Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Completeness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Complete genome sequence of the termite hindgut bacterium Spirochaeta coccoides type strain (SPN1T), reclassification in the genus Sphaerochaeta as Sphaerochaeta coccoides comb. nov. and emendations of the family Spirochaetaceae and the genus Sphaerochaeta

Spirochaeta coccoides Dröge et al. 2006 is a member of the genus Spirochaeta Ehrenberg 1835, one of the oldest named genera within the Bacteria. S. coccoides is an obligately anaerobic, Gram-negative, non-motile, spherical bacterium that was isolated from the hindgut contents of the termite Neotermes castaneus. The species is of interest because it may play an important role in the digestion of breakdown products from cellulose and hemicellulose in the termite gut. Here we provide a taxonomic re-evaluation for strain SPN1T, and based on physiological and genomic characteristics, we propose its reclassification as a novel species in the genus Sphaerochaeta, a recently published sister group of the Spirochaeta. The 2,227,296 bp long genome of strain SPN1T with its 1,866 protein-coding and 58 RNA genes is a part of the GenomicEncyclopedia of Bacteria and Archaea project.

59 BASIC BIOLOGICAL SCIENCES↗

Completeness map evaluation demonstrated with candidate next-generation cardiac CT architectures

Purpose: In this report, the authors introduce the general concept of the completeness map, as a means to evaluate the completeness of data acquired by a given CT system design (architecture and scan mode). They illustrate the utility of completeness map by applying the completeness map concept to a number of candidate CT system designs, as part of a study to advance the state-of-the-art in cardiac CT. Methods: In order to optimally reconstruct a point within a volume of interest (VOI), the Radon transform on all possible planes through that point should be measured. The authors quantified the extent to which this ideal condition is satisfied for the entire image volume. They first determined a Radon completeness number for each point in the VOI, as the percentage of possible planes that is actually measured. A completeness map is then defined as a 3D matrix of the completeness numbers for the entire VOI. The authors proposed algorithms to analyze the projection datasets in Radon space and compute the completeness number for a fixed point and apply these algorithms to various architectures and scan modes that they are evaluating. In this report, the authors consider four selected candidate architectures, operating with different scan modes, for a total of five system design alternatives. Each of these alternatives is evaluated using completeness map. Results: If the detector size and cone angle are large enough to cover the entire cardiac VOI, a single-source circular scan can have {>=}99% completeness over the entire VOI. However, only the central z-slice can be exactly reconstructed, which corresponds to 100% completeness. For a typical single-source architecture, if the detector is limited to an axial dimension of 40 mm, a helical scan needs about five rotations to form an exact reconstruction region covering the cardiac VOI, while a triple-source helical scan only requires two rotations, leading to a 2.5x improvement in temporal resolution. If the source and detector of an inverse-geometry (IGCT) system have the same axial extent, and the spacing of source points in the axial and transaxial directions is sufficiently small, the IGCT can also form an exact reconstruction region for the cardiac VOI. If the VOI can be covered by the x-ray beam in any view, a composite-circling scan can generate an exact reconstruction region covering the VOI. Conclusions: The completeness map evaluation provides useful information for selecting the next-generation cardiac CT system design. The proposed completeness map method provides a practical tool for analyzing complex scanning trajectories, where the theoretical image quality for some complex system designs is impossible to predict, without yet-undeveloped reconstruction algorithms.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Closeout of the Melton Valley Completion Project at the Oak Ridge National Laboratory

