Pumped Storage Hydropower (PSH) FAST Commissioning Prize Technical Analysis

The US energy landscape has undergone major changes over the past 10 years and will continue to see significant changes in future decades as the power grid increases its reliance on variable renewable energy resources. Because of the inherent variability of these resources, renewable energy growth may require additional energy storage capacity to provide flexible load-following capabilities and other grid services that can quickly adjust to changes in energy demand and generation. Pumped storage hydropower (PSH)—one such energy storage technology—uses pumps to convey water from a lower reservoir to an upper reservoir for energy storage and releases water back to the lower reservoir via a powerhouse for hydropower generation. PSH facility pump and generation cycling often follows economic and energy demand conditions. Across the United States, 43 PSH facilities are in operation and 55 projects are in various permitting or licensing stages. Altogether, the 43 operational projects provide the wide majority (95%) of utility-scale electricity storage in the United States. These facilities also provide significant power and nonpower grid benefits, including large-scale electrical system reserve capacity, grid reliability support, and electricity supply-demand balancing through quick-response capabilities and operational flexibility. PSH systems can accomplish these at a scale (e.g., size) and cost that makes these systems highly attractive from a technical standpoint. Although these research concepts are still in their infancy, they demonstrate promising potential as future PSH energy storage technologies. Although PSH has many advantages, development in the United States has effectively stalled since the 1990s, partially because of the magnitude of project costs and financing interest during development and construction, the length of time from project investment until project revenue begins, permitting challenges, construction risks, competition from other storage technologies (e.g., batteries, hydrogen storage), and electricity market evolution and uncertainty. In short, the time, cost, and risk associated with modern PSH development have resulted in limited growth in the United States recently, despite the growing energy storage demand stemming from increased wind and solar power deployment. Technology innovation is needed to help reduce PSH commissioning time, cost, and risk, particularly during the post-licensing phase of project development. To address challenges facing the PSH industry and to improve PSH commissioning timelines, the US Department of Energy (DOE) Water Power Technologies Office (WPTO) initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning Prize project.

13 HYDRO ENERGY↗

Lessons from commissioning of the cryogenic system for the Short-Baseline Neutrino Detector at Fermilab

Results from commissioning and first year of operations of the cryogenic system of the Short-Baseline Neutrino Detector (SBND) and its membrane cryostat installed at the Fermi National Accelerator Laboratory are described. The SBND detector is installed in a 200 m3 membrane cryostat filled with liquid argon, which serves both as target and as active media. For the correct operation of the detector, the liquid argon must be kept in very stable thermal conditions while the contamination of electronegative impurities must be consistently kept at the level of small fractions of parts per billion. The detector is operated in Booster Neutrino Beams (BNB) at Fermilab for the search of sterile neutrinos and measurements of neutrino-argon cross sections. The cryostat and the cryogenic systems also serve as prototypes for the much larger equipment to be used for the LBNF/DUNE experiment. Since its installation in 2018-2023 and cooldown in spring of 2024, the cryostat and the cryogenic system have been commissioned to support the detector operations. The lessons learned through installation, testing, commissioning, cooldown, and initial operations are described.

Geynisman, Michael [Fermilab]↗

Sensorium: commissioning abundant sensors with augmented reality and QR codes

In the future, it will be possible to build high-quality models of building interiors based on data from a dense fleet of sensors reporting on air volumes much smaller than a room or zone. To enable such models, we are creating technologies that allow a fleet of sensors to be commissioned quickly at low cost. Our sensor commissioning process builds a 3D model of each building interior that includes sensor positions and sensor networking information such as sensor MAC addresses. It employs multiple technologies, including augmented reality, LiDAR, QR codes, and computer vision. Sensors can be commissioned at more than 10x the speed and at less than one tenth the cost of traditional approaches.

Bier, Eric A.↗

Geothermal research and development program of the US Atomic Energy Commission

Within the overall federal geothermal program, the Atomic Energy Commission has chosen to concentrate on development of resource utilization and advanced research and technology as the areas most suitable to the expertise of its staff and that of the National Laboratories. The Commission's work in geothermal energy is coordinated with that of other agencies by the National Science Foundation, which has been assigned lead agency by the Office of Management and Budget. The objective of the Commission's program, consistent with the goals of the total federal program is to facilitate, through technological advancement and pilot plant operations, achievement of substantial commercial production of electrical power and utilization of geothermal heat by the year 1985. This will hopefully be accomplished by providing, in conjunction with industry, credible information on the economic operation and technological reliability of geothermal power and use of geothermal heat.

