Extraction-Separation Performance and Dynamic Modeling of Orion Test Vehicles with Adams Simulation: 3rd Edition

NASA's Orion Capsule Parachute Assembly System (CPAS) Project is now in the qualification phase of testing, and the Adams simulation has continued to evolve to model the complex dynamics experienced during the test article extraction and separation phases of flight. The ability to initiate tests near the upper altitude limit of the Orion parachute deployment envelope requires extractions from the aircraft at 35,000 ft-MSL. Engineering development phase testing of the Parachute Test Vehicle (PTV) carried by the Carriage Platform Separation System (CPSS) at altitude resulted in test support equipment hardware failures due to increased energy caused by higher true airspeeds. As a result, hardware modifications became a necessity requiring ground static testing of the textile components to be conducted and a new ground dynamic test of the extraction system to be devised. Force-displacement curves from static tests were incorporated into the Adams simulations, allowing prediction of loads, velocities and margins encountered during both flight and ground dynamic tests. The Adams simulation was then further refined by fine tuning the damping terms to match the peak loads recorded in the ground dynamic tests. The failure observed in flight testing was successfully replicated in ground testing and true safety margins of the textile components were revealed. A multi-loop energy modulator was then incorporated into the system level Adams simulation model and the effect on improving test margins be properly evaluated leading to high confidence ground verification testing of the final design solution.

Varela, Jose G.↗

Large Payload Ground Transportation and Test Considerations

During test and verification planning for the Altair lunar lander project, a National Aeronautics and Space Administration (NASA) study team identified several ground transportation and test issues related to the large payload diameter. Although the entire Constellation Program-including Altair-has since been canceled, issues identified by the Altair project serve as important lessons learned for payloads greater than 7 m diameter being considered for NASA's new Space Launch System (SLS). A transportation feasibility study found that Altair's 8.97 m diameter Descent Module would not fit inside available aircraft. Although the Ascent Module cabin was only 2.35 m diameter, the long reaction control system booms extended nearly to the Descent Module diameter, making it equally unsuitable for air transportation without removing the booms and invalidating assembly workmanship screens or acceptance testing that had already been performed. Ground transportation of very large payloads over extended distances is not generally permitted by most states, so overland transportation alone would not be an option. Limited ground transportation to the nearest waterway may be possible, but water transportation could take as long as 66 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA's Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing such as hypergolic fuels, pyrotechnic devices, and high pressure gasses. Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure-roads, bridges, airframes, and buildings-necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider where and how large spacecraft are manufactured, tested, and launched could result in unforeseen cost to modify existing (or develop new) infrastructure, or incur additional risk due to increased handling operations or eliminating key verifications.

Rucker, Michelle A.↗

Thermal Hydraulic Experimental Test Article - Report of THETA Commissioning for METL Testing

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary and secondary system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. Figure 1 illustrates the main components of the primary system. THETA has been installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, Figure 2 and Figure 3. Since the FY20 THETA status report, [1], further water shakedown testing was performed, some final welding modifications were performed, all system components were sanitized, dry assembled, and commissioned before installing into METL test vessel #4. The THETA submersible electromagnetic flowmeter was welded closed to hermetically seal internal components from sodium followed by a helium leak check for the final time

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Nuclear Thermal Propulsion Ground Test History

