Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technology Demonstration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

Bigelow Expandable Activity Module (BEAM) ISS Year - Two

Bigelow Expandable Activity Module's (BEAM) life has been extended and in addition to being a test bed of the first human-rated expandable space module, BEAM will be utilized as an ISS (International Space Station) stowage module. Hear about BEAM's on-orbit performance as well as highlights of BEAM's use on ISS as a technology demonstration.

BEAM↗

Three Years of Atmospheric Characterization at Ka/Q-band with the NASA/POLIMI Alphasat Receiver in Milan, Italy

Since June of 2014, NASA Glenn Research Center (GRC) and the Politecnico di Milano (POLIMI) have jointly conducted a propagation campaign within the framework of the Alphasat propagation experiment through a propagation terminal at the POLIMI campus in Milan, Italy. The terminal utilizes the 20 GHz and 40 GHz beacons broadcast by the Aldo Paraboni Technology Demonstration Payload (TDP #5), and consists of dual coherent Ka- and Q-band beacon receivers. These provide a direct measurement of the signal attenuation and scintillation and are complemented by concurrent weather instrumentation that provides measurements of the atmospheric conditions at the receiver. The primary goal of these measurements is to improve model predictions of communication system performance at 40 GHz. Over three years of concurrent measurements have now been collected from the terminal, and herein we present a statistical analysis of the results thus far, as well as a summary of recent hardware upgrades to the receivers that were made in September 2017.

Radio Transmission↗

Evolution of Electronic Approval Request Procedures at Charlotte Douglas International Airport

At many major U.S. airports, a departure approval request, or 'APREQ,' establishes a later runway departure time for a flight, allowing it to absorb tactical delay on the ground. APREQ times are traditionally coordinated by a process known as 'call-for-release' whereby an airport surface traffic manager calls an airspace traffic manager on the telephone. This research examines new electronic APREQ coordination enabled by the NASA Airspace Technology Demonstration-2 system and compares it to the call-for-release method of coordination. During the initial deployment period, electronic APREQ coordination was used for more than half of eligible flights. A majority of electronic requests were approved in less than one minute on average. Data suggest that both the average tactical delay and compliance with the electronically coordinated departure times did not differ significantly from departure times coordinated using call-for-release.

APREQ↗

NASA Additive Manufacturing Initiatives for Deep Space Human Exploration

Additive Manufacturing (AM) is being infused into aerospace industries at an accelerated pace. Reasons for this rapid adoption include: (1) Innovation Capability e.g. design features such as topology optimization, integrated fluid passages, and mesh structures; (2) Rapid Development and Optimization - ability to quickly iterate the design, development, and test cycle; (3) Affordability - reductions in part counts, cost, and schedule. NASA's Marshall Space Flight Center (MSFC) has taken a leadership role in application of AM technologies for deep space human exploration, leading the Agency's In Space Manufacturing (ISM) initiative and the application of AM for a broad variety of space propulsion systems. MSFC has championed the development of ISM capabilities since our first reduced-gravity aircraft experiment flew in 1999. Partnering with Made In Space, MSFC placed the first 3D Printer on ISS in 2014 and the second generation printer, the Additive Manufacturing Facility, in 2016. The next ISS technology demonstration will be the Refabricator, a recycler/basic printer scheduled to launch in late Fall 2018. Ground-based development is progressing in common use materials, metals 3D printing, printed electronics, and the new cornerstone of ISM, the FabLab. The latest developments in each area will be described. An overview of NASA's In Space Robotic Manufacturing and Assembly (IRMA) ground-based risk reduction projects will also be presented. MSFC has aggressively incorporated AM capabilities for design and development of space propulsion components. The capabilities have been rapidly matured and extensively exercised to produce and hot-fire test the Additive Manufacturing Demonstrator Engine, an in-space class prototype engine. This experience base has been extended to support Aerojet Rocketdyne in the application of AM to the RS-25, the Space Launch System Core Stage engine, and to small propulsion systems and thrusters for small satellites and cubesats. The latest developments will be described. In responding to a request from NASA's Commercial Crew Program for a consistent methodology for evaluation of AM processes and parts, MSFC began development of a draft standard for AM space flight hardware in late 2014. The draft was broadly disseminated for comments in mid-2015, and subsequently revised into two documents, a standard and a specification for AM space flight hardware, which were formally released by MSFC in October 2017. An overview of the key elements of these documents will be presented.

