Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contingency Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

International Space Station Attitude Control and Energy Storage Experiment: Effects of Flywheel Torque

The Attitude Control and Energy Storage Experiment is currently under development for the International Space Station; two counter-rotating flywheels will be levitated with magnetic bearings and placed in vacuum housings. The primary objective of the experiment is to store and discharge energy, in combination with existing batteries, into the electrical power system. The secondary objective is to use the flywheels to exert torque on the Station; a simple torque profile has been designed so that the Station's Control Moment Gyroscopes will be assisted in maintaining torque equilibrium attitude. Two energy storage contingencies could result in the inadvertent application of torque by the flywheels to the Station: an emergency shutdown of one flywheel rotor while the other remains spinning, and energy storage with only one rotor instead of the counterrotating pair. Analysis of these two contingencies shows that attitude control and the microgravity environment will not be adversely affected.

Roithmayr, Carlos M.↗

International Space Station (ISS) External Thermal Control System (ETCS) Loop A Pump Module (PM) Jettison Options Assessment

On December 11, 2013, the International Space Station (ISS) experienced a failure of the External Thermal Control System (ETCS) Loop A Pump Module (PM). To minimize the number of extravehicular activities (EVA) required to replace the PM, jettisoning the faulty pump was evaluated. The objective of this study was to independently evaluate the jettison options considered by the ISS Trajectory Operations Officer (TOPO) and to provide recommendations for safe jettison of the ETCS Loop A PM. The simulation selected to evaluate the TOPO options was the NASA Engineering and Safety Center's (NESC) version of Program to Optimize Simulated Trajectories II (POST2) developed to support another NESC assessment. The objective of the jettison analysis was twofold: (1) to independently verify TOPO posigrade and retrograde jettison results, and (2) to determine jettison guidelines based on additional sensitivity, trade study, and Monte Carlo (MC) analysis that would prevent PM recontact. Recontact in this study designates a propagated PM trajectory that comes within 500 m of the ISS propagated trajectory. An additional simulation using Systems Tool Kit (STK) was run for independent verification of the POST2 simulation results. Ultimately, the ISS Program removed the PM jettison option from consideration. However, prior to the Program decision, the retrograde jettison option remained part of the EVA contingency plan. The jettison analysis presented showed that, in addition to separation velocity/direction and the atmosphere conditions, the key variables in determining the time to recontact the ISS is highly dependent on the ballistic number (BN) difference between the object being jettisoned and the ISS.

Murri, Daniel G.↗

Topological Machine Learning Methods for Power System Responses to Contingencies

While deep learning tools, coupled with the emerging machinery of topological data analysis, are proven to deliver various performance gains in a broad range of applications, from image classification to biosurveillance to blockchain fraud detection, their utility in areas of high societal importance such as power system modeling and, particularly, resilience quantification in the energy sector yet remains untapped. To provide fast acting synthetic regulation and contingency reserve services to the grid while having minimal disruptions on customer quality of service, we propose a new topology-based system that depends on a neural network architecture for impact metric classification and prediction in power systems. This novel topology-based system allows one to evaluate the impact of three power system contingency types, in conjunction with transmission lines, transformers, and transmission lines combined with transformers. We show that the proposed new neural network architecture equipped with local topological measures facilitates more accurate classification of unserved load as well as the amount of unserved load. In addition, we are able to learn more about the complex relationships between electrical properties and local topological measurements on their simulated response to contingencies for the NREL-SIIP power system.

contingency analysis↗

Rooftop Photovoltaics and Electric Vehicle Co-Adoption: Attitudes, Norms, Diffusion, and Economics