Nuclear Thermal Propulsion (NTP) was started in ~1955 under the Atomic Energy Commission as project Rover and was assigned to Los Alamos National Laboratory. The Nevada Test Site was selected in 1956 and facility construction began in 1957. The KIWI-A was tested on July 1, 1959 for 5 minutes at 70MW. KIWI-A1 was tested on July 8, 1960 for 6 minutes at 85MW. KIWI-A3 was tested on October 10, 1960 for 5 minutes at 100MW. The National Aeronautics and Space Administration (NASA) was formed in 1958. On August 31, 1960 the AEC and NASA established the Space Nuclear Propulsion Office and named Harold Finger as Director. Immediately following the formation of SNPO, contracts were awarded for the Reactor In Flight Test (RIFT), master plan for the Nuclear Rocket Engine Development Station (NRDS), and the Nuclear Engine for Rocket Vehicle Application (NERVA). From December 7, 1961 to November 30, 1962, the KIWI-B1A, KIWI-B1B, and KIWI-B4A were tested at test cell A. The last two engines were only tested for several seconds before noticeable failure of the fuel elements. Harold Finger called a stop to any further hot fire testing until the problem was well understood. The KIWI-B4A cold flow test showed the problem to be related to fluid dynamics of hydrogen interstitial flow causing fuel element vibrations. President Kennedy visited the NTS one week after the KIWI-B4A failure and got to see the engine starting to be disassembled in the maintenance facility. The KIWI-B4D and KIWI-B4E were modified to not have the vibration problems and were tested in test cell C. The NERVA NRX program started testing in early 1964 with NRX-A1 cold flow test series (unfueled graphite core), NRX-A2 and NRX-A3 power test series up to 1122 MW for 13 minutes. In March 1966, the NRX-EST (Engine System Test) was the first breadboard using flight functional relationship and total operating time of 116 minutes. The NRX-EST demonstrated the feasibility of a hot bleed cycle. The NRX-A5 had multiple start-ups in May-June 1966 with 30.75 minutes accumulative operating time at or above 1GW. The NRX-A6 was tested in December 1969 and ran for 62 minutes at 1100 MW. Each engine had post-test examination and found various structure anomalies which were identified for correction and the fuel element corrosion rate was reduced. The Phoebus series of research reactors began testing at test cell C, in June 1965 with Phoebus 1A. Phoebus 1A operated for 10.5 minutes at 1100 MW before unexpected loss of propellant and leading to an engine breakdown. Phoebus 1B ran for 30 minutes in February of 1967. Phoebus 2A was the highest steady state reactor built at 5GW. Phoebus 2A ran for 12 minutes at 4100 MW demonstrating sufficient power is available. The Peewee test bed reactor was tested November- December 1968 in test cell C for 40 minutes at 500MW with overall performance close to pre-run predictions. The XE' engine was the only engine tested with close to a flight configuration and fired downward into a diffuser at the Engine Test Stand (ETS) in 1969. The XE' was 1100 MW and had ~28 start-ups. The nuclear furnace NF-1 was operated at 44 MW with multiple test runs at 90 minutes in the summer of 1972. The NF-1 was the last NTP reactor tested. The Rover/NERVA program was cancelled in 1973. However, before cancellation, a lot of other engineering work was conducted by Aerojet on a 75, 000 lbf prototype flight engine and by Los Alamos on a ~16,000 lbf "Small Engine" nuclear rocket design. The ground test history of NTP at the NRDS also offers many lessons learned on how best to setup, operate, emergency shutdown, and post-test examine NTP engines. The reactor and engine maintenance and disassembly facilities were used for assembly and inspection of radioactive engines after testing. Most reactor/ engines were run at test cell A or test cell C with open air exhaust. The Rover/NERVA program became aware of a new environmental regulation that would restrict the amount of radioactive particulates allowed to be release in open air and successfully demonstrated a scrubber concept with the NF-1. The ETS stand was the only one with a high altitude test chamber used for XE'. The ETS and other test cells showed the effects the engine's radiation had on the facility materials and instrumentation as well as side effects the ground test facility has back on the engine operation. The breakdown of Phoebus 1A at test cell C showed how the site was cleaned up and back to operation for five more engines before the program was cancelled.

