Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Assurance Case”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Evaluation of Open-Source Hard Real Time Software Packages

Reliable software is, at times, hard to find. No piece of software can be guaranteed to work in every situation that may arise during its use here at Glenn Research Center or in space. The job of the Software Assurance (SA) group in the Risk Management Office is to rigorously test the software in an effort to ensure it matches the contract specifications. In some cases the SA team also researches new alternatives for selected software packages. This testing and research is an integral part of the department of Safety and Mission Assurance. Real Time operation in reference to a computer system is a particular style of handing the timing and manner with which inputs and outputs are handled. A real time system executes these commands and appropriate processing within a defined timing constraint. Within this definition there are two other classifications of real time systems: hard and soft. A soft real time system is one in which if the particular timing constraints are not rigidly met there will be no critical results. On the other hand, a hard real time system is one in which if the timing constraints are not met the results could be catastrophic. An example of a soft real time system is a DVD decoder. If the particular piece of data from the input is not decoded and displayed to the screen at exactly the correct moment nothing critical will become of it, the user may not even notice it. However, a hard real time system is needed to control the timing of fuel injections or steering on the Space Shuttle; a delay of even a fraction of a second could be catastrophic in such a complex system. The current real time system employed by most NASA projects is Wind River's VxWorks operating system. This is a proprietary operating system that can be configured to work with many of NASA s needs and it provides very accurate and reliable hard real time performance. The down side is that since it is a proprietary operating system it is also costly to implement. The prospect of replacing this somewhat costly implementation is the focus of one of the SA group s current research projects. The explosion of open source software in the last ten years has led to the development of a multitude of software solutions which were once only produced by major corporations. The benefits of these open projects include faster release and bug patching cycles as well as inexpensive if not free software solutions. The main packages for hard real time solutions under Linux are Real Time Application Interface (RTAI) and two varieties of Real Time Linux (RTL), RTLFree and RTLPro. During my time here at NASA I have been testing various hard real time solutions operating as layers on the Linux Operating System. All testing is being run on an Intel SBC 2590 which is a common embedded hardware platform. The test plan was provided to me by the Software Assurance group at the start of my internship and my job has been to test the systems by developing and executing the test cases on the hardware. These tests are constructed so that the Software Assurance group can get hard test data for a comparison between the open source and proprietary implementations of hard real time solutions.

Mattei, Nicholas S.↗

Manufacturing methods of a composite cell case for a Ni-Cd battery

Basic manufacturing method refinements for using graphite epoxy material for a nickel cadmium battery cell case were performed to demonstrate production feasibility. The various facets of production scale-up, i.e., process and tooling development, together with material and process control, were integrated into a comprehensive manufacturing process that assures production reproducibility and product uniformity. Test results substantiate that a battery cell case produced from graphite epoxy pre-impregnated material, utilizing the internal pressure bag fabrication method, is feasible.

Bauer, J. L.↗

Relating Measured Component Damage to Assessed Component Reliability in Reliability Integrity Management (RIM)

There is currently no widely agreed detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. It may be possible to develop an approach to licensing such a plant that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev.0, endorses, with conditions, the subject portion of the ASME Code. But that portion of the ASME code is written at a very high level, and there are fundamental technical challenges associated with applying it literally to licensing a real plant. In the RIM approach, applicants need to do the following (among other things): • Allocate target reliabilities to structures, systems, and components (SSCs) that collectively support the top-level plant safety and availability objectives; • Understand failure modes of those SSCs, and the degradation mechanisms that could lead to those failure modes; • Develop and propose a program of surveillances that will identify degradation prior to failure of SSCs; • Provide a means of reporting results, taking actions for anomalous or undesirable conditions, and give the regulator assurance of continued safe operations. Applying RIM in a specific case will call for advances in the state of practice of relating physical observables to functional reliability of certain component types. Except where a given level of damage corresponds to a failed (or nearly failed) state, it is not practical to establish a precise quantitative relationship between physical observables and reliability. This paper focuses on managing risk of passive component failures based on observable damage parameters. A simple approach to cumulative damage modeling will be illustrated with a view to possible use in RIM applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Radiotherapy Quality Assurance Report From Children's Oncology Group AHOD0031