Werner, L. B.↗

Report of the Presidential Commission on the Space Shuttle Challenger Accident, Volume 1

The findings of the Commission regarding the circumstances surrounding the Challenger accident are reported and recommendations for corrective action are outlined. All available mission data, subsequent tests, and wreckage analyses were reviewed and specific failure scenarios were developed. The Commission concluded that the cause of the Mission 51-L accident was the failure of the pressure seal in the aft field joint of the right solid rocket motor. The failure was due to a faulty design unacceptably sensitive to a number of factors. These factors were the effects of temperature, physical dimensions, the character of materials, the effects of reuse, processing, and the reaction of the joint to dynamic loading. In addition to analyzing the material causes of the accident, the Commission examined the chain of decisions that culminated in approval of the launch. It concluded that the decision making process was flawed in several ways including (1) failure in communication resulting in a launch decision based on incomplete and misleading information, (2) a conflict between engineering data and management judgements, and (3) a NASA management structure that permitted flight safety problems to bypass key Shuttle managers.

Rogers, W. P.↗

Implementation of the Recommendations of the Presidential Commission on the Space Shuttle Challenger Accident

This final status report describes the actions taken by NASA in response to the recommendations of the Presidential Commission on the Space Shuttle Challenger Accident (Mission 51-L). The Commission recommendations and NASA's responses to them are summarized in the Executive Summary, which is accompanied by a schedule showing significant program milestones. A detailed discussion of the activities undertaken by NASA to implement each of the nine Commission recommendations is included and other related NASA actions required for safe return to flight are discussed. A copy of the interim plan submitted to the President one year ago and other significant reference documents are included as appendixes.

Source record↗

Commissioning Results on the JWST Testbed Telescope

The one-meter 18 segment JWST Testbed Telescope (TBT) has been developed at Ball Aerospace to facilitate commissioning operations for the JWST Observatory. Eight different commissioning activities were tested on the TBT: telescope focus sweep, segment ID and Search, image array, global alignment, image stacking, coarse phasing, fine phasing, and multi-field phasing. This paper describes recent commissioning results from experiments performed on the TBT.

Dean, Bruce H.↗

NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

Hoover, Jay C.↗

Dynamic Control System Performance during Commissioning of the Space Technology 7-Disturbance Reduction System Experiment of LISA Pathfinder

The Space Technology-7 Disturbance Reduction System (DRS) launched aboard the European Space Agencys LISA Pathfinder spacecraft on December 3, 2015, after more than a decade in development. DRS consists of three prima-ry components: an Integrated Avionics Unit (IAU), Colloidal MicroNewton Thrusters, and Dynamic Control System (DCS) algorithms implemented on the IAU. During the portions of the mission in which the DRS was under control, the DCS was responsible for controlling the spacecraft and the free-floating test masses that were part of the LISA Test Package. The commissioning period was originally divided into two periods: before propulsion separation and after pro-pulsion separation. A recommissioning period was added after an anomaly oc-curred in the thruster system. The paper will describe the activities used to com-mission DRS, present results from the commissioning of the DCS and the re-commissioning activities performed after the thruster anomaly.

Hsu, Oscar↗

Dynamic Control System Performance during Commissioning of the Space Technology 7-Disturbance Reduction System Experiment of LISA Pathfinder

The Space Technology-7 Disturbance Reduction System (DRS) launched aboard the European Space Agency's LISA Pathfinder spacecraft on December 3, 2015, after more than a decade in development. DRS consists of three primary components: an Integrated Avionics Unit (IAU), Colloidal MicroNewton Thrusters, and Dynamic Control System (DCS) algorithms implemented on the IAU. During the portions of the mission in which the DRS was under control, the DCS was responsible for controlling the spacecraft and the free-floating test masses that were part of the LISA Test Package. The commissioning period was originally divided into two periods: before propulsion separation and after propulsion separation. A recommissioning period was added after an anomaly occurred in the thruster system. The paper will describe the activities used to commission DRS, present results from the commissioning of the DCS and the recommissioning activities per-formed after the thruster anomaly.