Gerrish, Harold P.↗

Extrapolating the Trends of Test Drop Data with Opening Shock Factor Calculations: the Case of the Orion Main and Drogue Parachutes Inflating to 1st Reefed Stage

We describe a new calculation of the opening shock factor C (sub k) characterizing the inflation performance of NASA's Orion spacecraft main and drogue parachutes opening under a reefing constraint (1st stage reefing), as currently tested in the Capsule Parachute Assembly System (CPAS) program. This calculation is based on an application of the Momentum-Impulse Theorem at low mass ratio (R (sub m) is less than 10 (sup -1)) and on an earlier analysis of the opening performance of drogues decelerating point masses and inflating along horizontal trajectories. Herein we extend the reach of the Theorem to include the effects of payload drag and gravitational impulse during near-vertical motion - both important pre-requisites for CPAS parachute analysis. The result is a family of C (sub k) versus R (sub m) curves which can be used for extrapolating beyond the drop-tested envelope. The paper proves this claim in the case of the CPAS Mains and Drogues opening while trailing either a Parachute Compartment Drop Test Vehicle or a Parachute Test Vehicle (an Orion capsule boiler plate). It is seen that in all cases the values of the opening shock factor can be extrapolated over a range in mass ratio that is at least twice that of the test drop data.

Potvin, Jean↗

Sub-kW Class Hall-Effect Thruster Power Processing Unit for Wide Output Range Applications

The National Aeronautics and Space Administration (NASA) Small Spacecraft Electric Propulsion (SSEP) project is maturing high-propellant throughput sub-kilowatt Hall-effect thruster technologies to enable small spacecraft deep space science and exploration missions with high delta-v requirements. In support of this effort, development of a power processing unit (PPU) capable of providing discharge power of up to 1 kW continues to be pursued at the NASA Glenn Research Center (GRC). Previous reported work included a successful integrated test of a scalable, modular breadboard discharge power supply with the NASA-H64M laboratory model Hall-effect thruster and presentation of notional designs for the various auxiliary power supplies needed for thruster operation. Since that time, auxiliary power supply designs have been completed and fabricated, with the cathode heater and keeper power supplies being successfully tested with a hollow cathode assembly (HCA) in the NASA GRC Vacuum Facility 56 (VF-56). The desire for a lower mass, higher efficiency, and more versatile PPU to maximize performance of power and mass-limited small spacecraft has led to the exploration of a discharge power supply based on a series-parallel (LCC) resonant topology. This topology has enabled the discharge power supply to operate over a wider output range at switching frequencies 4-5 times higher than previous design iterations. Simulation models of the topology have been developed and a breadboard of the topology has been fabricated and evaluated on both resistive loads and an integrated Hall thruster test. This paper will present collected performance and integrated test data from both the fabricated auxiliary and resonant discharge power supplies. Advantages of the resonant converter architecture over more traditional pulse-width modulated (PWM) techniques in Hall-effect thruster discharge power supply applications will also be described.

electric propulsion↗

Sub-kW Class Hall-Effect Thruster Power Processing Unit for Wide Output Range Applications

The National Aeronautics and Space Administration (NASA) Small Spacecraft Electric Propulsion (SSEP) project is maturing high-propellant throughput sub-kilowatt Hall-effect thruster technologies to enable small spacecraft deep space science and exploration missions with high delta-v requirements. In support of this effort, development of a power processing unit (PPU) capable of providing discharge power of up to 1 kW continues to be pursued at the NASA Glenn Research Center (GRC). Previous reported work included a successful integrated test of a scalable, modular breadboard discharge power supply with the NASA-H64M laboratory model Hall-effect thruster and presentation of notional designs for the various auxiliary power supplies needed for thruster operation. Since that time, auxiliary power supply designs have been completed and fabricated, with the cathode heater and keeper power supplies being successfully tested with a hollow cathode assembly (HCA) in the NASA GRC Vacuum Facility 56 (VF-56). The desire for a lower mass, higher efficiency, and more versatile PPU to maximize performance of power and mass-limited small spacecraft has led to the exploration of a discharge power supply based on a series-parallel (LCC) resonant topology. This topology has enabled the discharge power supply to operate over a wider output range at switching frequencies 4-5 times higher than previous design iterations. Simulation models of the topology have been developed and a breadboard of the topology has been fabricated and evaluated on both resistive loads and an integrated Hall thruster test. This paper will present collected performance and integrated test data from both the fabricated auxiliary and resonant discharge power supplies. Advantages of the resonant converter architecture over more traditional pulse-width modulated (PWM) techniques in Hall-effect thruster discharge power supply applications will also be described.

