Ramjet cost estimating handbook

The subject program was conducted for the purpose of generating cost information on ramjet engines and developing a methodology that could be employed to accurately predict production costs ramjet engines. The methodology addresses many different ramjet types, sizes and production quantities. The methodology determines the cost of individual modules of ramjet assemblies based on similarity of the modules to baseline components that are identified in a cost handbook. (There are typically around 20 basic components of a given ramjet to be costed.) The total cost of the engine is a summation of all the appropriate cost elements. A significant accomplishment of the program was the development of a large cost data base on many different configurations, materials of construction and variations in manufacturing processes. This data base should provide a good foundation on which to build other cost data as it becomes available.

Emmons, H. T.↗

Advanced Statistical Methods in Spacecraft Flight Software Cost Estimation: Bayesian Regression and Nonlinear Principal Components Analysis to Support System Engineering in the Early Project Lifecycle

This paper provides an overview of the new features and model updates in the upcoming release of the NASA Analogy Software Cost Tool (ASCoT). ASCoT, hosted within the Online NASA Space Estimation Tools (ONSET) on the One NASA Cost Engineering (ONCE) Database, is a web-based tool that provides a suite of estimation tools to support early lifecycle NASA flight software cost analysis. In addition to the traditional parametric flight software costing method COCOMO II, ASCoT contains a Bayesian linear regression to predict total flight software development cost as a function of total spacecraft cost, as well as four analogic methods: k-Nearest Neighbors (kNN) and Clustering models to predict Effort (in work-months) and total source lines of code (SLOC). These methods are designed to work primarily with system-level inputs such as mission type (orbiter, lander, etc.), mission destination (Earth, Inner Planetary, etc.), and the number of instruments and deployables. Nonlinear principal components analysis (NLPCA) is performed to find the principal features of the data composed of both categorical and numerical variables and is necessary prior to defining our analogic methods. Sensitivity analyses and in- and out-of-sample model performance results are presented for the Bayesian CER and the analogic models.

Johnson, James K.↗

Cost estimates for flat plate and concentrator collector arrays

The current module and installation costs for the U.S. National Photovoltaic Program's grid-connected systems are significantly higher than required for economic viability of this alternative. Attention is accordingly given to the prospects for installed module cost reductions in flat plate, linear focus Fresnel concentrator, and point focus Fresnel concentrator candidate systems. Cost projections indicate that all three systems would meet near-term and midterm goals, provided that module costs of $2.80/W(p) and $0.70/W(p), respectively, are met. The point focus Fresnel system emerges as the most viable for the near term.

Shimada, K.↗

Estimating the cost of major ongoing cost plus hardware development programs

Approaches are developed for forecasting the cost of major hardware development programs while these programs are in the design and development C/D phase. Three approaches are developed: a schedule assessment technique for bottom-line summary cost estimation, a detailed cost estimation approach, and an intermediate cost element analysis procedure. The schedule assessment technique was developed using historical cost/schedule performance data.

Bush, J. C.↗

A quality-agnostic combinatoric cost estimation model for large-format directed energy deposition metal additive manufacturing

Directed energy deposition (DED) additive manufacturing (AM) processes are amenable to synergistic combination into multi-process AM systems due to similar requirements for automation and energy sources. This work analyzes the economic performance of such DED AM systems from a quality-agnostic combinatoric standpoint with a model that calculates lowest-cost system combinations based on part geometry and process performance metrics. Common DED AM systems research focuses on a single process and does not consider the process, system, and application in the context of all possible system combinations (e.g., the combined set of process selection(s), motion system(s), and process hardware), leading to limited applicability of the resulting DED AM systems to cost-sensitive components such as those found in energy generation applications. The model developed herein incorporates the capital, material, and energy costs associated with DED AM system combinations into a predictive tool for estimating part and system cost, the output of which is intended to guide deployment of finite research and development resources towards DED AM system combinations with the lowest costs and greatest likelihood of economic impact. The DED AM systems identified by this framework may enable domestic production of the large conventionally cast and forged components necessary for energy generation.

Shanafield, Alexandra [ORNL]↗

Shared mooring system designs and cost estimates for wave energy arrays

For floating renewable energy devices to become more cost-efficient and commercially scalable, their mooring system designs must be low-cost and suited for large-scale installations. Large arrays of floating devices, such as wave energy converters (WECs), will likely be designed with an individual mooring system for each device in the array. However, new mooring technology advancements provide options to use shared mooring lines to connect adjacent devices to one another, reducing the total number of anchors in the array, thereby reducing material use and cost. Here, this paper explores the design, modeling, and cost analysis of shared mooring systems for various sizes of arrays consisting of heaving oscillating water column (OWC) WECs. Shared mooring systems for WEC arrays sized in 2 x N and N x N grid layouts are designed to meet the relevant design standards, checking their performance with a nonlinear time-domain dynamic simulation, and the costs of each are calculated and compared. Several assumptions are taken in the design process to produce efficient results, providing a preliminary optimization for guidance on design decisions rather than a full, detailed design analysis. Mooring system costs per WEC were found to decrease as the number of WECs in the array increase, up to certain array sizes. The 2 x 3 array had the lowest mooring system cost per WEC out of all arrays considered, with a 60% cost reduction relative to using individual mooring systems. The 3 x 3 and 4 x 4 arrays achieved a 50% cost per WEC reduction. In addition to these significant cost reductions, the shared mooring system designs can provide advantages through smaller mooring system footprints, lower installation times, and less seabed disturbance.