The overall objectives of the project were to (1) Identify personal and social norms, peer effects, demographics and contextual factors (such as household energy expenditures, experience with outages, charging infrastructure availability) that may facilitate or hinder Solar-EV co-adoption; (2) outline strategies for the design of programs and practices that will enable reasoned RPV and EV adoption and their co-adoption; and (3) assemble a dataset comprised of survey responses of RPV-EV co-adopters, RPV-only adopters, EV-only adopters, and non-adopters. These objectives were only partially fulfilled given the decision to terminate the project. The research team was able to complete the semi-structured interviews, the core BY1 task and summarize the results below. As well, once the team learned of the research project’s fate, it sought and obtained the DOE SETO Technical Manager’s approval to repurpose funds for BY2 tasks to the extent feasible. Rather than invest further resources in expanding the pool of potential survey respondents and having no budget to survey, the research team repurposed funds subject and undertook a more limited (geographically) survey, but also expanded to it to include contingent valuation questions. The analysis of the survey data will necessarily be delayed given the lack of budget support, although some information on the respondent sample is in the results. Given a lack of attention to co-adoption previously, the insights generated in this project should assist decision-makers and industry actors in the development of programs and practices that enable reasoned RPV adoption and EV adoption and their co-adoption.

14 SOLAR ENERGY↗

Cost estimation: An expert-opinion approach

A methodology is outlined which can be used to estimate the costs of research and development projects. The approach uses the Delphi technique a method developed by the Rand Corporation for systematically eliciting and evaluating group judgments in an objective manner. The use of the Delphi allows for the integration of expert opinion into the cost-estimating process in a consistent and rigorous fashion. This approach can also signal potential cost-problem areas. This result can be a useful tool in planning additional cost analysis or in estimating contingency funds. A Monte Carlo approach is also examined.

Buffalano, C.↗

Risk Management Technique for design and operation of facilities and equipment

The Risk Management System collects information from engineering, operating, and management personnel to identify potentially hazardous conditions. This information is used in risk analysis, problem resolution, and contingency planning. The resulting hazard accountability system enables management to monitor all identified hazards. Data from this system are examined in project reviews so that management can decide to eliminate or accept these risks. This technique is particularly effective in improving the management of risks in large, complex, high-energy facilities. These improvements are needed for increased cooperation among industry, regulatory agencies, and the public.

Fedor, O. H.↗

The Deep Space Network information system in the year 2000

The Deep Space Network (DSN), the largest, most sensitive scientific communications and radio navigation network in the world, is considered. Focus is made on the telemetry processing, monitor and control, and ground data transport architectures of the DSN ground information system envisioned for the year 2000. The telemetry architecture will be unified from the front-end area to the end user. It will provide highly automated monitor and control of the DSN, automated configuration of support activities, and a vastly improved human interface. Automated decision support systems will be in place for DSN resource management, performance analysis, fault diagnosis, and contingency management.

Markley, R. W.↗

Illumination requirements for operating a space remote manipulator

Critical issues and requirements involved in illuminating remote manipulator operations in space help establish engineering designs for these manipulators. A remote manipulator is defined as any mechanical device that is controlled indirectly or from a distance by a human operator for the purpose of performing potentially dangerous or hazardous tasks to increase safety, reliability, and efficiency. Future space flights will rely on remote manipulators for a variety of tasks including satellite repair and servicing, structural assembly, data collection and analysis, and performance of contingency tasks. Carefully designed illumination of these manipulators will assure that these tasks will be completed efficiently and successfully. Studies concerning the influence of illumination on operation of a remote manipulator are few. Available results show that illumination can influence how successfully a human operates a remote manipulator. The intent of this study was to more fully examine this topic.

Chandlee, George O.↗

Community-wide Validation of Geospace Model Ground Magnetic Field Perturbation Predictions to Support Model Transition to Operations