The U.S. Department of Energy DOE Order 413.3A (Program and Project Management for the Acquisition of Capital Assets) identifies major milestones in a project life cycle that require approval upon achievement, including Critical Decision-4 (CD-4), the project completion milestone. A CD-4 document is required for all DOE projects in accordance with DOE Order 413.3A, Program and Project Management for Acquisition of Capital Assets. A conditional CD-4 report was prepared for the Melton Valley Completion Project (MVCP) in order to document the completion of the remedial action in the Melton Valley watershed. Approval of the MVCP CD-4 was 'conditional' pending final resolution of a small quantity of unexpected pyrophoric material, with no current disposition pathway, remaining in one of the waste trenches that were to be remediated as part of the completion project. This paper will provide an overview of the MVCP remediation work and the process successfully used to demonstrate closeout of a major CERCLA project in accordance with DOE requirements. In summary: The MV ROD was planned to be completed in 12 years; however, under the ACP the remedial activities were completed 6 years ahead of schedule (September 2006). Highlights of the remedial actions include: - Completion of remedial action activities at 219 release sites identified in the MV ROD. - Construction of 58 hectares of multilayer caps for SWSA 4, SWSA 5, SWSA 6, Pits 2, 3 and 4 and Trenches 5, 6, and 7; - Complete excavation, retrieval and over-pack of 204 casks, 8 boxes, and 530 m{sup 3} of loose waste from the TRU waste retrieval project; - Complete demolition and disposition of approx. 557 m{sup 2} of various buildings such as HRE ancillary facilities, NHF, Liquid LLW pumping stations, 7841 Scrap Yard, misc. storage buildings, and well P and A; - Removal of LLW sludges and stabilization of T-1, T-2, and HFIR tanks; - In situ grouting/stabilization of approx. 12 km of inactive waste pipelines; - Excavation and disposition of approx. 38,000 m{sup 3} of soil from HFIR impoundments, HRE cryogenic pond, IHP and contaminated soil from miscellaneous leak sites; - Completion of in-situ grouting of LLLW matrix at Trenches 5 and 7. The CD-4 document to demonstrate attainment of the project completion milestone was prepared to document close-out activities. Approval of the MVCP CD-4 was obtained but deemed 'conditional' pending final resolution of a small quantity of unexpected pyrophoric material, with no current disposition pathway, remaining in Trench 13 of the 22 Trench Area in SWSA 5N. DOE is currently evaluating options for the final disposition of this material and has committed to resolution of the issue by the end of Fiscal Year 2008. At that time, all aspects of the Melton Valley Completion Project will be complete. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Completion Effects on Diagnosing Multistage Facture Treatments with Distributed Temperature Sensing

Summary Distributed temperature sensing (DTS) is a valuable tool to diagnose multistage hydraulic fracture treatments. When a stage interval is shut in, the clusters that take more fluid during pumping warm up more slowly. Therefore, the fluid volume injected into each cluster can be quantitatively interpreted by numerical inversion of the warm-back temperature behavior. This general concept assumes that the different warm-back behavior is controlled by only the injected fluid volume; however, recent observations of DTS data indicate that completion configurations significantly influence the warm-back behavior. This paper investigates the completion effects on the DTS interpretation. In ideal conditions, when a stage is fractured, the upstream stage intervals should show an almost uniform temperature that is close to the injected fluid temperature. This is due to the high fluid velocity of injected fluid in the wellbore, and the upstream intervals have not been perforated (noncommunicating intervals), so the only heat transfer is heat conduction between the wellbore fluid and the surrounding reservoir. But the field DTS data show considerably irregular variations in temperature along the upstream stage intervals. These variations are caused by the completion effects. The nonuniform temperature profile is caused by different heat transfer behavior induced by completion hardware along the production casing string, such as joints, clamps, and blast protectors, and by the sensing cable location in the cement, as well as the cement quality. Because the varying heat transfer behavior impacts the warm-back behavior as well as the temperature profile, the completion effects need to be considered in DTS interpretation. A method of DTS interpretation considering the completion effects to diagnose multistage fracture treatments was developed. Because the heat transfer between a wellbore and a reservoir depends on the overall heat transfer coefficient describing heat conduction through the completion in a forward model, this parameter needs to be tuned all along the wellbore. To calibrate the completion effect, the temperature inversion is conducted using the temperature measured at a stage interval that is upstream of a stage interval currently being treated. Because the interpreted stage interval is not perforated at that time, the thermal behavior at the noncommunicating interval is governed by only the heat conduction through the completion environment. Once the effective values of the overall heat transfer coefficient are estimated along the interpreted stage interval, they can be assumed to be constant physical parameters. Then, the fluid volume distribution is interpreted by using the effective overall heat transfer coefficient profile along each interval. This study provides a field application of the developed interpretation method. The new interpretation method provides more accurate diagnosis of fracture treatments by DTS interpretation.

