Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation and Lessons Learned

In May 2016, the U.S. Nuclear Regulatory Commission (NRC) staff provided a digital instrumentation and control (I&C) regulatory infrastructure integrated action plan to the NRC for approval. One of the objectives of that plan was to establish a clear regulatory structure with reduced regulatory uncertainty to enable the expanded safe use of digital I&C in commercial nuclear reactors while continuing to ensure safety and security. To achieve this end, the NRC, with collaboration from industry, developed a streamlined License Amendment Request Alternate Review (AR) process for safety-related (SR) digital I&C upgrades. In spite of this effort, the industry has remained reluctant to perform such I&C upgrades because of perceived regulatory and financial risks associated with being the first or an early adopter of the AR process for SR I&C upgrades. The U.S. Department of Energy Light Water Reactor Sustainability Program at the Idaho National Laboratory performed Initial Scoping Phase research to help break this impasse by supporting a SR I&C Pilot Upgrade, working with MPR Associates, ScottMadden Inc., and Exelon Generation. Exelon’s Limerick Generating Station (LGS) was selected as the target for this research. This paper summarizes the Initial Scoping Phase engineering and operations, licensing, and project management activities necessary to bound the scope, schedule, and estimated cost of the project sufficiently to enable utility management authorization of Conceptual Design Phase activities. These efforts and associated products are intended to provide a template to support larger industry efforts to perform similar upgrades as a foundation stone for a digital transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership. As a result of the combined effort of Exelon Generation and research participants, Conceptual Design Phase activities for the subject upgrade at LGS were approved by Exelon. Further, the U.S. Department of Energy also awarded a $50 million cost share award to Exelon in order to pave the way for SR I&C modernization and associated control room upgrades across the U.S. nuclear fleet. Additional research reports are planned for the Conceptual Design Phase, Detailed Design Phase, and the Implementation Phase of the LGS project to document the process followed and promulgate lessons learned to industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Baseline Human Factors and Ergonomics in Support of Control Room Modernization at Nuclear Power Plants

As part of control room modernization at a nuclear power plant, a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model . These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—meant to catalog final products—rather than formative—meant to guide the overall modernization process. In this report, we highlight two crucial formative subelements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two subelements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomic baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and help ensure that control room modernization represents the successful evolution of the control system.

99 GENERAL AND MISCELLANEOUS↗

Safety Tests on Irradiated AGR-1 Compacts 3-3-2, 3-2-2, and 6-2-1

Post-irradiation examination (PIE) is in progress on coated particle fuel compacts from the first Advanced Gas Reactor irradiation experiment (AGR-1). The AGR-1 Post-Irradiation Examination Plan, INL/PLN- 2828/Rev. 1, includes safety testing of the irradiated compacts in the Oak Ridge National Laboratory (ORNL) Core Conduction Cooldown Test Facility (CCCTF) facility and the Idaho National Laboratory Fuel Accident Condition Simulator (FACS) to evaluate the effect of elevated temperature on the fuel microstructure and fission product retention. Safety tests will involve heating compacts for 100– 500 hours to maximum temperatures of 1600°C–1800°C, where 1600°C is the expected maximum temperature during a high-temperature gas-cooled reactor depressurization conduction cooldown event, and 1800°C is the expected temperature at which the performance of the SiC layer will begin to degrade. ORNL completed the first AGR-1 post-irradiation compact safety test in FY2011. During the first two quarters of FY2012, three additional safety tests were completed. Each of these three compacts was heated up to a maximum temperature of 1600°C and held at this temperature for a period of 300 hours. The standard heating profile specified in each compact examination plan called for a controlled ramp of the furnace to 1600°C with soaks at 400 and 1250°C, a hold at 1600°C for 300 hours, and then a controlled ramp back down to room temperature. The CCCTF performed as designed, except for a few interruptions while the furnace was being ramped up to 1600°C. These interruptions were caused by several power supply problems and one mechanical problem with the cold finger. The root causes of these issues have been identified and addressed to ensure better reliability for future CCCTF operation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Virtual reality as a human factors design analysis tool: Macro-ergonomic application validation and assessment of the Space Station Freedom payload control area

