Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONSTRUCTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Accelerating Optimal Integration of Energy Efficiency Strategies with Industrialized Modular Construction: Preprint

The National Renewable Energy Laboratory's (NREL's) Industrialized Construction Innovation team first introduced the Industrialized Construction Assessment Framework to achieve affordable, net-zero energy (NZE) modular multifamily buildings in the 2020 ACEEE paper "Integrating Energy Efficiency Strategies with Industrialized Construction for our Clean Energy Future." Since then, NREL has continued to drive the ambitious plan to accelerate optimal integration of energy efficiency strategies during industrialized construction with little or no additional cost, labor, and production time. This follow-on paper introduces the Energy in Modular (EMOD) buildings method and presents NREL's research efforts over the last two years in collaboration with industry, including affordable housing partners. NREL has developed an idealized NZE modular multifamily building design that incorporates five energy efficiency strategies well suited for industrialized construction in factories: (1) envelope thermal control, (2) envelope infiltration control, (3) mechanical, electrical, and plumbing systems, (4) smart controls, and (5) solar plus storage. This paper highlights results from leveraging design for manufacturing and assembly principles, testing, and validation pilots with factory partners; demonstrating pod prototypes in test stand at NREL; and performing simulations. Overall, these research efforts address barriers to whole-building system integration, such as poor installation quality of thermal and air barriers; lack of unitized systems for space conditioning, energy recovery and ventilation, and water heating; problematic on-site installation, commissioning, and configuration of controls; and lack of cost-effective integration for grid-friendly design and emerging technologies. Conclusively, the paper delineates next steps for future work with NREL's partners toward developing a transformational pathway for our clean energy future.

affordable housing↗

An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China

The construction and demolition waste generation rates (C and D WGRs) is an important factor in decision-making and management of material waste in any construction site. The present study investigated WGRs by conducting on-site waste sorting and weighing in four ongoing construction projects in Shenzhen city of South China. The results revealed that WGRs ranged from 3.275 to 8.791 kg/m{sup 2} and miscellaneous waste, timber for formwork and falsework, and concrete were the three largest components amongst the generated waste. Based on the WGRs derived from the research, the paper also discussed the main causes of waste in the construction industry and attempted to connect waste generation with specific construction practices. It was recommended that measures mainly including performing waste sorting at source, employing skilful workers, uploading and storing materials properly, promoting waste management capacity, replacing current timber formwork with metal formwork and launching an incentive reward program to encourage waste reduction could be potential solutions to reducing current WGRs in Shenzhen. Although these results were derived from a relatively small sample and so cannot justifiably be generalized, they do however add to the body of knowledge that is currently available for understanding the status of the art of C and D waste management in China.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How much have adverse occupational health outcomes among construction workers improved over time? Evidence from 25 years of medical screening

Background Construction workers have always had a high risk of occupational illnesses. We used 25 years of data from a medical screening program serving older construction workers to determine how much health outcomes have improved over the past 60 years. Methods We investigated changes in relative risk for chest radiographs consistent with pneumoconiosis, COPD by spirometry, lung cancer mortality, and audiometry-assessed hearing impairment among workers participating in a medical screening program. Results were stratified by decade of first construction employment: before 1960, 1960–1969, 1970–1979, 1980–1989, and after 1990. Poisson and Cox regression analyses assessed relative risk by decade adjusted for age, sex, smoking, and years of construction trade work. Results Subjects were 94% male and, on average, 60 years old with 25 years of construction work. When compared to workers employed before 1960, those first employed after 1990 experienced the following reductions in model-adjusted relative risks: chronic obstructive pulmonary disease, 32%; all pneumoconiosis, 68%; parenchymal abnormalities, 35%; pleural abnormalities, 71%; hearing impairment, 20%; and lung cancer mortality, 48%. Risks started to decline in the 1960s with greatest reductions among workers first employed after 1970. Conclusions This study demonstrates the positive impact that adoption of occupational health protections have had over the past 60 years. The greatest risk reductions were observed for outcomes with strong regulatory and legal incentives to reduce exposures and associated risks, such as those associated with inhalation hazards (asbestos and silica), while lowest improvement was for hearing impairment, for which little regulatory enforcement and few prevention incentives have been adopted.

