Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “contractors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

2008 NASA Seal/Secondary Air System Workshop

The 2008 NASA Seal/Secondary Air System Workshop covered the following topics: (i) Overview of NASA s new Orion project aimed at developing a new spacecraft that will fare astronauts to the International Space Station, the Moon, Mars, and beyond; (ii) Overview of NASA s fundamental aeronautics technology project; (iii) Overview of NASA Glenn s seal project aimed at developing advanced seals for NASA s turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing seal leakage as well as high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Turbine seal development topics covered include a method for fast-acting HPT blade tip clearance control, noncontacting low-leakage seals, intershaft seals, and a review of engine seal performance requirements for current and future Army engine platforms.

Steinetz, Bruce M.↗

EVA 2010: Preparing for International Space Station EVA Operations Post-Space Shuttle Retirement

The expected retirement of the NASA Space Transportation System (also known as the Space Shuttle ) by 2011 will pose a significant challenge to Extra-Vehicular Activities (EVA) on-board the International Space Station (ISS). The EVA hardware currently used to assemble and maintain the ISS was designed assuming that it would be returned to Earth on the Space Shuttle for refurbishment, or if necessary for failure investigation. With the retirement of the Space Shuttle, a new concept of operations was developed to enable EVA hardware (Extra-vehicular Mobility Unit (EMU), Airlock Systems, EVA tools, and associated support hardware and consumables) to perform ISS EVAs until 2015, and possibly beyond to 2020. Shortly after the decision to retire the Space Shuttle was announced, the EVA 2010 Project was jointly initiated by NASA and the OneEVA contractor team. The challenges addressed were to extend the operating life and certification of EVA hardware, to secure the capability to launch EVA hardware safely on alternate launch vehicles, to protect for EMU hardware operability on-orbit, and to determine the source of high water purity to support recharge of PLSSs (no longer available via Shuttle). EVA 2010 Project includes the following tasks: the development of a launch fixture that would allow the EMU Portable Life Support System (PLSS) to be launched on-board alternate vehicles; extension of the EMU hardware maintenance interval from 3 years (current certification) to a minimum of 6 years (to extend to 2015); testing of recycled ISS Water Processor Assembly (WPA) water for use in the EMU cooling system in lieu of water resupplied by International Partner (IP) vehicles; development of techniques to remove & replace critical components in the PLSS on-orbit (not routine); extension of on-orbit certification of EVA tools; and development of an EVA hardware logistical plan to support the ISS without the Space Shuttle. Assumptions for the EVA 2010 Project included no more than 8 EVAs per year for ISS EVA operations in the Post-Shuttle environment and limited availability of cargo upmass on IP launch vehicles. From 2010 forward, EVA operations on-board the ISS without the Space Shuttle will be a paradigm shift in safely operating EVA hardware on orbit and the EVA 2010 effort was initiated to accommodate this significant change in EVA evolutionary history.

Chullen, Cinda↗

Validating Human Performance Models of the Future Orion Crew Exploration Vehicle

NASA's Orion Crew Exploration Vehicle (CEV) will provide transportation for crew and cargo to and from destinations in support of the Constellation Architecture Design Reference Missions. Discrete Event Simulation (DES) is one of the design methods NASA employs for crew performance of the CEV. During the early development of the CEV, NASA and its prime Orion contractor Lockheed Martin (LM) strived to seek an effective low-cost method for developing and validating human performance DES models. This paper focuses on the method developed while creating a DES model for the CEV Rendezvous, Proximity Operations, and Docking (RPOD) task to the International Space Station. Our approach to validation was to attack the problem from several fronts. First, we began the development of the model early in the CEV design stage. Second, we adhered strictly to M&S development standards. Third, we involved the stakeholders, NASA astronauts, subject matter experts, and NASA's modeling and simulation development community throughout. Fourth, we applied standard and easy-to-conduct methods to ensure the model's accuracy. Lastly, we reviewed the data from an earlier human-in-the-loop RPOD simulation that had different objectives, which provided us an additional means to estimate the model's confidence level. The results revealed that a majority of the DES model was a reasonable representation of the current CEV design.

