Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONTRACTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Flexible Service Contracting for Risk Management within Integrated Transmission and Distribution Systems

The general objective of our project has been to investigate the ability of Independent Distribution System Operators (IDSOs), functioning as linkage agents for Integrated Transmission and Distribution (ITD) systems, to facilitate the flexible availability and usage of reserve in support of ITD system operations. This general objective is in accordance with Order 2222 of the U.S. Federal Energy Regulatory Commission (FERC), titled “Participation of Distributed Energy Resource Aggregations in Markets Operated by Regional Transmission Organizations and Independent System Operators”. The Final Rule for FERC Order 2222 was issued on September 17, 2020. The primary contribution of our project is that we have formulated an innovative energy management Transactive Energy Design (TES) approach for ITD systems that provides promising support for our project objective. Specifically, we have developed a new type of IDSO-managed TES design for distribution system operations, as well as new types of swing contracts permitting IDSOs to participate in transmission system operations as providers of reserve harnessed from distribution system resources in return for appropriate compensation. Together, these design elements constitute a scalable market-based approach facilitating efficient reserve procurement for ITD system operations from a fuller range of power resources. The efficacy of our approach has been demonstrated by means of detailed conceptual analyses as well as test case simulations. To implement the latter, we have developed the ITD TES Platform V2.0, a computational platform that permits the modeling and software implementation of ITD system operations over time. The Electric Reliability Council of Texas (ERCOT) energy region has been used as the empirical anchor for the development of this platform. Our conceptual and test-case work has been reported in a Wiley/IEEE Press book, two refereed book chapters, and seven refereed journal articles. The key components comprising the ITD TES Platform V2.0 have been released as documented open-source software at online GitHub repositories.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Renewable Energy Contracting Options and Renewable Energy Certificates

Virtual Trainings are the online version of the multi-day workshops known as In-Plants (INPLTs) offered by the DOE Better Plants program. ORNL has a 6-session weekly training on Renewable Energy Contracting Options and RECs starting August 5th 2025 (10 am ET) focused on options and resources for the manufacturing sector. This session is earmarked for Tuesday, August 26th, 10 AM ET.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Skeletal muscle fiber type composition and performance during repeated bouts of maximal, concentric contractions

Force output and fatigue and recovery patterns were studied during intermittent short-term exercise. 27 men performed three bouts of 30 maximal unilateral knee extensions on 2 different occasions. Blood flow was maintained or occluded during recovery periods (60 s). Blood flow was restricted by inflating a pneumatic cuff placed around the proximal thigh. Muscle biopsies from vastus lateralis were analyzed for identification of fast twitch (FT) and slow twitch (ST) fibers and relative FT area. Peak torque decreased during each bout of exercise and more when blood flow was restricted during recovery. Initial peak torque (IPT) and average peak torque (APT) decreased over the three exercise bouts. This response was 3 fold greater without than with blood flow during recovery. IPT and APT decreased more in individuals with mainly FT fibers than in those with mainly ST fibers. It is suggested that performance during repeated bouts of maximal concentric contractions differs between individuals with different fiber type composition. Specifically, in high intensity, intermittent exercise with emphasis on anaerobic energy release a high FT composition may not necessarily be advantageous for performance.

Muscle Contraction↗

CoCoSim Tutorial: Contract-based Compositional Verification of Simulink Models

This tutorial presents CoCoSim, a verification framework for MATLAB Simulink and Stateflow models. We demonstrate CoCoSim’s architecture, designed to be compatible with Lustre-based verification tools, as well as easily extensible to other candidate backends. We focus on CoCoSim’s powerful compositional verification scheme, which allows for scalable verification through the usage of abstractions of subsystems, express ed in the form of Assume-Guarantee Contracts. We show CoCoSim’s interconnection with NASA’s Formal Requirements Tool (FRET), that enables a seamless transition between authoring and formally verifying requirements for Simulink/Stateflow models. Finally, we discuss work in progress with regards to test case generation options in CoCoSim, demonstrating the generation of MC/DC tests for Simulink artifacts.

Formal Verification↗

Utility Energy Service Contract Boosts Chemical Weapons Destruction Mission at Army Pueblo Chemical Depot

For six decades, the U.S. Army has safely and securely stored chemical munitions at the Pueblo Chemical Depot in Colorado. To help fulfill international treaty obligations and to meet a congressional deadline of 2023 for the elimination of these aging weapons, initial destruction of the Pueblo chemical weapons stockpile began in 2015. A utility energy service contract (UESC) executed in 2016 between the U.S. Army Corps of Engineers and the Depot’s serving utility, Black Hills Energy (BHE), directly supported this mission with the installation of a new electrical substation that was essential to the Depot’s need for uninterrupted power.

Army Pueblo Chemical Depot↗