can meet performance requirements. State-of-the-art manufacturing and processing techniques have been applied to the heritage F-1, resulting in a low recurring cost engine while retaining the benefits of Apollo-era experience. NASA test facilities have been used to perform low-cost risk-reduction engine testing. In early 2014, NASA and the Dynetics Team agreed to move additional large liquid oxygen/kerosene engine work under Dynetics' ABEDRR contract. Also led by AR, the objectives of this work are to demonstrate combustion stability and measure performance of a 500,000 lbf class Oxidizer-Rich Staged Combustion (ORSC) cycle main injector. A trade study was completed to investigate the feasibility, cost effectiveness, and technical maturity of a domestically produced Atlas V engine that could also potentially satisfy NASA SLS payload-to-orbit requirements via an advanced booster application. Engine physical dimensions and performance parameters resulting from this study provide the system level requirements for the ORSC risk reduction test article. The test article is scheduled to complete critical design review this fall and begin testing in 2017. Dynetics has also designed, developed, and built innovative tank and structure assemblies using friction stir welding to leverage recent NASA investments in manufacturing tools, facilities, and processes, significantly reducing development and recurring costs. The full-scale cryotank assembly was used to verify the structural design and prove affordable processes. Dynetics performed hydrostatic and cryothermal proof tests on the assembly to verify the assembly meets performance requirements. This paper will discuss the ABEDRR engine task and structures task achievements to date and the remaining effort through the end of the contract.

Crocker, Andrew M.↗

Lightweight Thrust Chamber Assemblies using Multi-Alloy Additive Manufacturing and Composite Overwrap

Additive Manufacturing (AM) has brought significant design and fabrication opportunities for complex components with internal features such as liquid rocket engine thrust chambers not previously possible. This technology allows for significant cost savings and schedule reductions in addition to new performance optimization through weight reduction and increased margins. Specific to regeneratively-cooled combustion chambers and nozzles for liquid rocket engines, additive manufacturing offers the ability to form the complex internal coolant channels and the closeout of the channels to contain the high pressure liquid propellants with a single operation. Much of additive manufacturing development has focused on monolithic alloys using Laser Powder Bed Fusion (L-PBF), which do not allow for complete optimization of the structure. The National Aeronautics and Space Administration (NASA) completed feasibility of an AM bimetallic L-PBF GRCop-84 copper-alloy combustion chamber with an AM electron beam freeform Inconel 625 structural jacket under the Low Cost Upper Stage Propulsion (LCUSP) Project. A follow-on project called Rapid Analysis and Manufacturing Propulsion Technology (RAMPT) is under development to further expand large-scale multi-alloy thrust chambers while maturing composite overwrap technology for significant weight savings opportunities. The RAMPT project has three primary objectives: 1) Advancing blown powder Directed Energy Deposition (DED) to fabricate integral-channel large scale nozzles, 2) Develop composite overwrap technology to reduce weight and provide structural capability for thrust chamber assemblies, and 3) Develop bimetallic and multi-metallic additively manufactured radial and axial joints to optimize material performance. In addition to these primary manufacturing developments, analytical modeling efforts compliment the process development to simulate the AM processes to reduce build failures and distortions. The RAMPT project is also maturing the supply chain for various manufacturing processes described above in addition to L-PBF of GRCop-42. This paper will present an overview of the RAMPT project, the process development and hardware progress to date, material and hot-fire testing results, along with future developments.

Additive Manufacturing↗

Development of standardized specifications for silicon solar cells

A space silicon solar cell assembly (cell and coverglass) specification aimed at standardizing the diverse requirements of current cell or assembly specifications was developed. This specification was designed to minimize both the procurement and manufacturing costs for space qualified silicon solar cell assembilies. In addition, an impact analysis estimating the technological and economic effects of employing a standardized space silicon solar cell assembly was performed.

Scott-Monck, J. A.↗

An Example of Concurrent Engineering

The Collaborative Engineering Design and Analysis Room (CEDAR) facility allows on-the- spot design review capability for any project during all phases of development. The required disciplines assemble in this facility to work on any problems (analysis, manufacturing, inspection, etc.) associated with a particular design. A small highly focused team of specialists can meet in this room to better expedite the process of developing a solution to an engineering task within the framework of the constraints that are unique to each discipline. This facility provides the engineering tools and translators to develop a concept within the confines of the room or with remote team members that could access the team's data from other locations. The CEDAR area is envisioned as excellent for failure investigation meetings to be conducted where the computer capabilities can be utilized in conjunction with the Smart Board display to develop failure trees, brainstorm failure modes, and evaluate possible solutions.

