Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Nuclear Nonproliferation and Arms Control Primer Prepared for the Blue Ribbon Commission on America’s Nuclear Future

To provide a brief overview of key arms control and nonproliferation arrangements for the layperson that may be relevant to the Commission's comprehensive review of policies for managing the back end of the nuclear fuel cycle. Primer would be published by the Commission and made publicly available, probably as an appendix to a larger Commission report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NWTC Dynamometer and Controllable Grid Interface Commissioning and Testing of General Electric Wind Turbine Drivetrain: Cooperative Research and Development Final Report, CRADA Number CRD 14-551

This CRADA (1) facilitates commissioning of the new NWTC 5MW dynamometer facility while testing a General Electric (Participant) 2.75MW wind turbine drivetrain under loaded conditions, (2) facilitates commissioning of the new NWTC the Controllable Grid Interface (CGI) as part of testing the GE 2.75MW drivetrain, (3) facilitates further wind turbine drivetrain testing utilizing the commissioned dynamometer and CGI test facilities.

17 WIND ENERGY↗

Commissioning Plan for the Cameca NanoSIMS 50L

In late March of 2017 a Cameca® NanoSIMS 50L was delivered to the Nuclear Security Advanced Technologies (NSAT) group at ORNL. This instrument occupies the cutting edge of Secondary Ion Mass Spectrometry (SIMS) technology, and will ultimately solidify the NSAT group’s position at the forefront of the nuclear security research and development community. This document describes the processes whereby the ORNL NanoSIMS 50L will be commissioned, culminating in the group’s ability to demonstrate both depth of proficiency and breadth of capability to sponsors and the broader community. Before describing the specific metrics and benchmarks defining the commissioning process, this document delves into the body of literature specific to SIMS analysis in support of nuclear forensics research. This in-depth literature review sets the stage for an explanation of how the NanoSIMS 50L platform will help address existing research questions and define new ones. Lastly, the document describes the measurements and projects that will take place as part of the instrument’s commissioning phase.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

NSLS-II SR Commissioning Report

The NSLS-II storage ring (SR) phase I commissioning has been successfully completed in May 12, 2014. In accordance to the project milestone, 25 mA average current was achieved in the storage ring with PETRA III 500 MHz 7-cell PETRA-III RF cavity but w/o ID’s and Landau cavities. In about 5 weeks we delivered a 3 GeV beam to the ring injection straight section, made the 1st turn around the ring, achieved hundreds of turns optimizing injection, stored beam having sextupoles and RF turned ON. Injection efficiency was achieved 95%, close orbit rms value is ~100 um, tune and chromaticity were measured and adjusted as desired, and beam lifetime was a few hours depending on the stored beam current. This report consists of a summary, a chronological part, the injector system performance in Ch3, SR commissioning experience in Ch4 and the outlook of remaining work in Ch5. The SR commissioning experience includes the software experience, hardware (timing, diagnostics, RF, vacuum, PS) operation experience, the strategy for initial injection beam to the stored beam, measurement of the linear optics and control to the desired value, nonlinear beam dynamics study, beam instability study, the subsystem reliability and fault study at different scenarios.

36 MATERIALS SCIENCE↗

Construction Specification Section 01810 Facility Commissioning Requirements (Revised Version)

The purpose of the commissioning process for this project is to provide SNL assurance that equipment/systems have been provided as required, installed in the prescribed manner and operate in compliance with SNL project requirements, basis of design, contract documentation, and operational needs. In addition, commissioning provides SNL assurance that any special safety engineered features to prevent or control the accidental release of hazardous energy operate appropriately. Commissioning is intended to enhance the quality of system startup, operation and aid in the orderly and timely transfer of fully functioning systems.