Wong, Douglas T.↗

4D Dynamic RNP Annual Interim Report-Year 1

This Annual Interim Report summarizes the activities led by Raytheon, in collaboration with GE Aviation and SAIC, and presents the results obtained during the first year of this research effort to expand the RNP concept to 4 dimensions relative to a dynamic frame of reference. Joint Program Development Office (JPDO)Concepts of Operations for the Next Generation Air Transportation System (NextGen) considers 4 Dimension Trajectory (4DT) procedures a key enabler to Trajectory Based Operations (TBO). The JPDO defines 4DT as a precise description of an aircraft path in space and time . While NextGen assumes that this path is defined within an Earth-reference frame, many 4DT procedure implementations will require an aircraft to precisely navigate relative to a moving reference such as another aircraft to form aggregate flows or a weather cell to allow for flows to shift. Current methods of implementing routes and flight paths rely on aircraft meeting a Required Navigation Performance (RNP) specification and being equipped with a monitoring and alerting capability to annunciate when the aircraft system is unable to meet the performance specification required for the operation. Since all aircraft today operate within the NAS relative to fixed reference points, the current RNP definition is deemed satisfactory. However, it is not well understood how the current RNP construct will support NextGen 4DT procedures where aircraft operate relative to each other or to other dynamic frames of reference. The objective of this research effort is to analyze candidate 4DT procedures from both an Air Navigation Service Provider (ANSP) and aircraft perspective, to identify their specific navigational requirements, assess the shortcomings of the current RNP construct to meet these requirements, to propose an extended 4 Dimensional Dynamic RNP (4D Dynamic RNP) construct that accounts for the dynamic spatial and temporal nature of the selected 4DT procedures, and finally, to design an experiment using the Airspace and Traffic Operations Simulation (ATOS) system to validate the 4D Dynamic RNP construct. This Annual Interim Report summarizes the activities led by Raytheon, in collaboration with GE Aviation and SAIC, and presents the results obtained during the first year of this research effort to expand the RNP concept to 4 dimensions relative to a dynamic frame of reference. A comprehensive assessment of the state-of-the-art international implementation of current RNP was completed and presented in the Contractor Report RNP State-of-the-Art Assessment, Version 4, 17 December 2008 . The team defined in detail two 4DT operations, Airborne Precision Spacing and Self-Separation, that are ideally suited to be supported by 4D Dynamic RNP and developed their respective conceptual frameworks, Required Interval Management Performance (RIMP) Version 1.1, 13 April 2009 and Required Self Separation Performance (RSSP) Version 1.1, 13 April 2009 . Finally, the team started the development of a mathematical model and simulation tool for RIMP and RSSP scheduled to be delivered during the second year of this research effort.

Finkelsztein, Daniel M.↗

Ares I-X Roll Control System Development

Project Managers often face challenging technical, schedule and budget issues. This presentation will explore how the Ares I-X Roll Control System Integrated Product Team (IPT) mitigated challenges such as concurrent engineering requirements and environments and evolving program processes, while successfully managing an aggressive project schedule and tight budget. IPT challenges also included communications and negotiations among inter- and intra-government agencies, including the US Air Force, NASA/MSFC Propulsion Engineering, LaRC, GRC, KSC, WSTF, and the Constellation Program. In order to successfully meet these challenges it was essential that the IPT define those items that most affected the schedule critical path, define early mitigation strategies to reduce technical, schedule, and budget risks, and maintain the end-product focus of an "unmanned test flight" context for the flight hardware. The makeup of the IPT and how it would function were also important considerations. The IPT consisted of NASA/MSFC (project management, engineering, and safety/quality) and contractors (Teledyne Brown Engineering and Pratt and Whitney Rocketdyne, who supplied heritage hardware experience). The early decision to have a small focused IPT working "badgelessly" across functional lines to eliminate functional stove-piping allowed for many more tasks to be done by fewer people. It also enhanced a sense of ownership of the products, while still being able to revert back to traditional roles in order to provide the required technical independence in design reviews and verification closures. This presentation will highlight several prominent issues and discuss how they were mitigated and the resulting Lessons Learned that might benefit other projects.

