Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DOE contractors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

2023 Annual Site Environmental Report for Sandia National Laboratories, Tonopah Test Range, Nevada

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the contract and oversees contractor operations at Sandia National Laboratories, Tonopah Test Range. Activities at the site are conducted in support of U.S. Department of Energy weapons programs and have operated at the site since 1957. The U.S. Department of Energy and its management and operating contractor are committed to safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report. This report summarizes the environmental protection, restoration, and monitoring programs in place at Sandia National Laboratories, Tonopah Test Range during calendar year 2023. Environmental topics include cultural resource management, chemical management, air quality, ecology, environmental restoration, oil storage, site sustainability, terrestrial surveillance, waste management, water quality, wastewater discharge, and implementation of the National Environmental Policy Act. This report is prepared in accordance with and as required by DOE O 231.1B, Admin Change 1, Environment, Safety and Health Reporting, and has been approved for public distribution.

54 ENVIRONMENTAL SCIENCES↗

2023 Annual Site Environmental Report for Sandia National Laboratories, Kaua‘i Test Facility, Hawai‘i

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the contract and oversees contractor operations at the Sandia National Laboratories Kaua‘i Test Facility in Hawai‘i. Activities at the site are conducted in support of U.S. Department of Energy weapons programs, and the site has operated as a rocket preparation launching and tracking facility since 1962. The U.S. Department of Energy and its management and operating contractor are committed to safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report. This report summarizes the environmental protection, restoration, and monitoring programs in place at Sandia National Laboratories, Kaua‘i Test Facility, during calendar year 2023. Environmental topics include cultural resource management, chemical management, air quality, meteorology, ecology, oil storage, site sustainability, terrestrial surveillance, waste management, water quality, wastewater discharge, and implementation of the National Environmental Policy Act. This report is prepared in accordance with and as required by DOE O 231.1B, Admin Change 1, Environment, Safety and Health Reporting, and has been approved for public distribution.

54 ENVIRONMENTAL SCIENCES↗

Tools And Methods to Analyze Plant Outage Schedule and Assist Schedulers in Improving Outage Resilience

Refueling outages of nuclear power plants (NPPs) are considered one of the most critical phases throughout the plant lifetime. In such instances, tens of thousands of activities (e.g., maintenance, surveillance) are performed in a short amount of time (typically 2-3 weeks unless major backfitting or modernization projects are carried out) by a large number of crews (e.g., electricians, mechanics) that are hired as contractors. As a consequence, a plant outage can be expensive not only in terms of costs (e.g., contractor labor, material), but also in terms of loss generation since the plant is taken off the grid during the full outage duration (an indicative metric is about 1.2M$/day of loss of revenue). Thus, there is a continuous need to decrease the economic impact of outages on plant finances. This can be done by: decreasing the frequency of plant outages (e.g., from 18 to 24 months), reducing the time to complete the outage, and reducing the risk of outage delays. The Optimization of Outage Activities project under the Risk Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program focuses on developing tools and methods to support NPPs with outage schedule optimization. The developed tools and methods are designed to analyze plant outage schedule with the goal of identify critical elements in the schedule that might pose a high risk of delays. These methods and tools can be considered resource-centric in the sense that they address outage challenges as a resource optimization problem. In this context, resources are either time and crews; outage delays occurs when either (or both) resources are insufficient to complete the set of tasks assigned at a specific time instant of the outage. This report provides details on how plant resources (time and crews) can be allocated in such a way that delays are minimized. In this respect, two classes of methods have been developed: the first one focuses on the time resource and how variability of the time to complete outage tasks may impact outage delays. The second one integrates available resources to assess when dailies activities should be performed such that the risk of outage delays are minimized.

