Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

Expedited desalination permitting enables adaptive planning and water system cost reduction

Seawater desalination is a drought-proof water supply for coastal cities, but widespread development of desalination plants in the U.S. has been limited by both cost and the complexity of permitting processes designed to minimize environmental impact . This work estimates the value of accelerating the permitting timeline without changing environmental or social standards. On average, faster permitting reduces the frequency of desalination plant construction and operation, the overall costs of robust water system operation, the environmental impacts of drought-tolerant water supplies due to shorter duration of plant operation. Expedited permitting allows fundamental changes in how water infrastructure is deployed, facilitating a transition from anticipatory construction and continuous operation of seawater desalination capacity as a redundant drought buffer to just-in-time (i.e. adaptive) deployment of seawater desalination capacity when critical drought thresholds are crossed. We demonstrate the value of expedited desalination permitting in enabling adaptive planning and reducing water system costs using a simple case study in Santa Barbara, CA. We discuss additional forms of adaptive water infrastructure planning as enabled by faster permitting and address their challenges and opportunities. Lastly, we identify synergies between innovation in adaptive planning, innovation in expedited permitting practices, and innovation in water technology.

adaptive planning↗

Joint Fleet Sizing and Charging System Planning for Autonomous Electric Vehicles

This paper studies the joint fleet sizing and charging system planning problem for a company operating a fleet of autonomous electric vehicles (AEVs) for passenger and goods transportation. Most of the relevant published papers focus on intracity scenarios and adopt heuristic approaches, e.g., agent based simulation, which do not guarantee optimality. In contrast, we propose a mixed integer linear programming model for intercity scenarios. This model incorporates comprehensive considerations of 1) limited AEV driving range; 2) optimal AEV routing and relocating operations; 3) time-varying origin-destination transport demands; and 4) differentiated operation cost structure of passenger and goods transportation. The proposed model can be computational expensive when the scale of the transportation network is large. We then exploit the structure of this program to expedite its solution. Numerical experiments are conducted to validate the proposed method. Our experimental results show that AEVs in passenger and goods transportation have remarkable planning and operation differences. We also demonstrate that intelligent routing and relocating operations, charging system and vehicle parameters, e.g., charging power, battery capacity, driving speed etc., can significantly affect the economic efficiency and the planning results of an AEV fleet.

33 ADVANCED PROPULSION SYSTEMS↗

Dynamic Charging Rendezvous and Motion Planning for a Multi-AGV Team Including a Mobile Charging Host

Teams of automated battery-powered electric vehicles have the potential to execute complex mission tasks in off-road environments for agriculture, military, and other applications. Limited onboard energy reserves hinder their adoption in large-scale resource-constrained environments, where recharging is a necessity. It may be infeasible to install a network of static charging stations in off-road environments. For this reason, dedicated mobile host vehicles with charging capabilities are proposed as a means to increase range and capabilities of the multivehicle team. Here, in this study, we consider an ad hoc planning framework, where results from a high-confidence trajectory planner are leveraged to plan charging rendezvous between a host and other worker vehicles in a receding horizon fashion to provide high confidence that energy reserves will not be prematurely exhausted. The core problem is posed so as to minimize the impact of recharging on the mission in terms of task delays, overall energy utilization, and costs of fast charging. Through extensive Monte Carlo simulations of an off-road mission, we show a decrease in task delays without substantial increases in energy needs by updating the charging rendezvous plan during the mission. However, if updates are made too often, model mismatch may cause unnecessary cycling and mission failure.

Energy constraints↗

Planning a Resilient Power Sector: Ensuring Reliable, Secure, Safe, and Affordable Electricity

Decision makers around the globe are exploring strategies to ensure the reliable, secure, safe, and affordable supply of electricity to power economic growth and achieve development goals. Vulnerabilities of the power sector to natural hazards (e.g., acts of nature, severe weather, and climate variabilities), technological hazards (e.g., accidents and system or structure failures), and threats or human-caused incidents (e.g., intentional cyber-attacks or acts of terror) can impede the provision of the energy services necessary to achieve these goals. Although decision makers cannot prevent an act of nature such as an earthquake, they can anticipate, prepare for, and adapt to potential vulnerabilities through planning. The purpose of power sector resilience planning is to identify vulnerabilities and devise strategies to mitigate them. This document reviews some of the hazards that power sectors face and how decision makers can plan to increase resilience.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Power Sector Resilience Planning: To Ensure Reliable, Secure, Safe and Affordable Electricity Supplies (Lab Translation)