Unger, Ronald J.↗

Improving Life-Cycle Cost Management of Spacecraft Missions

This presentation will explore the results of a recent NASA Life-Cycle Cost study and how project managers can use the findings and recommendations to improve planning and coordination early in the formulation cycle and avoid common pitfalls resulting in cost overruns. The typical NASA space science mission will exceed both the initial estimated and the confirmed life-cycle costs by the end of the mission. In a fixed-budget environment, these overruns translate to delays in starting or launching future missions, or in the worst case can lead to cancelled missions. Some of these overruns are due to issues outside the control of the project; others are due to the unpredictable problems (unknown unknowns) that can affect any development project. However, a recent study of life-cycle cost growth by the Discovery and New Frontiers Program Office identified a number of areas that are within the scope of project management to address. The study also found that the majority of the underlying causes for cost overruns are embedded in the project approach during the formulation and early design phases, but the actual impacts typically are not experienced until late in the project life cycle. Thus, project management focus in key areas such as integrated schedule development, management structure and contractor communications processes, heritage and technology assumptions, and operations planning, can be used to validate initial cost assumptions and set in place management processes to avoid the common pitfalls resulting in cost overruns.

Clardy, Dennon↗

Risk Mitigation Approach to Commercial Resupply to the International Space Station

In August 2006, NASA awarded Space Act Agreements (SAAs) for Commercial Orbital Transportation Services (COTS) under the Commercial Crew and Cargo Project Office at Johnson Space Center. One of the goals of the SAAs is to facilitate U.S. private industry demonstration of cargo transportation capabilities, ultimately achieving reliable, cost effective access to low-Earth orbit (LEO). Each COTS provider is required to complete International Space Stations (ISS) Integration activities, which includes meeting the physical and functional interfaces and interface requirements between the ISS and COTS vehicles. These requirements focus on the areas of risk to the ISS during rendezvous and proximity operations, as well as the integration operations while the COTS vehicle is berthed to the ISS. On December 23, 2008, NASA awarded Commercial Resupply Service (CRS) contracts to provide resupply services to the ISS, following the Shuttle retirement. In addition to performing any ISS Integration activities, NASA will be performing independent assessments of the launch vehicle and orbital vehicle to evaluate the readiness of the contractor to deliver NASA cargo safely to the ISS. This paper will address the activities NASA Centers, both JSC and KSC, in the oversight and insight function over commercial visiting vehicles to the ISS.

Koons, Diane S.↗

A Comparison of the Capability of Sensitivity Level 3 and Sensitivity Level 4 Fluorescent Penetrants to Detect Fatigue Cracks in Aluminum

Historically both sensitivity level 3 and sensitivity level 4 fluorescent penetrants have been used to perform NASA Standard Level inspections of aerospace hardware. In April 2008, NASA-STD-5009 established a requirement that only sensitivity level 4 penetrants were acceptable for inspections of NASA hardware. Having NASA contractors change existing processes or perform demonstration tests to certify sensitivity level 3 penetrants posed a potentially huge cost to the Agency. This study was conducted to directly compare the probability of detection sensitivity level 3 and level 4 penetrants using both Method A and Method D inspection processes. The study results strongly support the conclusion that sensitivity level 3 penetrants are acceptable for NASA Standard Level inspections

Parker, Bradford, H.↗

NASA's Participation in Joint SatOPS Compatibility Efforts 2009-2010

Many U.S. government organizations build or fly space systems: a) NASA, NOAA, Navy, Air Force, NRO, ORS. Others? b) Through the Joint SatOps Compatibility Committee (JSCC) we have increased the grass-roots interaction between many of these organizations. c) We all deal with many of the same challenges: More rapid deployments, lower budgets; Advancing technologies - frameworks, clouds, virtualization; Evolving concepts - automation, situational awareness, enterprise mngt. Standardization - formal or by common use. There is an inherently governmental role in creating the business case for contractors and commercial product vendors to move in directions beneficial to multiple government space organizations.