97 MATHEMATICS AND COMPUTING↗

Scalable Fabrication of a Fibrous Amine-functionalized Matrix (FAM) Sorbent for Critical Mineral Recovery

We report a novel flat sheet Fibrous Amine-functionalized Matrix (FAM) sorbent platform designed for efficient and selective capture of CM from dilute solutions. The FAM sorbent features crosslinked amine microfilms coated onto/within a glass fiber matrix, providing fast mass transfer and excellent mechanical stability. Systematic batch and flow-through tests with FAM revealed rapid metal uptake kinetics and high capacity for representative species, achieving ~90 mg/g of Gallium, ~100 mg/g of Cobalt, and ~90 mg/g for Neodymium. Moreover, multiple eluents, including mineral acids and complexing agents, enabled highly effective desorption of adsorbed metals, demonstrating the feasibility of regenerating FAM sorbents. Importantly, tests with authentic coal ash leachate demonstrated strong selectivity toward U.S. Department of Energy (DOE)-listed CM and rare earth elements over abundant base cations, confirming the robustness of FAM in realistic complex solutions. The flat sheet geometry was amenable to scaling into durable spiral wound modules, highlighting the potential for future regeneration and reuse. This work establishes FAM sorbents as a promising platform for the recovery of CM from wastewaters, advancing both resource sustainability and environmental stewardship.

critical mineral recovery↗

Geospatial and Information Substitution and Anonymization Tool (GISA)

The Geospatial and Information Substitution and Anonymization Tool (GISA) incorporates techniques for obfuscating identifiable information from point data or documents, while simultaneously maintaining chosen variables to enable future use and meaningful analysis. This approach promotes collaboration and data sharing while also reducing the risk of exposure to sensitive information. GISA can be used in a number of different ways, including the anonymization of point spatial data, batch replacement/removal of user-specified terms from file names and from within file content, and aid with the selection and redaction of images and terms based on recommendations using natural language processing. Version 1 of the tool, published here, has updated functionality and enhanced capabilities to the beta version published in 2023. Please see User Documentation for further information on capabilities, as well as a guide for how to download and use the tool. If there are any feedback you would like to provide for the tool, please reach out with your feedback to edxsupport@netl.doe.gov. Disclaimer: This project was funded by the United States Department of Energy, National Energy Technology Laboratory, in part, through a site support contract. Neither the United States Government nor any agency thereof, nor any of their employees, nor the support contractor, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. The Geospatial and Information Substitution and Anonymization Tool (GISA) was developed jointly through the U.S. DOE Office of Fossil Energy and Carbon Management’s EDX4CCS Project, in part, from the Bipartisan Infrastructure Law.

Bipartisan Infrastructure Law↗

Energy Savings With Acceptable Indoor Air Quality Through Improved Airflow Control in Residential Retrofits

The Partnership for Advanced Residential Retrofit (PARR) has been a U.S. Department of Energy (DOE) Building America team since 2009, with a primary focus on upgrading the performance of existing buildings to reduce energy loads. In this project, PARR’s work explored the integration of airflow-focused measures in residential retrofit homes with the goal to maximize energy savings while ensuring acceptable indoor air quality (IAQ) using a systems approach to controlling four contributing air streams: • Building air leakage (natural, uncontrolled infiltration), • Forced-air distribution system static pressure and airflow rate, • Distribution system duct leakage, and • Mechanical ventilation. This project addressed airflows in houses, their combined impact on energy use and IAQ, and the comparative effects of typical insulation and air sealing practices versus integrated system-level retrofits. Additionally, practical considerations for contractors taking either approach were addressed. Finally, the effects of supply ventilation and exhaust ventilation on IAQ were compared in occupied homes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Underground Test Area (UGTA) Sampling Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada National Security Site, Nevada

The purpose of this groundwater sampling plan (referred to herein as “the Plan”) is to describe the approach for collecting and analyzing groundwater samples to meet the objectives of the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity. The Plan is focused on the Central and Western Pahute Mesa corrective action units (CAUs 101 and 102). The remaining UGTA CAUs are in the final stage of the UGTA strategy (Closure Report [CR] stage), and monitoring requirements for these CAUs are described in their respective CRs. The Plan supersedes the Nevada National Security Site Integrated Groundwater Sampling Plan and its ensuing Record of Technical Change (ROTC) (DOE/EMNV, 2019b). The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) and its ensuing ROTC (DOE/EMNV, 2018), and the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). The Plan is implemented by the Environmental Program Services (EPS) contractor. Implementation of the Plan provides data to complete corrective actions prescribed by the FFACO to protect the public from groundwater contaminated by historical underground nuclear testing. The Plan’s scope comprises sample collection and analysis requirements for assessing the extent of groundwater contamination from underground nuclear testing. Sampling wells located in the communities surrounding the Nevada National Security Site (NNSS) is performed by other organizations (e.g., management and operating [M&O] contractor) and is therefore not included within the Plan. The results of the community sampling are presented in the annual NNSS environmental reports.