16 TIDAL AND WAVE POWER↗

Quality Guidelines for Energy System Studies: Cost Estimation Methodology for NETL Techno-economic Assessments

This Quality Guidelines for Energy System Studies (QGESS) summarizes the methodology employed by the National Energy Technology Laboratory (NETL) in calculating plant costs in its techno-economic studies, such as the Cost and Performance Baseline for Fossil Energy Systems series of reports. It also outlines the approach used to calculate the cost of electricity (COE) or cost of product (COP) metrics by which NETL estimates the impact of technology options. These metrics and a clear understanding of the methodology used are essential in allowing different plant technologies to be compared on a similar basis. These guidelines were initially developed for power producing plants, although they can be applied to a variety of different revenue generating plants (e.g., coal to liquids, syngas generation, hydrogen) by substituting the industrial product quantity for the electrical quantity in the equations. The tables contained in this QGESS have been expanded upon relative to previous versions to include values to assume for several industries.

20 FOSSIL-FUELED POWER PLANTS↗

Cost Estimate for Molybdenum and Tantalum Refractory Metal Alloy Flow Circuit Concepts

The Early Flight Fission-Test Facilities (EFF-TF) team at NASA Marshall Space Flight Center (MSFC) has been tasked by the Naval Reactors Prime Contract Team (NRPCT) to provide a cost and delivery rough order of magnitude estimate for a refractory metal-based lithium (Li) flow circuit. The design is based on the stainless steel Li flow circuit that is currently being assembled for an NRPCT task underway at the EFF-TF. While geometrically the flow circuit is not representative of a final flight prototype, knowledge has been gained to quantify (time and cost) the materials, manufacturing, fabrication, assembly, and operations to produce a testable configuration. This Technical Memorandum (TM) also identifies the following key issues that need to be addressed by the fabrication process: Alloy selection and forming, cost and availability, welding, bending, machining, assembly, and instrumentation. Several candidate materials were identified by NRPCT including molybdenum (Mo) alloy (Mo-47.5 %Re), tantalum (Ta) alloys (T-111, ASTAR-811C), and niobium (Nb) alloy (Nb-1 %Zr). This TM is focused only on the Mo and Ta alloys, since they are of higher concern to the ongoing effort. The initial estimate to complete a Mo-47%Re system ready for testing is =$9,000k over a period of 30 mo. The initial estimate to complete a T-111 or ASTAR-811C system ready for testing is =$12,000k over a period of 36 mo.

Hickman, Robert R.↗

Availability and cost estimate of a high naphthene, modified aviation turbine fuel

Information from an Air Force study was used to determine the potential availability and cost of a modified conventional fuel with a naphthene content which could have a thermal stability near that of JP-7 for high-speed civil transports. Results showed sufficient capacity for a fuel made of a blend of 50 percent naphthenic straight run kerosene and 50 percent hydrocracked product, assuming a near-term requirement of 210,000 BBL per day. Fuel cost would be as low as 62.5 to 64.5 cents per gallon, assuming 20 dollars per barrel for crude.

Prok, George M.↗

Hydrogen from coal cost estimation guidebook

In an effort to establish baseline information whereby specific projects can be evaluated, a current set of parameters which are typical of coal gasification applications was developed. Using these parameters a computer model allows researchers to interrelate cost components in a sensitivity analysis. The results make possible an approximate estimation of hydrogen energy economics from coal, under a variety of circumstances.

Billings, R. E.↗

Space Transportation Booster Engine Configuration Study. Volume 3: Program Cost estimates and work breakdown structure and WBS dictionary

The objective of the Space Transportation Booster Engine Configuration Study is to contribute to the ALS development effort by providing highly reliable, low cost booster engine concepts for both expendable and reusable rocket engines. The objectives of the Space Transportation Booster Engine (STBE) Configuration Study were: (1) to identify engine development configurations which enhance vehicle performance and provide operational flexibility at low cost; and (2) to explore innovative approaches to the follow-on Full-Scale Development (FSD) phase for the STBE.

Source record↗

Fast Conceptual Cost Estimating of Aerospace Projects Using Historical Information

Accurate estimates can be created in less than a minute by applying powerful techniques and algorithms to create an Excel-based parametric cost model. In five easy steps you will learn how to normalize your company 's historical cost data to the new project parameters. This paper provides a complete, easy-to-understand, step by step how-to guide. Such a guide does not seem to currently exist. Over 2,000 hours of research, data collection, and trial and error, and thousands of lines of Excel Visual Basic Application (VBA) code were invested in developing these methods. While VBA is not required to use this information, it increases the power and aesthetics of the model. Implementing all of the steps described, while not required, will increase the accuracy of the results.

