Cost estimation of balance of plant equipment scale up for proton exchange membrane water electrolyzer systems

Water electrolyzers that use electricity to split water into hydrogen and oxygen could be a key technology for increasing hydrogen supply to meet expanded and emerging market applications, although currently the capital costs of these electrolyzers are high. Here we examine cost reductions that might be achieved by scaling up proton exchange membrane (PEM) electrolyzer systems and leveraging economies of scale through balance of plant (BOP) components for system sizes between 1 MW and 1 GW. We estimate BOP equipment capital costs of about $\$$848/kW at 1 MW, potentially decreasing to $\$$87/kW at 1 GW (2022-dollar year basis) with most of the cost reduction happening as systems scale from 1 MW to 100 MW. We find that BOP subsystems hydrogen drying and water knockout benefited the most from economies-of-scale cost reductions, and piping, instrumentation, and housing and power electronics were less impacted. These cost reductions from economies of scale could be more significant than estimated cost reductions from manufacturing scale-up reported in literature. These results add to the knowledge base that could guide optimal system designs that balance process scale-up with plant modularization and numbering-up. We also estimate that scaling up BOP could potentially lower the levelized cost of hydrogen (LCOH) by $\$$1.7-$\$$4.6/kg, depending on the scale-up magnitude and the plant capacity factor.

08 HYDROGEN↗

ASCoT 3: Nonlinear Principal Components Analysis and Uncertainty Quantification in Early Concept Spacecraft Flight Software Cost Estimation

For mission planners and evaluators alike, value in cost models comes from a mean or median prediction, an understanding of the uncertainty on that prediction, and an understanding of model performance. Here we apply advanced statistical and machine learning methods to spacecraft flight software cost, effort, and SLOC estimation, and present the results in the latest version of the Analogy Software Cost Tool (ASCoT). We present in- and out-of-sample performance metrics for our models, each of which incorporate some amount of epistemic uncertainty. ASCoT, hosted on the One NASA Cost Engineering (ONCE) database via the Online NASA Space Estimation Tool (ONSET), was first showcased in 2016 as a number of analogy-based models and methods (kNN and Clustering) to support early project formulation. This ASCoT update improves upon the previous analogic methods by incorporating uncertainty in the data transformations. In particular, we use a Nonlinear Principal Components Analysis (NLPCA) to deal with ordinal data.

Robotic Spacecraft↗

A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

Mizell, Carolyn↗

Machine learning models for maintenance cost estimation in delivery trucks using diesel and natural gas fuels

The maintenance costs can represent about 15%–60% of the cost of produced goods depending on the type of goods transported. To comply with stringent emissions regulations, diesel engines are incorporated with complex after-treatment systems that demand increased maintenance. The availability of alternative fuels such as natural gas and propane has fostered the natural gas and propane powertrain systems as well as electrification options for heavy- and medium-duty vehicles. A critical barrier to adopting alternative fuel vehicles has been the lack of knowledge on comparative vehicle maintenance/repair costs with conventional diesel. Moreover, the region of operation, the type of vehicle operation, and seasonal temperature changes also affect the duty cycle which impacts the maintenance and repair costs. This study focuses on estimating the cost-per-mile for heavy-duty vehicles using machine learning models such as random forest, xgboost, neural networks, and a super-learner model. The super-learner model achieved an error as low as 0.0068 $/mile for mean absolute error and 0.0086 $/mile for root mean square error with a coefficient of determination/R-Squared of 97.28%. Specifically, the paper investigates the data collected from the maintenance and repair costs associated with delivery trucks using diesel and natural gas fuels. Since the availability of data is the major constraint, we leveraged the data collected by West Virginia University and the partnership with fleet companies. This allows for additional information related to maintenance costs and fleet-specific maintenance practices of alternative fuel vehicles. This study promotes clean fuel technologies and enables fleet management companies to adopt alternative fuel vehicles in case of similar or lower cost of maintenance compared to diesel vehicles resulting in reduced emissions and total cost of ownership.

Katreddi, Sasanka↗

Development of weight and cost estimates for lifting surfaces with active controls

Equations and methodology were developed for estimating the weight and cost incrementals due to active controls added to the wing and horizontal tail of a subsonic transport airplane. The methods are sufficiently generalized to be suitable for preliminary design. Supporting methodology and input specifications for the weight and cost equations are provided. The weight and cost equations are structured to be flexible in terms of the active control technology (ACT) flight control system specification. In order to present a self-contained package, methodology is also presented for generating ACT flight control system characteristics for the weight and cost equations. Use of the methodology is illustrated.

Anderson, R. D.↗

Mass Production Cost Estimation of Direct H 2 PEM Fuel Cell Systems for Transportation Applications (2017 - 2021) (Final Report)

This report summarizes project activities for an assessment of transportation fuel cell system cost from 2017 to 2021. The project defined and projected the mass production costs of direct hydrogen PEM fuel cell power systems for LDVs (automobiles), MDVs, and HDVs for current and future technologies. In each year of the project, the fuel cell power system designs and cost projections were updated to reflect technological advances. Systems were defined corresponding to direct H2 PEM FC power systems for ~80 kWnet LDVs, 70-170 kWnet MDVs, and 275-330 kWnet HDVs. A selection of systems was analyzed in each year. Major components, their functionality, and relevant parameters were defined in system diagrams. The system definitions were supported by system performance modeling calculations. A BOM for each system analyzed was created that tabulated all system components and subsystems contained in the power systems. Several annual manufacturing rates were considered for each system analyzed.