54 ENVIRONMENTAL SCIENCES↗

NETL LCA Update: Recent Highlights

The presentation was an update on impactful work completed by the NETL LCA Team during the past year. This presentation was part of a special session where DOE national laboratories are sharing updates on their LCA work. In addition to NETL, the session included presentations from Argonne National Laboratory, Lawrence Berkeley National Laboratory, the National Renewable Energy Laboratory, and the Pacific Northwest National Laboratory. This presentation from NETL includes updates on the Natural Gas Baseline, the Electricity Baseline, and Critical Mineral Collaborations/METALLIC. The figures are generally high level diagrams illustrating the scope and workflow for projects and are generally pulled from already public materials and published work.

critical minerals↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Roll to Roll (R2R) Manufacturing of Electrolysis Electrodes for Low Cost Hydrogen Production: Cooperative Research and Development Final Report, CRADA Number CRD-18-00780

NREL, Argonne National Laboratory (ANL) and Oak Ridge National Laboratory (ORNL), which are also referred to collectively herein as the "Contractors" will perform electrode ink development and characterization, focusing on 1) inks with appropriate properties for R2R (gravure and slot-die) coating onto PFSA membrane and 2) catalysts suitable for electrolysis. Participant will develop acceptance criteria and characterization methods for direct coating on the membrane. The purpose of this project is to show feasibility for cost reduction of the electrode through increased throughput and improved material utilization. Successful completion of this project will result in more affordable hydrogen production via proton exchange membrane (PEM) electrolysis by substantially reducing the anode precious metal content and catalyst-coated membrane processing costs. Assists laboratory in achieving programmatic scope, adds new capability to the laboratory's core competencies. This project uses and enhances the laboratory's core competencies, and enhances U.S. competitiveness by utilizing DOE developed intellectual property and/or capabilities. This project will benefit the Fuel Cell subprogram within the EERE Fuel Cell Technologies Office (FCTO) by actively developing materials, formulations, components, and processes for PEM electrolyzer stacks for overcoming critical technical barriers to widespread hydrogen production for zero-emission transportation applications. Through this JWS, NREL, ANL and ORNL are assisting a key domestic industry partner, Proton Energy Systems, Inc., in the area of low-cost electrolyzer electrode formulation and coating technology. After completion of this project, NREL, ANL and ORNL will be able to verify whether the direct deposit coating processes investigated are suitable for producing CCMs for PEM electrolyzers, which is of great interest and benefit to the DOE EERE Fuel Cell Technologies Office (FCTO) and H2@Scale missions.

08 HYDROGEN↗

System Health and Status Reporting is Used to Improve Infrastructure Systems at the Hanford Site - 20449

Reliable physical infrastructure systems are vital to completing the clean-up mission and the start-up and commissioning of new nuclear waste processing facilities at the Hanford Site. Key infrastructure systems at Hanford include water, sewer, and electrical utilities, roads, telecommunications/network systems, and fire systems. All of the infrastructure systems are non-nuclear, General Service systems that are being maintained under formal engineering configuration control and none are specifically credited in any documented safety analysis (DSA). Starting in calendar year 2017, the Hanford Site's infrastructure and services contractor started producing system health and status reports for a total of 15 critical infrastructure systems as means to get a better understanding of each system's health and how it could be improved to ensure better and more reliable service delivery. As the reporting, tracking, and use of the metrics has matured, the number of systems for which reports are being developed has been expanded to a total of 23. Each of the critical infrastructure systems are assigned primary and alternate design authorities that complete qualifications on each assigned system. The design authorities actively manage and maintain configuration control on each of their systems and track metrics associated with availability, maintenance (corrective and preventive), and configuration of the technical baseline. The metrics are based on the principles established in Chapter V of DOE O 420.1C, Facility Safety, [1] and have been tailored as appropriate to each of the key infrastructure systems. An overall assessment of system health is performed and documented on a routine basis (e.g., quarterly). Included in this documentation is a quantitative score for each of the metrics (i.e., availability, maintenance, configuration management) along with results of system walk-downs, description of any permanent design modifications, identification of new or emerging issues and vulnerabilities affecting the system, and an assessment by the design authority of actions necessary to improve the system health score. The overall status scores are calculated using a formula and based on a pre-determined grading scale, a color is assigned for simple presentation. The information gained from developing the reports is being used to (1) assist with making timely and better informed decisions through the use of solid technical bases that are increasing the overall reliability and capabilities of the Site's infrastructure systems as new expense and capital projects in the Reliability Projects Investment Portfolio (RPIP) are prioritized and executed; (2) feed the risk management program, and (3) integrate the technical content of Master Plans that describe the Site's needs for the system and the system's capabilities to meet those future needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Saving Estimation of ASHRAE Guideline 36 Supervisory Setpoint Reset Controls in a Commercial Large Office Building