Purpose: A phase 3 trial assessing response-based therapy in intermediate-risk Hodgkin lymphoma mandated real-time central review of involved field radiation therapy (IFRT) and imaging records by a centralized review center to maximize protocol compliance. We report the impact of centralized radiation therapy review on protocol compliance. Methods and Materials: Review of simulation films, port films, and dosimetry records was required before and after treatment. Records were reviewed by study-affiliated or review center–affiliated radiation oncologists. A deviation of 6% to 10% from protocol-specified dose was scored as “minor”; a deviation of >10% was “major.” A volume deviation was scored as “minor” if margins were less than specified or “major” if fields transected disease-bearing areas. Interventional review and final compliance review scores were assigned to each radiation therapy case and compared. Results: Of 1712 patients enrolled, 1173 underwent IFRT at 256 institutions in 7 countries. An interventional review was performed in 88% of patients and a final review in 98%. Overall, minor and major deviations were found in 12% and 6% of patients, respectively. Among the cases for which ≥1 pre-IFRT modification was requested by the Quality Assurance Review Center and subsequently made by the treating institution, 100% were made compliant on final review. By contrast, among the cases for which ≥1 modification was requested but not made by the treating institution, 10% were deemed compliant on final review. Conclusions: In a large trial with complex treatment pathways and heterogeneous radiation therapy fields, central review was performed in a large percentage of cases before IFRT and identified frequent potential deviations in a timely manner. When suggested modifications were performed by the institutions, deviations were almost eliminated.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Computational and Experimental Validation of the Serviceability of CPS Actuators Under RBMK Graphite Stack Distortion Conditions

The results of computational and experimental studies performed at NIKIET to validate the serviceability of the actuating mechanisms of the safety-and-control system in terms of assuring the passability of the absorbing working rods in the case of channel bending under conditions of RMMK-1000 graphite stack distortion are presented. The results of this work were used for the power-generating units with RBMK-1000. They can be used for other types of reactors, in which the working absorbing rods of the SCS move in channels, as well as in other areas of industry where the passability of solid elements is important.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A proposed approach to the application of nonlinear irreversible thermodynamics to fracture in composite materials

The fracture criteria upon which most fracture mechanics is based involves an energy balance that is not appropriate for the fracture mechanics of viscoelastic materials such as polymer matrix composites. A more appropriate criterion based upon nonequilibrium thermodynamics and involving a power balance rather than an energy balance is proposed. This crierion is based upon a reformulation of the second law of thermodynamics which focuses attention on the total Legendre transform of energy expressed as a functional over time and space. This excess energy functional can be shown to be equivalent to the Rice J integral if the only irreversible process is the propogation of a single crack completely through the thickness of the specimen and if the crack propogation is assured to be independent of time. For the more general case of more than one crack in a viscoelastic medium integration over both time and space is required. Two experimentally measurable parameters are proposed which should permit the evaluation of this more general fracture criterion.

Lindenmeyer, P. H.↗

Optimistic barrier synchronization

Barrier synchronization is fundamental operation in parallel computation. In many contexts, at the point a processor enters a barrier it knows that it has already processed all the work required of it prior to synchronization. The alternative case, when a processor cannot enter a barrier with the assurance that it has already performed all the necessary pre-synchronization computation, is treated. The problem arises when the number of pre-sychronization messages to be received by a processor is unkown, for example, in a parallel discrete simulation or any other computation that is largely driven by an unpredictable exchange of messages. We describe an optimistic O(log sup 2 P) barrier algorithm for such problems, study its performance on a large-scale parallel system, and consider extensions to general associative reductions as well as associative parallel prefix computations.

Nicol, David M.↗

Automatic Stabilization

This report lays more stress on the principles underlying automatic piloting than on the means of applications. Mechanical details of servomotors and the mechanical release device necessary to assure instantaneous return of the controls to the pilot in case of malfunction are not included. Descriptions are provided of various commercial systems.

