Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “closed loop”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

Probabilistic feedback.

Fokker-Planck equation for probability density of dynamical system under random input and probabilistic feedback applied to closed loop control systems analysis

Foy, W. H., Jr.↗

Corrosion reduction of aluminum alloys in flowing high-temperature water

Report describes a technique for reducing the corrosion rate of aluminum by adding colloidal substances in a closed-loop system. Experimental work shows that the addition of graphite and colloidal hydrated aluminum oxide significantly reduces the corrosion rate in flowing high-temperature water.

Draley, J. E.↗

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 1

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory↗

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 2

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory↗

Approach guidance planet tracker.

Working breadboard model of planet tracker under various illuminating conditions, discussing hardware and closed loop tracking error analysis accounting for signal to noise effects

Cohen, M. K.↗

Sensitivity aspects of linear digital control systems.

Linear computer-controlled closed loop systems sensitivity analysis, deriving estimation error incremental covariance to demonstrate quality deterioration under perturbed initial conditions, parameters, etc

Christie, L. A.↗