Engineering↗

Evaluation of “Tight Oil” Well Performance and Completion Practices in the Powder River Basin - “Time Slice” Analysis

The objective of this paper is to assess how well completion practices and well performance have evolved over time (“time slices”) in the tight sands and shales of the Powder River Basin (PRB). This information can provide a foundation for helping operators define more effective well completion practices and thus optimize well performance in an emerging “tight oil” basin. To start, the authors assembled a “database” containing well completion practices, production data, and geologic information for more than 800 horizontal (Hz) wells targeting three “tight oil” formations -- Turner, Frontier, and Mowry--placed on production in the past dozen years. To control for the impact of geologic and reservoir properties on well performance, the authors defined 12 geologically distinct areas (“partitions”) for the Turner, Frontier, and Mowry Shale in the Powder River Basin (4 partitions in each formation). This paper discusses the methodology for establishing “time slices” for each partition within each of the three “tight oil” formations, including (1) taking out, to the extent practical, the effects of geology by partitioning the three “tight oil” formations based on their geologic parameters; (2) using type curves and estimated ultimate recoveries (EURs) to establish a reliable measure of well performance; and (3) rigorously inspecting the production and well completion data to assure a quality dataset. Partition #2, a high thermal maturity area of the Frontier Sandstone in the western Powder River Basin, helps illustrate the results of the study. Using a dataset of 55 Hz wells, the study found that well performance has steadily improved, with oil EURs increasing from 180 MBbl in 2012-13 to 290 MBbl in 2018-19. Much of this improvement was due to the use of longer Hz laterals, increasing notably from 3,765 ft in 2012-13 to 10,260 ft in 2018-19. More intensive completion practices contributed, as well. For example, the number of frac stages more than doubled, from 17 to 35, and proppant concentrations increased from 1,060 lbs/ft to 1,320 lbs/ft. Finally, the data show diminishing returns to longer laterals and more intensive completion practices. For example, the key performance measure of oil EUR per 1,000 ft of lateral is decreasing. For 2012-13, Hz wells recovered 50 MBbl of oil per 1,000 ft of lateral while the more recent 2018-19 Hz wells only provide 30 MBbl of oil per 1,000 ft of lateral. Considerable insight can be gained by using “time slices” and geologic partitioning to better understand the relationship between changes in well drilling and completion practices and changes in well performance in emerging “tight oil” plays. The results from this study can also serve as a foundation for subsequent, more intense efforts involving data analytics for defining more optimum well completion practices targeting specified geologic settings and formations.

02 PETROLEUM↗

Analysis of Completion Design Impact on Cluster Efficiency and Pressure-Based Well Communication in HFTS-2 Delaware Basin

The Hydraulic Fracturing Test Site 2 (HFTS-2) is a joint industry project in the Delaware basin to advance hydraulic fracturing understanding and improve productivity in shale reservoirs. The project integrates multi-disciplinary approaches to evaluate different completion designs, well spacing, inter-well communication, and stimulated rock volume, among other factors. This paper focused on two major areas related to hydraulic fracture performance. First, an analysis of different completion designs on cluster efficiency based on near well Distributed Acoustic Sensing (DAS). Second, an evaluation of well and completion designs on inter-well fracture driven interactions (FDIs) based on downhole pressure monitoring. Fluid/sand distribution and cluster efficiency analyses were based on near wellbore DAS data collected from two adjacent horizontal wells completed in two different landing zones in the Wolfcamp formation. These wells had different completion designs aiming to evaluate the effect of normal vs. extended stage lengths, perforation hole tapering and limited entry. Standard deviation from ideal fluid/sand distribution and waterfall plots were used to evaluate cluster efficiency for each design and stage. Inter-well FDIs analysis was conducted among the horizontal wells and a vertical monitor well. One horizontal well served as the monitor well while the other horizontal well was being treated. The vertical well was instrumented with downhole pressure and temperature gauges to aid monitoring fracture height growth. The pressure response during and after fracturing was characterized based on maximum pressure increase value and slope. Pressure response vs. FDIs trigger factors such distance, cluster efficiency and stage fluid volume were also analyzed. Based on the different completion and perforation designs tested, DAS analysis suggests that limited entry design worked best. Extreme limited entry showed the potential of high perforation erosion and reduced cluster efficiency. Here, the limited entry and tapered perforation design demonstrated potential to improve the cluster efficiency for extended stage lengths. Pressure monitoring across formation units proved to be critical to understand fracture interactions and fracture vertical growth. Pressure communication across different formation units during hydraulic fracturing operation indicate fractures grew upwards during Wolfcamp wells fracturing. However, this pressure communication dissipated over time. High intensity FDIs were recorded when the frac stages Downloaded from http://onepetro.org/URTECONF/proceedings-pdf/21URTC/1-21URTC/D011S018R001/2477607/urtec-2021-5289-ms.pdf/1 by Carol Worster on 28 February 2022 URTeC 5289 were closer to the pressure gauge location in the monitor wells. Some of these stages that produced high intensity FDIs also had high fluid volume per cluster and low cluster efficiency. The multi-disciplinary and high-quality data collected from HFTS-2 helped to further understand why completion approaches such as limited entry and tapered perforation design are successful in improving cluster efficiency. The DAS data combined with downhole high-resolution pressure measurements also helped to quantify the effect of lower cluster efficiency data on the incidence and intensity of FDIs.

