Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DISPATCHES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

The value of hydropower flexibility for electricity system decarbonization

Hydropower is an abundant, dispatchable, clean energy resource that will play an important role in supporting the clean energy transition. In particular, dispatchable hydropower can provide the operational flexibility that will be required in future systems with high variable renewable energy penetrations. However, the theoretical operational flexibility of hydropower can be restricted in practice by various non-power constraints. In this paper, we quantify how increasing the operational flexibility of dispatchable hydropower resources with reservoirs impacts least-cost generation portfolios and supports power system decarbonization. Specifically, we conduct a capacity expansion analysis of a two-zone system: a hydro-dominated region and a neighboring region with aggressive decarbonization targets that are represented by the United States Pacific Northwest and California respectively. We then introduce a quantifiable index for characterizing the operational flexibility of reservoir hydropower and assess how changes in this metric impact the system-optimal generation portfolio. We find that increasing hydropower flexibility leads to more investment in wind generation, less investment in natural gas generation, lower system costs, and lower system emissions. We further demonstrate a substitution effect between the grid services provided by flexible hydropower operation, increased transmission capacity on a congested line, and energy storage resources. Finally, we show that increasing the operational flexibility of hydropower increases the effective load carrying capability of both hydropower and wind resources. This research supports a more nuanced understanding of how hydropower can support electricity system decarbonization and may motivate reassessing the cost-benefit tradeoffs of non-power constraints that restrict operational flexibility.

Capacity expansion modeling↗

Hydropower operation in future power grid with various renewable power integration

Hydropower generation may play an increasingly important role in the power grid under increasing contribution of variable renewable sources such as wind and solar. An improved understanding of the changes to hydropower dispatch under future higher VRE grid conditions reveals research gap that should be informed power grid planning and reservoir water releases policies considering multiple other water uses and varying hydrologic condition. Here this study aims to understand the role of hydropower in a changing power grid by employing a production cost model, PLEXOS, across future power system scenarios, planning horizons, and regions. We explore optimized hydropower dispatch to understand its potential role in minimizing the system cost and renewable curtailment. We also examine the sensitivity of hydropower revenue under various grid scenarios of the Eastern U.S. and hydrology conditions. Results indicate hydropower generation follows net load and compensates for the variability of solar and wind generation. Although energy prices are lower during some periods in the future grid scenarios, there is a potential for higher revenue for hydropower by providing both energy and ancillary services during times of stress. Additionally, hydropower revenue is sensitive to hydrology in the SERC region, which we considered as an example. The feasibility of hydropower dispatching with higher ramps between low and high hourly-capacity factors, as indicated in the optimization model, requires further study to consider other water use and ecology constraints.

13 HYDRO ENERGY↗

Integration of Storage in the DC Link of a Full Converter-Based Distributed Wind Turbine

Energy storage is known to support the dispatchability of variable renewable resources. In this paper, we model a battery energy storage system (BESS) integrated with the DC link of a Type IV full converter-based wind turbine and the necessary controls to achieve efficient dispatch. To support the validation of control methodologies, we build a detailed model of a Type IV research wind turbine at the National Renewable Energy Laboratory (NREL), the Controls Advanced Research Turbine (CART 3), and we integrated a lithium-ion BESS model in grid-following mode into the model. The simulation results illustrate the sizing and control of the DC link-integrated BESS for a given variable wind resource and varying dispatch strategies (i.e., under constant, uncertain, and ramping wind scenarios). The integrated storage can smooth variabilities in distributed wind output, hedge against uncertainties, provide the ramping capability, as well as support stability under voltage and frequency transients. All of these have been illustrated in MATLAB/Simulink.

DC-link voltage↗

A Modified Maximum Entropy Inverse Reinforcement Learning Approach for Microgrid Energy Scheduling

Increasing popularity of integrating distributed energy resources (DERs) into the power system brings a challenge to optimize the microgrid dispatch policy. The reinforcement learning methods suffer from a long-time problem with the theoretical assumption of the objective/reward function for the microgrid system. Although the traditional inverse reinforcement learning (IRL) approaches can solve this problem to some extent, they encounter a limitation of complex computations for state visitation frequency in the large and continuous state space. To alleviate this limitation, we propose a modified maximum entropy IRL (MMIRL) method to extract the reward function from the expert demonstrations for solving the microgrid energy scheduling problem. The proposed MMIRL algorithm is promising in recovering the reward function and learning the dispatch policy compared to conventional approaches. Case studies are performed in an energy arbitrage problem and a microgrid system with DERs. Results substantiate that the proposed MMIRL approach can learn the dispatch policy with more than 99% efficiency and outperforms other comparative methods.

