At least 163 records · Page 9

EXTENDING THE USEFUL LIFE OF OLDER MASS SPECTROMETERS

Thermal ionization and gas mass spectrometers are widely used across the Department of Energy (DOE) Complex and contractor laboratories. These instruments support critical missions, where high reliability and low measurement uncertainty are essential. A growing number of these mass spectrometers are significantly older than their original design life. The reality is that manufacturers have declared many of the instrument models obsolete, with direct replacement parts and service no longer available. Some of these obsolete models do not have a next generation, commercially available replacement. Today's budget conscious economy demands for the use of creative funds management. Therefore, the ability to refurbish (or upgrade) these valuable analytical tools and extending their useful life is a cost effective option. The Savannah River Site (SRS) has the proven expertise to breathe new life into older mass spectrometers, at a significant cost savings compared to the purchase and installation of new instruments. A twenty-seven year old Finnigan MAT-261{trademark} Thermal Ionization Mass Spectrometer (TIMS), located at the SRS F/H Area Production Support Laboratory, has been successfully refurbished. Engineers from the Savannah River National Laboratory (SRNL) fabricated and installed the new electronics. These engineers also provide continued instrument maintenance services. With electronic component drawings being DOE Property, other DOE Complex laboratories have the option to extend the life of their aged Mass Spectrometers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Report by the International Space Station (ISS) Management and Cost Evaluation (IMCE) Task Force

The International Space Station (ISS) Management and Cost Evaluation Task Force (IMCE) was chartered to conduct an independent external review and assessment of the ISS cost, budget, and management. In addition, the Task Force was asked to provide recommendations that could provide maximum benefit to the U.S. taxpayers and the International Partners within the President's budget request. The Task Force has made the following principal findings: (1) The ISS Program's technical achievements to date, as represented by on-orbit capability, are extraordinary; (2) The Existing ISS Program Plan for executing the FY 02-06 budget is not credible; (3) The existing deficiencies in management structure, institutional culture, cost estimating, and program control must be acknowledged and corrected for the Program to move forward in a credible fashion; (4) Additional budget flexibility, from within the Office of Space Flight (OSF) must be provided for a credible core complete program; (5) The research support program is proceeding assuming the budget that was in place before the FY02 budget runout reduction of $1B; (6) There are opportunities to maximize research on the core station program with modest cost impact; (7) The U.S. Core Complete configuration (three person crew) as an end-state will not achieve the unique research potential of the ISS; (8) The cost estimates for the U.S.-funded enhancement options (e.g., permanent seven person crew) are not sufficiently developed to assess credibility. After these findings, the Task Force has formulated several primary recommendations which are published here and include: (1) Major changes must be made in how the ISS program is managed; (2) Additional cost reductions are required within the baseline program; (3) Additional funds must be identified and applied from the Human Space Flight budget; (4) A clearly defined program with a credible end-state, agreed to by all stakeholders, must be developed and implemented.

Young, A. Thomas↗

Facilities and Infrastructure FY 2017 Budget At-A-Glance

The Facilities and Infrastructure Program includes EERE’s capital investments, operations and maintenance, and site-wide support of the National Renewable Energy Laboratory (NREL). It is the nation’s only national laboratory with a primary mission dedicated to the research, development and demonstration (RD&D) of energy efficiency, renewable energy and related technologies. EERE is NREL’s steward, primary client and sponsor of NREL’s designation as a Federally Funded Research and Development Center. The Facilities and Infrastructure (F&I) budget maintains NREL’s research and support infrastructure, ensures availability for EERE’s use, and provides a safe and secure workplace for employees.

Budget, Finance, FY 2017, Facilities, Infrastructu↗

Budget Period 2 Summary Report Part 2: Hywind Maine Project

This project was performed under the Work for Others—Funds in Agreement FIA-14-1793 between Statoil and the Alliance for Sustainable Energy, manager and operator of the National Renewable Energy Laboratory (NREL). To support the development of a 6-MW spar-mounted offshore wind turbine, Statoil funded NREL to perform tasks in the following three categories: 1. Design and analysis 2. Wake modeling 3. Concept resource assessment. This study expands upon the work conducted in Budget Period 1 (BP1) to investigate the influence of the wake generated from an upstream turbine on a downstream turbine using Computational Fluid Dynamics (CFD) high-fidelity modeling tool. Simulator fOr Wind Farms Application (SOWFA) is an NREL high fidelity modeling tool that couples OpenFOAM CFD and NREL’s Aero-Elastic code Fatigue, Aerodynamics, Structures, and Turbulence (FAST). In BP1 the configuration was based on Hywind-3MW at 140 m water depth in the Gulf of Maine; however this study for Budget Period 2 (BP2) the configuration investigated is based on Hywind-6MW at 220 m water depth off the coast of Boston. The objectives were to perform two-turbines One-Way Coupling (OWC), three-turbines Two-Way Coupling (TWC), and to investigate wind power plant optimization.