Decision makers around the globe are exploring strategies to ensure the reliable, secure, safe, and affordable supply of electricity to power economic growth and achieve development goals. Vulnerabilities of the power sector to natural hazards (e.g., acts of nature, severe weather, and climate variabilities), technological hazards (e.g., accidents and system or structure failures), and threats or human-caused incidents (e.g., intentional cyber-attacks or acts of terror) can impede the provision of the energy services necessary to achieve these goals. Although decision makers cannot prevent an act of nature such as an earthquake, they can anticipate, prepare for, and adapt to potential vulnerabilities through planning. The purpose of power sector resilience planning is to identify vulnerabilities and devise strategies to mitigate them. This document reviews some of the hazards that power sectors face and how decision makers can plan to increase resilience.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Planning a Resilient Power Sector: Ensuring Reliable, Secure, Safe, and Affordable Electricity

Decision makers around the globe are exploring strategies to ensure the reliable, secure, safe, and affordable supply of electricity to power economic growth and achieve development goals. Vulnerabilities of the power sector to natural hazards (e.g., acts of nature, severe weather, and climate variabilities), technological hazards (e.g., accidents and system or structure failures), and threats or human-caused incidents (e.g., intentional cyber-attacks or acts of terror) can impede the provision of the energy services necessary to achieve these goals. Although decision makers cannot prevent an act of nature such as an earthquake, they can anticipate, prepare for, and adapt to potential vulnerabilities through planning. The purpose of power sector resilience planning is to identify vulnerabilities and devise strategies to mitigate them. This document reviews some of the hazards that power sectors face and how decision makers can plan to increase resilience.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Aniak Energy Action Plan

In 2017, the Native Village of Aniak received a grant for the Aniak Energy Efficiency Project from the United States Department of Energy Office of Indian Energy policy and programs. The objective of the project was to reduce and stabilize energy costs in tribal buildings by setting energy efficiency improvement goals to provide direction for a future retrofit project. This final report begins with information about the community of Aniak and the project procedure. Chapters follow on each component of the project. The project team began by recording information about the seven project buildings as well as the Aniak Traditional Council’s goals for each building. Tribal staff also gathered baseline data on each building, including their energy use and general condition. An energy professional surveyed each building, prepared an energy model using AkWarm-C energy modeling software to determine energy-saving retrofits, and completed energy audits, summarized within this report. Each energy audit lists energy efficiency measures and energy conservation measures to pursue to improve the building and decrease its energy use. This report also contains three resources to help with the next steps in an energy retrofit project: a data monitoring plan to track the building condition and energy use through a retrofit project, a maintenance plan to facilitate energy conservation, and a list of funding and training opportunities that could provide resources for a retrofit or training for maintenance staff. Finally, readers can find materials from the outreach component of the project which demonstrated sustainable practices to the community. This Energy Action Plan marks the conclusion of the Aniak Energy Efficiency Project, but is meant to lead to the next step towards safe, comfortable, and energy efficient tribal buildings that will continue to benefit the community of Aniak for many years to come.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Kwigillingok Energy Action Plan

In 2017, the Native Village of Kwigillingok received a grant for the Kwigillingok Energy Efficiency Project from the United States Department of Energy Office of Indian Energy. The objective of the project was to reduce and stabilize energy costs in tribal buildings by setting energy efficiency improvement goals to provide direction for a future retrofit project. This final report begins with information about the community of Kwigillingok and the project procedure. Chapters follow on each component of the project. The project team began by recording information about the six project buildings as well as the I.R.A. Council’s goal for each building. Tribal staff also gathered baseline data on each building, including their energy use and general condition. An energy professional surveyed each building, prepared an energy model using AkWarm-C energy modeling software to determine energy-saving retrofits, and completed energy audits, summarized within this report. Each energy audit lists energy efficiency measures and energy conservation measures to pursue to improve the building and decrease its energy use. This report also contains three resources to help with the next steps in an energy retrofit project: a data monitoring plan to track the building condition and energy use through a retrofit project, a maintenance plan to facilitate energy conservation, and a list of funding and training opportunities that could provide resources for a retrofit or training for maintenance staff. Finally, readers can find materials from the outreach component of the project, which demonstrated sustainable practices to the community. This Energy Action Plan marks the conclusion of the Kwigillingok Energy Efficiency Project but is meant to lead to the next step towards safe, comfortable, and energy efficient tribal buildings that will continue to benefit the community of Kwigillingok for many years to come.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Atmautluak Energy Action Plan