Haus, FR↗

Airplane Spinning

A summary on spinning is presented to point out the state of the art and the most important parameters', and to show the effects of these parameters on the spin and spin-recovery characteristics. The discussion presented applies to the fully developed spin, but does not apply to the spin entry, or incipient spin. The principal factors in spinning are mass distribution, which is by far the most important single parameter, and tail design, which is particularly important for conditions of zero or near-zero loading. By knowing the mass distribution and tail design, it is possible in many cases to predict whether an airplane has satisfactory spin-recovery characteristics. In other cases, however, it is necessary to make spin tests to assure satisfactory recovery.

Bowman, James S.↗

Method for Tracking and Communicating Aggregate Risk Through the Use of Model-Based Systems Engineering (MBSE) Tools

Large, complex projects can identify a significant number and variety of risks, throughout the project life cycle. These risks are analyzed, mitigated, closed or accepted as independent uncertainties. Once closed or accepted, it is easy for projects to lose awareness of their impact. In reality, each of these risks contributes some amount to the overall risk posture of the project. The ability to track and effectively communicate this aggregate risk has represented a challenge to project management. There have been previous attempts to create a schema to communicate the aggregate effect of risks, without notable success. Most of these attempts have centered on some additive metric derived from the scoring of likelihood and consequence values. This, in and of itself, is a logical approach, but all too often the scores were then aggregated to a level where all context was lost. One weakness has been a lack of attempt to create linkages or logical groups of the risks upon which useful aggregation could then occur. The overall move to model-based (systems) engineering (MBSE) has opened up a vast frontier of opportunities to better integrate all project data. MBSE provides an underlying layer that links data items to each other. Objectives link to requirements, which then link to functions, functions to physical architecture items, and so on, as far down as projects want to model. While it started with a focus on modeling requirements based on things like use cases, efforts are now underway to integrate safety and mission assurance (S&MA) information and analyses, such as risks. This effort, called Model Based Mission Assurance (MBMA), is yielding models that are more useful and are a more accurate representations of the systems. MBSE models, with this ability to link related items, provide a new means of tracking and communicating aggregate risks. In the proposed method, risks are added into the models as distinct items, having attributes that communicate a scoring derived from the likelihood and consequence values as charted on the standard NASA 5x5 risk matrix. Like earlier efforts, each box in the 5x5 has an associated scoring, which may include both a current score and potential post-mitigation/control score. The risk items are then linked to elements of the model, such as system objectives/goals, requirements, functions, or physical architecture items, with "Risk to" relationships. These risks will then be communicated by use of reports generated from the model, detailing all risks and/or hazards linked to model elements. These reports can include aggregate impacts, including a current scoring and potential future state scoring based on the planned mitigations and/or controls. These reports will show all risks, open, accepted, and closed, linked to project objectives or requirements. When run as part of an upcoming risk acceptance discussion, these reports will serve to remind the team of all previous risks that relate to the effected portion of the system. When included as part of periodic program or project reviews, risk reviews, and safety reviews, this method can improve the overall understanding of the system's true risk posture. This proposed method takes full advantage of the advances that modern modeling techniques provide, with a minimal investment of additional time. Utilizing the model environment also enables a near constant access to current state of aggregate risks.

model based mission assurance↗

ISO 50001 for Commercial Buildings: Lessons Learned From U.S. DOE Pilot Project: Preprint

In the U.S., the ISO 50001 Standard, which establishes energy management systems (EnMSs) and processes, has shown uptake primarily in the industrial sector. The U.S. Department of Energy (DOE) undertook a pilot program to explore ISO 50001 implementation in commercial buildings. Eight organizations participated as pilots, with technical assistance provided by DOE, the National Renewable Energy Laboratory (NREL), the Lawrence Berkeley National Laboratory (LBNL), and the Georgia Institute of Technology (Georgia Tech). This paper shares important lessons learned from the pilot. Staff time was the most critical resource required to establish effective EnMSs in commercial buildings. The pilot also revealed that technical support and template/example materials were essential inputs. Crucial activities included evaluating performance, identifying goals, making connections, communicating operational controls, and tracking/reviewing progress. Benefits realized included enhanced intra-organizational connections, greater energy awareness, increased process efficiencies, and improved ability to make business cases. Incremental benefits for ISO 50001 certification were greater accountability, assurance of best practices, public relations opportunities, and potential to unlock verified savings credits or incentive money. Incremental certification costs included more staff/consultant time, money for certification, and a tendency to limit EnMS scope in order to ensure favorable audit results. Five best practices were identified - utilizing expert technical assistance, training, and other resources; focusing on implementation over documentation; keeping top management involved; considering organizational structure when selecting EnMS scope; and matching the implementation level to an EnMS's scope and scale. The last two practices are particularly relevant to the commercial buildings sector.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development and Testing of a First-of-a-Kind Process to Support Commissioning a New Hazard Category 2 Nuclear Facility - 16573