Designing, commissioning, and retrofitting HVAC control systems for energy efficiency is crucial, but the use of ad-hoc control sequences by designers and contractors, based on scattered information, results in diverse and sub-optimal sequences. ASHRAE Guideline 36 (G36) addresses the challenge by providing standardized, rule-based HVAC control sequences that prioritize energy efficiency. However, there is limited evaluation of their energy performance at the building level, with only a few studies primarily focused on HVAC airside systems in small-to-medium-sized commercial buildings. In this study, the energy performance of ASHRAE Guideline 36 control sequences was assessed using a large office building emulator in Chicago. The emulator features a central plant system with multiple chillers and boilers as well as multiple variable air volume (VAV) systems with terminal reheat. To achieve a high-fidelity representation, we developed a Spawn-of-EnergyPlus-based model for the large office building, maintaining the DOE prototype large office building setup but substituting the HVAC system with its Modelica counterpart. This substitution ensures that the building thermal load, HVAC system's dynamics, and detailed control sequences are all accurately represented. The study involved evaluating and implementing control strategies outlined in ASHRAE Guideline 36-2021 to replace conventional controls. These strategies include the demand-based supply air temperature and duct static pressure setpoint reset and the request logic for demand-based reset of chilled/hot water supply temperature setpoints and pipe static pressure setpoints. Energy performance was evaluated under various load conditions, including cooling, heating, and transitional seasons, both for individual control strategies and in combination. The results indicate that the collective control strategies retrofit yield greater energy savings than the sum of individual strategies, highlighting the synergistic benefits of incorporating both airside and plant-side control retrofits. Additionally, energy savings of up to 41% in the heating season, 18% in the shoulder season, and 20 % in the cooling season were observed compared to baseline control while maintaining the thermal comfort level.

ASHRAE Guideline 36, Commercial buildings, Control↗

Finding of No Adverse Effect for the Façade Alteration of Building 23-117, Administration Building, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to update the façade of Building 23-117 in the town of Mercury (Nevada State Historic Preservation Office [SHPO] Resource No. B15256), which is on the Nevada National Security Site (NNSS) in Nye County, Nevada. The purpose of the undertaking is to incorporate Building 23-117 into the new Mercury campus in accordance with the master plan for the modernization of Mercury. The NNSA/NFO will implement this undertaking in accordance with the Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada, hereafter referred to as the Mercury PA. Building 23-117 was built in 1982 as the architect-engineer Administration Building1 for Holmes & Narver, a government contractor who helped design and engineer the town of Mercury and other areas on the NNSS from its inception until the termination of their contract in 1990. The building continued to be used by subsequent government contractors and is currently still in use by MSTS. The town of Mercury and the immediate surrounding area have been formally determined eligible for listing in the National Register of Historic Places (National Register, NRHP) as the Mercury Historic District (MHD, SHPO Resource No. D230) under Criteria A and C for its importance in supporting nuclear testing and scientific research from 1951 through 1992. Building 23-117 was identified as a contributing element to the MHD in a 2018 architectural survey of the district (Reno et al.) and recorded on a Nevada Architectural Resource Assessment (ARA) form (Reno et al. 2017). It is a historic property for the purposes of compliance with Section 106 of the National Historic Preservation Act (NHPA) and is subject to the stipulations of the Mercury PA. The NNSA/NFO requested that Desert Research Institute (DRI), cultural resource subject matter experts, analyze the effects of the proposed project on historic properties in the Area of Potential Effect (APE) and make a recommended finding for the undertaking in accordance with Section 106 of the NHPA and the Mercury PA. The purpose of this letter report is to submit documentation related to the mitigation of the façade alteration of Building 23-117 (Nevada State Historic Preservation Office [SHPO] Resource No. B15256) in the Mercury Historic District (MHD, SHPO Resource No. D230). This submission is intended to comply with the stipulations in the Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site at Mercury in Nye County, Nevada, hereafter referred to as the Mercury PA.