58 GEOSCIENCES↗

Completion Design Considerations for a Horizontal Enhanced Geothermal System

The petroleum industry has had considerable success in recent decades in developing unconventional shale plays using horizontal drilling and multi-zonal isolation and stimulation techniques to fracture tight formations to enable the commercial production of oil and gas. Similar well completions could be used in Enhanced Geothermal Systems (EGS) to create multiple fractures from horizontal wells. This study assesses whether well completion techniques used in the unconventional shale industry to create multi-stage fractures can be applied to an enhanced geothermal system, with a focus on the completion of the EGS injection well. This study assumes an Enhanced Geothermal System (EGS) consisting of a central horizontal injection well flanked on each side by horizontal production wells, connected to the injection well by multiple fractures. The focus is on the design and completion of the horizontal well. For the purpose of developing design criteria, a reservoir temperature of 200 degrees C (392 degrees F) and an injection well flow rate of 87,000 barrels per day (160 kg/s), corresponding to production well flow rates of 43,500 barrels per day (80 kg/s) is assumed. The analysis found that 9-5/8 inches 53.5 pounds per foot (ppf) P110 casing string with premium connections meets all design criteria for the horizontal section of injection well. A P110 grade is fairly common and is often used in horizontal sections of shale development wells in petroleum operations. Next, several zonal isolation systems commonly used in the shale gas industry were evaluated. Three techniques were evaluated -- a 'plug and perf' design, a 'sand and perf' design, and a 'packer and port' design. A plug and perf system utilizes a cemented casing throughout the length of the injector wellbore. The sand and perf system is identical to the plug and perf system, but replaces packers with sand placed in the casing after stimulation to screen out the stimulated perforated zones and provide zonal isolation. The packer and port completion approach utilizes an open horizontal hole that zonally isolates areas through the use of external packers and a liner. A review of technologies used in these systems was performed to determine if commercially available equipment from the petroleum industry could be used at the temperatures, pressures, and sizes encountered in geothermal settings. The study found no major technical barriers to employing shale gas multi-zonal completion techniques in a horizontal well in a geothermal setting for EGS development. For all techniques considered, temperature limitations of equipment are a concern. Commercially available equipment designed to operate at the high temperatures encountered in geothermal systems are available, but is generally unproven for geothermal applications. Based on the study, further evaluation of adapting oil and gas completion techniques to EGS is warranted.

15 GEOTHERMAL ENERGY↗

Complete tunneling of light through impedance-mismatched barrier layers

We investigate the conditions for and properties of the complete tunneling of light through a composite barrier made of impedance-mismatched metamaterial layers. It is shown that two kinds of complete tunneling phenomena exist: phase-unmodulated and phase-modulated complete tunneling. The local surface modes formed near the interfaces between the metamaterial barrier layers play key roles in complete tunneling. Using the terminology of coupled-mode theory, phase-unmodulated complete tunneling occurs through successive mode couplings: from the incident light to the local surface mode and then to the other local surface mode and finally to the light mode in the transmission layer. Phase-modulated complete tunneling results from the complete transfer of the incident optical power to the transmission layer through the direct mediation of the symmetrically and antisymmetrically coupled supermodes of the local surface modes.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Direct memory access transfer completion notification

DMA transfer completion notification includes: inserting, by an origin DMA engine on an origin node in an injection first-in-first-out (`FIFO`) buffer, a data descriptor for an application message to be transferred to a target node on behalf of an application on the origin node; inserting, by the origin DMA engine, a completion notification descriptor in the injection FIFO buffer after the data descriptor for the message, the completion notification descriptor specifying a packet header for a completion notification packet; transferring, by the origin DMA engine to the target node, the message in dependence upon the data descriptor; sending, by the origin DMA engine, the completion notification packet to a local reception FIFO buffer using a local memory FIFO transfer operation; and notifying, by the origin DMA engine, the application that transfer of the message is complete in response to receiving the completion notification packet in the local reception FIFO buffer.