The Department of Energy's Department of Environmental Management faces the complex task of cleaning up waste from nuclear weapons production. Often, the clean-up requires novel and untested technologies and approaches. In these cases, it is always necessary to provide some measure of assurance that the design engineers will be able to produce a design that will function in the means intended. Too many times we have seen first of a kind nuclear processing technologies put forth as commercially ready, only to be found insufficiently mature once attempted to be readied for operation. As now required by the DOE's Technology Readiness Assessment Process, it is necessary to demonstrate technologies in a similar environment to the current application and tested with a range of bounding simulants, or actual waste materials, if possible. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating Safety and Mission Assurance into Systems Engineering Modeling Practices

During the early development of products, flight, or experimental hardware, emphasis is often given to the identification of technical requirements, utilizing such tools as use case and activity diagrams. Designers and project teams focus on understanding physical and performance demands and challenges. It is typically only later, during the evaluation of preliminary designs that a first pass, if performed, is made to determine the process, safety, and mission quality assurance requirements. Evaluation early in the life cycle, though, can yield requirements that force a fundamental change in design. This paper discusses an alternate paradigm for using the concepts of use case or activity diagrams to identify safety hazard and mission quality assurance risks and concerns using the same systems engineering modeling tools being used to identify technical requirements. It contains two examples of how this process might be used in the development of a space flight experiment, and the design of a Human Powered Pizza Delivery Vehicle, along with the potential benefits to decrease development time, and provide stronger budget estimates.

Requirements↗

A Fuzzy Logic Approach for Separation Assurance and Collision Avoidance for Unmanned Aerial Systems

In the coming years, operations in low altitude airspace will vastly increase as the capabilities and applications of small Unmanned Aerial Systems (sUAS) continue to multiply. Therefore, solutions to managing sUAS in highly congested airspace must be explored. In this study, a Fuzzy Logic based approach was used to help mitigate the risk of collisions between aircraft using separation assurance and collision avoidance techniques. The system was evaluated for its effectiveness to mitigate the risk of mid-air collisions between aircraft. This system utilizes only current state information and can resolve potential conflicts without knowledge of intruder intent. The avoidance logic was verified using formal methods and shown to select the correct action in all instances. Additionally, the Fuzzy Logic Controllers were shown to always turn the vehicles in the correct direction. Numerical testing demonstrated that the avoidance system was able to prevent a mid-air collision between two sUAS in all tested cases. Simulations were also performed in a three-dimensional environment with a heterogenous fleet of sUAS performing a variety of realistic missions. Simulations showed that the system was 99.98 effective at preventing mid-air collisions when separation assurance was disabled (unmitigated case) and 100 effective when enabled (mitigated case).

Verification & Validation of a Fuzzy Logic Control↗

Design and testing of a phantom and instrumented gynecological applicator based on GaN dosimeter for use in high dose rate brachytherapy quality assurance