A virtual reality (VR) Applications Program has been under development at MSFC since 1989. Its objectives are to develop, assess, validate, and utilize VR in hardware development, operations development and support, missions operations training, and science training. A variety of activities are under way within many of these areas. One ongoing macro-ergonomic application of VR relates to the design of the Space Station Freedom Payload Control Area (PCA), the control room from which onboard payload operations are managed. Several preliminary conceptual PCA layouts have been developed and modeled in VR. Various managers and potential end users have virtually 'entered' these rooms and provided valuable feedback. Before VR can be used with confidence in a particular application, it must be validated, or calibrated, for that class of applications. Two associated validation studies for macro-ergonomic applications are under way to help characterize possible distortions of filtering of relevant perceptions in a virtual world. In both studies, existing control rooms and their 'virtual counterparts will be empirically compared using distance and heading estimations to objects and subjective assessments. Approaches and findings of the PCA activities and details of the studies are presented.

Hale, Joseph P.↗

Need for research and training reactors for advanced reactor designs

Full text of publication follows. Research and training reactors have served a valuable role in helping train workforce for currently operating fleet of light water reactors. These research and training reactors have been used in reactor laboratory classes to familiarize the students with such vital concepts as approach to criticality, reactor period, neutron moderation, reactivity, flux distribution and leakage, etc. As the industry moves toward advanced non-light-water reactor designs, it is critical that research and training reactors be developed and deployed at university campuses to help train the new generation of nuclear and non-nuclear engineers who are likely to design, build, and operate these advanced reactors. Among the designs currently being pursued for nuclear power generation include molten salt, sodium cooled, and gas cooled designs, with options for various fuel forms. Thus, industry and DOE in collaboration with academic institutions should devise plans on how to familiarize the next generation of nuclear workforce with hands-on experience necessary for such designs. These research and training reactors will play a vital role in familiarizing the future workforce with hands-on experience with concepts associated with fast spectrum reactors, gas cooled reactors, and other features not associated with light water reactors. In addition to classical nuclear engineering concepts, these advanced research and training reactors can also be used for hands-on training as well as for research on features being considered in the design of GEN-IV reactors: cyber security for digital control room operations, hybrid energy system, hydrogen generation, district heating, autonomous control... (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

3D Modeling of Safety-Related Upgrade Pilot Project

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper will present the development of the HFE 3D modeling execution of the Main Control Room safety upgrades. New equipment and modifications are planned for upgrading the new safety systems. 3D modeling allows for visualization of the new equipment and modifications to be shared with engineering and design teams for evaluation and review. Anthropometric considerations such as sight lines and functional reach can be evaluated directly using the 3D model. This effort has helped to provide visualizations for additional review with operations personnel and project stakeholders.

3D Modeling↗

Application of Cryocoolers to a Vintage Dilution Refrigerator

A dilution refrigerator is required for 50mK detector operation of CDMS (Cryogenic Dark Matter Search). Besides shielding the dilution refrigerator itself, the liquid nitrogen shield and liquid helium bath in the refrigerator cool the detector cryostat heat shields and cool electronics, resulting in significant external heat loads at 80K and at 4K. An Oxford Instruments Kelvinox 400 has served this role for ten years but required daily transfers of liquid nitrogen and liquid helium. Complicating the cryogen supply is the location 800 meters below ground in an RF shielded, class 10000 clean room at Soudan, MN. Nitrogen and helium re-liquefiers using cryocoolers were installed outside the clean room and continuously condense room temperature gas and return the liquids to the dilution refrigerator through a transfer line. This paper will describe the design, installation, controls and performance of liquefaction systems.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Sensor Impact Evaluation at Different Sensor Locations in a Multi-zone Office Building

FY 2022 Q1 deliverables include the development of an emulator that can evaluate the sensor impacts at different sensor locations (i.e., thermostat locations) in a multizone office building. This report presents the detailed procedure of developing the emulator and using the emulator for preliminary sensor impact analysis. In designing new multizone buildings or retrofitting existing buildings, the room thermostat locations or subzoning design has been often determined by best practices without considering the effects of this design in terms of energy or thermal comfort. In subzoning design, the total number of thermostats is usually smaller than the total number of rooms. As a result, one thermostat in one room often controls the indoor temperature of several other adjacent rooms. For example, five zones might share one thermostat located in one of the zones. Because the demands for thermal load in different zones could be different for the multizone buildings, this subzoning design can compromise control performance and waste building energy consumption. Furthermore, for multizone buildings, subzoning could introduce thermal discomfort for zones. This issue has not be thoroughly investigated in simulation/field studies, and the US Department of Energy’s Oak Ridge National Laboratory explored the impacts of subzoning design through modeling and experimental study.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Impact of Wall Control Performance on Connected Lighting Systems