In 2017, the Native Village of Atmautluak received a grant for the Atmautluak Energy Efficiency Project from the United States Department of Energy Office of Indian Energy. The objective of the project was to reduce and stabilize energy costs in tribal buildings by setting energy efficiency improvement goals to provide direction for a future retrofit project. This final report begins with information about the community of Atmautluak and the project procedure. Chapters follow on each component of the project. The project team began by recording information about the six project buildings as well as the Traditional Council’s goal for each building. Tribal staff also gathered baseline data on each building, including their energy use and general condition. An energy professional surveyed each building, prepared an energy model using AkWarm-C energy modeling software to determine energy-saving retrofits, and completed energy audits, summarized within this report. Each energy audit lists energy efficiency measures and energy conservation measures to pursue to improve the building and decrease its energy use. This report also contains three resources to help with the next steps in an energy retrofit project: a data monitoring plan to track the building condition and energy use through a retrofit project, a maintenance plan to facilitate energy conservation, and a list of funding and training opportunities that could provide resources for a retrofit or training for maintenance staff. Finally, readers can find materials from the outreach component of the project which demonstrated sustainable practices to the community. This Energy Action Plan marks the conclusion of the Atmautluak Energy Efficiency Project, but is meant to lead to the next step towards safe, comfortable, and energy efficient tribal buildings that will continue to benefit the community of Atmautluak for many years to come.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Akiachak Energy Action Plan

In 2017, the Akiachak Native Community received a grant for the Akiachak Energy Efficiency Project from the United States Department of Energy Office of Indian Energy. The objective of the project was to reduce and stabilize energy costs in tribal buildings by setting energy efficiency improvement goals to provide direction for a future retrofit project. This final report begins with information about the community of Akiachak and the project procedure. Chapters follow on each component of the project. The project team began by recording information about the nine project buildings as well as the I.R.A. Council’s goal for each building. Tribal staff also gathered baseline data on each building, including their energy use and general condition. An energy professional surveyed each building, prepared an energy model using AkWarm-C energy modeling software to determine energy-saving retrofits, and completed energy audits, summarized within this report. Each energy audit lists energy efficiency measures and energy conservation measures to pursue to improve the building and decrease its energy use. This report also contains three resources to help with the next steps in an energy retrofit project: a data monitoring plan to track the building condition and energy use through a retrofit project, a maintenance plan to facilitate energy conservation, and a list of funding and training opportunities that could provide resources for a retrofit or training for maintenance staff. Finally, readers can find materials from the outreach component of the project which demonstrated sustainable practices to the community. This Energy Action Plan marks the conclusion of the Akiachak Energy Efficiency Project, but is meant to lead to the next step towards safe, comfortable, and energy efficient tribal buildings that will continue to benefit the community of Akiachak for many years to come.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lao Power Sector Vulnerability Assessment and Resilience Action Plan

This purpose of this work is to develop a power sector resilience action plan for the Lao PDR (resilience action plan). The resilience action plan provides strategies to address the key vulnerabilities identified in a previous vulnerability assessment.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Los Alamos National Laboratory Campus Master Plan Communication Strategy

The purpose of this Campus Master Plan (CMP) Communication Strategy is to establish an appropriate approach to communication that ensures the comprehensive site planning (henceforth campus master planning) process and associated products for the Los Alamos National Laboratory (LANL) site are effective and sustainable.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

A Multistage Stochastic Transmission Expansion Algorithm for Wide-Area Planning under Uncertainty

The overall objective for this project was to develop and demonstrate a set of methods for solving the transmission investment problem for a large network considering many possible scenarios of future conditions and multiple decision points when investments can be made. Project sub-objectives achieved this goal through a succession of extending the methods to apply to problems with increasing complexity or additional features, including the number of decision points, whether generation and transmission are co-optimized, and whether AC or DC power flow is used. A transmission model was developed for the Western Electric Coordinating Council (WECC) region, the high-voltage transmission system that serves the western third of the continental U.S. Using a dataset provided by WECC and by researchers from John Hopkins University, we have validated and demonstrated the model and used it to compare the new method for solving multi-stage stochastic transmission planning to several state-of-the-art techniques. The project has resulted in several key outcomes and achievements: The covariance-based method for choosing a small set of hours to represent short-term variability has superior performance in terms of accuracy to existing methods, including K-means clustering and Importance Sampling; The combined partitioning method for long-term uncertainty with the nested clustering approach for choosing representative hours for each long-term group has superior accuracy for equivalent computational effort compared with existing methods; Using the partitioning/clustering method combined with Sample Average Approximation provides both statistical bounds on the quality of the solution and at the same time, a complete investment plan for all contingencies in the full uncertainty set; no existing methods can provide both at the same time; The method is demonstrated to work well for choosing both transmission and generation investments; A variant on the method allows for both scenario selection and simultaneous correction for the error from the DC power flow approximation to provide a tractable method for AC power flow-based transmission planning under uncertainty; The method applied to the WECC case study demonstrates the additional value to the system operator and the consumer of identifying flexible investment options in the near-term decisions. In particular, the case study exhibits significant option value in postponing some transmission additions that appear useful but in some long-term system states create new congestion problems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Importance of Modeling Carbon Dioxide Transportation and Geologic Storage in Energy System Planning Tools

