Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMAND MODULE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Orion Capsule Handling Qualities for Atmospheric Entry

Two piloted simulations were conducted at NASA's Johnson Space Center using the Cooper-Harper scale to study the handling qualities of the Orion Command Module capsule during atmospheric entry flight. The simulations were conducted using high fidelity 6-DOF simulators for Lunar Return Skip Entry and International Space Station Return Direct Entry flight using bank angle steering commands generated by either the Primary (PredGuid) or Backup (PLM) guidance algorithms. For both evaluations, manual control of bank angle began after descending through Entry Interface into the atmosphere until drogue chutes deployment. Pilots were able to use defined bank management and reversal criteria to accurately track the bank angle commands, and stay within flight performance metrics of landing accuracy, g-loads, and propellant consumption, suggesting that the pilotability of Orion under manual control is both achievable and provides adequate trajectory performance with acceptable levels of pilot effort. Another significant result of these analyses is the applicability of flying a complex entry task under high speed entry flight conditions relevant to the next generation Multi Purpose Crew Vehicle return from Mars and Near Earth Objects.

Tigges, Michael A.↗

Thermal Protection System design studies for lunar crew module

The results of a study to predict aeroheating and Thermal Protection System (TPS) requirements for manned entry vehicles returning to Earth from the moon are presented. The effects of vehicle size and lunar-return strategies on the aerothermodynamic environment and TPS design were assessed. Study guidelines were based on an Apollo Command Module (CM) configuration and lunar return strategies included direct entry and aerocapture followed by Low Earth Orbit entry (LEO). Convective heating was obtained by the boundary layer integral matrix procedure (BLIMP) code, and radiative heating was computed with the QRAD program. The AESOP-STAB code and the AESOP-THERM code were used for TPS analysis for ablating materials and nonablating materials respectively. Results indicated that there was an optimum size for minimum heating and that direct entry had higher heating rates than aerocapture. Aerocapture resulted in higher heat loads and TPS weight. The TPS weight factor was 6-8 percent for all lunar return strategies, with the TPS weight being about 50 percent less than that of the original Apollo CM vehicle.

Williams, S. D.↗

Multiple rate digital command detection system with range clean-up capability

A multi-rate digital command system is disclosed which uses the composite signal of a mu-type ranging system as a subcarrier to transmit range codes and data from a station to a receiver where the range codes are sequentially phase modulated on a subcarrier of frequency by one of its own subharmonics and data is phase modulated on a selected ranging component. A range cleanup loop in a spacecraft locks the phase of a locally generated reference component to a received ranging component and retransmits the component to a ground station. When the inverse phase of a ranging component is received and detected, the cleanup loop is modified to demodulate phase modulated command symbols while continuing tracking the same ranging component. The command symbol rate is coherently related to the ranging signal component bit rate.

Lesh, J. R.↗

Apollo network

Although the design of the Apollo network followed closely behind the Manned Space Flight Network (MSFN) modification for the Gemini program, many site modifications were necessary to provide Apollo support due to the greater scope of the Apollo program. The Apollo program requires instrumentation for support of the S-I, S-11, S IV-B/IU, Command Service Module (CSM) and Lunar Excursion Module (LEM) stages. Command Service Module (CSM) and Lunar Excursion Module (LEM) stages. Support must also be provided at both orbital and lunar distances. Increased data processing capability is required for processing and displaying significantly larger amounts of information. The ground network requires the capability of processing both Pulse Code Modulation (PCM) telemetry and command data for the CSM, LEM, and S IV-B/IU. In various stages of the Apollo program, both tone (on UHF) and digital [on Unified S-Band (USB) and UHF] command capabilities are required. Also at various stages both USB and VHF telemetry links are required.

Ground support system↗

System analysis study of space platform and station accommodations for life sciences research facilities. Volume 2: Study results. Appendix D: Life sciences research facility requirements

The purpose of this requirements document is to develop the foundation for concept development for the Life Sciences Research Facility (LSRF) on the Space Station. These requirements are developed from the perspective of a Space Station laboratory module outfitter. Science and mission requirements including those related to specimens are set forth. System requirements, including those for support, are detailed. Functional and design requirements are covered in the areas of structures, mechanisms, electrical power, thermal systems, data management system, life support, and habitability. Finally, interface requirements for the Command Module and Logistics Module are described.

Wiley, Lowell F.↗

Using Modules with MPICH-G2 (and "Loose Ends")

A new approach to running complex, distributed MPI jobs using the MPICH-G2 library is described. This approach allows the user to switch between different versions of compilers, system libraries, MPI libraries, etc. via the "module" command. The key idea is a departure from the prescribed "(jobtype=mpi)" approach to running distributed MPI jobs. The new method requires the user to provide a script that will be run as the "executable" with the "(jobtype=single)" RSL attribute. The major advantage of the proposed method is to enable users to decide in their own script what modules, environment, etc. they would like to have in running their job.