Smith, Danford↗

Testing for the J-2X Upper Stage Engine

NASA selected the J-2X Upper Stage Engine in 2006 to power the upper stages of the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Based on the proven Saturn J-2 engine, this new engine will provide 294,000 pounds of thrust and a specific impulse of 448 seconds, making it the most efficient gas generator cycle engine in history. The engine's guiding philosophy emerged from the Exploration Systems Architecture Study (ESAS) in 2005. Goals established then called for vehicles and components based, where feasible, on proven hardware from the Space Shuttle, commercial, and other programs, to perform the mission and provide an order of magnitude greater safety. Since that time, the team has made unprecedented progress. Ahead of the other elements of the Constellation Program architecture, the team has progressed through System Requirements Review (SRR), System Design Review (SDR), Preliminary Design Review (PDR), and Critical Design Review (CDR). As of February 2010, more than 100,000 development engine parts have been ordered and more than 18,000 delivered. Approximately 1,300 of more than 1,600 engine drawings were released for manufacturing. A major factor in the J-2X development approach to this point is testing operations of heritage J-2 engine hardware and new J-2X components to understand heritage performance, validate computer modeling of development components, mitigate risk early in development, and inform design trades. This testing has been performed both by NASA and its J-2X prime contractor, Pratt & Whitney Rocketdyne (PWR). This body of work increases the likelihood of success as the team prepares for testing the J-2X powerpack and first development engine in calendar 2011. This paper will provide highlights of J-2X testing operations, engine test facilities, development hardware, and plans.

Buzzell, James C.↗

Paths to the LISA Laser

The LISA mission requires a highly stable, low noise laser with 1 W output that will operate for the 5 year mission lifetime. The best way to achieve this is with a master oscillator power amplifier design, which allows the noise and lifetime requirements to be addressed to a large extent independently. We are working with two aerospace contractors who are performing reliability studies on oscillator designs that our laboratory at Goddard is evaluating. I will describe the oscillator designs we are considering and the reliability studies now underway.

Camp, Jordan B.↗

Altitude Testing of Large Liquid Propellant Engines

The National Aeronautics and Space Administration entered a new age on January 14, 2004 with President Bush s announcement of the creation the Vision for Space Exploration that will take mankind back to the Moon and on beyond to Mars. In January, 2006, after two years of hard, dedicated labor, engineers within NASA and its contractor workforce decided that the J2X rocket, based on the heritage of the Apollo J2 engine, would be the new engine for the NASA Constellation Ares upper stage vehicle. This engine and vehicle combination would provide assured access to the International Space Station to replace that role played by the Space Shuttle and additionally, would serve as the Earth Departure Stage, to push the Crew Excursion Vehicle out of Earth Orbit and head it on a path for rendezvous with the Moon. Test as you fly, fly as you test was chosen to be the guiding philosophy and a pre-requisite for the engine design, development, test and evaluation program. An exhaustive survey of national test facility assets proved the required capability to test the J2X engine at high altitude for long durations did not exist so therefore, a high altitude/near space environment testing capability would have to be developed. After several agency concepts the A3 High Altitude Testing Facility proposal was selected by the J2X engine program on March 2, 2007 and later confirmed by a broad panel of NASA senior leadership in May 2007. This facility is to be built at NASA s John C. Stennis Space Center located near Gulfport, Mississippi. 30 plus years of Space Shuttle Main Engine development and flight certification testing makes Stennis uniquely suited to support the Vision For Space Exploration Return to the Moon. Propellant handling infrastructure, engine assembly facilities, a trained and dedicated workforce and a broad and varied technical support base will all ensure that the A3 facility will be built on time to support the schedule needs of the J2X engine and the ultimate flight of the first Ares I vehicle. The A3 facility will be able to simulate pre-ignition altitude from sea-level to 100,000 feet and maintain it up to 650 seconds. Additionally the facility will be able to accommodate initial ignition, shutdown and then restart test profiles. A3 will produce up to 5000 lbm/sec of superheated steam utilizing a Chemical Steam generation system. Two separate inline steam ejectors will be used to produce a test cell vacuum to simulate the 100,000 ft required altitude. Operational capability will ensure that the facility can start up and shutdown without producing adverse pressure gradients across the J2X nozzle. The facility will have a modern thrust measurement system for accurate determination of engine performance. The latest advances in data acquisition and control will be incorporated to measure performance parameters during hotfire testing. Provisions are being made in the initial design of the new altitude facility to allow for testing of other, larger engines and potential upper stage launch vehicles that might require vacuum start testing of the engines. The new facility at Stennis Space Center will be complete and ready for hotfire operations in late 2010.