electric propulsion↗

Assessing the Performance, Application, and Cost of Retrofit Wall Systems for Residential Buildings

The Oak Ridge National Laboratory, Pacific Northwest National Laboratory, and the University of Minnesota have been conducting a three-year study of residential retrofit wall systems. The researchers have identified, tested, and verified the hygrothermal performance of 16 wall assemblies in retrofit applications. The approach to this study includes a comprehensive literature review, the involvement of an advisory group of thermal enclosure experts, smallscale experimental in situ testing of the wall assemblies at the University of Minnesota’s Cloquet Residential Research Facility, and energy and hygrothermal simulation of wall assemblies using EnergyPlus, THERM, and WUFI. Simulation and experimental results are then combined with an economic analysis to produce a techno-economic study of residential wall systems for deep energy retrofits.This presentation summarizes the findings of this research project and is intended to guide architects and designers on how to retrofit existing wall assemblies without creating durability issues.

Desjarlais, Andre Omer↗

Reefing Line Tension in CPAS Main Parachute Clusters

Reefing lines are an essential feature to manage inflation loads. During each Engineering Development Unit (EDU) test of the Capsule Parachute Assembly System (CPAS), a chase aircraft is staged to be level with the cluster of Main ringsail parachutes during the initial inflation and reefed stages. This allows for capturing high-quality still photographs of the reefed skirt, suspension line, and canopy geometry. The over-inflation angles are synchronized with measured loads data in order to compute the tension force in the reefing line. The traditional reefing tension equation assumes radial symmetry, but cluster effects cause the reefed skirt of each parachute to elongate to a more elliptical shape. This effect was considered in evaluating multiple parachutes to estimate the semi-major and semi-minor axes. Three flight tests are assessed, including one with a skipped first stage, which had peak reefing line tension over three times higher than the nominal parachute disreef sequence.

Ray, Eric S.↗

Extraction and Separation Modeling of Orion Test Vehicles with ADAMS Simulation

The Capsule Parachute Assembly System (CPAS) project has increased efforts to demonstrate the performance of fully integrated parachute systems at both higher dynamic pressures and in the presence of wake fields using a Parachute Compartment Drop Test Vehicle (PCDTV) and a Parachute Test Vehicle (PTV), respectively. Modeling the extraction and separation events has proven challenging and an understanding of the physics is required to reduce the risk of separation malfunctions. The need for extraction and separation modeling is critical to a successful CPAS test campaign. Current PTV-alone simulations, such as Decelerator System Simulation (DSS), require accurate initial conditions (ICs) drawn from a separation model. Automatic Dynamic Analysis of Mechanical Systems (ADAMS), a Commercial off the Shelf (COTS) tool, was employed to provide insight into the multi-body six degree of freedom (DOF) interaction between parachute test hardware and external and internal forces. Components of the model include a composite extraction parachute, primary vehicle (PTV or PCDTV), platform cradle, a release mechanism, aircraft ramp, and a programmer parachute with attach points. Independent aerodynamic forces were applied to the mated test vehicle/platform cradle and the separated test vehicle and platform cradle. The aero coefficients were determined from real time lookup tables which were functions of both angle of attack ( ) and sideslip ( ). The atmospheric properties were also determined from a real time lookup table characteristic of the Yuma Proving Grounds (YPG) atmosphere relative to the planned test month. Representative geometries were constructed in ADAMS with measured mass properties generated for each independent vehicle. Derived smart separation parameters were included in ADAMS as sensors with defined pitch and pitch rate criteria used to refine inputs to analogous avionics systems for optimal separation conditions. Key design variables were dispersed in a Monte Carlo analysis to provide the maximum expected range of the state variables at programmer deployment to be used as ICs in DSS. Extensive comparisons were made with Decelerator System Simulation Application (DSSA) to validate the mated portion of the ADAMS extraction trajectory. Results of the comparisons improved the fidelity of ADAMS with a ramp pitch profile update from DSSA. Post-test reconstructions resulted in improvements to extraction parachute drag area knock-down factors, extraction line modeling, and the inclusion of ball-to-socket attachments used as a release mechanism on the PTV. Modeling of two Extraction parachutes was based on United States Air Force (USAF) tow test data and integrated into ADAMS for nominal and Monte Carlo trajectory assessments. Video overlay of ADAMS animations and actual C-12 chase plane test videos supported analysis and observation efforts of extraction and separation events. The COTS ADAMS simulation has been integrated with NASA based simulations to provide complete end to end trajectories with a focus on the extraction, separation, and programmer deployment sequence. The flexibility of modifying ADAMS inputs has proven useful for sensitivity studies and extraction/separation modeling efforts. 1