99 GENERAL AND MISCELLANEOUS↗

Special Report on Review of "The Department of Energy's Quality Assurance Process for Prime Recipients' Reporting for the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was established to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in health and science, and invest in the Nation's energy future. The Department of Energy (Department) will receive an unprecedented $37 billion in Recovery Act funding to support a variety of science, energy, and environmental initiatives. The majority of the funding received by the Department will be allocated to various recipients through grants, cooperative agreements, contracts, and other financial instruments. To ensure transparency and accountability, the Office of Management and Budget (OMB) requires that recipients report on their receipt and use of Recovery Act funds on a quarterly basis to FederalReporting.gov. OMB also specifies that Federal agencies should develop and implement formal procedures to help ensure the quality of recipient reported information. Data that must be reported by recipients includes total funding received; funds expended or obligated; projects or activities for which funds were obligated or expended; and the number of jobs created and/or retained. OMB requires that Federal agencies perform limited data quality reviews of recipient data to identify material omissions and/or significant reporting errors and notify the recipients of the need to make appropriate and timely changes to erroneous reports. As part of a larger audit of recipient Recovery Act reporting and performance measurement and in support of a Government-wide review sponsored by the Recovery Accountability and Transparency Board, we completed an interim review to determine whether the Department had established a process to ensure the quality and accuracy of recipient reports. Our review revealed that the Department had developed a quality assurance process to facilitate the quarterly reviews of recipient data. The process included procedures to compare existing information from the Department's financial information systems with that reported to FederalReporting.gov by recipients. In addition, plans were in place to notify recipients of anomalies and/or errors exposed by the quality assurance process. While the Department has made a good deal of progress in this area, we did, however, identify several issues which could, if not addressed, impact the effectiveness of the quality assurance process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advancing Aeronautics: A Decision Framework for Selecting Research Agendas

Publicly funded research has long played a role in the development of aeronautics, ranging from foundational research on airfoils to development of the air-traffic control system. Yet more than a century after the research and development of successful controlled, sustained, heavier-than-air flight vehicles, there are questions over the future of aeronautics research. The field of aeronautics is relatively mature, technological developments within it have become more evolutionary, and funding decisions are sometimes motivated by the continued pursuit of these evolutionary research tracks rather than by larger factors. These developments raise questions over whether public funding of aeronautics research continues to be appropriate or necessary and at what levels. Tightened federal budgets and increasing calls to address other public demands make these questions sharper still. To help it address the questions of appropriate directions for publicly funded aeronautics research, the National Aeronautics and Space Administration's (NASA's) Aeronautics Research Mission Directorate (ARMD) asked the RAND Corporation to assess the elements required to develop a strategic view of aeronautics research opportunities; identify candidate aeronautic grand challenges, paradigms, and concepts; outline a framework for evaluating them; and exercise the framework as an example of how to use it. Accordingly, this research seeks to address these questions: What aeronautics research should be supported by the U.S. government? What compelling and desirable benefits drive government-supported research? How should the government--especially NASA--make decisions about which research to support? Advancing aeronautics involves broad policy and decisionmaking challenges. Decisions involve tradeoffs among competing perspectives, uncertainties, and informed judgment.

AERONAUTICS↗

Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Lessons Learned in Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Remote Versus Local Forcing of Chlorophyll Variability in the South Atlantic Bight

This TM documents results of analyses addressing the local versus remote forcing of chlorophyll variability on the shelf and slope regions of the South Atlantic Bight (SAB) based on satellite-derived products and a limited amount of in situ data. This study is part of a larger multi-disciplinary, multi-institutional effort to study the Eastern U.S. Continental Shelf carbon budget (U.S. Eastern Continental Shelf Carbon Budget: Modeling, Data Assimilation, and Analysis, U.S. ECoS), a project funded by the NASA Earth System Enterprise Interdisciplinary Science Program that started in the summer of 2004.

