Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “2008”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Computation Directorate 2008 Annual Report

Whether a computer is simulating the aging and performance of a nuclear weapon, the folding of a protein, or the probability of rainfall over a particular mountain range, the necessary calculations can be enormous. Our computers help researchers answer these and other complex problems, and each new generation of system hardware and software widens the realm of possibilities. Building on Livermore's historical excellence and leadership in high-performance computing, Computation added more than 331 trillion floating-point operations per second (teraFLOPS) of power to LLNL's computer room floors in 2008. In addition, Livermore's next big supercomputer, Sequoia, advanced ever closer to its 2011-2012 delivery date, as architecture plans and the procurement contract were finalized. Hyperion, an advanced technology cluster test bed that teams Livermore with 10 industry leaders, made a big splash when it was announced during Michael Dell's keynote speech at the 2008 Supercomputing Conference. The Wall Street Journal touted Hyperion as a 'bright spot amid turmoil' in the computer industry. Computation continues to measure and improve the costs of operating LLNL's high-performance computing systems by moving hardware support in-house, by measuring causes of outages to apply resources asymmetrically, and by automating most of the account and access authorization and management processes. These improvements enable more dollars to go toward fielding the best supercomputers for science, while operating them at less cost and greater responsiveness to the customers.

99 GENERAL AND MISCELLANEOUS↗

Physical and Life Sciences 2008 Science & Technology Highlights

This document highlights the outstanding research and development activities in the Physical and Life Sciences Directorate that made news in 2008. It also summarizes the awards and recognition received by members of the Directorate in 2008.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Summary of operations and performance of the Murdock site restoration project in 2008.

This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the third full year of system operation, from January 1 through December 31, 2008. Performance in June 2005 through December 2007 was reported previously (Argonne 2007, 2008). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A.

54 ENVIRONMENTAL SCIENCES↗

This Letter is a Non-Technical Annual Report of Activities on Project 2007-275-00, Impact of American Shad for the Period February 1, 2008 through January 31, 2009.

This letter is a non-technical annual report of activities on Project 2007-275-00, Impact of American Shad for the period February 1, 2008 through January 31, 2009. A non-technical report is appropriate at this time since data collection is ongoing and results are preliminary. This report is intended to highlight accomplishments during this performance period. Progress on administrative work elements in the statement of work has been captured in the periodic status reports provided through Pisces. During this performance period the USGS accomplished the following tasks: (1) Co-chaired a symposium on American shad in the Columbia Basin at the annual meeting of the Western Division, American Fisheries Society. The USGS gave four presentations from work done during this project. Abstracts of the presentations were attached to the 2007 progress report. (2) Continued parameterization of a bioenergetics model for juvenile American shad. We performed a literature review to determine the applicability of the existing adult salmon bioenergetics parameters to juvenile fall Chinook salmon in support of our modeling investigation of diet overlap between juvenile American shad and fall Chinook salmon. We formulated testable hypotheses to investigate using bioenergetics models and conceptually developed model simulations. Held an in-house workshop to obtain feedback on the physiological parameters we selected for the American shad bioenergetics model and to solicit feedback on our modeling approach to address research questions. (3) Received a Section 10 ESA sampling permit based on the application submitted in the 2007 contract period. With the ESA permit in hand, we obtained scientific collection permits from the states of Washington and Oregon that allowed us to use a variety of fisheries sampling techniques to capture juvenile and adult American shad. (4) Conducted field sampling to meet project objectives. Gillnetting efforts to capture adult American shad near Astoria were discontinued in accordance with our ESA permit after encountering a higher-than-expected number of salmonids. Only 30 PIT-tagged adult pre-spawn American shad were released. Another 53 adults were processed for diet and population characterization. Collection objectives for adult pre-spawn fish were met for areas downstream from Bonneville, John Day, and McNary dams. In October we captured 30 post-spawn adult shad from the McNary Dam forebay for diet analysis. Collection objectives for juvenile American shad were met for all four areas. (5) Began laboratory work to enumerate and accomplish dry-weight analysis of prey items from juvenile and adult shad stomachs. (6) Continued to exchange information and develop relations with others interested in American shad research. As an example, at the request of the U.S. Fish and Wildlife Service, Northeast Fishery Center, Lamar, PA, we provided tissue samples from adult Columbia River American shad for use in genetic comparisons with Hudson River fish. Key findings during this contract period: (1) Determined that prevalence of Ichthyophonus infection among adult American shad was the highest level detected in any population of fish throughout the Pacific region. A manuscript describing results is in preparation. (2) Thiaminase specific activity assessed from Columbia River juvenile and adult American shad is higher than that of forage fish of salmonines in the Great Lakes. The consumption of forage fish high in thiaminase can lead to thiamine deficiency in the predator if the diet of the predators contains little other prey. (3) Adult American shad are feeding during their freshwater migration. Plans for next year: (1) Completing laboratory analysis of the gut contents of juvenile and adult American shad collected. (2) Completing bioenergetics model parameterization and testing hypotheses. (3) Describing the age composition of the adult American shad run during the 2008 spawning migration via aging of scales and otoliths. (4) Providing a draft final report describing project tasks and findings.