artificial intelligence, reinforcement learning, m↗

Performance Evaluation of an Advanced Distributed Energy Resource Management Algorithm

This paper presents performance evaluation of a new distributed energy resource management system (DERMS) algorithm via an advanced hardware-in-the-loop (HIL) platform. The HIL platform provides realistic testing in a laboratory environment, including the accurate modeling of sub-transmission and distribution networks, the DERMS software controller, and 84 power hardware solar photovoltaic (PV) inverters, standard communication protocols, and a capacitor bank controller. The DERMS algorithm is also called, Grid-Optimization of Solar (GO-Solar) platform which includes predictive state estimation (PSE) and online multiple objective optimization (OMOO) to dispatch the legacy devices and distributed energy resources (e.g., PV). The voltage regulation performance is evaluated under three scenarios, volt-var smart inverter (baseline), and DERMS control for 100% and 30% of PV. The results show that controlling 30% of PV systems with the GO-Solar platform may provide the best balance of control performance and implementation cost.

distributed energy resource management system (DER↗

Self-Organizing Map-Based Resilience Quantification and Resilient Control of Distribution Systems Under Extreme Events

Due to climate change, extreme weather events are occurring more frequently and with increasing impact. This trend poses a significant challenge for distribution system operators (DSO) to ensure that there is uninterrupted power supply to critical loads in their networks. To embed resilience into DSO's decision-making, resilience needs to be first quantified and then integrated into the system-level optimization. Therefore, this paper first develops a novel self-organizing map (SOM) based method (called SomRes) to quantify the time-varying resilience index of a system that can leverage the powerful classification property of SOMs and removes some of the disadvantages of subjective weight assignment methods. Using SomRes, a resilient resource allocation and operational dispatch algorithm is further developed to enhance system resilience against extreme events by considering the SomRes resilience index directly as the feedback. Here, the proposed resilience quantification approach is benchmarked with a state-of-the-art approach and the efficacy of the proposed resilient dispatch algorithm is demonstrated through several deterministic and statistical case studies on the IEEE 123-bus distribution system. Simulation studies show that the proposed SomRes quantification method is an appropriate indicator of system resilience, and the resilient resource allocation and dispatch strategy can significantly reduce critical load shedding under varying event propagation scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Secure and Adaptive Hierarchical Multi-Timescale Framework for Resilient Load Restoration Using a Community Microgrid

Distribution system integrated community microgrids (CMGs) can partake in restoring loads during extended duration outages. At such times, the CMGs are challenged with limited resource availability, absence of robust grid support, and heightened demand-supply uncertainty. Here, this paper proposes a secure and adaptive three-stage hierarchical multi-timescale framework for scheduling and real-time (RT) dispatch of CMGs with hybrid PV systems to address these challenges. The framework enables the CMG to dynamically expand its boundary to support the neighboring grid sections and is adaptive to the changing forecast error impacts. The first stage solves a stochastic extended duration scheduling (EDS) problem to obtain referral plans for optimal resource rationing. The intermediate near-real-time (NRT) scheduling stage updates the EDS schedule closer to the dispatch time using new obtained forecasts, followed by the RT dispatch stage. To make the decisions more secure and robust against forecast errors, a novel concept called delayed recourse is designed. The approach is evaluated via numerical simulations on a modified IEEE 123-bus system and validated using OpenDSS and hardware-in-loop simulations. The results show superior performance in maximizing load supply and continuous secure distribution network operation under different operating scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Co-simulation Framework for Community-scale Building-grid Integration [SWR-21-75]

