Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “permitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

Utah FORGE: Phase 2C Topical Report

This is the topical report that wraps up the work and results achieved during Utah FORGE Phase 2C. The zip file includes several folders containing (1) an overview; (2) the results; (3) the lessons learned; and (4) the conclusions. It also contains a folder containing appendices including (1) the updated permitting inventory; (2) the updated site characterization data inventory; (3) the updated conceptual geological model; and (4) the stakeholders engagement and outreach status.

15 GEOTHERMAL ENERGY↗

Comminty Geothermal: Planning and Design of a Heating and Cooling System in Framingham, Massachusetts

These reports, plans, and drawings review the achievements of Home Energy Efficiency Team (HEET) and its partners to plan and design a network of interconnected ground-source heat pump systems, or geothermal network, in an area encompassing multiple environmental justice (EJ) neighborhoods in the City of Framingham, MA. The materials provided in this dataset include, a) stakeholder and design best practices, b) study on optimal method to interconnect geothermal loops, c) guidelines for monitoring and metering, d) operations and maintenance plans, e) permitting guidelines and f) 10-day driller tutorial curriculum. These materials can guide the efficient and ethical design of future geothermal networks nationwide. The capacity of the system is estimated at 217 tons and is designed to provide 100% of heating and cooling needs for the buildings connected to the loop. In this project, 80 boreholes are used as the main thermal resources, the distribution system (or loop) consists of 0.61 miles of an 8-inch single-pipe at ambient temperature, with the capacity to connect 44 buildings, including 13 apartment buildings from the Framingham Housing Authority, one transitional home, one school building and 29 single family homes. While Framingham already has a geothermal network loop that is currently in the commissioning stage, our proposed project is unique because it is the first utility-led expansion loop (2nd loop) project that will connect to an adjacent existing geothermal loop (1st loop) in a pre-existing neighborhood. Both the 1st and 2nd loops are being installed, owned and operated by Eversource Energy, the utility Deployment Partner.

15 GEOTHERMAL ENERGY↗

Benchmarking Non-Hardware Balance-of-System (Soft) Costs for U.S. Photovoltaic Systems, Using a Bottom-Up Approach and Installer Survey – Second Edition

This report presents results from the second U.S. Department of Energy (DOE) sponsored, bottom-up data-collection and analysis of non-hardware balance-of-system costs -- often referred to as 'business process' or 'soft' costs -- for U.S. residential and commercial photovoltaic (PV) systems. In service to DOE's SunShot Initiative, annual expenditure and labor-hour-productivity data are analyzed to benchmark 2012 soft costs related to (1) customer acquisition and system design (2) permitting, inspection, and interconnection (PII). We also include an in-depth analysis of costs related to financing, overhead, and profit. Soft costs are both a major challenge and a major opportunity for reducing PV system prices and stimulating SunShot-level PV deployment in the United States. The data and analysis in this series of benchmarking reports are a step toward the more detailed understanding of PV soft costs required to track and accelerate these price reductions.

14 SOLAR ENERGY↗

Hydrogen Technologies Safety Guide

The purpose of this guide is to provide basic background information on hydrogen technologies. It is intended to provide project developers, code officials, and other interested parties the background information to be able to put hydrogen safety in context. For example, code officials reviewing permit applications for hydrogen projects will get an understanding of the industrial history of hydrogen, basic safety concerns, and safety requirements.

08 HYDROGEN↗

Texas Solar Collaboration Action Plan

The Texas Solar Collaboration Action Plan outlines activity to improve the solar permitting and interconnection processes for cities of San Antonio, Austin and Houston.

14 SOLAR ENERGY↗

Federal Air Pollutant Emission Regulations and Preliminary Estimates of Potential-to-Emit from Biorefineries. Pathway #1: Dilute-Acid and Enzymatic Deconstruction of Biomass-to-Sugars and Biological Conversion of Sugars-to-Hydrocarbons

Biorefineries are subject to environmental laws, including complex air quality regulations that aim to protect and improve the quality of the air. These regulations govern the amount of certain types of air pollutants that can be emitted from different types of emission sources. To determine which federal air emission regulations potentially apply to the sugars-to-hydrocarbon (HC) biorefinery, we first identified the types of regulated air pollutants emitted to the ambient environment by the biorefinery or from specific equipment. Once the regulated air pollutants are identified, we review the applicability criteria of each federal air regulation to determine whether the sugars-to-HC biorefinery or specific equipment is subject to it. We then estimate the potential-to-emit of pollutants likely to be emitted from the sugars-to-HC biorefinery to understand the air permitting requirements.