54 ENVIRONMENTAL SCIENCES↗

NASA Glenn Research Center Support of the ASRG Project

A high efficiency radioisotope power system is being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company (LMSSC) to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with DOELockheed Martin to produce ASC-F flight units, and one with GRC for the production of ASC-E3 engineering unit pathfinders that are built to the flight design. In support of those contracts, GRC provided testing, materials expertise, government furnished equipment, inspections, and related data products to DOELockheed Martin and Sunpower. The technical support includes material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests have been performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests have been used to characterize performance under operating conditions that are representative of various mission conditions. Technology transfers enhanced contractor capabilities for specialized production processes and tests. Despite termination of flight ASRG contract, NASA continues to develop the high efficiency ASC conversion technology under the ASC-E3 contract. This paper describes key government furnished services performed for ASRG and future tests used to provide data for ongoing reliability assessments.

Technology Transfer↗

Residential Façade Upgrades: Market Assessment and Recommendations

In support of DOE’s move toward transformational whole-building upgrades and enclosure solutions, the Pacific Northwest National Laboratory (PNNL) and National Renewable Energy Laboratory (NREL) are partnering and collaborating with leading building science researchers and home-performance entities to identify and characterize technical and economic barriers to façade retrofits in an effort to identify market-viable façade solutions and opportunities for an actionable plan to transform the market. The project includes partnerships with Building Science Corporation (BSC) and a combination of strategic implementation partners with home-performance and retrofit expertise and industry contacts. The project will include expert advisory and review consultation from Lawrence Berkeley National Laboratory’s (LBNL’s) Residential Windows & Attachments team and Oak Ridge National Laboratory’s Building Envelope team. The project consists of three parts: 1. a market analysis that captures the current state of the façade retrofit market and includes housing characteristics and retrofit costs, façade retrofit approaches and materials, contractor business models and workforce requirements to support advanced façade approaches; 2. an economic analysis focused on the viability of advanced façade retrofit approaches and materials; and 3. field demonstration of façade retrofits that include enhanced insulation/air-sealing and window technologies in multiple climate zones. This report represents the market analysis, as outlined in item 1 above. The goal of this analysis is to provide a techno-economic study that supports comprehensive retrofits of residential enclosures that include traditional approaches, and integrated wall assemblies and windows that result in durable, energy efficient, and marketable strategies. This study will provide a better knowledge base regarding the viable market for façade retrofit strategies, identify the barriers to uptake, analyze economic opportunities, and develop documentation specifically aimed to overcome technical and market barriers associated with installation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

DOE Hanford Tank Side Cesium Removal System (TSCR) Update: Fabrication and Factory Acceptance Testing - 20300