Distributed energy resources (DERs), including rooftop solar, energy storage, and flexible loads, are gaining popularity as costs decline and as building owners and utilities realize their benefits. DERs can improve distribution system efficiency, help prevent the need for expensive grid upgrades, and increase the resilience of local communities. However, they can also cause difficulties in grid operations and can require controls to achieve their benefits. To address this challenge, NREL researchers have developed a community-scale solution that assesses the impacts of DERs and their control strategies on a distribution system. The framework has been shown to reduce solar photovoltaic (PV) curtailment to 0%, mitigate the adverse impact of solar variability on the distribution voltage, and provide up to 5-day critical load support during emergency events. Utilizing 5 different modules representing the feeder, buildings, home energy management systems, an aggregator, and a utility controller, NREL expects this simulation technology to play a critical role in the continued integration of DERs. According to the Energy Information Administration (EIA), solar curtailments accounted for 94% of the total energy curtailed in the California Independent System Operator (CAISO) in 2020. By enabling Independent System Operators (ISOs) and utility operators to bring solar curtailments to 0%, the electrical grid can become less dependent on fossil-fueled power generation sources. NREL's co-simulation framework contains five major components: Distribution Feeder Model: describes the distribution feeder topology using OpenDSS, including the locations of all DERs. Residential Building Model: simulates a large number of buildings at a high resolution using OCHRETM. The model is equipped to control equipment based on signals from an external module. The model includes major household appliances such as HVAC and a water heater, non-dispatchable load models, a distributed PV system, and a home battery system. Home Energy Management System: optimizes the controls for the devices in a home using foreseeTM. The control can adjust based on the user preferences including cost, comfort, and convenience. In hierarchical control scenarios, where the houses follow signals from an aggregator, the home energy management system provides a flexibility band with a range of power and follows the dispatch signals received from aggregator. Community-Level Aggregator: solves for optimal energy dispatch based on the flexibility bands received from each home and the grid service signal received from the utility controller. Utility-Level Controller: provides grid signals for voltage control using Distributed Energy Resources (DERs), such as solar systems, in the community.

Balamurugan, Sivasathya Pradha↗

Storage Enabled Flexibility of Conventional Generation Assets (StorFlex)

The power systems have faced progressively more demanding operational requirements over the last two decades. Several factors contribute to these challenging operating conditions, including load growth, aging infrastructure, increasing penetrations of distributed energy resources (DERs), electrification of the economy, and policy initiatives such as decarbonization. The power system and its components must provide high operational flexibility to mitigate these challenges. For example, the proliferation of intermittent DERs such as wind and solar has increased the need for conventional generation assets like hydropower plants to respond to sudden load-generation imbalances. The higher flexibility requirements for hydropower plants cause more wear and tear, potentially shortening the useful lifespan of hydropower turbines. To reduce the need for hydropower plants to follow sudden changes in the dispatch signal, we investigate their combined operation with the energy storage systems (ESSs; “ESS-based hybridization”). Our analyses focuses on improving the lifespan of hydropower plants through ESS-based hybridization. Wear and tear on hydropower turbines (particularly Francis turbines) is modeled using a loss-of-life concept that is based on damage experienced by the turbine due to various cycles of operation. Then, we show that using ESSs to offset some of the high variation increases the remaining life of the hydropower plants. To demonstrate this, a few modeling tools were developed for this work: (1) a dynamic model for various components of the turbine and its governor; (2) a control strategy that assigns a slow-varying dispatch signal to a hydropower unit versus a fastmoving signal to ESS, such that the overall power request remains the same; and (3) models for the financial analysis to quantify the economic merits of such a framework. We used the models we developed to analyze the dispatch pattern of an actual hydropower plant with a power output of 50 MW and a head height of 152 m. This work showed that ESS-based hybridization could extend the life of the hydropower plant by 5% on average. This extension in life was then used to estimate the economic benefit in terms of cost deferrals associated with hydropower plant maintenance and replacement: on average, $3.6 million. Sensitivity analysis with respect to the size of ESS and cost of turbines was performed to show the variation in benefits over the range of turbine costs and ESS sizes. Crucially, stacking damage reduction and lifetime extension with other ESS value streams such as providing ancillary services could substantially increase the financial benefits of ESS-based hybridization. The higher costs associated with ESS of appropriate size would make more financial sense when multiple value streams are stacked and co-optimized to extract the maximum benefit. This dimension will be explored in future work.