Maynard, Bryon T.↗

Ares V: Progress Toward Unprecedented Heavy Lift

Ares V represents the vehicle that will again make possible human exploration beyond low Earth orbit. The Ares V is part of NASA s Constellation Program architecture developed to support the International Space Station (ISS), establish a permanent human presence on the Moon, and explore it to an extent far greater than was possible with the Apollo Program. Ares V will carry the lunar lander to orbit where it will join the Orion crew spacecraft, launched by the smaller Ares I launch vehicle. Then the Ares V upper stage will send the Orion and lander to the Moon. Ares V is also intended to launch automated cargo landers to the Moon. The Ares vehicles are designed to employ the proven technologies and experience from the Space Shuttle, Delta IV, and earlier U.S. programs, as well as sharing common components where feasible. The Ares V is in an early stage of concept development. However, commonality allows it to benefit from development work already under way on the Ares I, including the first stage booster, and upper stage, J-2X upper stage engine. This paper will discuss progress to date on the Ares V and its potential for freeing payload designers from current mass and volume constraints. Progress includes development progress on Ares I elements that will be shared by the two launch vehicles. The Ares I first stage recently completed a successful test firing of Development Motor 1 (DM-1). The J-2X engine is proceeding with manufacturing of components for the first development engines that will be used for testing. Several component-level tests have been completed or are under way that will help verify designs and confirm solutions to design challenges. The Ares V Earth departure stage will benefit from the Ares I upper stage development, including design, manufacturing, and materials testing. NASA is also working with government and industry to collect data on flights and testing of the operational RS-68 engine and potential upgrades. The Ares V team continues to evaluate technical options, vehicle configurations, and operations concepts for the Ares V. The team recently completed a Fall Face-to-Face meeting that served as a stepping-stone to the Systems Requirements Review (SRR). This four-day meeting served as an information exchange for the various teams at several NASA field centers and supporting contractors.