97 MATHEMATICS AND COMPUTING↗

Direct memory access transfer completion notification

Methods, systems, and products are disclosed for DMA transfer completion notification that include: inserting, by an origin DMA on an origin node in an origin injection FIFO, a data descriptor for an application message; inserting, by the origin DMA, a reflection descriptor in the origin injection FIFO, the reflection descriptor specifying a remote get operation for injecting a completion notification descriptor in a reflection injection FIFO on a reflection node; transferring, by the origin DMA to a target node, the message in dependence upon the data descriptor; in response to completing the message transfer, transferring, by the origin DMA to the reflection node, the completion notification descriptor in dependence upon the reflection descriptor; receiving, by the origin DMA from the reflection node, a completion packet; and notifying, by the origin DMA in response to receiving the completion packet, the origin node's processing core that the message transfer is complete.

97 MATHEMATICS AND COMPUTING↗

HFTS-2 Completions Design and State-of-the-Art Diagnostics Results

Various completion schemes were tested as part of the Hydraulic Fracture Test Site-2 (HFTS-2) project. The wells were instrumented with permanent fiber optic (FO) cable, and unique near-wellbore and far-field region surveys were acquired to evaluate spatial and temporal hydraulic fracture characteristics. The state-of-the-art diagnostics included substantial monitoring of both the well stimulation and longer-term production performance. The objective was to evaluate and improve stimulation distribution effectiveness (SDE) for different completion designs based on the diagnostics results. A hydraulic fracturing (HF) profile (i.e., proppant/fluid allocation among clusters) was obtained using near-wellbore Distributed Acoustic Sensing (DAS) data acquired during stimulation. Statistical analysis provided a quantitative assessment of SDE for the different completion designs. A novel workflow was developed to assess time-lapse fracture property changes at the cluster and stage levels based on Distributed Strain Sensing (DSS) data acquired during the production phase. These time-lapse fracture property changes were compared with the HF profile. Based on the statistical analysis, Rate Per Cluster (RPC) during proppant slurry placement appears to be a primary completion design variable, rather than the typical Rate Per Perf (RPP). If RPC was not maintained at a certain level, the likelihood of uneven distribution increased dramatically. The stage configurations that created low RPC while maintaining high RPP did not show improved SDE. The strain change results based on DSS data during the production phase indicated near-wellbore fracture property changes (e.g., aperture changes during well shut-in and flow periods) and aligned well with near-wellbore DAS signals acquired during stimulation. More importantly, fracture property changes based on DSS data acquired during two tests over a 7-month period show high consistency and good alignment with the near-wellbore HF profile. This workflow quantitatively evaluates SDE for different completion designs using diagnostic results and could help optimize completion strategy for future development projects. Here, the analysis and interpretation of results demonstrate the technical feasibility of using permanent fiber optic cable for stimulation and production monitoring and indic

58 GEOSCIENCES↗

EFFECTS OF DIFFUSE BACKGROUND EMISSION AND SOURCE CROWDING ON PHOTOMETRIC COMPLETENESS IN SPITZER SPACE TELESCOPE IRAC SURVEYS: THE GLIMPSE CATALOGS AND ARCHIVES

We characterize the completeness of point source lists from Spitzer Space Telescope surveys in the four Infrared Array Camera (IRAC) bandpasses, emphasizing the Galactic Legacy Infrared Mid-Plane Survey Extraordinaire (GLIMPSE) programs (GLIMPSE I, II, 3D, 360; Deep GLIMPSE) and their resulting point source Catalogs and Archives. The analysis separately addresses effects of incompleteness resulting from high diffuse background emission and incompleteness resulting from point source confusion (i.e., crowding). An artificial star addition and extraction analysis demonstrates that completeness is strongly dependent on local background brightness and structure, with high-surface-brightness regions suffering up to five magnitudes of reduced sensitivity to point sources. This effect is most pronounced at the IRAC 5.8 and 8.0 {mu}m bands where UV-excited polycyclic aromatic hydrocarbon emission produces bright, complex structures (photodissociation regions). With regard to diffuse background effects, we provide the completeness as a function of stellar magnitude and diffuse background level in graphical and tabular formats. These data are suitable for estimating completeness in the low-source-density limit in any of the four IRAC bands in GLIMPSE Catalogs and Archives and some other Spitzer IRAC programs that employ similar observational strategies and are processed by the GLIMPSE pipeline. By performing the same analysis on smoothed images we show that the point source incompleteness is primarily a consequence of structure in the diffuse background emission rather than photon noise. With regard to source confusion in the high-source-density regions of the Galactic Plane, we provide figures illustrating the 90% completeness levels as a function of point source density at each band. We caution that completeness of the GLIMPSE 360/Deep GLIMPSE Catalogs is suppressed relative to the corresponding Archives as a consequence of rejecting stars that lie in the point-spread function wings of saturated sources. This effect is minor in regions of low saturated star density, such as toward the Outer Galaxy; this effect is significant along sightlines having a high density of saturated sources, especially for Deep GLIMPSE and other programs observing closer to the Galactic center using 12 s or longer exposure times.