Fraire, Usbaldo, Jr.↗

Prism Assembly for Roman Space Telescope Wide Field Instrument Slit-less Spectroscopy

The Roman Space Telescope (RST) is a three mirror anastigmat design with a 2.4 m primary mirror. RST will be based in L2 orbit, from where it will provide science information on exoplanets and dark energy using the Coronagraph Instrument (CGI) and Wide Field Instrument (WFI). The WFI features a 300 megapixel near-infrared detector array which provides a field of view 100 times larger than that of Hubble Space Telescope. The Prism Assembly is a small add-on instrument to the Roman Space Telescope’s Wide Field Instrument (WFI), installed in a slot in WFI’s element wheel. The Prism assembly has a passband from 0.75 µm to 1.8 µm, enabling a survey of redshifts in the range 0.2 to 1.7 µm. It provides low resolution slit-less spectroscopy with a spectral resolution R > 70 for all wavelengths, and R < 170 for λ > 0.8 µm across the full field. The Prism Assembly has the potential to provide more supernova spectra than ground-based spectroscopy during the mission lifetime. Being a late add-on to the RST mission, the Prism Assembly has had restrictions on size, weight and geometry, and a challenging schedule, which has dictated much of the implementation. Despite these challenges, the Prism Assembly is a pocket-sized high-performance spectrographic element, implemented as a refractive, all-spherical optical design using only two elements, one S-TIH-1 glass and one CaF2. This presentation will give an overview of the Prism Assembly, from design and implementation, through alignment, test and calibration. (100 words): The Roman Space Telescope is a three mirror anastigmat design with a 2.4 m primary mirror, which will provide science information on dark energy and exoplanets. The Prism Assembly is a small add-on instrument to the telescope’s Wide Field Instrument, enabling low resolution slit-less spectroscopy with a spectral resolution 70 < R < 170 across the full field from λ= 0.75 µm to 1.8 µm. The Prism Assembly is a refractive, all-spherical optical design using a glass and a CaF2 element. This presentation will give an overview of the Prism Assembly, from design and implementation, through alignment, test and calibration.

Space Instrumentation↗

Development and construction status of the Mu2e electromagnetic calorimeter mechanical structures

