Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

A guide to onboard checkout. Volume 5: Data management

The baseline data management subsystem for a space station is discussed. The subsystem consists of equipment necessary to transfer, store, and process data to and from users and subsystems. It acquires and conditions a wide variety of input data from experiments, vehicle subsystems sensors, uplinked ground communications, and astronaut-activated controls. Computer techniques for failure analysis, reliability, and maintenance checkout onboard the space station are considered.

Source record

A guide to onboard checkout. Volume 3: Electrical power

The baseline electrical power subsystem for a space station is considered. The subsystem was anlayzed in order to define onboard checkout requirements. Reliability, failure effects, and maintenance are discussed.

Source record

A guide to onboard checkout. Volume 4: Propulsion

The propulsion system for a space station is considered with respect to onboard checkout requirements. Failure analysis, reliability, and maintenance features are presented. Computer analysis techniques are also discussed.

Source record

A guide to onboard checkout. Volume 6: Structures/mechanics

The structures and mechanical subsystem of a space station are considered. The subsystem includes basic structure (pressurization, equipment support, meteoroid protection, radiators, insulation, and docking interfaces), the docking mechanisms, spacecraft access (hatches, airlocks, and view ports), and antenna deployment mechanisms. Checkout is discussed in terms of reliability, failure analysis, and maintenance.

Source record

Design, develop, fabricate, assemble and checkout and advanced active damper system

An active electromagnetic damper system was developed for and used in a 5.5% aeroelastic model of Saturn 1B/SA206 launch configuration in wind tunnel tests to determine ground wind-induced loads. Detailed descriptions are given of the damper development program: approach, design analyses, fabrication, checkout, system calibration, wind tunnel test results, damper assembly and operating instructions, and trouble-shooting procedures. Conclusions and recommendations to improve the damper system for future applications are also presented.

Chang, C. S.

Modular checkout and test system.

Description of the development and performance of a new modular checkout and test system that represents a new concept proposed for the operational support of the space shuttle. The system is shown to have reached an advanced stage of experimental development and to be capable of meeting the requirements of the shuttle orbiter and booster with a minimum of equipment, facility, personnel, and time costs.

Warzecha, L. W.

Space Shuttle Avionics: a Redundant IMU On-Board Checkout and Redundancy Management System

A failure detection and isolation philosophy applicable to multiple off-the-shelf gimbaled IMUs are discussed. The equations developed are implemented and evaluated with actual shuttle trajectory simulations. The results of these simulations are presented for both powered and unpowered flight phases and at operational levels of four, three, and two IMUs. A multiple system checkout philosophy is developed and simulation results presented. The final task develops a laboratory test plan and defines the hardware and software requirements to implement an actual multiple system and evaluate the interim study results for space shuttle application.

Mckern, R. A.

Apollo experience report: Test and checkout

The problem areas encountered during the development of the acceptance testing and preflight checkout requirements and procedures for Apollo spacecraft are discussed. Recommendations are given for cases in which methods used in the Apollo program are considered to apply to future space flight programs.

Mechelay, J. E.

Applications Technology Satellite ATS-6 in orbit checkout report

The activities of the ATS-6 spacecraft for the checkout period of approximately four weeks beginning May 30, 1974 are described, along with the results of a performance evaluation of its subsystems and components. The following specific items are discussed: (1) subsystem requirements/specifications and in-orbit performance summary; (2) flight chronology; (3) spacecraft description; (4) structural/deployment subsystems; (5) electrical power subsystem; (6) thermal control subsystem; (7) telemetry and command subsystems; (8) attitude control subsystem; (9) spacecraft propulsion subsystem; (10) communication subsystem; and (12) experiment subsystem.

Moore, W.

Safety considerations involved in testing, checkout and launch operations at Cape Kennedy

This paper concerns itself with identifying safety problems associated with launch operations conducted during preparations for manned space flights at Cape Kennedy. This includes transportation and assembly of large space vehicles in the Vehicle Assembly Building, rollout to Launch Pad 39, test, checkout, and the launch countdown. Under these broad categories, the risks of fuel and oxidizer loading, installation of pyrotechnics, and similar hazardous operations are discussed. The many aspects for fire and rescue requirements are examined. These encompass the water deluge systems on the Mobile Service Structure and the Mobile Launcher, the insulated fire and rescue tractor, slide wire escape system, fire proximity suits, self-contained breathing apparatus and emergency cutting tools. In addition, written procedures for tests, emergencies, rescue and backout, as well as certification of personnel and TV monitoring of the launch system are detailed.-

Bolger, P. H.