79 ASTRONOMY AND ASTROPHYSICS↗

Low-rank Tensor Completion for PMU Data Recovery

This paper proposes a tensor completion method for the recovery of missing phasor measurement unit (PMU) measurements. Tensor completion as the general case of matrix completion has attracted increasing attention in recent years. The imputation accuracy for the existing matrix completion methods may be significantly reduced when there are consecutive data losses across multiple data channels. To tackle this issue, we explore the multi-way characteristics of PMU measurements by using a tensor model. We leverage the low-rank property of the PMU measurements and formulate the missing PMU data recovery problem as a low-rank tensor completion problem. An efficient algorithm based on alternating direction method of multipliers (ADMM) is developed to solve the tensor completion problem. The experiments using the real PMU dataset show that the proposed method exhibits better imputation accuracy compared with the conventional data recovery methods.

Ghasemkhani, Amir↗

Application of Horizontal Well Completion Techniques to Enhanced Geothermal Systems: Final Report October 2015 - September 2016

The petroleum industry has had success in developing unconventional shale plays using horizontal drilling and multi-zonal isolation and stimulation techniques to fracture tight formations, thus enabling the commercial production of oil and gas. Wellbore similarity exists with enhanced geothermal system (EGS) proposals. The technologies and techniques from the petroleum industry are being stretched to accommodate the higher temperatures, high water flow rates, and large-diameter completions encountered in geothermal settings. In this study, we assess whether well completion techniques used in the unconventional shale industry to create multi-stage fractures can be applied to an enhanced geothermal system, focusing on the fracture construction and completion of the EGS production well. We reviewed technologies used in these systems to determine if commercially available equipment from the petroleum industry could be used at the temperatures, pressures, and sizes encountered in geothermal settings. Our study found no major technical barriers to employing shale gas multi-zonal completion techniques in a horizontal well in a geothermal setting for EGS development. Temperature limitations of equipment are a concern for all techniques considered. Equipment designed to operate at high temperatures encountered in geothermal systems is commercially available, but is generally unproven for geothermal applications. Based on our study, further evaluation is warranted on adapting oil and gas completion techniques to EGS. This project is a continuation of the FY14 Horizontal Geothermal Completion project sponsored by the U.S. Department of Energy through the National Renewable Energy Laboratory and the Colorado School of Mines.

15 GEOTHERMAL ENERGY↗

Fiscal Year 2008 Phased Construction Completion Report for EU Z2-33 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee

The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2161&D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2224&D3) (Zone 2 RDR/RAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone 1 exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowing identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program and remedial actions (RAs) were completed for EU Z2-33. Remedial action was also performed at two additional areas in adjacent EU Z2-42 because of their close proximity and similar nature to a small surface soil RA in EU Z2-33. Remedial actions for building slabs performed in EU Z2-33 during fiscal year (FY) 2007 were reported in the Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2723&D1). Recommended RAs for EU Z2-42 were described in the Fiscal Year 2006 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2317&D2). Remedial actions performed in the Balance of Site (BOS) Laboratory Area of EU Z2-33 and two small areas in EU Z2-42 are described in Sects. 5 through 10 of this Phased Construction Completion Report (PCCR). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for EU Z2-33; (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs; (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results; and (4) Describe RAs performed in the EU Z2-33 BOS Laboratory Area and two small areas in EU Z2-42. Approximately 18 acres in EU Z2-33 are addressed in this PCCR. Based on the results of the DVS evaluation and RAs performed, all 18 acres are recommended for unrestricted industrial use to 10 ft bgs. Three Federal Facility Agreement sites are addressed and recommended for no further action within this acreage, including: (1) K-1004-L Recirculating Cooling Water Lines Leak Sites; (2) K-1044 Heavy Equipment Repair Shop; and (3) K-1015-A Laundry Pit. Remedial actions for EU Z2-33 were developed in response to DVS characterization results described in the EU Z2-33 Technical Memorandum (Appendix A) and to support reindustrialization of the East Tennessee Technology Park as a commercial industrial park. Remediation criteria were designed for the protection of a future industrial worker who normally would not have the potential for exposure to soil below 10ft bgs. Accordingly, the Zone 2 ROD required land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likelihood of land use controls in EU Z2-33 being modified to: (1) eliminate the restriction on disturbance of soils below 10 ft bgs where data indicate the absence of residual contamination at any depth that would result in an unacceptable risk to the future industrial worker, and (2) permit alternative land uses that would be protective of future site occupants. Results of this screening evaluation indicate a low probability that restrictions on disturbing soil below 10 ft bgs could be safely eliminated for EU Z2-33. A qualitative screening evaluation considered the likelihood of unrestricted land use being protective of future site occupants. Based on this qualitative assessment, all 18 acres addressed in this PCCR were assigned a low probability for consideration of release for unrestricted land use.