13 HYDRO ENERGY↗

CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meacham Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success. An Aquatic Habitat Inventory was conducted from river mile 0-8 on Isquulktpe Creek and the data collected was compared with data collected in 1994. Monitoring plans will continue throughout the duration of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance in accordance with the Umatilla River Subbasin Salmon and Steelhead Production Plan (NPPC 1990) and the Final Umatilla Willow Subbasin Plan (Umatilla/Willow Subbasin Planning Team 2005).

13 HYDRO ENERGY↗

South Fork Salmon River Watershed Restoration, 2008-2009 Annual Report.

The watershed restoration work elements within the project area, the South Fork Salmon River Watershed, follow the watershed restoration approach adopted by the Nez Perce Tribe Department of Fisheries Resource Management (DFRM) - Watershed Division. The vision of the Nez Perce Tribe DFRM-Watershed Division focuses on protecting, restoring, and enhancing watersheds and treaty resources within the ceded territory of the Nez Perce Tribe under the Treaty of 1855 with the United States Federal Government. The program uses a holistic approach, which encompasses entire watersheds, ridge top to ridge top, emphasizing all cultural aspects and strategies that rely on natural fish production and healthy river ecosystems. The Nez Perce Tribe DFRM-Watershed Division strives towards maximizing historic ecosystem productivity and health for the restoration of anadromous and resident fish populations and the habitat on which all depend on for future generations Originally, this project was funded to create a step/pool stream channel that was appropriate to restore fish passage where the 'Glory Hole Cascade' is currently located at the Stibnite Mine. Due to unforeseen circumstances at the time, the project is unable to move forward as planned and a request for a change in scope of the project and an expansion of the geographic area in which to complete project work was submitted. No additional funds were being requested. The ultimate goal of this project is to work with the holistic, ridge top to ridge top approach to protect and restore the ecological and biological functions of the South Fork Salmon River Watershed to assist in the recovery of threatened and endangered anadromous and resident fish species. FY 2008 Work Elements included two aquatic organism passage (AOP) projects to restore habitat connectivity to two fish-bearing tributaries to the East Fork South Fork Salmon River, Salt and Profile Creeks. The Work Elements also included road survey and assessment activities that move toward road decommissioning to reduce sediment delivery to spawning gravels and rearing habitats by reducing sedimentation from road related, man-made sources. For FY08, the project included the design and implementation of two fish barrier replacement structures mentioned above, the Salt and Profile Creek Bridges. These work elements were to be implemented on Valley County easements within the Payette National Forest. The existing culverts are full or partial barriers to most aquatic life species and all juvenile anadromous and resident fish species. Implementation will reconnect 9.34 miles of habitat, and provide natural stream channels to facilitate complete passage for all aquatic life forms. All designs were completed and a construction subcontract was awarded to construct free span, pre-cast concrete bridges. For 2008, the project statement of work also included all the necessary work elements to manage, coordinate, plan, and develop continuing strategies for restoration and protection activities.

13 HYDRO ENERGY↗

Habitat Restoration/Enhancement Fort Hall Reservation : 2008 Annual Report.