60 APPLIED LIFE SCIENCES↗

Mortality of older construction and craft workers employed at Department of Energy (DOE) nuclear sites: Follow‐up through 2021

Background To determine if construction and trades workers formerly employed at US Department of Energy (DOE) nuclear weapons sites are at significant risk for occupational diseases, we studied the mortality experience of participants in the Building Trades National Medical Screening Program (BTMed). Methods The cohort included 26,922 participants enrolled between 1998 and 2021 and 8367 deaths. Standardized mortality ratios were calculated based on US death rates. Cox models compared construction workers (n = 22,747; 7487 deaths) to two nonconstruction subpopulations: administrative, scientific and security workers (n = 1894; 330 deaths), and all other nonconstruction workers (n = 2218; 550 deaths). Results Mortality was elevated for all causes, all cancers, cancers of the trachea, bronchus, lung, kidneys, and lymphatic and hematopoietic system, mesothelioma, chronic obstructive pulmonary disease (COPD), asbestosis, transportation injuries, and other injuries, particularly accidental poisonings. There were 167 deaths from coronavirus disease 2019 (COVID-19), which was lower than expected using US death rates. Overall cause-specific mortality was significantly higher among construction workers than for internal comparison groups. Conclusions Construction workers employed at DOE sites have a significantly increased risk for occupational illnesses. Apart from COVID-19 deaths, this update: (1) found that mortality among construction workers is significantly elevated compared to the US population and significantly higher than in the internal comparison populations, and (2) confirmed excess risk for these workers for first employment after 1990. Cancer mortality risks are similar to the cancers identified for DOE compensation from radiation exposures. In conclusion, the high lung cancer risk supports the value of early lung cancer detection. Continued medical surveillance is important.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Social cost in construction projects

Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

54 ENVIRONMENTAL SCIENCES↗

Architects' perspectives on construction waste reduction by design

The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previous studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process.

54 ENVIRONMENTAL SCIENCES↗

Cross-cultural comparison of concrete recycling decision-making and implementation in construction industry

Waste management is pressing very hard with alarming signals in construction industry. Concrete waste constituents major proportions of construction and demolition waste of 81% in Australia. To minimize concrete waste generated from construction activities, recycling concrete waste is one of the best methods to conserve the environment. This paper investigates concrete recycling implementation in construction. Japan is a leading country in recycling concrete waste, which has been implementing 98% recycling and using it for structural concrete applications. Hong Kong is developing concrete recycling programs for high-grade applications. Australia is making relatively slow progress in implementing concrete recycling in construction. Therefore, empirical studies in Australia, Hong Kong, and Japan were selected in this paper. A questionnaire survey and structured interviews were conducted. Power spectrum was used for analysis. It was found that 'increasing overall business competitiveness and strategic business opportunities' was considered as the major benefit for concrete recycling from Hong Kong and Japanese respondents, while 'rising concrete recycling awareness such as selecting suitable resources, techniques and training and compliance with regulations' was considered as the major benefit from Australian respondents. However, 'lack of clients' support', 'increase in management cost' and 'increase in documentation workload, such as working documents, procedures and tools' were the major difficulties encountered from Australian, Hong Kong, and Japanese respondents, respectively. To improve the existing implementation, 'inclusion of concrete recycling evaluation in tender appraisal' and 'defining clear legal evaluation of concrete recycling' were major recommendations for Australian and Hong Kong, and Japanese respondents, respectively.