13 HYDRO ENERGY↗

Automation of FARM from Alpha Phase to Beta Phase

Integrated energy systems (IES) combine different energy technologies in synergistic ways to achieve a more secure and economical energy supply. The RAVEN-based HYBRID framework and the RAVEN plugin for grid and capacity optimization (HERON) are used to find the optimal installed capacity and the optimal economical dispatch of each component of the IES, by respecting the limits on the production variables and the corresponding rates of variation (explicit constraints). Besides, there are other process variables whose evolution needs to be bounded to avoid damaging the components (e.g., condensers, heat exchangers, steam generators, etc.) or degrading the process efficiency (e.g., electrolysis in the hydrogen production process). To avoid violating these latter limits (implicit constraints), a proof-of-concept HERON validator based on Feasible Actuator Range Modifier (FARM-Alpha) was developed by Argonne National Laboratory in January 2021. This FARM-Alpha validator calculates the evolution of process variables on whom the implicit constraints are placed, and then provides feedback to HERON dispatcher to adjust the power setpoints of three IES components, i.e., Balance of Plant, Secondary Energy Source, and Thermal Energy Storage, so as to meet both the explicit and implicit constraints. FARM-Alpha was designed to assess the performance of FARM as a HERON validator only, i.e., the list of components and implicit operational constraints were hard-coded within the source code. The lack of flexibility of the corresponding software structure does not allow the deployment in production environment. This report describes the development and the implementation of an enhanced version of the FARM-based validator (FARM-Beta), which ensures more flexibility for the end user in modeling multiple IES configurations and scenarios. Several test cases of the power dispatch problem were then selected to demonstrate the capabilities offered by FARM-beta. The test cases illustrate the efficiency of the closed-loop optimization scheme and the capability to calculate set-point trajectories satisfying both explicit and implicit constraints.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine (Final Report)

As the nation continues to encourage, through market structures and financial incentives, the proliferation of intermittent renewable electricity, how to optimize the ever-changing electric grid and identify means to retain and improve resilience, while ensuring continued reductions in GHG emissions, will be critical. According to Bloomberg, wind & solar generated 10.5% of US electricity in 2020 and that percentage continues to grow. In support of expanding renewable energy use, and to address its intermittent nature, this project will develop the Hydrogen Storage for Flexible Fossil Fuel Power Generation platform that is dispatchable, reliable, repeatable and have the ability to produce zero or negative carbon power while interfacing with geology capable of CO2 and hydrogen storage. GTI Energy (GTIE) and team members Illinois State Geological Survey (ISGS), Mitsubishi Heavy Industries America (MHIA), Ameren Illinois, Hexagon Purus, and the Low Carbon Resources Initiative (LCRI) completed a Phase I Conceptual Study under contract DE-FE0032012 for Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine. The Hydrogen Storage for Flexible Fossil Fuel Power Generation platform addresses the intermittent nature of the expanding use of Variable Renewable Energy (VRE) generation. The low cost of the electricity (COE) generated results in greater dispatch and more operation at higher power levels (higher efficiency), fewer short intervals, and fewer start/stop cycles. The reliable, resilient system can produce zero carbon power and store hydrogen. It will demonstrate hydrogen storage in geologic formations like those used in natural gas underground storage thus enabling large scale storage of hydrogen in sedimentary strata across the United States rather than in geographically restricted salt caverns. The Phase I study confirmed the system is feasible and generates power at lower cost than other low carbon approaches. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production. The study advanced the maturity of the H 2 storage-based system with flexible power generation by completing a Pre-FEED study (Phase II). The Pre-FEED focused on the selected Energy Farm on the University of Illinois Urbana-Champaign (UIUC) site that includes above ground and underground hydrogen storage, low-carbon hydrogen production (GTI’s Compact Hydrogen Generator, CHG) with underground CO2 sequestration, and a 40-MW class gas turbine. The Pre-FEED addressed the entire system and its interconnection to the natural gas and electric grid and mitigation of key risks, such as storage behavior, load-following, and system operation. During Phase 1 of the project, the team completed key tasks, which moved the entire demonstration project, specific components and approaches closer to commercialization. These Phase I Accomplishments include: Completing System Requirements Review; Completing System Layout and Modeling - Heat & Mass Balance and Process Flow Diagram; Completing modelling of 9 turbine performance cases; Evaluating rock strata for underground storage of hydrogen and sequestration of carbon dioxide; Completing initial modelling of underground storage of hydrogen and withdrawal with evaluation of loss and water production; Identifying roadable storage for above ground hydrogen storage; Identifying existing electrical infrastructure for receiving/delivering electricity; Identifying existing gas supply infrastructure for receiving natural gas; Document concept design/development plans in required reports. Conclusions: The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and generates power at lower cost than other low carbon approaches and even lower cost than the reference NGCC plant without carbon capture when taking advantage of 45Q carbon credits. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via the system requirements review with the whole team. These requirements were then incorporated into and iterated with our Heat & Mass Balance process model and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Large scale non-salt geologic storage of hydrogen is an enabling technology for a hydrogen-fired turbine that can be retrofitted into large-scale electric generating units (EGU). Our demonstration will include 428 MWh or ~4 hours full load of hydrogen storage (above and underground). Carbon capture inherent to the CHG process can capture 90% CO 2 (with upgrades to >98%). This system provides a COE of 23% savings relative to an NGCC with a post combustion amine system. Our proposed storage system decouples carbon capture and hydrogen production from power production; therefore, we expect our proposed system’s efficiency and variable COE to be superior resulting in overall higher dispatch and reduced deep cycling. Our demonstration will be full to multi-day hydrogen storage and has the potential for longer (seasonal) duration commercially. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production.