42 ENGINEERING↗

Pumped Storage Hydropower (PSH) FAST Commissioning Prize Technical Analysis

The US energy landscape has undergone major changes over the past 10 years and will continue to see significant changes in future decades as the power grid increases its reliance on variable renewable energy resources. Because of the inherent variability of these resources, renewable energy growth may require additional energy storage capacity to provide flexible load-following capabilities and other grid services that can quickly adjust to changes in energy demand and generation. Pumped storage hydropower (PSH)—one such energy storage technology—uses pumps to convey water from a lower reservoir to an upper reservoir for energy storage and releases water back to the lower reservoir via a powerhouse for hydropower generation. PSH facility pump and generation cycling often follows economic and energy demand conditions. Across the United States, 43 PSH facilities are in operation and 55 projects are in various permitting or licensing stages. Altogether, the 43 operational projects provide the wide majority (95%) of utility-scale electricity storage in the United States. These facilities also provide significant power and nonpower grid benefits, including large-scale electrical system reserve capacity, grid reliability support, and electricity supply-demand balancing through quick-response capabilities and operational flexibility. PSH systems can accomplish these at a scale (e.g., size) and cost that makes these systems highly attractive from a technical standpoint. Although these research concepts are still in their infancy, they demonstrate promising potential as future PSH energy storage technologies. Although PSH has many advantages, development in the United States has effectively stalled since the 1990s, partially because of the magnitude of project costs and financing interest during development and construction, the length of time from project investment until project revenue begins, permitting challenges, construction risks, competition from other storage technologies (e.g., batteries, hydrogen storage), and electricity market evolution and uncertainty. In short, the time, cost, and risk associated with modern PSH development have resulted in limited growth in the United States recently, despite the growing energy storage demand stemming from increased wind and solar power deployment. Technology innovation is needed to help reduce PSH commissioning time, cost, and risk, particularly during the post-licensing phase of project development. To address challenges facing the PSH industry and to improve PSH commissioning timelines, the US Department of Energy (DOE) Water Power Technologies Office (WPTO) initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning Prize project.

13 HYDRO ENERGY↗

Lessons from commissioning of the cryogenic system for the Short-Baseline Neutrino Detector at Fermilab

Results from commissioning and first year of operations of the cryogenic system of the Short-Baseline Neutrino Detector (SBND) and its membrane cryostat installed at the Fermi National Accelerator Laboratory are described. The SBND detector is installed in a 200 m3 membrane cryostat filled with liquid argon, which serves both as target and as active media. For the correct operation of the detector, the liquid argon must be kept in very stable thermal conditions while the contamination of electronegative impurities must be consistently kept at the level of small fractions of parts per billion. The detector is operated in Booster Neutrino Beams (BNB) at Fermilab for the search of sterile neutrinos and measurements of neutrino-argon cross sections. The cryostat and the cryogenic systems also serve as prototypes for the much larger equipment to be used for the LBNF/DUNE experiment. Since its installation in 2018-2023 and cooldown in spring of 2024, the cryostat and the cryogenic system have been commissioned to support the detector operations. The lessons learned through installation, testing, commissioning, cooldown, and initial operations are described.

Geynisman, Michael [Fermilab]↗

Sensorium: commissioning abundant sensors with augmented reality and QR codes

In the future, it will be possible to build high-quality models of building interiors based on data from a dense fleet of sensors reporting on air volumes much smaller than a room or zone. To enable such models, we are creating technologies that allow a fleet of sensors to be commissioned quickly at low cost. Our sensor commissioning process builds a 3D model of each building interior that includes sensor positions and sensor networking information such as sensor MAC addresses. It employs multiple technologies, including augmented reality, LiDAR, QR codes, and computer vision. Sensors can be commissioned at more than 10x the speed and at less than one tenth the cost of traditional approaches.

Bier, Eric A.↗

Site Selection Restart in Germany Results of the Site Selection Commission - 17017

Since 2011 Germany is pursuing a phase-out strategy concerning the use of nuclear power for electricity production. This decision was strongly influenced by the Fukushima event. In 2013 the federal government announced that they also had achieved an agreement with the Federal States in Germany on a law to restart the site selection for a repository for spent fuel and high-level heat-generating waste from scratch. The new law was passed in July 2013. At first a 34-member commission had been installed in April 2014 to evaluate the Site Selection Law [1] and to develop basic principles for site selection, including safety requirements and selection criteria for rock formations. The commission included representatives from the parliament, civil society organizations, industry, environmental organizations, trade unions and scientists. The commission forwarded its recommendations in summer 2016. The evaluated law should come into force in 2017. The stepwise approach for finding a suitable site for a repository for Germany's heat-generating waste might then start in 2017. As shown in publication [2], the site selection process will take several decades. The preferred solution based on the present state of the art is the final disposal in deep geological formations in a mine with the option 'Reversibility and Retrievability (R and R)'. The scientific challenges and the upcoming R and D program are complex. Therefore a 'step-back option' (learning process) is foreseen in the program. The R and D program has to react flexibly to new findings, demands or modifications of criteria or requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. Nuclear Regulatory Commission Historical Perspectives of Very Low-Level Radioactive Waste - 18367