08 HYDROGEN↗

Laser Atmospheric Wind Sounder (LAWS) phase 1. Volume 3: Project cost estimates

The laser atmospheric wind sounder (LAWS) cost modeling activities were initiated in phase 1 to establish the ground rules and cost model that would apply to both phase 1 and phase 2 cost analyses. The primary emphasis in phase 1 was development of a cost model for a LAWS instrument for the Japanese Polar Orbiting Platform (JPOP). However, the Space Station application was also addressed in this model, and elements were included, where necessary, to account for Space Station unique items. The cost model presented in the following sections defines the framework for all LAWS cost modeling. The model is consistent with currently available detail, and can be extended to account for greater detail as the project definition progresses.

Source record↗

Software Estimates Costs of Testing Rocket Engines

Simulation-Based Cost Model (SiCM) is a computer program that simulates pertinent aspects of the testing of rocket engines for the purpose of estimating the costs of such testing during time intervals specified by its users. A user enters input data for control of simulations; information on the nature of, and activity in, a given testing project; and information on resources. Simulation objects are created on the basis of this input. Costs of the engineering-design, construction, and testing phases of a given project are estimated from numbers and labor rates of engineers and technicians employed in each phase, the duration of each phase; costs of materials used in each phase; and, for the testing phase, the rate of maintenance of the testing facility. The three main outputs of SiCM are (1) a curve, updated at each iteration of the simulation, that shows overall expenditures vs. time during the interval specified by the user; (2) a histogram of the total costs from all iterations of the simulation; and (3) table displaying means and variances of cumulative costs for each phase from all iterations. Other outputs include spending curves for each phase.

Source record↗

Estimating costs and performance of systems for machine processing of remotely sensed data

This paper outlines a method for estimating computer processing times and costs incurred in producing information products from digital remotely sensed data. The method accounts for both computation and overhead, and may be applied to any serial computer. The method is applied to estimate the cost and computer time involved in producing Level II Land Use and Vegetative Cover Maps for a five-state midwestern region. The results show that the amount of data to be processed overloads some example computer systems, but that the processing is feasible on others.

Ballard, R. J.↗

A Life-Cycle Cost Estimating Methodology for NASA-Developed Air Traffic Control Decision Support Tools

This paper describes the development of a life-cycle cost (LCC) estimating methodology for air traffic control Decision Support Tools (DSTs) under development by the National Aeronautics and Space Administration (NASA), using a combination of parametric, analogy, and expert opinion methods. There is no one standard methodology and technique that is used by NASA or by the Federal Aviation Administration (FAA) for LCC estimation of prospective Decision Support Tools. Some of the frequently used methodologies include bottom-up, analogy, top-down, parametric, expert judgement, and Parkinson's Law. The developed LCC estimating methodology can be visualized as a three-dimensional matrix where the three axes represent coverage, estimation, and timing. This paper focuses on the three characteristics of this methodology that correspond to the three axes.

Wang, Jianzhong Jay↗

Software Estimates Costs of Testing Rocket Engines

Simulation-Based Cost Model (SiCM), a discrete event simulation developed in Extend , simulates pertinent aspects of the testing of rocket propulsion test articles for the purpose of estimating the costs of such testing during time intervals specified by its users. A user enters input data for control of simulations; information on the nature of, and activity in, a given testing project; and information on resources. Simulation objects are created on the basis of this input. Costs of the engineering-design, construction, and testing phases of a given project are estimated from numbers and labor rates of engineers and technicians employed in each phase, the duration of each phase; costs of materials used in each phase; and, for the testing phase, the rate of maintenance of the testing facility. The three main outputs of SiCM are (1) a curve, updated at each iteration of the simulation, that shows overall expenditures vs. time during the interval specified by the user; (2) a histogram of the total costs from all iterations of the simulation; and (3) table displaying means and variances of cumulative costs for each phase from all iterations. Other outputs include spending curves for each phase.

Smith, C. L.↗

Advanced transportation system study: Manned launch vehicle concepts for two way transportation system payloads to LEO. Program cost estimates document

This report describes Rockwell International's cost analysis results of manned launch vehicle concepts for two way transportation system payloads to low earth orbit during the basic and option 1 period of performance for contract NAS8-39207, advanced transportation system studies. Vehicles analyzed include the space shuttle, personnel launch system (PLS) with advanced launch system (ALS) and national launch system (NLS) boosters, foreign launch vehicles, NLS-2 derived launch vehicles, liquid rocket booster (LRB) derived launch vehicle, and cargo transfer and return vehicle (CTRV).

Duffy, James B.↗

Improving Space Project Cost Estimating with Engineering Management Variables

Current space project cost models attempt to predict space flight project cost via regression equations, which relate the cost of projects to technical performance metrics (e.g. weight, thrust, power, pointing accuracy, etc.). This paper examines the introduction of engineering management parameters to the set of explanatory variables. A number of specific engineering management variables are considered and exploratory regression analysis is performed to determine if there is statistical evidence for cost effects apart from technical aspects of the projects. It is concluded that there are other non-technical effects at work and that further research is warranted to determine if it can be shown that these cost effects are definitely related to engineering management.

Hamaker, Joseph W.↗

Nuclear Energy Cost Estimates for Net Zero World Initiative

This report provides recommended parameters for incorporating nuclear energy systems into decarbonization modeling scenarios. The values are primarily intended for the Net Zero World (NZW) Initiative but are expected to prove useful to other related efforts. Both costs and operational metrics are provided in the study. Several cost factors, namely overnight capital costs (OCC) and operational costs are taken to be country specific. OCC is defined as the value of building the reactor in one night considering all costs prior to the start of operations including fuel for the initial core load. The value assumes the build is neither a first nor a ‘Nth’ of a kind, but somewhere in between. All costs are escalated to 2022 USD values.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