07 ISOTOPE AND RADIATION SOURCES↗

Life cycle assessment of construction and demolition waste management

Highlights: • LCA of C&DW utilisation in road vs. C&DW landfilling. • C&DW utilisation in road better than landfilling for most categories. • Transportation is the most important process in non-toxic impact categories. • Leaching of oxyanions is the critical process in toxic impact categories. • Modelling of Cr fate in the subsoil is highly influential to the results. - Abstract: Life cycle assessment (LCA) modelling of construction and demolition waste (C&DW) management was carried out. The functional unit was management of 1 Mg mineral, source separated C&DW, which is either utilised in road construction as a substitute for natural aggregates, or landfilled. The assessed environmental impacts included both non-toxic and toxic impact categories. The scenarios comprised all stages of the end-of-life management of C&DW, until final disposal of all residues. Leaching of inorganic contaminants was included, as was the production of natural aggregates, which was avoided because of the use of C&DW. Typical uncertainties related to contaminant leaching were addressed. For most impact categories, utilisation of C&DW in road construction was preferable to landfilling; however, for most categories, utilisation resulted in net environmental burdens. Transportation represented the most important contribution for most nontoxic impacts, accounting for 60–95 per cent of these impacts. Capital goods contributed with negligible impacts. Leaching played a critical role for the toxic categories, where landfilling had lower impacts than utilisation because of the lower levels of leachate per ton of C&DW reaching the groundwater over a 100-year perspective. Leaching of oxyanions (As, V and Sb) was critical with respect to leaching. Typical experimental uncertainties in leaching data did not have a pivotal influence on the results; however, accounting for Cr immobilisation in soils as part of the impact assessment was critical for modelling the leaching impacts. Compared with the overall life cycle of building and construction materials, leaching emissions were shown to be potentially significant for toxicity impacts, compared with contributions from production of the same materials, showing that end-of-life impacts and leaching should not be disregarded when assessing environmental impacts from construction products and materials. CO{sub 2} uptake in the C&DW corresponding to 15 per cent carbonation could out-balance global warming impacts from transportation; however, carbonation would also likely result in increased toxicity impacts due to higher leaching of oxyanions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Identifying Modular Construction Worker Tasks Using Computer Vision

Modular construction is increasingly being seen as an attractive method for delivering building projects due to advantages in safety, quality, and lead-time. Despite these benefits, this method still relies heavily on human labor, which causes variability in factory assembly-line performance that can erode performance benefits of modular construction. Continuous improvement methods can alleviate some of these issues, but they also require continuous monitoring of human workers' performance. Due to limitations of manual time study and automated sensor-based monitoring methods, recently computer vision-based methods have gained momentum in identifying the activities of construction workers from the videos of onsite construction. Therefore, this paper explores the use of computer vision-based human activity recognition techniques to identify and classify worker activities in modular construction videos. Computer vision-based tracking method has been used to track the human workers in each frame, and Resnet-50 network has been used to classify the activity of tracked workers. Evaluation of this framework has achieved higher than 90% accuracy and recall in testing.

computer vision↗

Assessing methods in fusion and fitting for time series construction in remote sensing-based earth observations

This study evaluates the comparative performance of spatiotemporal fusion and time-series fitting methods for constructing high-spatiotemporal-resolution remote sensing time-series data. Due to in-class similarity of fusion methods and fitting methods, we employ the Fit-FC (Fitting, spatial Filtering, and residual Compensation) model as a representative fusion method and the linear harmonic fitting model as a representative fitting method. Both Fit-FC and the linear harmonic fitting are widely used for high-spatiotemporal-resolution time-series data construction, and we modify the original Fit-FC model to enable automatic time-series fusion. To ensure data representativeness, we use 3 years (2019–2021) of Harmonized Landsat and Sentinel-2 surface reflectance datasets and Terra MCD43A4 products. Eight experimental regions are selected worldwide to guarantee generalization of the comparative performance between fusion and fitting methods, covering diverse land-use types (cropland, developed land, forest, and grassland) and varying climatological conditions. Time-series of NDVI and surface reflectance are analyzed under both actual observations and simulated data-missing scenarios. The constructed time-series data reveals that (1) the modified Fit-FC and linear harmonic fitting model achieve excellent performance in constructing high-resolution time-series images; (2) the fusion method outperforms the fitting method in constructing time-series of NDVI and surface reflectance images in cropland-, forest-, and grassland-dominated regions; (3) both methods achieve comparable performance in developed-dominated regions; (4) the fusion method is more robust to missing data, and better captures abrupt phenological transitions under conditions of continuous missing data; (5) the fitting method is computationally more efficient, making it suitable for large-scale time-series image reconstruction. This study provides valuable insights for selecting optimal strategies to generate high-resolution time-series images across diverse application scenarios and lays a foundation for extensions to other vegetation indices or land surface variables.