The United States Nuclear Regulatory Commission (NRC), in Title 10 of the Code of Federal Regulations Part 61 (10 CFR Part 61), 'Licensing Requirements for Land Disposal of Radioactive Waste', provides licensing procedures, performance objectives, and technical requirements for the issuance of licenses for the land disposal of low-level radioactive waste. Low-level radioactive waste is divided into four categories based on its potential risk and need for isolation. Class A is the lowest category of low-level radioactive waste and poses the least risk. A large percentage of Class A low-level waste contains very low radionuclide concentrations and does not pose a significant health and safety risk. In the current regulatory framework, this waste, referred to as low-activity or very low-level waste, is managed in the same manner as much more hazardous waste. In 1986 and 1990, as a result of the Low-Level Radioactive Waste Policy Amendments Act of 1985, the NRC issued the Below Regulatory Concern (BRC) policy statement. This policy statement established an implementation plan regarding the expeditious handling of rulemaking petitions 'to exempt specific radioactive waste streams from regulation due to the presence of radionuclides in sufficiently low concentrations or quantities as to be below regulatory concern.' The BRC policy statement provided a consistent risk framework when considering regulatory exemption decisions, such as: (1) the release for unrestricted public use of lands and structures containing residual radioactivity; (2) the distribution of consumer products containing small amounts of radioactive material; (3) the disposal of very low-level radioactive waste at other than licensed disposal sites; and (4) the recycling of slightly contaminated equipment and materials. Due to concerns with the BRC policy that were raised by Congress, the States, the public, and others, Congress enacted the Energy Policy Act of 1992, which revoked the NRC's 1986 and 1990 BRC policy statements and led to the NRC's formal withdrawal of the BRC policy in 1993. Stakeholders raised concerns on NRC's potential deregulation of radioactive material. Additionally, in March 2005, the NRC staff proposed a rule to amend 10 CFR Part 20, 'Standards for Protection Against Radiation,' to include radiological criteria for controlling the disposition of solid materials with very small amounts of residual radioactivity. The NRC staff also proposed a limited disposition approach for the disposition of solid material, limiting the release of solid material meeting a 0.01 milli-Sievert per year (mSv/yr) [1 milli-rem (mrem/yr)] dose criterion, from licensed control. In June 2005, the Commission disapproved publication of the proposed rule and deferred the rulemaking until a later time, stating that the NRC's existing approach of reviewing specific cases on an individual basis was fully protective of public health and safety. This rulemaking effort was discontinued by the Commission in 2016. Recently, several nuclear power plant licensees have announced early decommissioning of their facilities. Some stakeholders have expressed concerns about the capacity and disposal costs associated with using the four existing low-level waste disposal sites for very low levels of radioactive waste (i.e., waste at the low end of the Class A category). A more risk-informed, performance based approach to waste disposal would allow more flexibility in managing this waste commensurate with its risk and hazard. A new approach would also allow the NRC to align with international standards for this type of waste. The NRC is presently conducting a scoping study to identify the actions the agency should take to strengthen its regulatory framework for very low-level waste disposal. The Very Low-Level Waste (VLLW) scoping study will consider divergent stakeholder comments; lessons learned from the BRC policy statements and the proposed rule on radiological criteria for controlling the disposition of solid materials; and best practices of other countries with respect to VLLW disposal. The NRC will also engage other government agencies to discuss regulatory options for VLLW. This paper offers a historical overview of past NRC initiatives to manage the lower end of Class A waste in a manner that is risk informed and performance based. It examines previous endeavors and discusses the regulatory challenges that arose. It also addresses lessons learned and introduces NRC's current effort regarding very low-level radioactive waste disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance and Commissioning of the BigBite Timing Hodoscope for Nucleon Form Factor Measurements at Jefferson Lab