Chang, Johnny↗

Remembering Apollo 11: The 30th Anniversary Data Archive CD-ROM

On July 20, 1969, the human race accomplished its single greatest technological achievement of all time when a human first set foot on another celestial body. Six hours after landing at 4:17 p.m. Eastern Standard Time (with less than thirty seconds of fuel remaining), Neil A. Armstrong took the "small step" into our greater future when he stepped off the Lunar Module, named Eagle, onto the surface of the Moon, from which he could look up and see Earth in the heavens as no one had done before him. He was shortly joined by Edwin "Buzz" Aldrin, and the two astronauts spent twenty-one hours on the lunar surface and returned forty-six pounds of lunar rocks. After their historic walks on the Moon, they successfully docked with Michael Collins, patiently orbiting the cold but no longer lifeless Moon alone in the Command module Columbia. This CR-ROM is intended as a collection of hard to find technical data and other interesting information about the Apollo 11 mission, as well as the apollo program in general. It includes basic overviews, such as a retrospective analysis, an annotated bibliography, and history of the lunar-orbit rendezvous concept. It also contains technical data, such as mission operations reports, press kits, and news references for all of the Apollo missions, the Apollo spacecraft, and the Saturn V launch vehicle. Rounding out this CD-ROM are extensive histories of the lunar Orbiter program (the robotic predecessor to Apollo, biographies of the Apollo astronauts and other key individuals, and interesting audio-visual materials, such as video and audio clips, photo galleries, and blueprint-like diagrams of the Apollo spacecraft.

Edgar M Cortright↗

Design/Development of Spacecraft and Module Crew Compartments

This slide presentation reviews the design and development of crew compartments for spacecraft and for modules. The Crew Compartment or Crew Station is defined as the spacecraft interior and all other areas the crewman interfaces inside the cabin, or may potentially interface.It uses examples from all of the human rated spacecraft. It includes information about the process, significant drivers for the design, habitability, definitions of models, mockups, prototypes and trainers, including pictures of each stage in the development from Apollo, pictures of the space shuttle trainers, and International Space Station trainers. It further reviews the size and shape of the Space Shuttle orbiter crew compartment, and the Apollo command module and the lunar module. It also has a chart which reviews the International Space Station (ISS) internal volume by stage. The placement and use of windows is also discussed. Interestingly according to the table presented, the number 1 rated piece of equipment for recreation was viewing windows. The design of crew positions and restraints, crew translation aids and hardware restraints is shown with views of the restraints and handholds used from the Apollo program through the ISS.

Goodman, Jerry R.↗

Post-Flight EDL Entry Guidance Performance of the 2011 Mars Science Laboratory Mission

The 2011 Mars Science Laboratory was the first successful Mars mission to attempt a guided entry which safely delivered the rover to a final position approximately 2 km from its target within a touchdown ellipse of 19.1 km x 6.9 km. The Entry Terminal Point Controller guidance algorithm is derived from the final phase Apollo Command Module guidance and, like Apollo, modulates the bank angle to control the range flown. For application to Mars landers which must make use of the tenuous Martian atmosphere, it is critical to balance the lift of the vehicle to minimize the range error while still ensuring a safe deploy altitude. An overview of the process to generate optimized guidance settings is presented, discussing improvements made over the last nine years. Key dispersions driving deploy ellipse and altitude performance are identified. Performance sensitivities including attitude initialization error and the velocity of transition from range control to heading alignment are presented. Just prior to the entry and landing of MSL in August 2012, the EDL team examined minute tuning of the reference trajectory for the selected landing site, analyzed whether adjustment of bank reversal deadbands were necessary, the heading alignment velocity trigger was in union with other parameters to balance the EDL risks, and the vertical L/D command limits. This paper details a preliminary postflight assessment of the telemetry and trajectory reconstruction that is being performed, and updates the information presented in the former paper Entry Guidance for the 2011 Mars Science Laboratory Mission (AIAA Atmospheric Flight Mechanics Conference; 8-11 Aug. 2011; Portland, OR; United States)