Wall controls form the only touchpoint for individual room users and that room’s lighting control system. As such, these interfaces strongly influence user understanding and utilization of the system, as well as overall acceptance. The Next Generation Lighting Systems (NGLS) program began an evaluation of the wall controls in 14 connected lighting systems installed in various rooms of the NGLS Living Lab at Parsons School of Design in New York City. These systems demonstrate the wide range of approaches to wall control setup and functionality taken by manufacturers. Characterizing the 14 controls across six attributes, only four, or 29%, were identical. Requirements for wall control design were not specified explicitly by NGLS. Rather, wall controls were required to provide system performance according to three criteria: vacancy control (manual on/auto off) of two zones; manual continuous dimming of the same two zones; and an AV presentation mode in one of the two zones. This report examines the classification of entries, the assessment method used to evaluate the systems from installation through day-to-day use, and the system performance observed to date for each.

42 ENGINEERING↗

A Tale of Two Simulators—A Comparative Human-in-the-Loop Nuclear Power Plant Operations Study on Thermal Power Dispatch for Hydrogen Production

A study was designed for a reconfigurable, full-scale, full-scope nuclear power plant control room simulator to compare two different thermal power dispatch systems, on separate simulator platforms, demonstrating a TPD concept of operation. A TPD system can provide a desirable alternative revenue source for utilities but requires addressing new and unique operational issues. The selection of representative scenarios and the scenario-based experimental design are presented as key elements to capture evidence for validating the developed TPD concept of operations overcome these operational issues.

Ulrich, Thomas A.↗

A novel tool for improving the data collection process during control room modernization human-system interface testing and evaluation activities - 271

The U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program is developing a scientific basis to extend the existing U.S. nuclear power plant (NPP) operating life beyond the current 60-year licensing period and to ensure NPP long-term reliability, productivity, safety, and security. Under the Advanced Instrumentation, Information, and Control (II and C) Systems Technologies pathway, the LWRS Program conducts targeted research and development to address long-term aging and obsolescence of existing instrumentation and control technologies, as well as to implement and test new digital II and C technology that enables broad innovation and business improvement in the NPP operating model. To this end, the role of human factors engineering (HFE) is important as part of ensuring that the control room modernization (CRM) activities account for the operator's cognitive and physiological characteristics. Part of the HFE process for CRM entails conducting tests and evaluations (T and Es) that will inform the design of new human-system interface (HSI) technologies. Qualitative data that captures operator feedback and important human-system interactions are an important part of T and E. However, the analyzing this qualitative data in order to provide actionable design recommendations can be time-consuming and error prone. This paper presents an early version of a tool, which uses a combination of natural language processing and supervised machine learning to support the analysis of qualitative data. The objectives of this tool is to improve the process of (1) sifting through freeform text for improved design issue identification, (2) maintaining consistency in theme coding conventions, and (3) readily providing actionable design guidance that can be traceable to state-of-the-art HFE guidelines such as NUREG-0700. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Applying Human Factors Evaluation and Design Guidance to a Nuclear Power Plant Digital Control System