Energy system planning tools suggest that the cost and feasibility of climate-stabilizing energy transitions are sensitive to the cost of CO 2 capture and storage processes (CCS), but the representation of CO 2 transportation and geologic storage in these tools is often simple or non-existent. We develop the capability of producing dynamic-reservoir-simulation-based geologic CO 2 storage supply curves with the Sequestration of CO 2 Tool (SCO 2 T) and use it with the ReEDS electric sector planning model to investigate the effects of CO 2 transportation and geologic storage representation on energy system planning tool results. We use a locational case study of the Electric Reliability Council of Texas (ERCOT) region. Our results suggest that the cost of geologic CO 2 storage may be as low as $3/tCO 2 and that site-level assumptions may affect this cost by several dollars per tonne. At the grid level, the cost of geologic CO 2 storage has generally smaller effects compared to other assumptions (e.g., natural gas price), but small variations in this cost can change results (e.g., capacity deployment decisions) when policy renders CCS marginally competitive. The cost of CO 2 transportation generally affects the location of geologic CO 2 storage investment more than the quantity of CO 2 captured or the location of electricity generation investment. We conclude with a few recommendations for future energy system researchers when modeling CCS. For example, assuming a cost for geologic CO 2 storage (e.g., $5/tCO 2 ) may be less consequential compared to assuming free storage by excluding it from the model.

20 FOSSIL-FUELED POWER PLANTS↗

Integration of Open-Source URBANopt and Dragonfly Energy Modeling Capabilities into Practitioner Workflows for District-Scale Planning and Design

High-performance districts and communities offer opportunities for reducing energy use, emissions, and costs, and can be instrumental in helping cities achieve their climate goals. The design of such communities requires identification of opportunities early on and their re-evaluation throughout the planning process. There is a need for energy modeling tools that connect 3D Computer-Aided Design (CAD) platforms to simulation engines, enabling detailed energy analysis of districts within the workflows and tools used by practitioners. This paper introduces the Dragonfly and URBANoptTM combined toolset that supports the creation of urban models from a range of geometry formats typically used by designers and planners, and provides an integrated pathway to simulate district-scale energy systems. The toolset is piloted by a global architecture and master planning firm to evaluate several key urban-scale technical questions for the design of a district in Chicago. The findings indicate that, while energy savings can be achieved through traditional architectural studies and enhancements to individual building efficiency, the modeling toolset helps identify additional savings and insights that can be achieved when considering district-scale energy systems. Finally, this study demonstrates how the Dragonfly/URBANopt toolset can integrate with master planning workflows, thereby enabling an iterative performance-based design process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

MAPGEN : mixed initiative planning and scheduling for the Mars '03 MER mission

The Mars Exploration Rovers Mars '03 mission is one of NASA's most ambitious science missions to date. The rovers will be launched in the summer of 2003 with each rover carrying instruments to conduct remote and in-situ observation to elucidate the planet's past climate, water activity, and habitability. Science is the primary driver of MER and, as a consequence, making best use of the scientific instruments, within the available resources, is a crucial aspect of the mission. To address this critically, the MER project has selected MAPGEN (Mixed-Initiative Activity Plan GENerator) as an activity planning tool. MAPGEN combines two exiting systems, each with a strong heritage: APGEN the Activity Planning tool from the Jet Propulsion Laboratory and the Europs Planning/Scheduling system from NASA Ames Research Center. This paper discusses the issues arising from combining these tools in the context of this mission.

planning and scheduling↗

Advances in Distributed Operations and Mission Activity Planning for Mars Surface Exploration

A centralized mission activity planning system for any long-term mission, such as the Mars Exploration Rover Mission (MER), is completely infeasible due to budget and geographic constraints. A distributed operations system is key to addressing these constraints; therefore, future system and software engineers must focus on the problem of how to provide a secure, reliable, and distributed mission activity planning system. We will explain how Maestro, the next generation mission activity planning system, with its heavy emphasis on portability and distributed operations has been able to meet these design challenges. MER has been an excellent proving ground for Maestro's new approach to distributed operations. The backend that has been developed for Maestro could benefit many future missions by reducing the cost of centralized operations system architecture.

Mars Exploration Rover (MER)↗

Orbital Express Mission Operations Planning and Resource Management using ASPEN

The Orbital Express satellite servicing demonstrator program is a DARPA program aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consists of: a) the Autonomous Space Transport Robotic Operations (ASTRO) vehicle, under development by Boeing Integrated Defense Systems, and b) a prototype modular next-generation serviceable satellite, NEXTSat, being developed by Ball Aerospace. Flexibility of ASPEN: a) Accommodate changes to procedures; b) Accommodate changes to daily losses and gains; c) Responsive re-planning; and d) Critical to success of mission planning Auto-Generation of activity models: a) Created plans quickly; b) Repetition/Re-use of models each day; and c) Guarantees the AML syntax. One SRP per day vs. Tactical team

automated planning scheduling↗