Purpose: High dose rate brachytherapy (HDR-BT) is widely used to treat gynecologic, anal, prostate, head, neck, and breast cancers. These treatments are typically administered in large dose per fraction (>5 Gy) and with high-gradient-dose-distributions, with serious consequences in case of a treatment delivery error (e.g., on dwell position and dwell time). Thus, quality assurance (QA) or quality control (QC) should be systematically and independently implemented. This paper describes the design and testing of a phantom and an instrumented gynecological applicator for pretreatment QA and in vivo QC, respectively. Methods: The authors have designed a HDR-BT phantom equipped with four GaN-based dosimeters. The authors have also instrumented a commercial multichannel HDR-BT gynecological applicator by rigid incorporation of four GaN-based dosimeters in four channels. Specific methods based on the four GaN dosimeter responses are proposed for accurate determination of dwell time and dwell position inside phantom or applicator. The phantom and the applicator have been tested for HDR-BT QA in routine over two different periods: 29 and 15 days, respectively. Measurements in dwell position and time are compared to the treatment plan. A modified position–time gamma index is used to monitor the quality of treatment delivery. Results: The HDR-BT phantom and the instrumented applicator have been used to determine more than 900 dwell positions over the different testing periods. The errors between the planned and measured dwell positions are 0.11 ± 0.70 mm (1σ) and 0.01 ± 0.42 mm (1σ), with the phantom and the applicator, respectively. The dwell time errors for these positions do not exhibit significant bias, with a standard deviation of less than 100 ms for both systems. The modified position–time gamma index sets a threshold, determining whether the treatment run passes or fails. The error detectability of their systems has been evaluated through tests on intentionally introduced error protocols. With a detection threshold of 0.7 mm, the error detection rate on dwell position is 22% at 0.5 mm, 96% at 1 mm, and 100% at and beyond 1.5 mm. On dwell time with a dwell time threshold of 0.1 s, it is 90% at 0.2 s and 100% at and beyond 0.3 s. Conclusions: The proposed HDR-BT phantom and instrumented applicator have been tested and their main characteristics have been evaluated. These systems perform unsupervised measurements and analysis without prior treatment plan information. They allow independent verification of dwell position and time with accuracy of measurements comparable with other similar systems reported in the literature.

60 APPLIED LIFE SCIENCES↗

SU-F-J-105: Towards a Novel Treatment Planning Pipeline Delivering Pareto- Optimal Plans While Enabling Inter- and Intrafraction Plan Adaptation

Purpose: To develop a new IMRT treatment planning methodology suitable for the new generation of MR-linear accelerator machines. The pipeline is able to deliver Pareto-optimal plans and can be utilized for conventional treatments as well as for inter- and intrafraction plan adaptation based on real-time MR-data. Methods: A Pareto-optimal plan is generated using the automated multicriterial optimization approach Erasmus-iCycle. The resulting dose distribution is used as input to the second part of the pipeline, an iterative process which generates deliverable segments that target the latest anatomical state and gradually converges to the prescribed dose. This process continues until a certain percentage of the dose has been delivered. Under a conventional treatment, a Segment Weight Optimization (SWO) is then performed to ensure convergence to the prescribed dose. In the case of inter- and intrafraction adaptation, post-processing steps like SWO cannot be employed due to the changing anatomy. This is instead addressed by transferring the missing/excess dose to the input of the subsequent fraction. In this work, the resulting plans were delivered on a Delta4 phantom as a final Quality Assurance test. Results: A conventional static SWO IMRT plan was generated for two prostate cases. The sequencer faithfully reproduced the input dose for all volumes of interest. For the two cases the mean relative dose difference of the PTV between the ideal input and sequenced dose was 0.1% and −0.02% respectively. Both plans were delivered on a Delta4 phantom and passed the clinical Quality Assurance procedures by achieving 100% pass rate at a 3%/3mm gamma analysis. Conclusion: We have developed a new sequencing methodology capable of online plan adaptation. In this work, we extended the pipeline to support Pareto-optimal input and clinically validated that it can accurately achieve these ideal distributions, while its flexible design enables inter- and intrafraction plan adaptation. This research is financially supported by Elekta AB, Stockholm, Sweden.