Sumrall, Phil↗

Testing to Transition the J-2X from Paper to Hardware

The J-2X Upper Stage Engine (USE) will be the first new human-rated upper stage engine since the Apollo program of the 1960s. It is designed to carry the Ares I and Ares V into orbit and send the Ares V to the Moon as part of NASA's Constellation Program. This paper will provide an overview of progress on the design, testing, and manufacturing of this new engine in 2009 and 2010. The J-2X embodies the program goals of basing the design on proven technology and experience and seeking commonality between the Ares vehicles as a way to minimize risk, shorten development times, and live within current budget constraints. It is based on the proven J-2 engine used on the Saturn IB and Saturn V launch vehicles. The prime contractor for the J-2X is Pratt & Whitney Rocketdyne (PWR), which is under a design, development, test, and engineering (DDT&E) contract covering the period from June 2006 through September 2014. For Ares I, the J-2X will provide engine start at approximately 190,000 feet, operate roughly 500 seconds, and shut down. For Ares V, the J-2X will start at roughly 190,000 feet to place the Earth departure stage (EDS) in orbit, shut down and loiter for up to five days, re-start on command and operate for roughly 300 seconds at its secondary power level to perform trans lunar injection (TLI), followed by final engine shutdown. The J-2X development effort focuses on four key areas: early risk mitigation, design risk mitigation, component and subassembly testing, and engine system testing. Following that plan, the J-2X successfully completed its critical design review (CDR) in 2008, and it has made significant progress in 2009 and 2010 in moving from the drawing board to the machine shop and test stand. Post-CDR manufacturing is well under way, including PWR in-house and vendor hardware. In addition, a wide range of component and sub-component tests have been completed, and more component tests are planned. Testing includes heritage powerpack, turbopump inducer water flow, turbine air flow, turbopump seal testing, main injector and gas generator, injector testing, augmented spark igniter testing, nozzle side loads cold flow testing, nozzle extension film cooling flow testing, control system testing with hardware in the loop, and nozzle extension emissivity coating tests. In parallel with hardware manufacturing, work is progressing on the new A-3 test stand to support full duration altitude testing. The Stennis A-2 test stand is scheduled to be turned over to the Constellation Program in September 2010 to be modified for J-2X testing also. As the structural steel was rising on the A-3 stand, work was under way in the nearby E complex on the chemical steam generator and subscale diffuser concepts to be used to evacuate the A-3 test cell and simulate altitude conditions.

Byrd, Tom↗

Post-Shuttle EVA Operations on ISS

The expected retirement of the NASA Space Transportation System (also known as the Space Shuttle ) by 2011 will pose a significant challenge to Extra-Vehicular Activities (EVA) on-board the International Space Station (ISS). The EVA hardware currently used to assemble and maintain the ISS was designed assuming that it would be returned to Earth on the Space Shuttle for refurbishment, or if necessary for failure investigation. With the retirement of the Space Shuttle, a new concept of operations was developed to enable EVA hardware (Extra-vehicular Mobility Unit (EMU), Airlock Systems, EVA tools, and associated support hardware and consumables) to perform ISS EVAs until 2015, and possibly beyond to 2020. Shortly after the decision to retire the Space Shuttle was announced, the EVA 2010 Project was jointly initiated by NASA and the One EVA contractor team. The challenges addressed were to extend the operating life and certification of EVA hardware, to secure the capability to launch EVA hardware safely on alternate launch vehicles, to protect for EMU hardware operability on-orbit, and to determine the source of high water purity to support recharge of PLSSs (no longer available via Shuttle). EVA 2010 Project includes the following tasks: the development of a launch fixture that would allow the EMU Portable Life Support System (PLSS) to be launched on-board alternate vehicles; extension of the EMU hardware maintenance interval from 3 years (current certification) to a minimum of 6 years (to extend to 2015); testing of recycled ISS Water Processor Assembly (WPA) water for use in the EMU cooling system in lieu of water resupplied by International Partner (IP) vehicles; development of techniques to remove & replace critical components in the PLSS on-orbit (not routine); extension of on-orbit certification of EVA tools; and development of an EVA hardware logistical plan to support the ISS without the Space Shuttle. Assumptions for the EVA 2010 Project included no more than 8 EVAs per year for ISS EVA operations in the Post-Shuttle environment and limited availability of cargo upmass on IP launch vehicles. From 2010 forward, EVA operations on-board the ISS without the Space Shuttle will be a paradigm shift in safely operating EVA hardware on orbit and the EVA 2010 effort was initiated to accommodate this significant change in EVA evolutionary history. 1

West, William↗

NASA Subsonic Rotary Wing Project

This slide presentation will outline the rationale for, and the initial results of, a contractor study being performed by a SAIC-led team of Bell Helicopter Textron, Sensis, and Optimal Synthesis. Together, this team represents an extensive body of subject matter expertise as related to rotorcraft technologies and design, airspace demand modeling simulation, and terminal area operations and flight path planning. The initial conceptual design results of a fleet of civil tiltrotor aircraft ranging in size from 10 to 120 passengers is a key highlight of the work to be presented. The intent of this presentation is to begin to provide the general community of rotorcraft researchers, manufacturers, and end-users an appreciation of the criticality of interjecting rotorcraft-specific technology and concepts of operation issues into Next Gen airspace requirements