09 BIOMASS FUELS↗

Review Team Focused Modeling Analysis of Radial Collector Well Operation on the Hypersaline Groundwater Plume beneath the Turkey Point Site near Homestead, Florida

Researchers at Pacific Northwest National Laboratory served as members of a U.S. Nuclear Regulatory Commission review team for the Florida Power & Light Company’s application for two combined construction permits and operating licenses (combined licenses or COLs) for two proposed new reactor units—Turkey Point Units 6 and 7. The review team evaluated the environmental impacts of the proposed action based on the October 29, 2014 revision of the COL application, including the Environmental Report, responses to requests for additional information, and supplemental information. As part of this effort, team members tasked with assessing the environmental effects of proposed construction and operation of Units 6 and 7 at the Turkey Point site reviewed two separate modeling studies that analyzed the interaction between surface water and groundwater that would be altered by the operation of radial collector wells (RCWs) at the site. To further confirm their understanding of the groundwater hydrodynamics and to consider whether certain actions, proposed after the two earlier modeling studies were completed, would alter the earlier conclusions documented by the review team in their draft environmental impact statement (EIS; NRC 2015), a third modeling analysis was performed. The third modeling analysis is discussed in this report.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Small Scale Field Test Demonstrating CO 2 Sequestration In Arbuckle Saline Aquifer And By CO 2 -Eor At Wellington Field, Sumner County, Kansas