Abstract The Mu2e experiment at Fermilab will search for the CLFV neutrino-less coherent conversion of a muon into an electron in the field of an aluminum nucleus. The observation of this process would be the evidence of physics beyond the Standard Model. Mu2e comprises a straw-tracker, an electromagnetic calorimeter and an external veto for cosmic rays. The calorimeter provides electron identification, a fast trigger and aids track reconstruction. It is a state-of-the-art crystal calorimeter and employs 1340 pure CsI crystals readout by UV-extended SiPM and fast electronics. The design consists of two identical annular disks positioned at the relative distance of 70 cm downstream the target.The hostile Mu2e conditions (total ionizing dose of 12 krad and a neutron fluence of 5 × 10 10 n/cm 2 @ 1 MeVeq (Si)/y, 1 T magnetic field and vacuum level of 10 −4 Torr) posed tight constraints on the mechanical structures and materials choice. The support structure of the two crystal matrices employs two aluminum hollow rings and parts made of open-cell vacuum-compatible carbon fiber. SiPMs and front-end electronics for each crystal are assembled in one mechanical unit inserted in a machined copper holder. The units are supported by a plate made of vacuum-compatible material. The plate integrates the cooling system made of a network of copper lines flowing a low temperature fluid and placed in thermal contact with the copper holders. The DAQ is hosted in aluminum crates positioned on the lateral surface of the disks. The crates also integrate the DAQ electronics cooling system. We review the constraints on the calorimeter structures design, the development of all the structural components, including the simulations that have determined the materials and technological choices and the specifications of the cooling station, components production and quality assurance tests, the procedures for detector assembly, transportation and installation in the experimental area.

Instruments & Instrumentation↗

Evaluation and characterization of the methane-carbon dioxide decomposition reaction

A program was conducted to evaluate and characterize the carbon dioxide-methane (CO2-CH4) decomposition reaction, i.e., CO2 + CH4 = 2C + 2H2O. The primary objective was to determine the feasibility of applying this reaction at low temperatures as a technique for recovering the oxygen (O2) remaining in the CO2 which exits mixed with CH4 from a Sabatier CO2 reduction subsystem (as part of an air revitalization system of a manned spacecraft). A test unit was designed, fabricated, and assembled for characterizing the performance of various catalysts for the reaction and ultraviolet activation of the CH4 and CO2. The reactor included in the test unit was designed to have sufficient capacity to evaluate catalyst charges of up to 76 g (0.17 lb). The test stand contained the necessary instrumentation and controls to obtain the data required to characterize the performance of the catalysts and sensitizers tested: flow control and measurement, temperature control and measurement, product and inlet gas analysis, and pressure measurement. A product assurance program was performed implementing the concepts of quality control and safety into the program effort.

Davenport, R. J.↗

Methods for testing high voltage connectors in vacuum, measurements of thermal stresses in encapsulated assemblies, and measurement of dielectric strength of electrodes in encapsulants versus radius of curvature

Internal embedment stress measurements were performed, using tiny ferrite core transformers, whose voltage output was calibrated versus pressure by the manufacturer. Comparative internal strain measurements were made by attaching conventional strain gages to the same type of resistors and encapsulating these in various potting compounds. Both types of determinations were carried out while temperature cycling from 77 C to -50 C.

Bever, R. S.↗

[Fall 2015 Abstract by Stephanie Scharf]

This Fall I worked on two different projects that culminated into a redesign of the spacesuit LLB (long life battery). I also did some work on the PLSS (personal life support system) battery with EC. My first project was redlining the work instruction for completing DPAs (destructive physical analysis) on battery cells in the Branch. The purpose of this document is to create a standard process and ensure that the data is collected in the same way, no matter who carries out the analysis. I observed three DPAs, conducted one with help, and conducted two on my own, all while taking notes on the procedure. These notes were used to write the final work instruction, which will become the Branch standard. My second project continued the work of the Summer co-op before me. I tested aluminum heat sinks for their ability to provide good thermal conduction and structural support during a thermal runaway event. The heat sinks had been designed by the previous Summer co-op, but there was not much time for testing before he left. We thus ran tests with a heater on the bottom of a trigger cell to try to drive thermal runaway and ensure that it will not propagate to adjacent cells. We also ran heat-to-vent tests in an oven to see if the assembly provided structural support and prevented sidewall rupture during thermal runaway. These tests were carried out at ESTA (Energy Systems Test Area) and are providing very promising results, indicating that safe, high performing (>180 Wh/kg) designs are possible. My main project was a redesign of the LLB (Lightweight Lithium Battery). Another summer intern had done some testing and concluded that there was no simple fix to mitigate thermal runaway propagation hazards in the existing design. The only option was a clean sheet redesign of the battery. I was given a volume and ideal energy density, and the rest of the design was up to me. First, I created new heat sink banks in CREO, using the information gathered in the metal heat sink tests from the summer intern. After this, I made capture plates to hold the cells in place, and I worked on nickel bussings for the electrical connections between the cells. Finally, I designed the test box enclosure that included sections for flame arresting materials. The battery brick design, which is the heart of the battery, promises to become the first for a manned spacecraft application to achieve > 180 Wh/kg. My work in redlining the DPA work instructions will also be used in selecting the cells for the battery. We had a few options for cells that would provide the necessary power output and needed to make a choice. We repeatedly charged and discharged cells for around a month until they went through 100 lifecycles. The plan was to compare the DPA results on fresh and cycled cells from each manufacturer to see if cycling introduces any differences. After the complete LLB design was approved, the parts were ordered and testing should begin the first week of December. Cutting open a cell for DPA After photo from oven heat-to-vent test