In this paper we continue the community-wide rigorous modern space weather model validation efforts carried out within GEM, CEDAR and SHINE programs. In this particular effort, in coordination among the Community Coordinated Modeling Center (CCMC), NOAA Space Weather Prediction Center (SWPC), modelers, and science community, we focus on studying the models' capability to reproduce observed ground magnetic field fluctuations, which are closely related to geomagnetically induced current phenomenon. One of the primary motivations of the work is to support NOAA SWPC in their selection of the next numerical model that will be transitioned into operations. Six geomagnetic events and 12 geomagnetic observatories were selected for validation.While modeled and observed magnetic field time series are available for all 12 stations, the primary metrics analysis is based on six stations that were selected to represent the high-latitude and mid-latitude locations. Events-based analysis and the corresponding contingency tables were built for each event and each station. The elements in the contingency table were then used to calculate Probability of Detection (POD), Probability of False Detection (POFD) and Heidke Skill Score (HSS) for rigorous quantification of the models' performance. In this paper the summary results of the metrics analyses are reported in terms of POD, POFD and HSS. More detailed analyses can be carried out using the event by event contingency tables provided as an online appendix. An online interface built at CCMC and described in the supporting information is also available for more detailed time series analyses.

MAGNETIC↗

Simulation and Postmortem Analysis of Angeles Forest Disturbance Event

Multiple unexpected solar photovoltaic (PV) plant responses in the California region following contingencies in recent years warrant postmortem analysis leveraging digital fault recorder (DFR) data for a better understanding of such events and preventing similar events in the future. Most utilities in US, in general, possess transient stability (TS) phasor-domain models of the power grid. Since traditional phasor-based transient stability planning models cannot perform such analysis, this paper presents an approach to extract a region of such models and convert it to Electromagnetic transient (EMT) models. The approach is based on the determination of the minimum impedance-weighted spanning tree between the fault location and affected PV plants in a Western Electricity Coordinating Council (WECC) planning model followed by conversion of this region into an EMT model. The accuracy of the proposed approach is validated against DFR records obtained from the 2018 Angeles Forest disturbance event.

Samanta, Sayan↗

An assessment of nominal and contingency altitude reboost scenarios during Space Station assembly

The results of an analysis of several reboost scenarios for nominal and contingency SS operations during the Phase I assembly sequence are presented. Space Station program requirements on assembly and operational altitudes are outlined, and essential features of the SS reaction control system are described. A nominal reboost strategy designed to meet the current program requirements is presented. In addition, reboost strategies are developed for several contingency scenarios, including one missed STS mission, and an extended STS outage. It is shown that the time-averaged propellant 'cost' of maintaining altitude is greatest for equivalent continuous-thrusting altitude maintenance; it decreases with increasing reboost/rendezvous time interval to an asymptotic minimum value.

Bilardo, Vincent J., Jr.↗

The cryogenics analysis program for Apollo mission planning and analysis

The cryogenics analysis program was developed as a simplified tool for use in premission planning operations for the Apollo command service module. Through a dynamic development effort, the program has been extended to include real time and postflight analysis capabilities with nominal and contingency planning features. The technical aspects of the program and a comparison of ground test and mission data with data generated by using the cryogenics analysis program are presented. The results of the program capability to predict flight requirements also are presented. Comparisons of data from the program with data from flight results, from a tank qualifications program, and from various system anomalies that have been encountered are discussed. Future plans and additional considerations for the program also are included. Among these plans are a three tank management scheme for hydrogen, venting profile generation for Skylab, and a capability for handling two gas atmospheres. The plan for two gas atmospheres will involve the addition of the capability to handle nitrogen as well as oxygen and hydrogen.

Scott, W.↗

International Space Station (ISS) Accommodation of a Single US Assured Crew Return Vehicle (ACRV)

The following report was generated to give the International Space Station (ISS) Program some additional insight into the operations and issues associated with accommodating a single U.S. developed Assured Crew Return Vehicle (ACRV). During the generation of this report, changes in both the ISS and ACRV programs were factored into the analysis with the realization that most of the work performed will eventually need to be repeated once the two programs become more integrated. No significant issues associated with the ISS accommodating the ACRV were uncovered. Kinematic analysis of ACRV installation showed that there are viable methods of using Shuttle and Station robotic manipulators. Separation analysis demonstrated that the ACRV departure path clears the Station structure for all likely contingency scenarios. The payload bay packaging analysis identified trades that can be made between payload bay location, Shuttle Remote Manipulator System (SRMS) reach and eventual designs of de-orbit stages and docking adapters.