Hsu, Oscar↗

Astrobee On-Orbit Commissioning

The Astrobee free flying robots operate in the interior of the International Space Station (ISS) under supervisory control of a ground operator or ISS crew. They replace the Synchronized Position Hold Engage and Reorient Experimental Satellites (SPHERES) as research platforms for zero-g free-flying robotics. Astrobee also provides a tool for improving the efficiency of ISS operations as a mobile camera/sensor platform available to flight and payload controllers. The Astrobee system consists of three robots with perching arms, a docking station, and a ground data system. Development began in late-2014, and flight hardware has been deployed to ISS on several launches starting in November 2018 and concluding in October 2019. Shortly after the first two robots arrived on ISS in April, we began a series of "commissioning" activities to validate both space and ground segments. We plan to complete commissioning and become an operational facility available to guest scientists by the end of 2019. This paper provides an overview of the Astrobee system, a description of the on-orbit activities, and commissioning results.

ISS↗

Site Selection Restart in Germany Results of the Site Selection Commission - 17017

Since 2011 Germany is pursuing a phase-out strategy concerning the use of nuclear power for electricity production. This decision was strongly influenced by the Fukushima event. In 2013 the federal government announced that they also had achieved an agreement with the Federal States in Germany on a law to restart the site selection for a repository for spent fuel and high-level heat-generating waste from scratch. The new law was passed in July 2013. At first a 34-member commission had been installed in April 2014 to evaluate the Site Selection Law [1] and to develop basic principles for site selection, including safety requirements and selection criteria for rock formations. The commission included representatives from the parliament, civil society organizations, industry, environmental organizations, trade unions and scientists. The commission forwarded its recommendations in summer 2016. The evaluated law should come into force in 2017. The stepwise approach for finding a suitable site for a repository for Germany's heat-generating waste might then start in 2017. As shown in publication [2], the site selection process will take several decades. The preferred solution based on the present state of the art is the final disposal in deep geological formations in a mine with the option 'Reversibility and Retrievability (R and R)'. The scientific challenges and the upcoming R and D program are complex. Therefore a 'step-back option' (learning process) is foreseen in the program. The R and D program has to react flexibly to new findings, demands or modifications of criteria or requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. Nuclear Regulatory Commission Historical Perspectives of Very Low-Level Radioactive Waste - 18367

The United States Nuclear Regulatory Commission (NRC), in Title 10 of the Code of Federal Regulations Part 61 (10 CFR Part 61), 'Licensing Requirements for Land Disposal of Radioactive Waste', provides licensing procedures, performance objectives, and technical requirements for the issuance of licenses for the land disposal of low-level radioactive waste. Low-level radioactive waste is divided into four categories based on its potential risk and need for isolation. Class A is the lowest category of low-level radioactive waste and poses the least risk. A large percentage of Class A low-level waste contains very low radionuclide concentrations and does not pose a significant health and safety risk. In the current regulatory framework, this waste, referred to as low-activity or very low-level waste, is managed in the same manner as much more hazardous waste. In 1986 and 1990, as a result of the Low-Level Radioactive Waste Policy Amendments Act of 1985, the NRC issued the Below Regulatory Concern (BRC) policy statement. This policy statement established an implementation plan regarding the expeditious handling of rulemaking petitions 'to exempt specific radioactive waste streams from regulation due to the presence of radionuclides in sufficiently low concentrations or quantities as to be below regulatory concern.' The BRC policy statement provided a consistent risk framework when considering regulatory exemption decisions, such as: (1) the release for unrestricted public use of lands and structures containing residual radioactivity; (2) the distribution of consumer products containing small amounts of radioactive material; (3) the disposal of very low-level radioactive waste at other than licensed disposal sites; and (4) the recycling of slightly contaminated equipment and materials. Due to concerns with the BRC policy that were raised by Congress, the States, the public, and others, Congress enacted the Energy Policy Act of 1992, which revoked the NRC's 1986 and 1990 BRC policy statements and led to the NRC's formal withdrawal of the BRC policy in 1993. Stakeholders raised concerns on NRC's potential deregulation of radioactive material. Additionally, in March 2005, the NRC staff proposed a rule to amend 10 CFR Part 20, 'Standards for Protection Against Radiation,' to include radiological criteria for controlling the disposition of solid materials with very small amounts of residual radioactivity. The NRC staff also proposed a limited disposition approach for the disposition of solid material, limiting the release of solid material meeting a 0.01 milli-Sievert per year (mSv/yr) [1 milli-rem (mrem/yr)] dose criterion, from licensed control. In June 2005, the Commission disapproved publication of the proposed rule and deferred the rulemaking until a later time, stating that the NRC's existing approach of reviewing specific cases on an individual basis was fully protective of public health and safety. This rulemaking effort was discontinued by the Commission in 2016. Recently, several nuclear power plant licensees have announced early decommissioning of their facilities. Some stakeholders have expressed concerns about the capacity and disposal costs associated with using the four existing low-level waste disposal sites for very low levels of radioactive waste (i.e., waste at the low end of the Class A category). A more risk-informed, performance based approach to waste disposal would allow more flexibility in managing this waste commensurate with its risk and hazard. A new approach would also allow the NRC to align with international standards for this type of waste. The NRC is presently conducting a scoping study to identify the actions the agency should take to strengthen its regulatory framework for very low-level waste disposal. The Very Low-Level Waste (VLLW) scoping study will consider divergent stakeholder comments; lessons learned from the BRC policy statements and the proposed rule on radiological criteria for controlling the disposition of solid materials; and best practices of other countries with respect to VLLW disposal. The NRC will also engage other government agencies to discuss regulatory options for VLLW. This paper offers a historical overview of past NRC initiatives to manage the lower end of Class A waste in a manner that is risk informed and performance based. It examines previous endeavors and discusses the regulatory challenges that arose. It also addresses lessons learned and introduces NRC's current effort regarding very low-level radioactive waste disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance and Commissioning of the BigBite Timing Hodoscope for Nucleon Form Factor Measurements at Jefferson Lab