54 ENVIRONMENTAL SCIENCES↗

Design, testing and emplacement of sand-bentonite for the construction of a gas-permeable seal test (gast)

The main aim of a gas-permeable seal is to increase the gas transport capacity of the backfilled underground structures without compromising the radionuclide retention capacity of the engineered barrier system or the host rock. Such a seal, proposed by NAGRA as part of the 'Engineered Gas Transport System' in a L/ILW repository, considers specially designed backfill and sealing materials such as sand/bentonite (S/B) mixtures with a bentonite content of 20- 30%. NAGRA's RD and D plan foresees demonstrating the construction and performance of repository seals and improving the understanding and the database for reliably predicting water and gas transport through these systems. The fluid flow and gas transport properties of these backfills have been determined at the laboratory scale and through modelling the maximum gas pressures in the near field of a repository system and the gas flow rates have been evaluated. Within this context, the Gas-permeable Seal Test (GAST) was constructed at Grimsel Test Site (GTS) to validate the effective functioning of gas-permeable seals at realistic scale. The intrinsic permeability of such seals should be in the order of 10-18 m2. Because the construction of S/B seals is not common practice for construction companies, a stepwise approach was followed to evaluate different construction and quality assurance methods. As a first step, an investigation campaign with simple tests in the laboratory and in the field followed by 1:1 scale pre-tests at GTS was performed. Through this gradual increase of the degree of complexity, practical experience was gained and confidence in the methods and procedures to be used was built, which allowed reliably producing and working with S/B mixtures at a realistic scale. During the whole pre-testing phase, a quality assurance (QA) programme for S/B mixtures was developed and different methods were assessed. They helped to evaluate and choose appropriate emplacement techniques and methodologies to achieve the target S/B dry density of 1.70 g/cm{sup 3}, which results in the desired intrinsic permeability throughout the experiment. The final QA methodology was targeted at engineering measures to decide if the work can proceed, and at producing high resolution material properties database for future water and gas transport modelling activities. The different applied QA techniques included standard core cutter tests, the application of neutron-gamma (Troxler) probes and two mass balance methods (2D and 3D). The methods, looking at different representative scales, have provided only slightly different results and showed that the average density of the emplaced S/B plug was between 1.65 and 1.73 g/cm{sup 3}. Spatial variability of dry densities was observed at decimeter scale. Overall, the pre-testing and QA programme performed for the GAST project demonstrated how the given design criteria and requirements can be met by appropriately planning and designing the material emplacement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The status of LILW disposal facility construction in Korea

In this paper, we discuss the experiences during the construction of the first LILW disposal facility in South Korea. In December 2005, the South Korean Government designated Gyeongju-city as a host city of Low- and Intermediate-Level Radioactive Waste(LILW) disposal site through local referendums held in regions whose local governments had applied to host disposal facility in accordance with the site selection procedures. The LILW disposal facility is being constructed in Bongilri, Yangbuk-myeon, Gyeongju. The official name of the disposal facility is called 'Wolsong Low and Intermediate Level Radioactive Waste Disposal Center (LILW Disposal Center)'. It can dispose of 800,000 drums of radioactive wastes in a site of 2,100,000 square meters. At the first stage, LILW repository of underground silo type with disposal capacity of 100,000 drums is under construction expected to be completed by June of 2014. The Wolsong Low and Intermediate Level Radioactive Waste Disposal Center consists of surface facilities and underground facilities. The surface facilities include a reception and inspection facility, an interim storage facility, a radioactive waste treatment building, and supporting facilities such as main control center, equipment and maintenance shop. The underground facilities consist of a construction tunnel for transport of construction equipment and materials, an operation tunnel for transport of radioactive waste, an entrance shaft for workers, and six silos for final disposal of radioactive waste. As of Dec. 2012, the overall project progress rate is 93.8%. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Expected treatment dose construction and adaptive inverse planning optimization: Implementation for offline head and neck cancer adaptive radiotherapy