The objectives of this project are to understand the processes that occur when a maximum of 70,000 metric tonnes of CO 2 are injected into two different formations to evaluate the response in different lithofacies and depositional environments. The evaluation will be accomplished through the use of both in situ and indirect MVA (monitoring, verification, and accounting) technologies. The project will optimize for carbon storage accounting for 99% of the CO 2 using lab and field testing and comprehensive characterization and modeling techniques. Site characterization and CO 2 injection should demonstrate state-of-the-art MVA tools and techniques to monitor and visualize the injected CO 2 plume and to refine geomodels developed using nearly continuous core, exhaustive wireline logs, and well tests and a multi-component 3-D seismic survey. Reservoir simulation studies will map the injected CO 2 plume and estimate tonnage of CO 2 stored in solution, as residual gas, and by mineralization and integrate MVA results and reservoir models shall be used to evaluate CO 2 leakage. A rapid-response mitigation plan was developed to minimize CO 2 leakage and provide a comprehensive risk management strategy. The CO 2 was intended to be supplied from a reliable facility and have an adequate delivery and quality of CO 2 . However, several unforeseen circumstances complicated this plan: (1) the initially negotiated CO 2 supply facility went offline and contracts associated with CO 2 supply had to be renegotiated, (2) a UIC Class VI permit proved to be difficult to obtain due to the experimental nature of the project. Both subjects are detailed in separate deliverables attached to this report. The CO 2 enhanced oil recovery (EOR) and geologic storage in Mississippian carbonate reservoir was sucessully deployed. Approximately 20,000 metric tons of CO 2 was injected in the upper part of the Mississippian reservoir to verify CO 2 EOR viability in carbonate reservoirs and evaluate a potential of transitioning to geologic CO 2 storage through EOR. A total of 1,101 truckloads, 19,803 metric tons—an average of 120 tonnes per day—were delivered over the course of injection that lasted from January 9 to June 21, 2016. After cessation of CO 2 injection, the KGS 2-32 well was converted to water injector and continues to operate. CO 2 EOR progression in the field was monitored weekly with fluid level, temperature, and production recording and formation fluid composition sampling. It is important to note that normally, CO 2 EOR pilots are less efficient than commercial operations due to lack of directional and precise well control, lack of surface facilities for CO 2 recycling, and other factors. As a result of this pilot CO 2 injection, the observed incremental average oil production increase was ~68% with only ~18% of injected CO 2 produced back. Decline curve analysis forecasts of additional cumulative oil produced were 32.44M STB to the end of 2027. Wellington Mississippian pilot efficiency by the end of forecast calculations is 11 MCF per barrel of produced oil. Using 32M STB oil production and $1,964,063 cost of CO 2 , CO 2 EOR cost per barrel of oil production is ~$60. Simple but robust monitoring technologies proved to be very efficient in detecting and locating CO 2 . High CO 2 reservoir retentions with low yields within an actively producing field could help to estimate real-world risks of CO 2 geological storage for future projects. The Wellington Field CO 2 EOR was executed in a controlled environment with high efficiency. This case study proves that CO 2 EOR could be successfully applied in Kansas carbonate reservoirs if CO 2 sources and associated infrastructure are available. Recent developments in unconventional resources development in Mid-Continent USA and associated large volume disposal of backflow water and the resulting seismic activity have brought more focus and attention to the Arbuckle Group in southern Kansas. Despite the commercial interest, limited essential information about reservoir properties and structural elements has impeded the management and regulation of disposal, an issue brought to the forefront by recent seismicity in and near areas of large volumes and rates of brine disposal. The Kansas Geological Survey (KGS) collected, compiled, and analyzed available data, including well logs, core data, step rate tests, drill stem tests, 2-D and 3-D seismic data, water level measurements, and others types of data. Several exploratory wells were drilled and core was collected and modern suites of logs were analyzed. Reservoir properties were populated into several site-specific geological models. The geological models illustrate the highly heterogeneous nature of the Arbuckle Group. Vertical and horizontal variability results in several distinct hydro-stratigraphic units that are the result of both depositional and diagenetic processes. During the course of this project, it has been demonstrated that advanced seismic interpretation methods can be used successfully for characterization of the Mississippian reservoir and Arbuckle saline aquifer. Analysis of post-stack 3-D seismic data at the Mississippian reservoir showed the response of a gradational velocity transition. Pre-stack gather analysis showed that porosity zones of the Mississippian and Arbuckle reservoirs exhibit characteristic amplitude versus offset (AVO) response. Simultaneous AVO inversion estimated P- and S-impedances. The 3-D survey gather azimuthal anisotropy analysis (AVAZ) provided information about the fault and fracture network and showed good agreement to the regional stress field and well data. Mississippian reservoir porosity and fracture predictions agreed well with the observed mobility of injected CO 2 in KGS well 2-32. Fluid substitution modeling predicted acoustic impedance reduction in the Mississippian carbonate reservoir introduced by the presence of CO 2 . Seismicity in the United States midcontinent has increased by orders of magnitude over the past decade. Spatiotemporal correlations of seismicity to wastewater injection operations have suggested that injection-related pore fluid pressure increases are inducing the earthquakes. In this investigation, we examine earthquake occurrence in southern Kansas and northern Oklahoma and its relation to the change in pore pressure. The main source of data comes from the Wellington Array in the Wellington oil field, in Sumner County, Kansas, which has monitored for earthquakes in central Sumner County, Kansas, since early 2015. The seismometer array was established to monitor CO 2 injection operations at Wellington Field. Although no seismicity was detected in association with the spring 2016 Mississippian CO 2 injection, the array has recorded more than 2,500 earthquakes in the region and is providing valuable understanding to induced seismicity. A catalog of earthquakes was built from this data and was analyzed for spatial and temporal changes, stress information, and anisotropy information. The region of seismic concern has been shown to be expanding through use of the Wellington earthquake catalog, which has revealed a northward progression of earthquake activity reaching the metropolitan area of Wichita. The stress orientation was also calculated from this earthquake catalog through focal mechanism inversion. The calculated stress orientation was confirmed through comparison to other stress measurements from well data and previous earthquake studies in the region. With this knowledge of the stress orientation, the anisotropy in the basement could be understood. This allowed for the anisotropy measurements to be correlated to pore pressure increases. The increase in pore pressure was monitored through time-lapse shear-wave anisotropy analysis. Since the onset of the observation period in 2010, the orientation of the fast shear wave has rotated 90°, indicating a change associated with critical pore pressure build up. The time delay between fast and slow shear wave arrivals has increased, indicating a corresponding increase in anisotropy induced by pore pressure rise. In-situ near-basement fluid pressure measurements corroborate the continuous pore pressure increase revealed by the shear-wave anisotropy analysis over the earthquake monitoring period. This research is the first to identify a change in pore fluid pressure in the basement using seismological data and it was recently published in the AAAS journal Science Advances (Nolte et al., 2017). The shear-wave splitting analysis is a novel application of the technique, which can be used in other regions to identify an increase in pore pressure. This increasing pore fluid pressure has become more regionally extensive as earthquakes are occurring in southern Kansas, where they previously were absent. These monitoring techniques and analyses provide new insight into mitigating induced seismicity’s impact on society.

02 PETROLEUM↗

Advancing Fuel Cell Electric Vehicles in San Francisco and Beyond

Final report for the Advancing Fuel Cell Electric Vehicles in San Francisco and Beyond program (October 1, 2016-June 30, 2019). The program was developed to increase community awareness of the viability, safety and availability of hydrogen fuel and FCEVs; update and standardize best practices in permitting and inspection of hydrogen fueling infrastructure; and develop a group procurement program.