Skylab checkout operations

The Skylab Program at Kennedy Space Center presented many opportunities for interesting and profound test and checkout experience. It also offered a compilation of challenges and promises for the Center and for the contractors responsible for the various modules making up Skylab. It is very probable that the various contractors had common experiences during the module and combined systems tests, but this paper will discuss those experiences from the viewpoint of the Multiple Docking Adapter contractor. The experience will consider personnel, procedures, and hardware.

Timmons, K. P.

Shuttle transportation system payload ground operations requirements and checkout

Payload ground operations and checkout verifications have become a major concern of STS scheduling operations. Ground scheduling techniques, interface verification simulators, and software verification tools will be used to minimize impact. The present paper discusses three such techniques: (1) baseline planning used for the STS system, (2) baseline operations concepts developed for the users, and (3) the necessary tools for implementation and analysis. Several payload schedules and flow charts are presented.

Johnson, J. W.

Installation and checkout of the DOE/NASA Mod-1 2000-kW wind turbine generator

The Mod-1 machine was assembled without the blades, tested, and sent to the site at Boone, North Carolina for erection. The blades were transported directly to the site. A series of checkout tests were then conducted to evaluate performance and loads. The results of these tests compared well with the design data.

Puthoff, R. L.

Advanced gamma ray balloon experiment ground checkout and data analysis

A software programming package to be used in the ground checkout and handling of data from the advanced gamma ray balloon experiment is described. The Operator's Manual permits someone unfamiliar with the inner workings of the software system (called LEO) to operate on the experimental data as it comes from the Pulse Code Modulation interface, converting it to a form for later analysis, and monitoring the program of an experiment. A Programmer's Manual is included.

Blackstone, M.

The preliminary checkout, evaluation and calibration of a 3-component force measurement system for calibrating propulsion simulators for wind tunnel models

The propulsion simulator calibration laboratory (PSCL) in which calibrations can be performed to determine the gross thrust and airflow of propulsion simulators installed in wind tunnel models is described. The preliminary checkout, evaluation and calibration of the PSCL's 3 component force measurement system is reported. Methods and equipment were developed for the alignment and calibration of the force measurement system. The initial alignment of the system demonstrated the need for more efficient means of aligning system's components. The use of precision alignment jigs increases both the speed and accuracy with which the system is aligned. The calibration of the force measurement system shows that the methods and equipment for this procedure can be successful.

Scott, W. A.

Data relay system for Space Shuttle and payload pre-launch checkout

Engineering requirements and design characteristics of the coherent throughput relay system which supports the East Coast prelaunch checkout of NASA's Space Shuttle and its payloads are presented. Link requirements and design constraints are reviewed, and gain/loss analysis is given. Group delay distortion is considered and isolation and antenna siting are discussed. The systems controlling various aspects of the relays are examined.

O'Donnell, Hugh B.

Testing and checkout experiences in the National Transonic Facility since becoming operational

The U.S. National Transonic Facility, constructed by NASA to meet the national needs for High Reynolds Number Testing, has been operational in a checkout and test mode since the operational readiness review (ORR) in late 1984. During this time, there have been problems centered around the effect of large temperature excursions on the mechanical movement of large components, the reliable performance of instrumentation systems, and an unexpected moisture problem with dry insulation. The more significant efforts since the ORR are reviewed and NTF status concerning hardware, instrumentation and process controls systems, operating constraints imposed by the cryogenic environment, and data quality and process controls is summarized.

Bruce, W. E., Jr.

Robotic lunar surface operations: Engineering analysis for the design, emplacement, checkout and performance of robotic lunar surface systems

The assembly, emplacement, checkout, operation, and maintenance of equipment on planetary surfaces are all part of expanding human presence out into the solar system. A single point design, a reference scenario, is presented for lunar base operations. An initial base, barely more than an output, which starts from nothing but then quickly grows to sustain people and produce rocket propellant. The study blended three efforts: conceptual design of all required surface systems; assessments of contemporary developments in robotics; and quantitative analyses of machine and human tasks, delivery and work schedules, and equipment reliability. What emerged was a new, integrated understanding of hot to make a lunar base happen. The overall goal of the concept developed was to maximize return, while minimizing cost and risk. The base concept uses solar power. Its primary industry is the production of liquid oxygen for propellant, which it extracts from native lunar regolith. Production supports four lander flights per year, and shuts down during the lunar nighttime while maintenance is performed.

Woodcock, Gordon R.