The Tank Side Cesium Removal (TSCR) System is a modular, quickly-deployable, and passively safe system for efficiently removing solids and cesium from alkaline liquid waste raffinate created by fuel processing on the Hanford site. This paper provides an overview of the project with particular emphasis on completion of fabrication and factory acceptance testing (FAT). All TSCR System components are inside three enclosures known as the Process Enclosure, Ancillary Enclosure, and Control Enclosure. The Process Enclosure is seismic design category II (SDC-II) and built to withstand the rigors of transportation and lifting, high winds, volcanic ash fall, and heavy precipitation (snow) over a temperature range of -25 to 115 deg. F. The Process Enclosure and Control Enclosure were fabricated in AVANTech's Columbia, SC facility, while the Ancillary Enclosure was fabricated in AVANTech's Richland, WA facility. The design and preliminary documented safety analysis were completed in December 2019, with all work being performed in accordance with ASME NQA-1 quality assurance requirements. The Process Enclosure, Ion Exchange Columns (IXCs), and several other TSCR components have a nuclear safety function and are designated as safety significant structures, systems, and components (SS-SSCs). The NQA-1 Commercial Grade Dedication (CGD) process was used to identify critical characteristics in order to accept materials and items used for fabrication of several safety significant TSCR components. This paper also addresses unique aspects and challenges of implementing CGD in DOE facilities and systems. After fabrication and preliminary testing, the Process and Control Enclosures were shipped to AVANTech's Richland facility where the complete TSCR System was setup and connected in a represented layout and configuration that will be used on the Hanford site. Test tanks and pumps were put in place and connected to the TSCR Process Enclosure in a manner that mimicked interfacing Double Shell Tanks in the 241-AP Tank Farm. The TSCR System was then tested/operated under conditions equivalent to those planned for onsite operation. Testing was separated into five separate phases as defined below: - Phase 1: Confirmation of TSCR System readiness for the FAT; - Phase 2: Verification of TSCR System operation under standard conditions; - Phase 3: Demonstration of TSCR System operation under non-standard conditions; - Phase 4: Demonstration of ion exchange media removal from an IXC; and - Phase 5: Completion of TSCR System lift plans and site mobilization. The Hanford Tank Operations Contractor, Washington River Protection Solutions (WRPS), participated in all phases of testing. Testing at AVANTech's Richland Facility allowed WRPS personnel to familiarize themselves with TSCR operations in a radiologically clean facility prior to onsite mobilization. Engineering and operations personnel gained valuable experience that allowed them to better refine onsite operational protocols and procedures - including handling and movement of IXCs with a forklift. This paper describes the technologies used by the TSCR System as well as how these technologies are deployed and operated to advance the Hanford mission of safely, efficiently, and effectively treating tank waste. It also provides detailed information on fabrication and FAT, including operational data from simulated tank waste runs. A project schedule for WRPS' planned construction acceptance testing, operational acceptance testing, and actual tank waste treatment is provided. This presentation should be of great interest to parties responsible for the design, testing, and mobilization of modular NQA-1 technologies for the treatment of raffinate and similar liquid wastes containing high concentrations of radioactive cesium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantum Computing and Simulations for Energy-Related Applications

Quantum Information Science (QIS) is an emerging field that has the potential to cause revolutionary advances in many areas of science and engineering, and nations around the world are vying for dominance in the field. To support DOE urgent task to make sure the U.S. wins the quantum race, in Spring of 2019 NETL started to establish and maintain QIS competency by focusing on energy-related applications. After more than five years’ hard-working, NETL QUEST (quantum for energy systems & technologies) team has made great progress on quantum sensing and quantum computing for energy applications. Significant outcomes have been achieved. To report our research progress and to propose new research directions, in this presentation at the American Physical Society (APS) annual meeting, I'm highlighting the progress of QUEST team on quantum computing for energy-related applications.

quantum computing↗

Hanford Immobilized Low-Activity Waste Transportation System Testing Results - 20043

The immobilized low-activity waste (ILAW) transportation system is a first-of-a-kind system that is being designed and tested to transport ILAW glass-filled containers from Hanford's Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility to the Integrated Disposal Facility (IDF) burial trench for permanent disposal. A prototype design and fabrication of one transport trailer and four engineered ILAW pallets was completed in mid-2018. Prototype qualification testing to verify adequacy of the design was completed in 2019 by Washington River Protection Solutions (WRPS) and affiliate ATKINS SNC-Lavalin Group. Prototype testing was completed to advance design maturation across all operational and facility interfaces, and under adverse environmental and operating conditions, including thermal assessment of the system at peak projected temperatures. Test design, observation, and feedback was well represented and supported by all ILAW Transportation System interfacing organizations: WTP constructor Bechtel National, Inc.; IDF operator CH2M (CHPRC); transportation contractor Mission Support Alliance (MSA); the U. S. Department of Energy Richland Operations Office (DOE/RL) and Office of River Protection (DOE/ORP); and Washington State Department of Ecology. This paper presents the results of prototype qualification testing and opportunities for design improvements based on testing. Changes to the final design as a result of prototype testing include improvements in safety, ergonomics, operational flexibility, and As-Low-As-Reasonably-Achievable (ALARA) applications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