The BigBite Timing Hodoscope detector is the primary subject of this thesis. The Super BigBite Spectrometer is a Jefferson Lab Hall A Collaboration project that has and will continue to measure nucleon electromagnetic form factors. This spectrometer includes the Timing Hodoscope which provides high resolution particle timing data for scattered electrons in the electron arm of BigBite. The Timing Hodoscope utilizes 90, 25 × 25 × 600 mm3 scintillator bars stacked on top of each other to form a single detector plane, and these bars are connected to 180 photo-multiplier tubes via light guides. Particles collide with the scintillating material creating a shower of optical photons and these particle events in the bars are collected to generate signals that are readout by the data acquisition (DAQ) electronics. NINO ASIC amplifier-discriminator cards output signals from the photo-multiplier tubes into analogue and logic signals, which are sent to analogue-to-digital (ADC) and time-to-digital (TDC) converter data acquisition readout modules. This data is then used for analysis of the detector. The focus of this thesis is the construction, commissioning, calibration, and performance of the BigBite Timing Hodoscope before and during the first of five nucleon electromagnetic form factor experiments at Jefferson Lab Hall A. Before the neutron magnetic form factor, G n M, experiment, cosmic ray data was collected during commissioning to confirm proper operation of the Timing Hodoscope electronics by observing the ADC and TDC data. Commissioning studies for charge normalization, gain matching, and other ADC and TDC detector data variables were performed before moving the detector into Hall A. Following installation in Hall A, several calibration studies were implemented to fine-tune the detector in preparation for use in the experiment. The calibration studies included analysis of timing cuts, TDC alignment, the time-walk effect, time difference offsets, and scintillator velocity corrections. Once the Timing Hodoscope was well-calibrated, data-taking during the experiment commenced and the beam-on-target data was used to characterize the Timing Hodoscope performance during the G n M experiment run-time. The performance analysis included studies observing energy deposit, cluster size, rates, accidentals, pile-up, tracking efficiency, position resolution, and time resolution. After application of physics cuts to ensure a data set comprised of particle tracks corresponding to elastic electrons, which is the main data of interest for measurement of G n M, the Timing Hodoscope is shown on average across all kinematic settings to have a >98% tracking efficiency, a position resolution of 4-6 cm in the non-dispersive plane and 1.5-2 cm in the dispersive plane, and a time resolution of 500-750 ps. These performance results are compared to a GEANT4 based performance simulation of the BigBite Timing Hodoscope for reference, showing to what degree the measured performance values match those taken from the simulation.

Marinaro, Ralph↗

Design and Commission of Solid State Switch Driver in SLAC Subbooster Modulator

The LINAC sub-booster modulator is a pulsed power supply to provide a 30kV pulse to drive a klystron in SLAC LINAC. It has utilized vacuum tetrode as pulse switch for more than 60 years. With the vacuum tetrode availability becoming less and its cost surging, a natural choice is to use solid state switch in this pulsed power modulator. To commission solid state switch in LINAC sub-booster modulator, a driver board is designed to drive a BEHLKE HTS-LC2 series MOSFET based switches. The design concept and some concerns in design will be presented. The driver board is universal for all HTS-LC2 series switches because they share the same driver signals and connections. After the driver is commissioned, two AI systems are introduced to design one core part of the driver, the results are presented here. During the commission of the driver board in the LINAC sub-booster modulators, some problems happened and were addressed.