Habitat enhancement, protection and monitoring were the focus of the Resident Fisheries Program during 2008. Enhancement and protection included sloping, fencing and planting wetlands plugs at sites on Spring Creek (Head-waters). Many previously constructed instream structures (rock barbs and wing dams) were repaired throughout the Fort Hall Indian Reservation (Reservation). Physical sampling during 2008 included sediment and depth measurements (SADMS) in Spring Creek at the Car Removal site. SADMS, used to track changes in channel morphology and specifically track movements of silt through Bottoms stream systems were completed for 5 strata on Spring Creek. Water temperature and chemistry were monitored monthly on Spring Creek, Clear Creek, Diggie Creek, and Portneuf (Jimmy Drinks) and Blackfoot rivers. Fish population densities and biomass were sampled in five reservation streams which included nine sites. Sampling protocols were identical to methods used in past years. Numbers of fish in Spring Creek series remained relatively low, however, there was an increase of biomass overall since 1993. Salmonid fry densities were monitored near Broncho Bridge and were similar to 2006, and 2007, however, as in years past, high densities of macrophytes make it very difficult to see fry in addition to lack of field technicians. Mean catch rate by anglers on Bottoms streams stayed the same as 2007 at 1.5/hr. Numbers of fish larger than 18-inches caught by anglers increased from 2007 at .20 to .26/hr.

13 HYDRO ENERGY↗

Albeni Falls Wildlife Mitigation Project, 2008 Annual Report.

The Albeni Falls Interagency Work Group (AFIWG) was actively involved in implementing wildlife mitigation activities in late 2007, but due to internal conflicts, the AFIWG members has fractionated into a smaller group. Implementation of the monitoring and evaluation program continued across protected lands. As of 2008, The Albeni Falls Interagency Work Group (Work Group) is a coalition comprised of wildlife managers from three tribal entities (Kalispel Tribe, Kootenai Tribe, Coeur d Alene Tribe) and the US Army Corps of Engineers. The Work Group directs where wildlife mitigation implementation occurs in the Kootenai, Pend Oreille and Coeur d Alene subbasins. The Work Group is unique in the Columbia Basin. The Columbia Basin Fish and Wildlife Authority (CBFWA) wildlife managers in 1995, approved what was one of the first two project proposals to implement mitigation on a programmatic basis. The maintenance of this kind of approach through time has allowed the Work Group to implement an effective and responsive habitat protection program by reducing administrative costs associated with site-specific project proposals. The core mitigation entities maintain approximately 9,335 acres of wetland/riparian habitats in 2008.

13 HYDRO ENERGY↗

Environmental Report 2008

The purposes of the Lawrence Livermore National Laboratory Environmental Report 2008 are to record Lawrence Livermore National Laboratory's (LLNL's) compliance with environmental standards and requirements, describe LLNL's environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites - the Livermore site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL's Environmental Protection Department. Submittal of the report satisfies requirements under DOE Order 231.1A, Environmental Safety and Health Reporting, and DOE Order 5400.5, Radiation Protection of the Public and Environment. The report is distributed electronically and is available at https://saer.lln.gov/, the website for the LLNL annual environmental report. Previous LLNL annual environmental reports beginning in 1994 are also on the website. Some references in the electronic report text are underlined, which indicates that they are clickable links. Clicking on one of these links will open the related document, data workbook, or website that it refers to. The report begins with an executive summary, which provides the purpose of the report and an overview of LLNL's compliance and monitoring results. The first three chapters provide background information: Chapter 1 is an overview of the location, meteorology, and hydrogeology of the two LLNL sites; Chapter 2 is a summary of LLNL's compliance with environmental regulations; and Chapter 3 is a description of LLNL's environmental programs with an emphasis on the Environmental Management System including pollution prevention. The majority of the report covers LLNL's environmental monitoring programs and monitoring data for 2008: effluent and ambient air (Chapter 4); waters, including wastewater, storm water runoff, surface water, rain, and groundwater (Chapter 5); and terrestrial, including soil, sediment, vegetation, foodstuff, ambient radiation, and special status wildlife and plants (Chapter 6). Complete monitoring data, which are summarized in the body of the report, are provided in Appendix A. The remaining three chapters discuss the radiological impact on the public from LLNL operations (Chapter 7), LLNL's groundwater remediation program (Chapter 8), and quality assurance for the environmental monitoring programs (Chapter 9). The report uses Systeme International units, consistent with the federal Metric Conversion Act of 1975 and Executive Order 12770, Metric Usage in Federal Government Programs (1991). For ease of comparison to environmental reports issued prior to 1991, dose values and many radiological measurements are given in both metric and U.S. customary units. A conversion table is provided in the glossary. The report is the responsibility of LLNL's Environmental Protection Department. Monitoring data were obtained through the combined efforts of the Environmental Protection Department; Environmental Restoration Department; Physical and Life Sciences Environmental Monitoring Radiation Laboratory; and the Hazards Control Department.