The United States (U.S.) nuclear industry, like similar process control industries, has moved toward upgrading its control rooms. The upgraded control rooms typically feature digital control system (DCS) displays embedded in the panels. These displays gather information from the system and represent that information on a single display surface. In this manner, the DCS combines many previously separate analog indicators and controls into a single digital display, whereby the operators can toggle between multiple windows to monitor and control different aspects of the plant. The design of the DCS depends on the function of the system it monitors, but revolves around presenting the information most germane to an operator at any point in time. DCSs require a carefully designed human system interface. This report centers on redesigning existing DCS displays for an example chemical volume control system (CVCS) at a U.S. nuclear power plant. The crucial nature of the CVCS, which controls coolant levels and boration in the primary system, requires a thorough human factors evaluation of its supporting DCS. The initial digital controls being developed for the DCSs tend to directly mimic the former analog controls. There are, however, unique operator interactions with a digital vs. analog interface, and the differences have not always been carefully factored in the translation of an analog interface to a replacement DCS. To ensure safety, efficiency, and usability of the emerging DCSs, a human factors usability evaluation was conducted on a CVCS DCS currently being used and refined at an existing U.S. nuclear power plant. Subject matter experts from process control engineering, software development, and human factors evaluated the DCS displays to document potential usability issues and propose design recommendations. The evaluation yielded 167 potential usability issues with the DCS. These issues should not be considered operator performance problems but rather opportunities identified by experts to improve upon the design of the DCS. A set of nine design recommendations was developed to address these potential issues. The design principles addressed the following areas: (1) color, (2) pop-up window structure, (3) navigation, (4) alarms, (5) process control diagram, (6) gestalt grouping, (7) typography, (8) terminology, and (9) data entry. Visuals illustrating the improved DCS displays accompany the design recommendations. These nine design principles serve as the starting point to a planned general DCS style guide that can be used across the U.S. nuclear industry to aid in the future design of effective DCS interfaces.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The Aircraft Simulation Role in Improving Flight Safety Through Control Room Training

NASA Dryden Flight Research Center uses its six-degrees-of-freedom (6-DOF) fixed-base simulations for mission control room training to improve flight safety and operations. This concept is applied to numerous flight projects such as the F-18 High Alpha Research Vehicle (HARV), the F-15 Intelligent Flight Control System (IFCS), the X-38 Actuator Control Test (XACT), and X-43A (Hyper-X). The Dryden 6-DOF simulations are typically used through various stages of a project, from design to ground tests. The roles of these simulations have expanded to support control room training, reinforcing flight safety by building control room staff proficiency. Real-time telemetry, radar, and video data are generated from flight vehicle simulation models. These data are used to drive the control room displays. Nominal static values are used to complete information where appropriate. Audio communication is also an integral part of training sessions. This simulation capability is used to train control room personnel and flight crew for nominal missions and emergency situations. Such training sessions are also opportunities to refine flight cards and control room display pages, exercise emergency procedures, and practice control room setup for the day of flight. This paper describes this technology as it is used in the X-43A and F-15 IFCS and XACT projects.

Shy, Karla S.↗

Spinning Reserve From Hotel Load Response: Initial Progress

This project was motivated by the fundamental match between hotel space conditioning load response capability and power system contingency response needs. As power system costs rise and capacity is strained demand response can provide a significant system reliability benefit at a potentially attractive cost. At ORNL s suggestion, Digital Solutions Inc. adapted its hotel air conditioning control technology to supply power system spinning reserve. This energy saving technology is primarily designed to provide the hotel operator with the ability to control individual room temperature set-points based upon occupancy (25% to 50% energy savings based on an earlier study [Kirby and Ally, 2002]). DSI added instantaneous local load shedding capability in response to power system frequency and centrally dispatched load shedding capability in response to power system operator command. The 162 room Music Road Hotel in Pigeon Forge Tennessee agreed to host the spinning reserve test. The Tennessee Valley Authority supplied real-time metering equipment in the form of an internet connected Dranetz-BMI power quality meter and monitoring expertise to record total hotel load during both normal operations and test results. The Sevier County Electric System installed the metering. Preliminary testing showed that hotel load can be curtailed by 22% to 37% depending on the outdoor temperature and the time of day. These results are prior to implementing control over the common area air conditioning loads. Testing was also not at times of highest system or hotel loading. Full response occurred in 12 to 60 seconds from when the system operator s command to shed load was issued. The load drop was very rapid, essentially as fast as the 2 second metering could detect, with all units responding essentially simultaneously. Load restoration was ramped back in over several minutes. The restoration ramp can be adjusted to the power system needs. Frequency response testing was not completed. Initial testing showed that the units respond very quickly. Problems with local power quality generated false low frequency signals which required testing to be stopped. This should not be a problem in actual operation since the frequency trip points will be staggered to generate a droop curve which mimics generator governor response. The actual trip frequencies will also be low enough to avoid power quality problems. The actual trip frequencies are too low to generate test events with sufficient regularity to complete testing in a reasonable amount of time. Frequency response testing will resume once the local power quality problem is fully understood and reasonable test frequency settings can be determined. Overall the preliminary testing was extremely successful. The hotel response capability matches the power system reliability need, being faster than generation response and inherently available when the power system is under the most stress (times of high system and hotel load). Periodic testing is scheduled throughout the winter and spring to characterize hotel response capability under a full range of conditions. More extensive testing will resume when summer outdoor temperatures are again high enough to fully test hotel response.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Packaging Technology for SiC High Temperature Circuits Operable up to 500 Degrees Centigrade