Purpose: To construct expected treatment dose for adaptive inverse planning optimization, and evaluate it on head and neck (h and n) cancer adaptive treatment modification. Methods: Adaptive inverse planning engine was developed and integrated in our in-house adaptive treatment control system. The adaptive inverse planning engine includes an expected treatment dose constructed using the daily cone beam (CB) CT images in its objective and constrains. Feasibility of the adaptive inverse planning optimization was evaluated retrospectively using daily CBCT images obtained from the image guided IMRT treatment of 19 h and n cancer patients. Adaptive treatment modification strategies with respect to the time and the number of adaptive inverse planning optimization during the treatment course were evaluated using the cumulative treatment dose in organs of interest constructed using all daily CBCT images. Results: Expected treatment dose was constructed to include both the delivered dose, to date, and the estimated dose for the remaining treatment during the adaptive treatment course. It was used in treatment evaluation, as well as in constructing the objective and constraints for adaptive inverse planning optimization. The optimization engine is feasible to perform planning optimization based on preassigned treatment modification schedule. Compared to the conventional IMRT, the adaptive treatment for h and n cancer illustrated clear dose-volume improvement for all critical normal organs. The dose-volume reductions of right and left parotid glands, spine cord, brain stem and mandible were (17 {+-} 6)%, (14 {+-} 6)%, (11 {+-} 6)%, (12 {+-} 8)%, and (5 {+-} 3)% respectively with the single adaptive modification performed after the second treatment week; (24 {+-} 6)%, (22 {+-} 8)%, (21 {+-} 5)%, (19 {+-} 8)%, and (10 {+-} 6)% with three weekly modifications; and (28 {+-} 5)%, (25 {+-} 9)%, (26 {+-} 5)%, (24 {+-} 8)%, and (15 {+-} 9)% with five weekly modifications. Conclusions: Adaptive treatment modification can be implemented including the expected treatment dose in the adaptive inverse planning optimization. The retrospective evaluation results demonstrate that utilizing the weekly adaptive inverse planning optimization, the dose distribution of h and n cancer treatment can be largely improved.

60 APPLIED LIFE SCIENCES↗

241-AZ Tank Farm Construction Extent of Condition Review for Tank Integrity

This report provides the results of an extent of condition construction history review for tanks 241-AZ-101 and 241-AZ-102. The construction history of the 241-AZ tank farm has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In the 241-AZ tank farm, the second DST farm constructed, both refractory quality and tank and liner fabrication were improved.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

241-SY Tank Farm Construction Extent of Condition Review for Tank Integrity

This report provides the results of an extent of condition construction history review for tanks 241-SY-101, 241-SY-102, and 241-SY-103. The construction history of the 241-SY tank farm has been reviewed to identify issues similar to those experienced during tank 241-AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank 241-AY-102 as the comparison benchmark. In the 241-SY tank farm, the third DST farm constructed, refractory quality and stress relief were improved, while similar tank and liner fabrication issues remained.

241-SY Tank Farm↗

Strategy Guideline: Application of a Construction Quality Process to Existing Home Retrofits

The Home Innovation Research Labs developed a construction quality process for new and existing high performance homes (HPH) in which high performance goals are established, specifications to meet those goals are defined, and construction monitoring points are added to the construction schedule so that critical energy efficiency details are systematically reviewed, documented, and tested in a timely manner. This report follows the evolution of the construction quality process from its development for new homes, to its application in the construction of a high performance home with enhanced specifications, and its application in a crawlspace renovation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

241-AP Tank Farm Construction Extent of Condition Review for Tank Integrity

This report provides the results of an extent of condition construction history review for the 241-AP tank farm. The construction history of the 241-AP tank farm has been reviewed to identify issues similar to those experienced during tank AY-102 construction. Those issues and others impacting integrity are discussed based on information found in available construction records, using tank AY-102 as the comparison benchmark. In the 241-AP tank farm, the sixth double-shell tank farm constructed, tank bottom flatness, refractory material quality, post-weld stress relieving, and primary tank bottom weld rejection were improved.

241-AP Tank Farm↗

Strategy Guideline: Application of a Construction Quality Process to Existing Home Retrofits

The Partnership for Home Innovation developed a construction quality process for new and existing high performance homes (HPH) in which high performance goals are established, specifications to meet those goals are defined, and construction monitoring points are added to the construction schedule so that critical energy efficiency details are systematically reviewed, documented, and tested in a timely manner. This report follows the evolution of the construction quality process from its development for new homes, to its application in the construction of a high performance home with enhanced specifications, and its application in a crawlspace renovation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