Mazanek, Daniel D.↗

UK regulatory review of the double contingency principle in criticality safety - 14379

The UK's regulatory regime is based on Licence Conditions (LCs) attached to a Nuclear Site Licence (NSL) and is non-prescriptive in nature. The law requires licensees to reduce health and safety risks to workers and the public 'so far as is reasonability practicable' (SFAIRP), and this framework provides licensees with flexibility to achieve this. Guidance for inspectors on the assessment of nuclear safety cases has been published in Office for Nuclear Regulation's (ONR) Safety Assessment Principles (SAPs) and supporting Technical Assessment Guides (TAGs). These guidance documents have recently been reviewed in the light of the Fukushima accident. The opportunity has also been taken to reconsider the use of the Double Contingency Principle used in criticality safety cases, an approach commonly regarded as the preferred means of criticality control internationally and featured in the SAPs and TAGs. Licensees in the UK have adopted several approaches in nuclear criticality safety cases based upon a combination of deterministic and probabilistic safety cases using the Double Contingency Principle and Design Basis Analysis. ONR has developed a targeted intervention to sample a number of nuclear safety cases in order to test the adequacy of methodologies used to secure nuclear criticality safety. This paper reports the results of this intervention and considers the need to review the advice currently given by the UK nuclear regulator, including on use of the Double Contingency Principle. (authors)

42 ENGINEERING↗

Contingency Power Study for Short Haul Civil Tiltrotor

AlliedSignal Engines (AE) defined a number of concepts that significantly increased the horsepower of a turboshaft engine to accommodate the loss of an engine and enable the safe landing of a twin-engined, 40-passenger, short haul civil tiltrotor. From these concepts, "Water/Methanol Injection," a "Better Power Turbine Than Required," and a "Secondary Combustor For Interturbine Reheat" were chosen, based on system safety and economics, for more detailed examination. Engine performance, mission, and cost analysis of these systems indicated contingency power levels of 26 to 70 percent greater than normal rated takeoff could be attained for short durations, thus enabling direct operating cost savings between 2 and 6 percent.

Eisenberg, Joseph D.↗

A Comment on the Suspected Solar Neutrino-Solar Activity Connection

Recently, it has been proposed that there exists a highly statistically significant (at greater than or equal to 98% level of confidence) relationship between Ar-37 production rate (viz., solar neutrinos) and the Ap geomagnetic index (viz., solar particles), based on the (chi)-square goodness-of-fit test and correlation analysis, for the interval 1970-1990. While a relationship between the two parameters, indeed, seems to be discernible, the strength of the relationship has been overstated. Instead of being significant at the afore-mentioned level of confidence, the relationship is found to be significant at only greater than or equal to 95% level of confidence, based on Yates' modification to the (chi)-square test for 2 x 2 contingency tables. Likewise, while correlation analysis yields a value of r = 0.2691, it is important to note that such a value suggests that only about 7% of the variance can be 'explained' by the inferred correlation and that the remaining 93% of the variance must be attributed to other sources.

Wilson, Robert M.↗

A comment on the suspected solar neutrino -- solar activity connection

Recently, it has been proposed that there exists a highly statistically significant (at greater than or equal to 98% level of confidence) relationship between Ar-37 production rate (namely, solar neutrinos) and the Ap geomagnetic index (namely, solar particles), based on the chi-square goodness-of-fit test and correlation analysis, for the interval 1970-1990. While a relationship between the two parameters, indeed, seems to be discernible, the strength of the relationship has been overstated. Instead of being significant at the afore-mentioned level of confidence, the relationship is found to be significant at only greater than or equal to 95% level of confidence, based on Yates' modification to the chi-square test for 2 x 2 contingency tables. Likewise, while correlation analysis yields a value of r = 0.2691, it is important to note that such a value suggests that only about 7% of the variance can be 'explained' by the inferred correlation and that the remaining 93% of the variance must be attributed to other sources.

Wilson, Robert M.↗