Mendeck, Gavin F.↗

Rocketdyne - Lunar Ascent Engine

The ascent engine was the last one from the moon, and I want to focus on the idea of redundancy and teams in regard to the engine. By teams, I mean teamwork - not just within Rocketdyne. It was teamwork within Rocketdyne; it was teamwork within Grumman; it was teamwork within NASA. These were all important elements leading to the successful development of the lunar excursion module (LEM) engine. Communication, rapid response, and cooperation were all important. Another aspect that went into the development of the ascent engine was the integration of technology and of lessons learned. We pushed all the above, plus technology and lessons learned, into a program, and that led to a successful result. One of the things that I like to think about - again in retrospect - is how it is very "in" now to have integrated product and process teams. These are buzzwords for teamwork in all program phases. That s where you combine a lot of groups into a single organization to get a job done. The ascent engine program epitomized that kind of integration and focus, and because this was the mid- to late-1960s; this was new ground for Rocketdyne, Grumman, and NASA. Redundancy was really a major hallmark of the Apollo Program. Everything was redundant. Once you got the rocket going, you could even lose one of the big F-1 engines, and it would still make it to orbit. And once the first stage separated from the rest of the vehicle, the second stage could do without an engine and still make a mission. This redundancy was demonstrated when an early Apollo launch shut down a J-2 second-stage engine. Actually, they shut down two J-2 engines on that flight. Even the third stage, with its single J-2 engine, was backed up because the first two stages could toss it into a recoverable orbit. If the third stage didn't work, you were circling the earth, and you had time to recover the command module and crew. Remember how on the Apollo 13 flight, there was sufficient system redundancy even when we lost the service module. That was a magnificent effort. TRW Inc. really ought to be proud of their engine for that. (See Slide 2, Appendix I) We had planned for redundancy; we had landed on the moon. However, weight restrictions in the architecture said, "You can t have redundancy for ascent from the moon. You've got one engine. It s got to work. There is no second chance. If that ascent engine doesn't work, you re stuck there." It would not have looked good for NASA. It wouldn't have looked good for the country. There was a letter written that President Richard Nixon would read if the astronauts got stuck on the moon, expressing how sorry we were and so forth. It was a scary letter, really. The ascent engine was an engine that had to work. (See Slide 3, Appendix I).

Harmon, Tim↗

Orion Entry Handling Qualities Assessments

The Orion Command Module (CM) is a capsule designed to bring crew back from the International Space Station (ISS), the moon and beyond. The atmospheric entry portion of the flight is deigned to be flown in autopilot mode for nominal situations. However, there exists the possibility for the crew to take over manual control in off-nominal situations. In these instances, the spacecraft must meet specific handling qualities criteria. To address these criteria two separate assessments of the Orion CM s entry Handling Qualities (HQ) were conducted at NASA s Johnson Space Center (JSC) using the Cooper-Harper scale (Cooper & Harper, 1969). These assessments were conducted in the summers of 2008 and 2010 using the Advanced NASA Technology Architecture for Exploration Studies (ANTARES) six degree of freedom, high fidelity Guidance, Navigation, and Control (GN&C) simulation. This paper will address the specifics of the handling qualities criteria, the vehicle configuration, the scenarios flown, the simulation background and setup, crew interfaces and displays, piloting techniques, ratings and crew comments, pre- and post-fight briefings, lessons learned and changes made to improve the overall system performance. The data collection tools, methods, data reduction and output reports will also be discussed. The objective of the 2008 entry HQ assessment was to evaluate the handling qualities of the CM during a lunar skip return. A lunar skip entry case was selected because it was considered the most demanding of all bank control scenarios. Even though skip entry is not planned to be flown manually, it was hypothesized that if a pilot could fly the harder skip entry case, then they could also fly a simpler loads managed or ballistic (constant bank rate command) entry scenario. In addition, with the evaluation set-up of multiple tasks within the entry case, handling qualities ratings collected in the evaluation could be used to assess other scenarios such as the constant bank angle maintenance case. The 2008 entry assessment was divided into two sections (see Figure 1). Entry I was the first, high speed portion of a lunar return and Entry II was the second, lower speed portion of a lunar return, which is similar (but not identical) to a typical ISS return.

Bihari, B.↗

Apollo experience report: Command and service module electrical power distribution on subsystem

A review of the design philosophy and development of the Apollo command and service modules electrical power distribution subsystem, a brief history of the evolution of the total system, and some of the more significant components within the system are discussed. The electrical power distribution primarily consisted of individual control units, interconnecting units, and associated protective devices. Because each unit within the system operated more or less independently of other units, the discussion of the subsystem proceeds generally in descending order of complexity; the discussion begins with the total system, progresses to the individual units of the system, and concludes with the components within the units.

Munford, R. E.↗

APOLLO PROJECT STATUS

Apollo manned lunar spacecraft developments, discussing the command module, service module, launch escape system, adapter and landing stage

APOLLO PROJECT↗

Lem docking in lunar orbit.

LEM docking with command module in lunar orbit, noting need for visual aids for alignment information

LUNAR ORBITAL RENDEZVOUS /LOR/↗

Electronic circuit delivers pulse of high interval stability

Circuit generates a pulse of high interval stability with a complexity level considerably below systems of comparable stability. This circuit is being used as a linear frequency discriminator in the signal conditioner of the Apollo command module.

Fisher, B.↗