The BigBite Timing Hodoscope detector is the primary subject of this thesis. The Super BigBite Spectrometer is a Jefferson Lab Hall A Collaboration project that has and will continue to measure nucleon electromagnetic form factors. This spectrometer includes the Timing Hodoscope which provides high resolution particle timing data for scattered electrons in the electron arm of BigBite. The Timing Hodoscope utilizes 90, 25 × 25 × 600 mm3 scintillator bars stacked on top of each other to form a single detector plane, and these bars are connected to 180 photo-multiplier tubes via light guides. Particles collide with the scintillating material creating a shower of optical photons and these particle events in the bars are collected to generate signals that are readout by the data acquisition (DAQ) electronics. NINO ASIC amplifier-discriminator cards output signals from the photo-multiplier tubes into analogue and logic signals, which are sent to analogue-to-digital (ADC) and time-to-digital (TDC) converter data acquisition readout modules. This data is then used for analysis of the detector. The focus of this thesis is the construction, commissioning, calibration, and performance of the BigBite Timing Hodoscope before and during the first of five nucleon electromagnetic form factor experiments at Jefferson Lab Hall A. Before the neutron magnetic form factor, G n M, experiment, cosmic ray data was collected during commissioning to confirm proper operation of the Timing Hodoscope electronics by observing the ADC and TDC data. Commissioning studies for charge normalization, gain matching, and other ADC and TDC detector data variables were performed before moving the detector into Hall A. Following installation in Hall A, several calibration studies were implemented to fine-tune the detector in preparation for use in the experiment. The calibration studies included analysis of timing cuts, TDC alignment, the time-walk effect, time difference offsets, and scintillator velocity corrections. Once the Timing Hodoscope was well-calibrated, data-taking during the experiment commenced and the beam-on-target data was used to characterize the Timing Hodoscope performance during the G n M experiment run-time. The performance analysis included studies observing energy deposit, cluster size, rates, accidentals, pile-up, tracking efficiency, position resolution, and time resolution. After application of physics cuts to ensure a data set comprised of particle tracks corresponding to elastic electrons, which is the main data of interest for measurement of G n M, the Timing Hodoscope is shown on average across all kinematic settings to have a >98% tracking efficiency, a position resolution of 4-6 cm in the non-dispersive plane and 1.5-2 cm in the dispersive plane, and a time resolution of 500-750 ps. These performance results are compared to a GEANT4 based performance simulation of the BigBite Timing Hodoscope for reference, showing to what degree the measured performance values match those taken from the simulation.

Marinaro, Ralph↗

Design and Commission of Solid State Switch Driver in SLAC Subbooster Modulator

The LINAC sub-booster modulator is a pulsed power supply to provide a 30kV pulse to drive a klystron in SLAC LINAC. It has utilized vacuum tetrode as pulse switch for more than 60 years. With the vacuum tetrode availability becoming less and its cost surging, a natural choice is to use solid state switch in this pulsed power modulator. To commission solid state switch in LINAC sub-booster modulator, a driver board is designed to drive a BEHLKE HTS-LC2 series MOSFET based switches. The design concept and some concerns in design will be presented. The driver board is universal for all HTS-LC2 series switches because they share the same driver signals and connections. After the driver is commissioned, two AI systems are introduced to design one core part of the driver, the results are presented here. During the commission of the driver board in the LINAC sub-booster modulators, some problems happened and were addressed.

AI Circuit Design↗

Detector Characterization for SuperCDMS Commissioning

Super Cryogenic Dark Matter Search (SuperCDMS) SNOLAB is a next generation direct detection experiment search ing for low mass dark matter using cryogenic germanium and silicon detectors operated at millikelvin temperatures. As the experiment begins its first commissioning data taking, establishing that the detectors respond to energy deposits in a stable, predictable way is a prerequisite for any future physics analysis. This work presents a study of detector stability for four SuperCDMS SNOLAB detectors, det 7 and det 15 (germanium), and det 11 and det 14 (silicon), using two data sets taken during early commissioning: dedicated Barium-133 calibration runs, which provide a known gamma ray energy reference at 356 keV, and low background runs, which record whatever background radiation the detectors see with no external source present. The Ba-133 data do not show a distinct, well localized line at the expected energy, and the low background data show a baseline that drifts and oscillates over time rather than remaining flat. This baseline instability appears consistently across multiple channels rather than being confined to one, suggesting a shared, detector wide cause rather than a single faulty channel. Together, these observations point to the detectors’ cryogenic support system as the likely source of the instability, since small temperature fluctuations introduced during normal operation of the cooling system could plausibly couple into the exquisitely temperature sensitive detectors. These results inform the ongoing commissioning effort by narrowing down where instability in the current data is originating from.

O'Hanlon, Viktoria M. [Skidmore Coll.; Fermilab]↗

Detector Characterization for SuperCDMS Commissioning

Super Cryogenic Dark Matter Search (SuperCDMS) SNOLAB is a next generation direct detection experiment search ing for low mass dark matter using cryogenic germanium and silicon detectors operated at millikelvin temperatures. As the experiment begins its first commissioning data taking, establishing that the detectors respond to energy deposits in a stable, predictable way is a prerequisite for any future physics analysis. This work presents a study of detector stability for four SuperCDMS SNOLAB detectors, det 7 and det 15 (germanium), and det 11 and det 14 (silicon), using two data sets taken during early commissioning: dedicated Barium-133 calibration runs, which provide a known gamma ray energy reference at 356 keV, and low background runs, which record whatever background radiation the detectors see with no external source present. The Ba-133 data do not show a distinct, well localized line at the expected energy, and the low background data show a baseline that drifts and oscillates over time rather than remaining flat. This baseline instability appears consistently across multiple channels rather than being confined to one, suggesting a shared, detector wide cause rather than a single faulty channel. Together, these observations point to the detectors’ cryogenic support system as the likely source of the instability, since small temperature fluctuations introduced during normal operation of the cooling system could plausibly couple into the exquisitely temperature sensitive detectors. These results inform the ongoing commissioning effort by narrowing down where instability in the current data is originating from.