54 ENVIRONMENTAL SCIENCES↗

Eelgrass Enhancement and Restoration in the Lower Columbia River Estuary, Period of Performance: Feb 2008-Sep 2009.

The purpose of this study was to evaluate the ability to enhance distribution of eelgrass (Zostera marina) in the Columbia River Estuary to serve as refuge and feeding habitat for juvenile salmon, Dungeness crab, and other fish and wildlife. We strongly suspected that limited eelgrass seed dispersal has resulted in the present distribution of eelgrass meadows, and that there are other suitable places for eelgrass to survive and form functional meadows. Funded as part of the Bonneville Power Administration's call for Innovative Projects, we initiated a multistage study in 2008 that combined modeling, remote sensing, and field experimentation to: (1) Spatially predict habitat quality for eelgrass; (2) Conduct experimental plantings; and (3) Evaluate restoration potential. Baseline in-situ measurements and remote satellite observations were acquired for locations in the Lower Columbia River Estuary (LCRE) to determine ambient habitat conditions. These were used to create a habitat site-selection model, using data on salinity, temperature, current velocity, light availability, wave energy, and desiccation to predict the suitability of nearshore areas for eelgrass. Based on this model and observations in the field, five sites that contained no eelgrass but appeared to have suitable environmental conditions were transplanted with eelgrass in June 2008 to test the appropriateness of these sites for eelgrass growth. We returned one year after the initial planting to monitor the success rate of the transplants. During the year after transplanting, we carried out a concurrent study on crab distribution inside and outside eelgrass meadows to study crab usage of the habitat. One year after the initial transplant, two sites, one in Baker Bay and one in Young's Bay, had good survival or expansion rates with healthy eelgrass. Two sites had poor survival rates, and one site had a total loss of the transplanted eelgrass. For submerged aquatic vegetation (SAV) restoration projects, these are reasonable success results and represent a small net gain in eelgrass in the LCRE. Crabs used both the eelgrass and unvegetated substrate, though in neither were there great abundance of the young-of-the-year crabs. During the field assessment of 12 potential transplant sites, divers discovered one site in southern Young's Bay that contained a previously undocumented eelgrass bed. This integrated project developed the first predictive maps of sites suitable for eelgrass and other SAV in the lower estuary. In addition, techniques developed for this project to assess light levels in existing and potential submerged habitats have great potential to be used in other regions for nearshore and coastal monitoring of SAV. Based on these preliminary results, we conclude that eelgrass distribution could likely be expanded in the estuary, though additional information on current eelgrass locations, usage by species of interest, and monitoring of current conditions would help develop a baseline and verify benefit. Our recommendations for future studies include: (1) Site Monitoring. Continued monitoring of restoration sites along with physical metrics of light, temperature and salinity within beds. Continued monitoring will both assist managers in understanding the longevity and expansion rate of planted sites and inform practical guidance on the minimum planted eelgrass required to develop a resilient meadow. (2) Natural bed documentation and monitoring. Document current eelgrass habitat conditions in the Columbia River by mapping eelgrass and other SAV species and monitoring physical metrics in natural beds. This will assist by better defining the factors that control the annual and spatial variation in eelgrass in the estuary, and thus lead to improved management. Improved information on conditions will help refine a habitat suitability model that can more accurately predict where eelgrass can be restored or areas under duress. (3) Monitor Species Use. Expanded monitoring of Dungeness crab and salmon use and benefit from eelgrass in the estuary to evaluate how feeding and rearing functions of eelgrass benefit the survival and growth of these species. We have two final recommendations. First, if transplanting of eelgrass is to be expanded, donor stocks of plants should also be expanded to reduce the dependence on natural meadows. We recommend that an eelgrass culture facility be considered to supply stocks of eelgrass for planting that are developed from the eelgrass populations now in the estuary. Second, freshwater submerged aquatic vegetation (SAV) occurs in many parts of the estuary, and probably has importance to juvenile salmon (although this also needs verification). Restoration and expansion of freshwater SAV should be considered in a comprehensive effort to restore the submerged vegetation habitats through the Columbia River estuary.

13 HYDRO ENERGY↗

Sandy River Delta Habitat Restoration : Annual Report, January 2008 - March 2009.