Signorini, Sergio R.↗

Seeding Innovative Ideas and Partnering with the Ecosystem

Jenn Gustetic will talk about how NASA selects ideas and collaborates with the ecosystem to develop new technologies for NASA’s portfolio. She will explain how the organization encourages collaboration, co-invests to develop ideas from lab to market, and acts as the hub-and-spoke of the ecosystem. Jenn will also discuss NASA’s journey to break silos and work horizontally across programs. • Gathering and evaluating ideas internally and externally with diverse players – engaging communities, being the hub-and-spoke of the ecosystem, and encouraging collaboration through co-investments • Identify the best ideas, funding ideas from maturation to hand-off with fluctuating budgets, and managing IP and tech transfer • Balancing investments in projects that address NASA’s needs with higher risk ideas that may not have an obvious application • Transitioning ideas to the next phase – training people and teams and ensuring ownership • Developing a 3.0 innovation capacity strategy – disrupting silos, enabling the ecosystem to work seamlessly together, and taking people and leaders along

innovation↗

Formerly Utilized Sites Remedial Action Program - Program Update - 17530

The legacy of the United States' early atomic energy program is an important piece of our Nation's history. That legacy however, left low-level radiological contamination at properties now owned and operated by commercial, private and/or local government entities. Although many of these contaminated sites were identified by the Government in the past, additional properties continue to be identified. The United States Government, thru the US Department of Energy (USDOE) and the US Army Corps of Engineers (USACE), is addressing these sites with the Formerly Utilized Sites Remedial Action Program (FUSRAP) and has been doing so since the 1970's. The USDOE and the USACE both have roles in the Program. The USACE FUSRAP Program has an important task but faces many challenges to achieve a success conclusion. Since the implementation of 'sequestration cap' budgeting by Congress in 2012, the annual budget for the Program has decreased significantly compared to the funding levels in prior years. The Program complies with USACE Civil Works budgetary reprogramming rules that requires close coordination between the project and program teams to appropriately and efficiently obligate and expend Program funding. The very nature of environmental remediation work results in consistently finding additional unknowns during each phase of a project. The Program is required to follow Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) guidance and conduct cost recovery activities but does not have authorities such as those held by the US Environmental Protection Agency (USEPA). In order to pursue cost recovery actions, conclude a settlement agreement or file an administrative order, USACE must engage the US Department of Justice or USEPA to act on their behalf as USACE does not have the authority to do so themselves. Twenty years later, USACE continues to carry out the FUSRAP mission and work in coordination with the USDOE Office of Legacy Management (DOE-LM) to ensure that the Government's responsibilities are addressed. Success is measured by finishing each site cleanup so they can be turned back to their property owner and stakeholders for safe use. USACE continues to seek new technologies and methods of approach to improve and expedite site investigations and clean ups. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of the potential application of the Davenport/Short information technology model to a research and development organization

Part of the role of the Mission Operations Lab is the development of budget inputs for Huntsville Operations/Payload Crew Training Center/Payload Operations Control Center (HOSC/PCTC/POCC) activity. These budget inputs are part of the formal Program Operating Plan (POP) process, which occurs twice yearly, and of the formal creation of the yearly operating plan. Both POPs and the operation plan serve the purpose of mapping out planned expenditures for the next fiscal year and for a number of outlying years. Based on these plans, the various Project Offices at the Center fund the HOSC/PCTC/POCC activity. Because of Mission Operations Lab's role in budget development, some of the Project Offices have begun looking to Mission Operations, and specifically the EO02 branch, to track expenditures and explain/justify any deviations from plans. EO02 has encountered difficulties acquiring the necessary information to perform this function. It appears that the necessary linkages with other units had not been fully developed and integrated with the flow of information in budget implementation. The purpose of this study is to document the budget process from the point of view of EO02 and to identify the steps necessary for it to effectively perform this role on a continuous basis.

Decker, Deron R.↗

Revitalizing Canton City Schools: A Sustainable and Cost-Effective Energy Efficiency Plan

The primary objective of this project was to focus on conducting the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) Level 2 Energy Audits of all the schools/school facilities in the portfolio, and on developing a comprehensive Strategic Plan for implementing energy improvements. The overall aim of budget period 1 (BP1) was to implement Energy Audits and the Strategic Plan to provide a clear pathway to prioritize energy improvements as well as allow the district to access private sector funding (if needed) and/or tax credits and realize high-impact health and safety benefits for Budget Period 2.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Regional Chemistry from Global CTMs with EC-Modeled Met-fields for the TRACE-P Mission

The UC Irvine project for Trace-P (PI: Prather) is a collaboration with Frontier-Japan (Wild and Akimoto) and U. Oslo (Sundet and Isaksen) to make high-resolution global T63 CTM simulations of trace gases and the oxidant budgets for the Trace-P period. Research at FRS and Oslo is not funded by GTE/TRACE-P. Completed control runs for the Trace-P period at T63L40 resolution using the standard emissions with the two related, but independent CTMs at Frontier-UCI and at U. Oslo. Preliminary diagnosis of the impact of Asian emissions on ozone and oxidant budgets is completed. A series of sensitivity runs is beginning to analyze where uncertainty in emissions is related to better simulation of the Trace-P observations.