Young, Larry A.↗

Using Facility Condition Assessments to Identify Actions Related to Infrastructure

To support cost effective, quality research it is essential that laboratory and testing facilities are maintained in a continuous and reliable state of availability at all times. NASA Langley Research Center (LaRC) and its maintenance contractor, Jacobs Technology, Inc. Research Operations, Maintenance, and Engineering (ROME) group, are in the process of implementing a combined Facility Condition Assessment (FCA) and Reliability Centered Maintenance (RCM) program to improve asset management and overall reliability of testing equipment in facilities such as wind tunnels. Specific areas are being identified for improvement, the deferred maintenance cost is being estimated, and priority is being assigned against facilities where conditions have been allowed to deteriorate. This assessment serves to assist in determining where to commit available funds on the Center. RCM methodologies are being reviewed and enhanced to assure that appropriate preventive, predictive, and facilities/equipment acceptance techniques are incorporated to prolong lifecycle availability and assure reliability at minimum cost. The results from the program have been favorable, better enabling LaRC to manage assets prudently.

Rubert, Kennedy F.↗

Rocketdyne - SE-7 and SE-8 Engines

The 70-pound SE-7 engine is very similar with its two valves, ablative material, a silicon carbide liner, a silicon carbide throat, and overall configuration. There were different wraps. One had a ninety-degree ablative material orientation. That is important because it caused problems with the SE-8, but not for this application. It was not overly stressed. It was a validation of the off-the-shelf application approach. There were two SE-7 engines located on the stage near the bottom. They had their own propellant tanks. That was the application. All it did was give a little bit of gravity by firing to push the propellants to the bottom of the tanks for start or restart. It was not a particularly complicated setup. (See Slides 6 and 7, Appendix F) What had we learned? This was a proven engine in a space environment. There weren't any development issues. Off-the-shelf seemed to work. There were no operational issues, which made the SE-7 very cost-effective. Besides NASA, the customer for this application was the Douglas Aircraft Company. Douglas decided the off-the-shelf idea was cost-effective. With the Gemini Program, the company was McDonnell Aircraft Corporation, which was part of the reason the off-the-shelf idea was applied to the Apollo. (See Slide 8, Appendix F) However, here are some differences between Apollo and Gemini vehicles. For one thing, the Apollo vehicle was really moving at high speed when it re-entered the atmosphere. Instead of a mere 17,000 miles per hour, it was going 24,000 miles per hour. That meant the heat load was four times as high on the Apollo vehicle as on the Gemini craft. Things were vibrating a little more. We had two redundant systems. Apollo was redundant where it could be as much as possible. That was really a keystone or maybe an anchor point for Apollo. We decided to pursue the off-the-shelf approach. However, the prime contractor was a different entity - the North American Space Division. They thought they ought to tune up this off-the-shelf setup. It was a similar off-the-shelf application, but at a higher speed. They wanted to improve it. What they wanted to improve was the material performance of silicon carbide. They were uncomfortable with the cracks they were seeing. They were uncomfortable with the cracks in the throat, and feeling that the environment was a little tougher, that maybe it was going to rattle, perhaps something would fall out, and they would have a problem. They wanted to eliminate the ceramic liner, and they wanted a different throat material. (See Slides 9 and 10, Appendix F) The Rocketdyne solutions were to replace silicon carbide material with a more forgiving ceramic material. Also, due to the multiple locations within the vehicle, the shape of the nozzles varied. Some nozzles were long, and some nozzles were short. We came up with a single engine design with variable nozzle extensions and configurations to fit particular vehicle locations. (See Slides 10 and 11, Appendix F)

Harmon, Tim↗