Butts, Glenn↗

The use of activity-based cost estimation as a management tool for cultural change

It will be shown that the greatest barrier to American exploration of the planet Mars is not the development of the technology needed to deliver humans and return them safely to earth. Neither is it the cost of such an undertaking, as has been previously suggested, although certainly, such a venture may not be inexpensive by some measures. The predicted costs of exploration have discouraged serious political dialog on the subject. And, in fact, even optimistic projections of the NASA budget do not contain the resources required, under the existing development and management paradigm, for human space exploration programs. It will be demonstrated that the perception of the costs of such a venture, and the cultural responses to the perceptions are factors inhibiting American exploration of the moon and the planet Mars. Cost models employed in the aerospace industry today correctly mirror the history of past space programs, and as such, are representative of the existing management and development paradigms. However, if, under this current paradigm no major exploration programs are feasible, then cost analysis methods based in the past may not have great utility in exploring the needed cultural changes. This paper explores the use of a new type of model, the activity based cost model, which will treat management style as an input variable, in a sense providing a tool whereby a complete, affordable program might be designed, including both the technological and management aspects.

Mandell, Humboldt↗

A Decision Tool that Combines Discrete Event Software Process Models with System Dynamics Pieces for Software Development Cost Estimation and Analysis

The development process for a large software development project is very complex and dependent on many variables that are dynamic and interrelated. Factors such as size, productivity and defect injection rates will have substantial impact on the project in terms of cost and schedule. These factors can be affected by the intricacies of the process itself as well as human behavior because the process is very labor intensive. The complex nature of the development process can be investigated with software development process models that utilize discrete event simulation to analyze the effects of process changes. The organizational environment and its effects on the workforce can be analyzed with system dynamics that utilizes continuous simulation. Each has unique strengths and the benefits of both types can be exploited by combining a system dynamics model and a discrete event process model. This paper will demonstrate how the two types of models can be combined to investigate the impacts of human resource interactions on productivity and ultimately on cost and schedule.

Mizell, Carolyn Barrett↗

Nuclear Energy Cost Estimates for Net Zero World Initiative – 2024 Update

This report provides recommended parameters for incorporating nuclear energy systems into decarbonization modeling scenarios. The values are primarily intended for the Net Zero World (NZW) Initiative but are expected to prove useful to other related efforts. Both costs and operational metrics are provided in the study for large reactors and small modular reactors (SMR).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Performance, size, mass, and cost estimates for projected 1kW EOL Si, InP, and GaAs arrays

One method of evaluating the potential of emerging solar cell and array technologies is to compare their projected capabilities in space flight applications to those of established Si solar cells and arrays. Such an application-oriented comparison provides an integrated view of the elemental comparisons of efficiency, radiation resistance, temperature sensitivity, size, mass, and cost in combination. In addition, the assumptions necessary to make the comparisons provide insights helpful toward determining necessary areas of development or evaluation. Finally, as developments and evaluations progress, the results can be used in more precisely defining the overall potential of the new technologies in comparison to existing technologies. The projected capabilities of Si, InP, and GaAs cells and arrays are compared.

Slifer, Luther W., Jr.↗

Cost estimates for removal of orbital debris

While there are currently no active measures for the removal of nonfunctional satellites or spent rocket stages from earth orbit, it has been deemed prudent to begin to identify and economically evaluate potential approaches for such orbital decluttering. The methods presently considered encompass retrieval with an OMV, forcible deorbiting via attached propulsive devices, and deorbiting via passive, drag-augmentation devices; the increases in payload-delivery costs they represent are respectively $15-20 million/object, $7.8 million/vehicle, and $5.5-15.5 million/unit. OMV removal appears the least economically feasible method.

Petro, Andrew↗

Graphite waste classification and disposal cost estimation for high temperature gas and salt reactors

As high-temperature reactor designs progress to demonstration, managing the radioactive wastes from these systems presents unique challenges. This work explores the irradiated graphite source term produced by three reactor designs: The Modular High Temperature Gas reactor (MHTGR), a pebble-bed High Temperature Gas Reactor (pb-HTGR), and a Fluoride-cooled High-temperature Reactor (FHR). We predicted a C-14 concentration of 4.3 Ci/m 3 for the MHTGR, 1.2 Ci/m 3 for the pebble bed HTGR, and 2.5 Ci/m 3 for the gFHR after 20 years of operation. The final C-14 concentration highly depended on the graphite nitrogen impurity, a major precursor for C-14. The C-14 concentration in all reactor types exceeded the 0.8 Ci/m3 threshold, resulting in a Class C waste classification. The costs associated with accepting the graphite after 20 years in a low-level waste disposal facility were projected to be 255 dollars per kWe for the MHTGR, 248 dollars per kWe for the pb-HTGR, and 56.8 dollars per kWe for the FHR.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