03 NATURAL GAS↗

Control system for multi-system coordination via a single reference governor

This report describes the improvements to the Feasible Actuator Range Modifier (FARM) component of the RAVEN-based HYBRID framework for analysis of Integrated Energy Systems (IES). FARM supports the HERON plug-in that solves the power dispatch problem. The solution involves economically optimal dispatches that satisfy the limits on production variables and corresponding rates of variation (explicit constraints) as well as the limits on the process variables tied to the service life of equipment (implicit constraints). The problem can be addressed as a two-stage process, i.e., HERON power dispatcher estimates a solution that meets explicit constraints (low-resolution physics), whereas FARM uses the simulation outcomes of HYBRID high-fidelity model to capture the system dynamic response and enforce implicit constraints (high-resolution physics). The initial version of the code (FARM-Alpha) was released by Argonne National Laboratory in January 2021 followed by FARM-Beta (January 2022) and FARM-Gamma (April 2022).

42 ENGINEERING↗

Application of FARM to an IES scenario within the FORCE ecosystem

The FARM (Feasible Actuator Range Modifier) software module is a component of the RAVEN-based FORCE framework for analysis of Integrated Energy Systems (IES). FARM supports the HERON software module in the evaluation of the optimal dispatch by evaluating feasible set-points for the different IES unit components. Set-points are required to satisfy limits on both production variables (i.e., the variables to be optimized such as the electrical power, the hydrogen production rate, etc.) and process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.). This problem is addressed by adopting a two-stage approach. First, the HERON power dispatcher determines set-points that meet the constraints on the former variables (e.g., power levels and power ramp rate limits). These constraints are called explicit constraints. Then, FARM adjusts these set-points to ensure the respect of the limits on the latter variables given the knowledge of the system physics acquired through machine learning algorithms. These constraints are called implicit constraints. From this standpoint, FARM constitutes a bridge between the HERON power dispatcher that adopts a simplified description of the IES unit (low-resolution physics) and the HYBRID high-fidelity models (high-resolution physics). The original version of the FARM software module (FARM-Alpha) was released by Argonne National Laboratory in January 2021. In the latest version of the code released in July 2022 (FARM-Delta), the Reference Governor (RG) algorithm was upgraded to a Multi-Input Multi-Output version from its original Single-Input Single-Output form. The RG algorithm acts to enforce constraints. With this improvement an IES unit is now treated as a single dynamic system from the standpoint of control. The crosstalk among components in an IES unit is now fully considered thereby ensuring a true optimization is obtained for those units that have multiple set-points. In this report, the capabilities of FARM-Delta operating within the FORCE ecosystem are demonstrated for an IES test case. The specific configuration of IES unit for this case was selected by the IES team with consultation from the Advanced Reactor IES Expert Group. A full TEA analysis that invoked HERON, HYBRID, FARM, and RAVEN was performed and serves to demonstrate how the latest modification to FARM algorithms (i.e., state variable selection, state-space matrices derivation, set-point verification) can shape setpoints that might otherwise compromise the health of equipment through accelerated wear and tear. In this specific test case, it was demonstrated that these algorithms ensure a more efficient utilization of steam resources to be shared by two different subsystems, namely Balance of Plant (BOP) and High-Temperature Steam Electrolysis (HTSE). Finally, some code improvements that can further enhance the user-friendliness are suggested.