Scharf, Stephanie↗

[Redesign of the Spacesuit Long Life Battery and the Personal Life Support System Battery]

This fall I was working on two different projects that culminated into a redesign of the spacesuit LLB (long life battery). I also did some work on the PLSS (personal life support system) battery with EC. My first project was redlining the work instruction for completing DPAs (destructive physical analysis) on battery cells in the department. The purpose of this document is to create a standard process and ensure that the data in the same way no matter who carries out the analysis. I observed three DPAs, conducted one with help, and conducted two on my own all while taking notes on the procedure. These notes were used to write the final work instruction that will become is the department standard. My second project continued the work of the summer co-op before me. I was testing aluminum heat sinks for their ability to provide good thermal conduction and structural support during a thermal runaway event. The heat sinks were designed by the summer intern but there was not much time for testing before he left. We ran tests with a heater on the bottom of a trigger cell to try to drive thermal runaway and ensure that it will not propagate to adjacent cells. We also ran heat-to-vent tests in an oven to see if the assembly provided structural support and prevented sidewall rupture during thermal runaway. These tests were carried out at ESTA (energy systems test area) and are providing very promising results that safe, high performing (greater than 180 Wh/kg) designs are possible. My main project was a redesign of the LLB battery. Another summer intern did some testing and concluded that there was no simple fix to mitigate thermal runaway propagation hazards in the current design. The only option was a clean sheet redesign of the battery. I was given a volume and ideal energy density and the rest of the design was up to me. First, I created new heat sink banks in Creo using the information gathered in the metal heat sink tests from the summer intern. After this, I made capture plates to hold the cells in place and I worked on nickel bussings for the electrical connections between the cells. Finally, I designed the test box enclosure that included sections for flame arresting materials. The battery brick design, which is the heart of the battery, promises to become the first for a manned spacecraft application to achieve greater than 180 Wh/kg. My work in redlining the DPA work instructions will also be used in selecting the cells for the battery. We had a few options of cells that would provide the necessary power output and needed to make a choice. We repeatedly charged and discharged cells for around a month until they went through 100 lifecycles. The plan is to compare the DPA results on fresh and cycled cells from each manufacturer to see if cycling introduces any differences. After the complete LLB design was approved, the parts were ordered and testing should begin the first week of December. Some of my side projects included working on the CAD data for the PLSS with EC and attending the NASA Aerospace Battery Workshop in Huntsville. I was also a member of the Tours and Lectures Committee for the USRA and Pathways interns. I coordinated Apollo Evening and was on the committee for touring KSC and seeing an Atlas 5 launch. I really enjoyed my time at JSC and I would like to continue working for NASA or another aerospace company in the future. I have worked other internships prior to this, but I think the heavy research and development focus is the best fit for me. I originally thought I would need to go to grad school to work in an environment like this, but I now see it is possible with a bachelor’s degree and hard work. I would like to go into the workforce and maybe continue my education with night classes.