08 HYDROGEN↗

Performance of the A-01 Constructed Wetland over 20 Years

The A-01 wetland treatment system (WTS) was designed to remove metals from the effluent at the A-01 National Pollution Discharge Elimination System (NPDES) outfall at the Savannah River Site, Aiken, SC. The A-01 effluent flows from a retention basin to a splitter box, where it is distributed to four pairs of cells in series before discharge to a stream. Each treatment cell is a one-acre wetland that contains Schoenoplectus californicus (giant bulrush) and has a nominal 24-hour retention time. The purpose of this research was to investigate metal removal, distribution and retention in the A-01 WTS over a period of 20 years. During 20 years of operation, systematic water and sediment sampling validated the wetlands' performance. After passage through the treatment cells, Cu concentrations were well below permit limits (22 pg L -1 ) during all years of operation, often falling below 10 pg L -1 . Cu removal has been consistent over time, averaging about 80% despite large changes in influent Cu concentrations. Most divalent metals were rapidly removed from the water and held in the sediments shortly after the water entered the treatment wetlands. Average removal of Pb from water by the wetland system was 67 and 74%, respectively, in 2004, and 2020. Comparable values for Zn were 52 and 65%, respectively. Generally, the highest concentrations of Cu, Pb, and Zn were found in the sediment from the first cell in each pair of cells suggesting that most of the Cu, Pb, and Zn in the A-01 effluent was bound to the sediment quickly. Diffusive gradients in thin films (DGT) measurements of Cu and Zn in the sediments were much lower than bulk sediment concentrations. These results suggest that most of the Cu and Zn in the A-01 WTS sediments was not bioavailable, hence not toxic to aquatic organisms, as a likely consequence of adsorption to sediment particles and complexation with organic and inorganic substances.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2020. Final Report

The U.S. Department of Energy requires that all its site facilities develop an annual site environmental report to comply with DOE Order 231.1B, Chg 1, and DOE Order 458.1, Admin Chg 4. This report provides a synopsis of calendar year 2020 information related to environmental management performance and compliance efforts at Pacific Northwest National Laboratory. It summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and Orders, and provides environmental management performance benchmarks and their status to the public, regulatory agencies, community officials, Native American tribes, and public interest groups.

54 ENVIRONMENTAL SCIENCES↗

An Examination of the Hydropower Licensing and Federal Authorization Process

Site-permitting and regulation are necessary to ensure hydropower projects (both original and relicensed) comply with statutory requirements and address multiple stakeholder priorities that consider a range of factors, including water quality, species protection, cultural resource impacts, and recreation. However, the time involved in acquiring a license for an individual hydropower project can be highly variable by project, leading to increased project costs, financial risks, and uncertainties. In part, this variability is the result of a regulatory structure that has evolved over time to include multiple approvals and compliance requirements administered by the Federal Energy Regulatory Commission (FERC), U.S. Army Corp of Engineers (USACE), federal land management agencies, federal and state resource agencies, and Indian Tribes. Ultimately, the time, benefits, costs, and risks to developers associated with hydropower regulatory processes and/or the preparation (e.g., studies) required for regulatory agency review are not well documented or synthesized in the public domain, which may increase uncertainty and variability within the process. This report addresses these needs by presenting results of a comprehensive examination of hydropower licensing including quantitative and qualitative analyses of timelines, causal factors, and their combined effect on risk and costs to developers.

13 HYDRO ENERGY↗

GeoRePORT Protocol Volume IV: Socioeconomic Assessment Tool

The GeoRePORT Socioeconomic Assessment Tool provides guidance on how to complete the GeoRePORT Excel-based input spreadsheet. The GeoRePORT Socioeconomic Assessment Tool is designed to report land access, permitting, market, and transmission favorability for geothermal projects.

15 GEOTHERMAL ENERGY↗

GeoRePORT Protocol Volume V: International Socioeconomic Assessment Tool

The GeoRePORT International Socioeconomic Assessment Tool provides guidance on how to complete the GeoRePORT Excel-based input spreadsheet. The GeoRePORT Socioeconomic Assessment Tool is designed to report land access, permitting, market, and transmission favorability for geothermal projects.

15 GEOTHERMAL ENERGY↗

Solar Energy Zone Market Analysis for the San Luis Valley Region of Colorado

This report examines the commercial viability of solar energy zones (SEZs) in the San Luis Valley of Colorado ("the Valley") based on market conditions in 2022. The Bureau of Land Management (BLM) may designate a SEZ on federal land to expedite environmental review and permitting for solar energy projects. The purpose of this analysis is to understand whether current market conditions support the need for SEZs in the Valley.

14 SOLAR ENERGY↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2021 (Final Report)

The U.S. Department of Energy requires that all its site facilities develop an annual site environmental report to comply with DOE Order 231.1B Chg 1 and DOE Order 458.1 Admin Chg 4. This report provides a synopsis of calendar year 2021 information related to environmental management performance and compliance efforts at the Pacific Northwest National Laboratory. It summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and Orders, and provides environmental management performance benchmarks and their status to the public, regulatory agencies, community officials, Native American tribes, and public interest groups.

54 ENVIRONMENTAL SCIENCES↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

13 HYDRO ENERGY↗