New high temperature low power 8-pin packages have been fabricated using commercial fabrication service. These packages are made of aluminum nitride and 96 percent alumina with Au metallization. The new design of these packages provides the chips inside with EM shielding. Wirebond geometry control has been achieved for precise mechanical tests. Au wirebond samples with 45 degree heel-angle have been tested using wireloop test module. The geometry control improves the consistency of measurement of the wireloop breaking point.Also reported on is a parametric study of the thermomechanical reliability of a Au thick-film based SiC die-attach assembly using nonlinear finite element analysis (FEA) was conducted to optimize the die-attach thermo-mechanical performance for operation at temperatures from room temperature to 500 degrees Centigrade. This parametric study centered on material selection, structure design and process control.

Chen, Lian-Yu↗

Development of intelligent instruments with embedded HTTP servers for control and data acquisition in a cryogenic setup—The hardware, firmware, and software implementation

The power of Ethernet for control and automation technology is being largely understood by the automation industry in recent times. Ethernet with HTTP (Hypertext Transfer Protocol) is one of the most widely accepted communication standards today. Ethernet is best known for being able to control through internet from anywhere in the globe. The Ethernet interface with built-in on-chip embedded servers ensures global connections for crate-less model of control and data acquisition systems which have several advantages over traditional crate-based control architectures for slow applications. This architecture will completely eliminate the use of any extra PLC (Programmable Logic Controller) or similar control hardware in any automation network as the control functions are firmware coded inside intelligent meters itself. Here, we describe the indigenously built project of a cryogenic control system built for linear accelerator at Inter University Accelerator Centre, known as “CADS,” which stands for “Complete Automation of Distribution System.” CADS deals with complete hardware, firmware, and software implementation of the automated linac cryogenic distribution system using many Ethernet based embedded cryogenic instruments developed in-house. Each instrument works as an intelligent meter called device-server which has the control functions and control loops built inside the firmware itself. Dedicated meters with built-in servers were designed out of ARM (Acorn RISC (Reduced Instruction Set Computer) Machine) and ATMEL processors and COTS (Commercially Off-the-Shelf) SMD (Surface Mount Devices) components, with analog sensor front-end and a digital back-end web server implementing remote procedure call over HTTP for digital control and readout functions. At present, 24 instruments which run 58 embedded servers inside, each specific to a particular type of sensor-actuator combination for closed loop operations, are now deployed and distributed across control LAN (Local Area Network). A group of six categories of such instruments have been identified for all cryogenic applications required for linac operation which were designed to build this medium-scale cryogenic automation setup. These devices have special features like remote rebooters, daughter boards for PIDs (Proportional Integral Derivative), etc., to operate them remotely in radiation areas and also have emergency switches by which each device can be taken to emergency mode temporarily. Finally, all the data are monitored, logged, controlled, and analyzed online at a central control room which has a user-friendly control interface developed using LabVIEW{sup ®}. This paper discusses the overall hardware, firmware, software design, and implementation for the cryogenics setup.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The development of a Space Shuttle General Purpose Work Station (GPWS)

The GPWS being developed for the Life Sciences Laboratory to be flown on the fourth Spacelab mission in late 1985 is characterized, and results from Phase I and Phase II tests are reported. The GPWS is designed to provide biological protection for both experiment and operator, a clean-room environment, control of liquids at zero gravity, protection against Spacelab-cabin contamination by chemical vapors, and work space with lights and other accommodations for one or two users in the zero-gravity neutral-body position. The flight hardware subsystems are examined and illustrated; the approach taken to evaluate human factors, performance, contaminant control, and user accommodation is explained; the design-verification unit for ground testing is described; and the improvements introduced in constructing the flight version are indicated.

Wagner, P. A.↗