Rowe, Sidney↗

Fabrication of a Liner Assembly for the MARVEL Microreactor

A liner assembly for an intermediate heat exchanger within the MARVEL microreactor at Idaho National Laboratory has been fabricated using laser-based additive manufacturing. The liner design includes challenging features such as long thin walls, overhangs, and tight geometric tolerances. Two versions of the liner assembly, one full length and the other shortened, were printed from several materials (316L SS, Inconel 625, and Inconel 718) using four powder-based laser printers (AddUp BeAM Modulo 400 DED, EOS 290M LPBF, GE Concept M2, and GE Concept Xline 2000R LPBF) located at the Manufacturing Demonstration Facility of Oak Ridge National Laboratory. Dimensional accuracy, print time, and powder utilization have been evaluated to help assess the feasibility of these AM approaches to liner fabrication. Based on this assessment, a potentially cost-effective pathway for fabrication has been proposed.

36 MATERIALS SCIENCE↗

A Magnetoresistive Heat Switch for the Continuous ADR

In compensated elemental metals at low temperature, a several Tesla field can suppress electronic heat conduction so thoroughly that heat is effectively carried by phonons alone. In approximately one mm diameter single crystal samples with impurity concentrations low enough that electron conduction is limited by surface scattering, the ratio of zerofield to high-field thermal conductivity can exceed ten thousand. We have used this phenomenon to build a compact, solid-state heat switch with no moving parts and no enclosed fluids. The time scale for switching states is limited by time scale for charging the magnet that supplies the controlling field. Our design and fabrication techniques overcome the difficulties associated with manufacturing and assembling parts from single crystal tungsten. A clear disadvantage of the magnetoresistive switch is the mass and complexity of the magnet system for the controlling field. We have discovered a technique of minimizing this mass and complexity, applicable to the continuous adiabatic demagnetization refrigerator.

Canavan, E. R.↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

Mechanical Design and Development of TES Bolometer Detector Arrays for the Advanced ACTPol Experiment

The next generation Advanced ACTPol (AdvACT) experiment is currently underway and will consist of four Transition Edge Sensor (TES) bolometer arrays, with three operating together, totaling 5800 detectors on the sky. Building on experience gained with the ACTPol detector arrays, AdvACT will utilize various new technologies, including 150 mm detector wafers equipped with multichroic pixels, allowing for a more densely packed focal plane. Each set of detectors includes a feedhorn array of stacked silicon wafers which form a spline pro le leading to each pixel. This is then followed by a waveguide interface plate, detector wafer, back short cavity plate, and backshort cap. Each array is housed in a custom designed structure manufactured from high purity copper and then gold plated. In addition to the detector array assembly, the array package also encloses cryogenic readout electronics. We present the full mechanical design of the AdvACT high frequency (HF) detector array package along with a detailed look at the detector array stack assemblies. This experiment will also make use of extensive hardware and software previously developed for ACT, which will be modi ed to incorporate the new AdvACT instruments. Therefore, we discuss the integration of all AdvACT arrays with pre-existing ACTPol infrastructure.

Advanced ACTPol (AdvACT)↗

IER 516 - Zirconium Test Assembly (ZTA) Preliminary Experimental Design [Slides]

Zirconium present in large quantities in criticality safety applications such as fuel manufacturing and processing facilities, and in commercial thermal nuclear reactors. ICSBEP lacks benchmarks optimized for zirconium sensitivity to validate zirconium evaluations. Evaluators lack isotopic differential nuclear data in regions of high importance to fission systems.

K-PSO 2.0↗

Perspectives on three-dimensional printing of self-assembling materials and structures

Spiders, silks, and webs are marvels of nature that have inspired high-performance material design, resilient structural design, and innovative manufacturing in the materials science and engineering fields. In this article, we review the roles and mechanisms of self-assembly and spinning processes for making hierarchical structures of synthetic and natural fibers with multifunctionality. We discuss the ability of spider webs to maintain their functionality under construction while withstanding predator, human, and environmental threats, which comes from their self-assembled structures from nanoscales to macroscales. We conclude by exploring the future of novel mobile, autonomous, time- and cost-effective spider-inspired three-dimensional printing technology for making resilient biomaterials, structures, and synthetic silk materials.

42 ENGINEERING↗

Lessons learned for composite structures

Lessons learned for composite structures are presented in three technology areas: materials, manufacturing, and design. In addition, future challenges for composite structures are presented. Composite materials have long gestation periods from the developmental stage to fully matured production status. Many examples exist of unsuccessful attempts to accelerate this gestation period. Experience has shown that technology transition of a new material system to fully matured production status is time consuming, involves risk, is expensive and should not be undertaken lightly. The future challenges for composite materials require an intensification of the science based approach to material development, extension of the vendor/customer interaction process to include all engineering disciplines of the end user, reduced material costs because they are a significant factor in overall part cost, and improved batch-to-batch pre-preg physical property control. Historical manufacturing lessons learned are presented using current in-service production structure as examples. Most producibility problems for these structures can be traced to their sequential engineering design. This caused an excessive emphasis on design-to-weight and schedule at the expense of design-to-cost. This resulted in expensive performance originated designs, which required costly tooling and led to non-producible parts. Historically these problems have been allowed to persist throughout the production run. The current/future approach for the production of affordable composite structures mandates concurrent engineering design where equal emphasis is placed on product and process design. Design for simplified assembly is also emphasized, since assembly costs account for a major portion of total airframe costs. The future challenge for composite manufacturing is, therefore, to utilize concurrent engineering in conjunction with automated manufacturing techniques to build affordable composite structures. Composite design experience has shown that significant weight savings have been achieved, outstanding fatigue and corrosion resistance have been demonstrated, and in-service performance has been very successful. Currently no structural design show stoppers exist for composite structures. A major lesson learned is that the full scale static test is the key test for composites, since it is the primary structural 'hot spot' indicator. The major durability issue is supportability of thin skinned structure. Impact damage has been identified as the most significant issue for the damage tolerance control of composite structures. However, delaminations induced during assembly operations have demonstrated a significant nuisance value. The future challenges for composite structures are threefold. Firstly, composite airframe weight fraction should increase to 60 percent. At the same time, the cost of composite structures must be reduced by 50 percent to attain the goal of affordability. To support these challenges it is essential to develop lower cost materials and processes.