AI Circuit Design↗

Detector Characterization for SuperCDMS Commissioning

Super Cryogenic Dark Matter Search (SuperCDMS) SNOLAB is a next generation direct detection experiment search ing for low mass dark matter using cryogenic germanium and silicon detectors operated at millikelvin temperatures. As the experiment begins its first commissioning data taking, establishing that the detectors respond to energy deposits in a stable, predictable way is a prerequisite for any future physics analysis. This work presents a study of detector stability for four SuperCDMS SNOLAB detectors, det 7 and det 15 (germanium), and det 11 and det 14 (silicon), using two data sets taken during early commissioning: dedicated Barium-133 calibration runs, which provide a known gamma ray energy reference at 356 keV, and low background runs, which record whatever background radiation the detectors see with no external source present. The Ba-133 data do not show a distinct, well localized line at the expected energy, and the low background data show a baseline that drifts and oscillates over time rather than remaining flat. This baseline instability appears consistently across multiple channels rather than being confined to one, suggesting a shared, detector wide cause rather than a single faulty channel. Together, these observations point to the detectors’ cryogenic support system as the likely source of the instability, since small temperature fluctuations introduced during normal operation of the cooling system could plausibly couple into the exquisitely temperature sensitive detectors. These results inform the ongoing commissioning effort by narrowing down where instability in the current data is originating from.

O'Hanlon, Viktoria M. [Skidmore Coll.; Fermilab]↗

Detector Characterization for SuperCDMS Commissioning

Super Cryogenic Dark Matter Search (SuperCDMS) SNOLAB is a next generation direct detection experiment search ing for low mass dark matter using cryogenic germanium and silicon detectors operated at millikelvin temperatures. As the experiment begins its first commissioning data taking, establishing that the detectors respond to energy deposits in a stable, predictable way is a prerequisite for any future physics analysis. This work presents a study of detector stability for four SuperCDMS SNOLAB detectors, det 7 and det 15 (germanium), and det 11 and det 14 (silicon), using two data sets taken during early commissioning: dedicated Barium-133 calibration runs, which provide a known gamma ray energy reference at 356 keV, and low background runs, which record whatever background radiation the detectors see with no external source present. The Ba-133 data do not show a distinct, well localized line at the expected energy, and the low background data show a baseline that drifts and oscillates over time rather than remaining flat. This baseline instability appears consistently across multiple channels rather than being confined to one, suggesting a shared, detector wide cause rather than a single faulty channel. Together, these observations point to the detectors’ cryogenic support system as the likely source of the instability, since small temperature fluctuations introduced during normal operation of the cooling system could plausibly couple into the exquisitely temperature sensitive detectors. These results inform the ongoing commissioning effort by narrowing down where instability in the current data is originating from.

O'Hanlon, Viktoria M. [Skidmore Coll.; Fermilab]↗

Commissioning of Volumetric Modulated Arc Therapy (VMAT)

Purpose: Volumetric modulated arc therapy (VMAT) involves the simultaneous use of dynamic multileaf collimator (DMLC) techniques and gantry arcing; appropriate quality assurance is therefore required. This article describes the development and implementation of procedures for commissioning VMAT on a commercial linear accelerator (Elekta PreciseBeam VMAT with MLCi and Beam Modulator heads). Materials and Methods: Tests for beam flatness and symmetry at the variable dose rates required for VMAT were performed. Multileaf collimator (MLC) calibration was investigated using dynamic prescriptions. The cumulative dose delivered by a sliding window aperture was measured and compared with calculated values. Rotational accuracy was evaluated using dynamic prescriptions which required accurate correlated motion of both gantry and MLC leaves. Finally, measured and calculated dose distributions for complete VMAT treatment plans were compared and evaluated. Results: Beam symmetry was found to be better than 3% down to dose rates of 75 MU/min. MLC calibration provided continuity of dose at match planes of better than 4%, which was comparable to interleaf leakage effects. Integrated sliding window doses were within 3% of those calculated. Tests for rotational accuracy showed uniformity of peripheral dose mostly within {+-}4% of local control point dose, or approximately {+-}0.2% of total central dose. A two-arc prostate case showed an absolute dose difference between calculations and measurements of less than 3%, with gamma (3% and 3 mm) of better than 95%. Conclusions: VMAT has been successfully commissioned and has been introduced into clinical use. The Elekta DMLC has also been shown to be suitable for sliding window delivery.

62 RADIOLOGY AND NUCLEAR MEDICINE↗