97 MATHEMATICS AND COMPUTING↗

Implementation of a feature selection algorithm in FARM to identify important state variables and time-invariant matrices

The FARM (Feasible Actuator Range Modifier) software module is a component of the RAVEN-based FORCE framework for analysis of Integrated Energy Systems (IES). FARM aids the HERON software module in the evaluation of the optimal dispatch for the different IES components. Set-point trajectories are required to meet limits on both production variables (i.e., the variables to be optimized such as the electrical power, the hydrogen production rate, etc.) and process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.). To evaluate the feasibility of HERON generated set-points and to do so in an acceptable time, FARM employs reduced order models to represent the dynamic behavior of the systems to be dispatched. These surrogate models take the form of a linear dynamic system with sets of Linear Parameter Varying (LPV) matrices that are mapped to the system operating space. These matrices are derived from the trajectories of system state variables and system output variables during transients. The accuracy of LPV matrices depends on the selection of state variables. In previous reports, state variables were selected by adopting a complicated workflow requiring multiple software licenses and an advanced level of user expertise. In this report, a new workflow that automates the state variable selection process is presented. It significantly reduces the frequency of user interventions and does not require multiple software licenses. Each module in the new workflow is described in detail, and the input / output examples in each step of the workflow are provided. It was demonstrated that this workflow can greatly reduce the complexity of the state variable selection process, and that the updated FARM-Gamma and FARM-Delta validators can benefit from this workflow when solving the power dispatch problem of a representative IES test case. Finally, some code improvements that can further enhance the efficiency are suggested.

42 ENGINEERING↗

Integrate FARM with PID controllers: IES Simulation Ecosystem Control System Development

The FARM (Feasible Actuator Range Modifier) software module is a component of the RAVEN-based FORCE framework for analysis of Integrated Energy Systems (IES). FARM was designed to support the HERON software module in the solution of the optimal dispatch problem for IES units. As the result of HERON-FARM dispatch simulation, the set-point trajectories are optimized to meet constraints on both the production variables (i.e., the variables to be optimized such as the electrical power, the hydrogen production rate, etc.) and the process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.) at a coarse time resolution (every 10 or 100 seconds) over long time horizons (several days or weeks). In case the operational constraints need to be met at finer time resolution, the computational burden of HERON-FARM would linearly increase with the sampling rate, and sub-optimal solutions might be obtained. System responses characterized by overshoots and damped oscillations temporarily violating the imposed constraints might occur during abrupt power transients. In this report, a hierarchical control system architecture for the operation of the Dynamic Energy Technology and Integration Laboratory (DETAIL) facility constructed at INL was proposed. First, the preliminary studies on the proposed control strategy for operating the facility and the designed PI controllers were reviewed. In particular, the current approach for generating the set-point trajectories was studied, and its limits were identified. To this aim, the inclusion of a Supervisory Control layer embedding a modified version of the FARM algorithm for preserving the system safe operation over both long and real-time horizons was proposed. In this way, FARM would be applied twice, i.e., the original version (“FARM Validator”) aiding the solution of the power dispatch problem, and the modified version (“FARM Supervisory” coordinating the PI controllers to address the real-time control tasks. Despite the kernel of the two modules is the same algorithm, their roles, tasks, and capabilities are quite different. A detailed description of the role of FARM at addressing low-level control tasks is provided, along with tentative operational procedures for training the models embedded into the algorithm by using the collected experimental data.

42 ENGINEERING↗

Demonstrate FARM supervisory capabilities for a thermal energy storage problem for the DETAIL facility: IES Simulation Ecosystem Control System Development

The goal of the power dispatch problem for an Integrated Energy System (IES) is to adjust the power output and the heat flow of each component to maximize the profitability of the whole unit. Facilities that can integrate real-time digital signals, mock nuclear power, thermal energy storage and industrial heat use via high-temperature electrolysis were constructed at INL to support the research activities. The Dynamic Energy Technology and Integration Laboratory (DETAIL) houses the Microreactor Agile Non-nuclear Experimental Test Bed (MAGNET) and the Thermal Energy Distribution System (TEDS). In this report, the hierarchical control system architecture proposed in June 2023 milestone for the flexible operation of DETAIL facility is finalized and demonstrated. A brief description of the components and the corresponding Dymola models from the HYRBID repository is first provided. Then, the current control strategy is presented. In particular, the approach for generating the set-point trajectories to be fed to the PI controllers is analyzed, and its limits were identified. To preserve safe operation over both long-time and real-time horizons, the integration of a Supervisory Control layer embedding a modified version of FARM (Feasible Actuator Range Modifier) module is proposed. FARM is a component of the RAVEN-based FORCE framework designed to support HERON module at optimizing the operation of IES units. The proposed control system for DETAIL foresees FARM to be applied twice, i.e., the original version (“FARM-Validator”) aiding the solution of the power dispatch problem, and a modified version (“FARM-Supervisory”) coordinating the PID controllers. Despite the kernel of the two modules is the same, their tasks are quite different. The former intervenes at the beginning of each hour to prevent constraint violations over long time periods, the latter addresses real-time control tasks and monitors the response of constrained variables at a much finer time resolution. A tentative procedure for training the embedded Digital Twins with the experimental data is also proposed. Finally, the capabilities of the designed architecture and the impact of the added Supervisory Control layer are demonstrated by simulating a representative power dispatch scenario.