Prather, Michael J.↗

Vannevar Bush 2: Science for the 21st Century. Why Should Federal Dollars be Spent to Support Scientific Research?

On July 5, 1945, Dr. Vannevar Bush delivered a report to President Truman known as 'Science: The Endless Frontier'. In the report, Dr. Bush stated that 'scientific progress is one essential key to our security as a nation, to our better health, to more jobs, to a higher standard of living, and to our cultural progress'. Bush addressed job creation, the independence of basic research, the ties between research and application, and the nations's need for new talent. In 1995, there are strong similarities between the issues addressed in the Congress, Administration, and the public and those following World War 2. Federal funds and research funding are under severe pressure, including that from fiscal constraints in the federal budget due to the large and growing deficit and the escalating cost of health care. Defense conversion is addressed in the Congress and in industry, where many jobs are at stake. Conversion of the national laboratories, particularly nuclear weapons laboratories, has been a subject of a governmental commission and is the subject of draft legislation. Health care costs and the appropriate role of the federal government in funding basic and applied research has become a major topic of debate. Discussion on education in science has grown from the issue of how to produce more Ph.D.'s to how to improve the understanding of technology and science among the general public.

Miller, Kate↗

Funding Mechanisms for Federal Geothermal Permitting

The Department of Energy's (DOE) Geothermal Technologies Office (GTO) initiated a Geothermal Regulatory Roadmap (GRR) in March 2012 to facilitate the development of utility-scale geothermal power. The GRR team conducted a series of workshops during the summer of 2012, which included key representatives from federal and state agencies, as well as industry and other stakeholders involved in the permitting and development of utility-scale geothermal projects. In many of the GRR meetings held with agencies, industry, and other stakeholders, a recurring issue was competing priorities for agency staff's time, which result in permit processing delays. Some agency personnel explained how only a percentage of their weekly or monthly time is allocated to geothermal due to geothermal budget allocations. Others described how their time allocation was determined by agency priorities, and not by specific geothermal budget allocations. In these cases, geothermal may not be a priority at all. One suggestion that was to increase geothermal permit fees or to develop some other mechanisms of cost recovery to fund additional geothermal positions or contractors to process permits more quickly. Because much of the geothermal resource available in the western U.S. is on federal lands, analysis of cost recovery programs could identify opportunities for additional funding mechanisms to support federal agency personnel and processing permits for geothermal projects. This paper discusses: federal agency revenues received for geothermal projects, including: (1) lease revenues, (2) fixed fees, and (3) cost recovery fees; and potential federal agency budget sources for processing geothermal applications, including: (1) cost-recovery fees for services rendered, (2) set-aside funds (such as those employed by EPAct2005), and (3) the appropriations process. This paper then analyzes the three budget sources as mechanisms for increasing funds available to federal agencies for processing geothermal permits and approvals. This paper concludes that both set-asides and cost-recovery fees for services rendered were effective ways of ensuring sufficient funding for processing geothermal authorizations on federally-managed public lands in a timely manner.

15 GEOTHERMAL ENERGY↗

Achieving Energy Savings in Municipal Construction in Long Beach, CA

Long Beach Gas and Oil (LBGO), the public gas utility in Long Beach, California, partnered with the U.S. Department of Energy (DOE) to develop and implement solutions to build a new, low-energy modular office building that is at least 50% below requirements set by Energy Standard 90.1-2007 of the American Society of Heating, Refrigerating, and Air-conditioning Engineers (ASHRAE), the American National Standards Institute (ANSI), and the Illuminating Engineering Society of America (IESNA) as part of DOE’s Commercial Building Partnerships (CBP) program.3 The LBGO building, which demonstrates that modular construction can be very energy efficient, is expected to exceed the ASHRAE baseline by about 45%. The new 15,000-square foot (ft2) LBGO office building has two stories and houses private offices, open-plan cubicle offices, and a conference room and call center on the second floor. The building’s modular nature allowed LBGO to realize the cost benefits of fasttracked construction while saving substantial energy and reducing operational costs. The project was funded by the utility’s ratepayer revenue, which imposed a tight budget limit. The design process was a collaborative effort involving LBGO and its design-build team, Lawrence Berkeley National Laboratory (Berkeley Lab), and subcontractors Stantec (formerly Burt Hill) and LHB Inc. The team proposed efficiency measures based on computer modeling of the building in full compliance with ASHRAE 90.1-2007; in the modeled building, the lighting and cooling systems were the largest energy users, so increasing the efficiency of these systems was a top priority. Promising measures were modeled to estimate their energy performance, and each measure was evaluated for its feasibility within the budget.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