Whitehead, R. S.↗

An Experimental Investigation of Leak Rate Performance of a Subscale Candidate Elastomer Docking Space Seal

A novel docking seal was developed for the main interface seal of NASA s Low Impact Docking System (LIDS). This interface seal was designed to maintain acceptable leak rates while being exposed to the harsh environmental conditions of outer space. In this experimental evaluation, a candidate docking seal assembly called Engineering Development Unit (EDU58) was characterized and evaluated against the Constellation Project leak rate requirement. The EDU58 candidate seal assembly was manufactured from silicone elastomer S0383-70 vacuum molded in a metal retainer ring. Four seal designs were considered with unique characteristic heights. The leak rate performance was characterized through a mass point leak rate method by monitoring gas properties within an internal control volume. The leakage performance of the seals were described herein at representative docking temperatures of -50, +23, and +50 C for all four seal designs. Leak performance was also characterized at 100, 74, and 48 percent of full closure. For all conditions considered, the candidate seal assemblies met the Constellation Project leak rate requirement.

Garafolo, Nicholas G.↗

Composite Bus Structure for the SMEX/WIRE Satellite

In an effort to reduce the weight and optimize the structural design of the Small Explorer (SMEX) Wide-Field Infrared Explorer (WIRE) spacecraft, it has become desirable to change the material and construction from mechanically fastened aluminum structure to a fully bonded fiber-reinforced composite (FRC) structure. GSFC has developed the WIRE spacecraft structural bus design concept, including the instrument and launch vehicle requirements. The WIRE Satellite is the fifth of a series of SMEX satellites to be launched once per year. GSFC has chosen Composite Optics Inc. (COI) as the prime contractor for the development and procurement of the WIRE composite structure. The detailed design of the fully bonded FRC structure is based on COI's Short Notice Accelerated Production SATellite ("SNAPSAT") approach. SNAPSAT is a state of the art design and manufacturing technology for advanced composite materials which utilizes flat-stock detail parts bonded together to produce a final structural assembly. The structural design approach adopted for the WIRE structure provides a very viable alternative to both traditional aluminum construction as well as high tech. molded type composite structures. This approach to composite structure design is much less costly than molded or honeycomb sandwich type composite construction, but may cost slightly more than conventional aluminum construction on the subsystem level. However on the overall program level the weight saving achieved is very cost effective, since the primary objective is to allocate more mass for science payloads.

Rosanova, Giulio G.↗

SBASI: Actuated pyrotechnic time delay initiator

A precision pyrotechnic time delay initiator for missile staging was developed and tested. Incorporated in the assembly is a single bridgewire Apollo standard initiator (SBASI) for initiation, a through-bulkhead-initiator to provide isolation of the SBASI output from the delay, the pyrotechnic delay, and an output charge. An attempt was made to control both primary and secondary variables affecting functional performance of the delay initiator. Design and functional limit exploration was performed to establish tolerance levels on manufacturing and assembling operations. The test results demonstrate a 2% coefficient of variation at any one temperature and an overall 2.7% coefficient of variation throughout the temperature range of 30 to 120 F. Tests were conducted at simulated operational altitude from sea level to 200,000 feet.

Salter, S. J.↗

Development and fabrication of a solar cell junction processing system

Modifications to the ground plane, to insure a good electrical return path during the pulse discharge, were made using a ring of beryllium copper finger stock attached to the underside of the aluminum ground plate. Experiments on annealing of wafers with ion implantation damage continued. The entire surface of 100 mm diameter wafers were annealed by one pulse for the standard implant (10 keV, phosphorus, 2x10 to the 15th power ions/sq cm). While samples are being fabricated into solar cells for electrical characterization, work is continuing on improvement of the electron beam uniformity and the optimization of the diode parameters. The engineering design was completed and the manufacturing detail drawings were released for fabrication. Assembly of the subcomponents for the exit and entrance locks is almost complete. These components include the cassettes, the indexing mechanisms, main doors, and wafer carrier transfer modules. The 'Y' track and three phase transition track sections are under final assembly and test.

Giesling, R.↗