25 ENERGY STORAGE↗

Techno-Economic Analysis of Greenfield Geothermal Hybrid Power Plants using a Solar or Natural Gas Steam Topping Cycle

The relatively low generation costs associated with wind, solar photovoltaic (PV), and natural-gas power plants make it challenging for geothermal power plants to produce and sell the power that has the reliability and sustainability characteristics that are greatly needed in U.S. power markets. This is especially true for geothermal resources with low-to-medium temperatures, which results in relatively low-thermal efficiency and generation costs that are higher than those for wind, solar PV, and natural gas. This analysis evaluates solar thermal- and natural-gas combustion waste heat recovery-based topping cycle hybridization of geothermal binary power plants. This approach provides several benefits that may allow geothermal power plants to generate power at more competitive costs. First, the addition of solar thermal energy or natural-gas combustion waste heat input to a geothermal power plant provides additional heat input that can be converted to electrical power. Second, the temperature level of the heat obtained from concentrating solar collectors or natural-gas combustion exhaust is higher than that of geothermal heat, which provides opportunities for improving the efficiency of the conversion of thermal energy to electrical power. Third, the ease with which solar thermal systems integrate with energy storage and the flexibility of natural gas means power generation can occur during peak demand periods. The hybrid cycles are compared to equivalently sized, co-located, independent geothermal, concentrating solar, and/or natural-gas power plants. The hybrid cycle tends to produce slightly more power than the standalone plants combined. However, the hybrid plant Levelized Cost of Energy (LCOE) is slightly higher than the LCOE of the combined standalone power plants for each of the case study locations investigated. Using the steam-topping cycle, organic Rankine cycle (ORC)-bottoming cycle hybrid plant design to combine a solar thermal resource and low- temperature geothermal resource (<120 degrees C) leads to a hybrid plant with a lower LCOE than a standalone geothermal-only system. Thus, hybrid plants may enable the economic development of geothermal resources in locations with low geothermal resource temperatures. However, in areas with higher geothermal resource temperatures (>120 degrees C), the geothermal-only plant has a lower LCOE than the hybrid cycle and thus could be developed without the need for solar heat addition. iv A geothermal-natural-gas reciprocating engine hybrid plant was evaluated for an Elk Hills, California case study location. The Elk Hills case study analysis indicates that when the natural-gas engine operates for more than 12 hours per day the hybrid plant can produce power at an LCOE lower than a standalone geothermal plant, and comparable to that of the standalone natural-gas reciprocating engine, while also reducing the carbon intensity of the power generated relative to the standalone natural-gas engine. This may represent a scenario in which the hybrid plant provides an opportunity for the deployment of a low-temperature geothermal resource that otherwise may have an LCOE too high to develop and operate as a standalone resource, while also reducing the carbon intensity of natural-gas generation sources. A "triple-hybrid" plant that combines natural gas, solar thermal, thermal energy storage, and geothermal was also investigated. A natural-gas combustion turbine (NGCT) is added to the geothermal-solar hybrid such that the hot exhaust gas from the gas turbine provides an alternative source of heat to the steam turbine of the hybrid cycle. Analysis results suggest that the triple-hybrid plant has a significantly higher energy generation and revenue than a standalone NGCT or the original geothermal-solar hybrid. The triple-hybrid design benefits most from using a smaller solar field so that the solar energy can be dispatched at the most valuable times available. The triple-hybrid plant also has a lower LCOE than the standalone NGCT. The triple-hybrid plant was evaluated making simple assumptions about the dispatch profile of the gas cycle, and more nuanced and realistic dispatching schedules should be analyzed in future work.

15 GEOTHERMAL ENERGY↗