60 APPLIED LIFE SCIENCES↗

Initial experience of ArcCHECK and 3DVH software for RapidArc treatment plan verification

The purpose of this study was to perform delivery quality assurance with ArcCHECK and 3DVH system (Sun Nuclear, FL) and to evaluate the suitability of this system for volumetric-modulated arc therapy (VMAT) (RapidArc [RA]) verification. This software calculates the delivered dose distributions in patients by perturbing the calculated dose using errors detected in fluence or planar dose measurements. The device is tested to correlate the gamma passing rate (%GP) and the composite dose predicted by 3DVH software. A total of 28 patients with prostate cancer who were treated with RA were analyzed. RA treatments were delivered to a diode array phantom (ArcCHECK), which was used to create a planned dose perturbation (PDP) file. The 3DVH analysis used the dose differences derived from comparing the measured dose with the treatment planning system (TPS)-calculated doses to perturb the initial TPS-calculated dose. The 3DVH then overlays the resultant dose on the patient's structures using the resultant “PDP” beams. Measured dose distributions were compared with the calculated ones using the gamma index (GI) method by applying the global (Van Dyk) normalization and acceptance criteria, i.e., 3%/3 mm. Paired differences tests were used to estimate statistical significance of the differences between the composite dose calculated using 3DVH and %GP. Also, statistical correlation by means of logistic regression analysis has been analyzed. Dose-volume histogram (DVH) analysis for patient plans revealed small differences between treatment plan calculations and 3DVH results for organ at risk (OAR), whereas planning target volume (PTV) of the measured plan was systematically higher than that predicted by the TPS. The t-test results between the planned and the estimated DVH values showed that mean values were incomparable (p < 0.05). The quality assurance (QA) gamma analysis 3%/3 mm showed that in all cases there were only weak-to-moderate correlations (Pearson r: 0.12 to 0.74). Moreover, clinically relevant differences increased with increasing QA passing rate, indicating that some of the largest dose differences occurred in the cases of high QA passing rates, which may be called “false negatives.” The clinical importance of any disagreement between the measured and the calculated dose is often difficult to interpret; however, beam errors (either in delivery or in TPS calculation) can affect the effectiveness of the patient dose. Further research is needed to determinate the role of a PDP-type algorithm to accurately estimate patient dose effect.

61 RADIATION PROTECTION AND DOSIMETRY↗

COTS Ceramic Chip Capacitors: An Evaluation of the Parts and Assurance Methodologies

Commercial-Off-The-Shelf (COTS) multilayer ceramic chip capacitors (MLCCs) are continually evolving to reduce physical size and increase volumetric efficiency. Designers of high reliability aerospace and military systems are attracted to these attributes of COTS MLCCs and would like to take advantage of them while maintaining the high standards for long-term reliable operation they are accustomed io when selecting military qualified established reliability (MIL-ER) MLCCs. However, MIL-ER MLCCs are not available in the full range of small chip sizes with high capacitance as found in today's COTS MLCCs. The objectives for this evaluation were to assess the long-term performance of small case size COTS MLCCs and to identify effective, lower-cost product assurance methodologies. Fifteen (15) lots of COTS X7R dielectric MLCCs from four (4) different manufacturers and two (2) MIL-ER BX dielectric MLCCs from two (2) of the same manufacturers were evaluated. Both 0805 and 0402 chip sizes were included. Several voltage ratings were tested ranging from a high of 50 volts to a low of 6.3 volts. The evaluation consisted of a comprehensive screening and qualification test program based upon MIL-PRF-55681 (i.e., voltage conditioning, thermal shock, moisture resistance, 2000-hour life test, etc.). In addition, several lot characterization tests were performed including Destructive Physical Analysis (DPA), Highly Accelerated Life Test (HALT) and Dielectric Voltage Breakdown Strength. The data analysis included a comparison of the 2000-hour life test results (used as a metric for long-term performance) relative to the screening and characterization test results. Results of this analysis indicate that the long-term life performance of COTS MLCCs is variable -- some lots perform well, some lots perform poorly. DPA and HALT were found to be promising lot characterization tests to identify substandard COTS MLCC lots prior to conducting more expensive screening and qualification tests. The results indicate that lot- specific screening and qualification are still recommended for high reliability applications. One significant and concerning observation is that MIL- type voltage conditioning (100 hours at twice rated voltage, 125 C) was not an effective screen in removing infant mortality parts for the particular lots of COTS MLCCs evaluated.

Brusse, Jay A.↗