During the period 2008-2009, there were 2 contracts with BPA. One (38539) was dealing with the restoration work for 2007 and the other (26198) was an extension on the 2006 contract including the NEPA for Dam removal on the old channel of the Sandy River. For contract 38539, the Sandy River Delta Habitat Restoration project continued its focus on riparian hardwood reforestation with less emphasis on wetlands restoration. Emphasis was placed on Sundial Island again due to the potential removal of the dike and the loss of access in the near future. AshCreek Forest Management was able to leverage additional funding from grants to help finance the restoration effort; this required a mid year revision of work funded by BPA. The revised work not only continued the maintenance of restored hardwood forests, but was aimed to commence the restoration of the Columbia River Banks, an area all along the Columbia River. This would be the final restoration for Sundial Island. The grant funding would help achieve this. Thus by 2011, all major work will have been completed on Sundial Island and the need for access with vehicles would no longer be required. The restored forests continued to show excellent growth and development towards true riparian gallery forests. Final inter-planting was commenced, and will continue through 2010 before the area is considered fully restored. No new wetland work was completed. The wetlands were filled by pumping in early summer to augment the water levels but due to better rainfall, no new fuel was required to augment existing. Monitoring results continued to show very good growth of the trees and the restoration at large was performing beyond expectations. Weed problems continue to be the most difficult issue. The $100,000 from BPA planned for forest restoration in 2008, was augmented by $25,000 from USFS, $120,000 from OR150 grant, $18,000 from LCREP, and the COE continued to add $250,000 for their portion. Summary of the use of these funds are displayed in Table 1 (page 5). Work on the restoration of the original Sandy River channel (dam removal, contract 26198) continued slowly. The draft EA was completed and sent out for review. The COE has decided to finish the NEPA with the intent to complete the project.

13 HYDRO ENERGY↗

Emissions inventory report summary for Los Alamos National Laboratory for calendar year 2008

Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory’s potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department/Air Quality Bureau, under 20.2.70 NMAC. This permit was modified and reissued on July 16, 2007. This Title V Operating Permit (Permit No. P-100M2) includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semiannual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semiannual emissions reporting for LANL for calendar year 2008. LANL’s 2008 emissions are well below the emission limits in the Title V Operating Permit.

54 ENVIRONMENTAL SCIENCES↗

Temperature and Water Depth Monitoring Within Chum Salmon Spawning Habitat Below Bonneville Dam -- Annual Report -- October 2007-September 2008

The overall goal of the project described in this report is to provide a sound scientific basis for operation of the Federal Columbia River Power System (FCRPS) in ways that will effectively protect and enhance chum salmon populations----a species listed in March 1999 as threatened under the Endangered Species Act of 1973 (ESA). The study objective during fiscal year 2008 was to provide real-time data on Ives Island area water temperature and water surface elevations from the onset of chum salmon spawning through the end of chum salmon emergence. Sampling locations included areas where riverbed temperatures were elevated, potentially influencing alevin development and emergence timing. In these locations, hydrosystem operation caused large, frequent changes in river discharge that affected salmon habitat by dewatering redds and altering egg pocket temperatures. The 2008 objective was accomplished using temperature and water-level sensors deployed inside piezo¬meters. Sensors were integrated with a radio telemetry system such that real-time data could be downloaded remotely and posted hourly on the Internet.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Worker Safety and Health and Nuclear Safety Quarterly Performance Analysis (January - March 2008)

The DOE Office of Enforcement expects LLNL to 'implement comprehensive management and independent assessments that are effective in identifying deficiencies and broader problems in safety and security programs, as well as opportunities for continuous improvement within the organization' and to 'regularly perform assessments to evaluate implementation of the contractor's processes for screening and internal reporting.' LLNL has a self-assessment program, described in ES&H Manual Document 4.1, that includes line, management and independent assessments. LLNL also has in place a process to identify and report deficiencies of nuclear, worker safety and health and security requirements. In addition, the DOE Office of Enforcement expects LLNL to evaluate 'issues management databases to identify adverse trends, dominant problem areas, and potential repetitive events or conditions' (page 14, DOE Enforcement Process Overview, December 2007). LLNL requires that all worker safety and health and nuclear safety noncompliances be tracked as 'deficiencies' in the LLNL Issues Tracking System (ITS). Data from the ITS are analyzed for worker safety and health (WSH) and nuclear safety noncompliances that may meet the threshold for reporting to the DOE Noncompliance Tracking System (NTS). This report meets the expectations defined by the DOE Office of Enforcement to review the assessments conducted by LLNL, analyze the issues and noncompliances found in these assessments, and evaluate the data in the ITS database to identify adverse trends, dominant problem areas, and potential repetitive events or conditions. The report attempts to answer three questions: (1) Is LLNL evaluating its programs and state of compliance? (2) What is LLNL finding? (3) Is LLNL appropriately managing what it finds? The analysis in this report focuses on data from the first quarter of 2008 (January through March). This quarter is analyzed within the context of information identified in previous quarters to include April 2007 through March 2008. The results from analyzing the deficiencies are presented in accordance with the two primary NTS reporting thresholds for WSH and nuclear safety noncompliances: (1) those related to certain events or conditions and (2) those that are management issues. In addition, WSH noncompliances were also analyzed to determine if any fell under the 'other significant condition' threshold. This report also identifies noncompliance topical areas that may have issues that do not meet the NTS reporting threshold but should remain under observation. These are placed on the 'watch list' for continued analysis.