O'Hanlon, Viktoria M. [Skidmore Coll.; Fermilab]↗

Commissioning of Volumetric Modulated Arc Therapy (VMAT)

Purpose: Volumetric modulated arc therapy (VMAT) involves the simultaneous use of dynamic multileaf collimator (DMLC) techniques and gantry arcing; appropriate quality assurance is therefore required. This article describes the development and implementation of procedures for commissioning VMAT on a commercial linear accelerator (Elekta PreciseBeam VMAT with MLCi and Beam Modulator heads). Materials and Methods: Tests for beam flatness and symmetry at the variable dose rates required for VMAT were performed. Multileaf collimator (MLC) calibration was investigated using dynamic prescriptions. The cumulative dose delivered by a sliding window aperture was measured and compared with calculated values. Rotational accuracy was evaluated using dynamic prescriptions which required accurate correlated motion of both gantry and MLC leaves. Finally, measured and calculated dose distributions for complete VMAT treatment plans were compared and evaluated. Results: Beam symmetry was found to be better than 3% down to dose rates of 75 MU/min. MLC calibration provided continuity of dose at match planes of better than 4%, which was comparable to interleaf leakage effects. Integrated sliding window doses were within 3% of those calculated. Tests for rotational accuracy showed uniformity of peripheral dose mostly within {+-}4% of local control point dose, or approximately {+-}0.2% of total central dose. A two-arc prostate case showed an absolute dose difference between calculations and measurements of less than 3%, with gamma (3% and 3 mm) of better than 95%. Conclusions: VMAT has been successfully commissioned and has been introduced into clinical use. The Elekta DMLC has also been shown to be suitable for sliding window delivery.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Commissioning of the HELIOS spectrometer.

This paper describes the implementation and commissioning of a device based on a new concept for measurements of nuclear reactions in inverse kinematics. The HELIcal Orbit Spectrometer, HELIOS, was commissioned at Argonne National Laboratory by studying the {sup 28}Si(d,p){sup 29}Si reaction in inverse kinematics. This experiment served as a proof of principle for this previously untested concept, and was used to verify the response and performance characteristics of HELIOS.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Cognitive barriers during monitoring-based commissioning of buildings

Monitoring-based commissioning (MBCx) is a continuous building energy management process used to optimize energy performance in buildings. Although monitoring-based commissioning (MBCx) can reduce energy waste by up to 20%, many buildings still underperform due to issues such as unnoticed system faults and inefficient operational procedures. While there are technical barriers that impede the MBCx process, such as data quality, the focuses of this paper are the non-technical, behavioral and organizational, barriers that contribute to issues initiating and implementing MBCx. In particular, this paper discusses cognitive biases, which can lead to suboptimal outcomes in energy efficiency decisions, resulting in missed opportunities for energy savings. This paper provides evidence of cognitive biases in decisions during the MBCx process using qualitative data from over 40 public and private sector organizations. The results describe barriers resulting from cognitive biases, listed in descending order of occurrence, including: risk aversion, social norms, choice overload, status quo bias, information overload, professional bias, and temporal discounting. Building practitioners can use these results to better understand potential cognitive biases, in turn allowing them to establish best practices and make more informed decisions. Finally, researchers can use these results to empirically test specific decision interventions and facilitate more energy efficient decisions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Design, construction, and first commissioning results of superconducting source for ions at NSCL/MSU

A new electron cyclotron resonance ion source (ECRIS) was constructed at the NSCL/MSU to replace the existing SC-ECRIS. This ECRIS operates at 18+14.5 GHz microwave frequencies with a planned upgrade to 24-28 GHz in the second phase of commissioning. A superconducting hexapole coil system produce the radial magnetic field; the axial trapping is produced with six superconducting solenoid coils enclosed in an iron yoke to allow the optimization of the distance between the plasma electrode and the resonant zone in the plasma. We report the details of the design, construction, and initial commissioning results of this new ECRIS.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