54 ENVIRONMENTAL SCIENCES↗

Completeness of the NASA/IPAC Extragalactic Database (NED) Local Volume Sample

We introduce the NASA/IPAC Extragalactic Database (NED) Local Volume Sample (NED-LVS), a subset of ~1.9 million objects with distances out to 1000 Mpc. We use UV and IR fluxes available in NED from all-sky surveys to derive physical properties, and estimate the completeness relative to the expected local luminosity density. The completeness relative to near-IR luminosities (which traces a galaxy's stellar mass) is roughly 100% at D < 30 Mpc and remains moderate (70%) out to 300 Mpc. For brighter galaxies (≳L * ), NED-LVS is ~100% complete out to ~400 Mpc. When compared to other local Universe samples (GLADE and HECATE), all three are ~100% complete below 30 Mpc. At distances beyond ~80 Mpc, NED-LVS is more complete than both GLADE and HECATE by ~10%–20%. NED-LVS is the underlying sample for the NED gravitational-wave follow-up service (NED-GWF), which provides prioritized lists of host candidates for GW events within minutes of alerts issued by the LIGO–Virgo–KAGRA collaboration. We test the prioritization of galaxies in the volume of GW170817 by three physical properties, where we find that both stellar mass and inverse specific star formation rate place the correct host galaxy in the top 10. In addition, NED-LVS can be used for a wide variety of other astrophysical studies: galaxy evolution, star formation, large-scale structure, galaxy environments, and more. The data in NED are updated regularly, and NED-LVS will be updated concurrently. Consequently, NED-LVS will continue to provide an increasingly complete sample of galaxies for a multitude of astrophysical research areas for years to come.

79 ASTRONOMY AND ASTROPHYSICS↗

Direct memory access transfer completion notification

Methods, apparatus, and products are disclosed for DMA transfer completion notification that include: inserting, by an origin DMA engine on an origin compute node in an injection FIFO buffer, a data descriptor for an application message to be transferred to a target compute node on behalf of an application on the origin compute node; inserting, by the origin DMA engine, a completion notification descriptor in the injection FIFO buffer after the data descriptor for the message, the completion notification descriptor specifying an address of a completion notification field in application storage for the application; transferring, by the origin DMA engine to the target compute node, the message in dependence upon the data descriptor; and notifying, by the origin DMA engine, the application that the transfer of the message is complete, including performing a local direct put operation to store predesignated notification data at the address of the completion notification field.

Archer, Charles J↗

Signaling completion of a message transfer from an origin compute node to a target compute node

Signaling completion of a message transfer from an origin node to a target node includes: sending, by an origin DMA engine, an RTS message, the RTS message specifying an application message for transfer to the target node from the origin node; receiving, by the origin DMA engine, a remote get message containing a data descriptor for the message and a completion notification descriptor, the completion notification descriptor specifying a local memory FIFO data transfer operation for transferring data locally on the origin node; inserting, by the origin DMA engine in an injection FIFO buffer, the data descriptor followed by the completion notification descriptor; transferring, by the origin DMA engine to the target node, the message in dependence upon the data descriptor; and notifying, by the origin DMA engine, the application that transfer of the message is complete in dependence upon the completion notification descriptor.

97 MATHEMATICS AND COMPUTING↗