99 GENERAL AND MISCELLANEOUS↗

2008 Federal Energy Management Program (FEMP) Market Report

This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Summary of operations and performance of the Utica aquifer and North Lake Basin wetlands restoration project in December 2008-November 2009.

This document summarizes the performance of the groundwater restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Utica, Nebraska, during the fifth year of system operation, from December 1, 2008, until November 30, 2009. Performance in earlier years was reported previously (Argonne 2005, 2006, 2008, 2009a). In the project at Utica, the CCC/USDA is cooperating with multiple state and federal agencies to remove carbon tetrachloride contamination from a shallow aquifer underlying the town and to provide supplemental treated groundwater for use in the restoration of a nearby wetlands area. Argonne National Laboratory has assisted the CCC/USDA by providing technical oversight for the aquifer restoration effort and facilities during this review period. This document presents overviews of the aquifer restoration facilities (Section 2) and system operations (Section 3), then describes groundwater production results (Section 4), groundwater treatment results (Section 5), and associated groundwater monitoring, system modifications, and costs during the review period (Section 6). Section 7 summarizes the present year of operation.

54 ENVIRONMENTAL SCIENCES↗

Site environmental report for 2008 Sandia National Laboratories, California.

Sandia National Laboratories, California (SNL/CA) is a government-owned/contractor operated laboratory. Sandia Corporation, a Lockheed Martin Company, operates the laboratory for the Department of Energy's National Nuclear Security Administration (NNSA). The NNSA Sandia Site Office oversees operations at the site, using Sandia Corporation as a management and operating contractor. This Site Environmental Report for 2008 was prepared in accordance with DOE Order 231.1A (DOE 2004a). The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2008. General site and environmental program information is also included.

54 ENVIRONMENTAL SCIENCES↗

Addendum to Third Supplemental Cultural Resources Review for the Infrastructure Cleanup on ALE, Hanford Site, HCRC# 2008-600-004D: Documentation of No Adverse Effect from Filling Two Cisterns at the National Register-Eligible Archaeological Site 45BN01032

The Third Supplemental Cultural Resources Review for the Infrastructure Cleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, 600 Area, Hanford Site, Benton County, Washington, HCRC#2008-600-004D completed by the Pacific Northwest National Laboratory (PNNL) Cultural Resources Project (CRP) for the U.S. Department of Energy, Richland Operations Office (DOE-RL) identified a National Register-eligible archaeological site 45BN01032, the historic Rattlesnake Hills Gas Field Compressor Station. The compressor station was the core of the Rattlesnake Hills Field gas distribution system which was in operation from 1929 until 1941. Within the industrial component of this site are two large rectangular concrete cisterns that were used for water storage, both located on the southeastern boundary of the site.The original remediation proposed by DOE-RL at this site was to remove t-posts, placed around both cisterns at some point after the gas field was abandoned. This undertaking was addressed in the Third Supplemental Cultural Resources Review for the Infrastructure Cleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, 600 Area, Hanford Site, Benton County, Washington, HCRC#2008-600-004D where a recommendation of no adverse effect to 45BN01032 was made because the t-posts are not contributing components of the site. Subsequent to the initial finding of No Adverse Effect, DOE-RL now proposes to fill these two cisterns with basalt rubble for health and safety reasons. This document outlines measures that will allow the two cisterns to be filled with no adverse effects to site 45BN01032.

Arid Lands Ecology Reserve↗