Clinton, Raymond↗

In-situ Diagnostic for Assessing Hall Thruster Wear

The design of a new diagnostic to measure the net erosion of Hall thruster surfaces is presented. This diagnostic consists of a pair of optical noncontact profilometer pens mounted to a set of motion stages, which can interrogate the surface features of multiple components of interest including the hollow cathode assembly, magnet front pole covers, and discharge channel. By comparing scans of these surfaces to reference features, estimates of the component erosion rates can be acquired throughout long-duration lifetime tests without venting and removing the thruster from the vacuum facility for external profilometry. This work presents a detailed overview of the diagnostic design including the precision positioning system. In addition, preliminary data are shown which verify diagnostic operation and establish a baseline that will be used to track the erosion of the Hall Effect Rocket with Magnetic Shielding (HERMeS) Technology Demonstration Unit 3 (TDU-3) during an ongoing long-duration wear test.

Ahern, Drew M.↗

On-Time Performance ASPM Non-Parametric Statistical Analysis

The purpose of this analysis is to provide a data-driven examination of two selected flight metrics, i.e., (1) total taxi-out time and (2) actual off time minus scheduled off block time. More specifically, Aviation System Performance Metrics (ASPM) data were analyzed to determine any possible differences in CLT (Charlotte Douglas International Airport) departure flights on these two metrics when comparing pre-IADS (Integrated Arrival, Departure, and Surface Operations) against post-IADS metering operations. This was originally presented to the ATD-2 (Airspace Technology Demonstration-2) Analytics team in August 2018.

tech transfer↗

In-Situ Diagnostic for Assessing Hall Thruster Wear

The design of a new diagnostic to measure the net erosion of Hall thruster surfaces is presented. This diagnostic consists of a pair of optical non-contact profilometer pens mounted to a set of motion stages, which can interrogate the surface features of multiple components of interest including the hollow cathode assembly, magnet front pole covers, and discharge channel. By comparing scans of these surfaces to reference features, estimates of the component erosion rates can be acquired throughout long-duration lifetime tests without venting and removing the thruster from the vacuum facility for external profilometry. This work presents a detailed overview of the diagnostic design including the precision positioning system. In addition, preliminary data are shown which verify diagnostic operation and establish a baseline that will be used to track the erosion of the Hall Effect Rocket with Magnetic Shielding (HERMeS) Technology Demonstration Unit 3 (TDU-3) during an ongoing long-duration wear test.

Ahern, Drew M.↗

Evolution of Electronic Approval Request Procedures at Charlotte Douglas International Airport

A departure approval request, or APREQ, establishes a later runway departure time for a flight, allowing it to absorb tactical delay on the ground. APREQ times are traditionally coordinated by a process known as "call-for-release" whereby an airport surface traffic manager calls an airspace traffic manager on the telephone. This research examines new electronic APREQ coordination enabled by the NASA Airspace Technology Demonstration-2 system and compares it to the traditional call-for-release method of coordination. During the initial deployment period, electronic APREQ coordination was used for more than half of eligible flights. A majority of electronic requests were approved in less than one minute on average. Both the average tactical delay and compliance with the electronically coordinated departure times did not differ significantly from departure times coordinated using call-for-release.

APREQ↗

Ramp Traffic Console (RTC) Ramp Manager Traffic Console (RMTC) User Manual

This document serves as a user manual for the Ramp Traffic Console (RTC) in the Ramp Control Tower. It describes the elements of the RTC interface and provides explanations for how to utilize the RTC to manage ramp traffic. The RTC provides live data for all flights including Earliest Off-Block Times (EOBT) and Traffic Management Initiatives (TMI). The RTC augments management of ramp traffic by providing notifications of runway configurations, and lists flight arrivals, near arrivals and departures as additional sources of information. If applicable, this document also provides instructions for use of the Ramp Manager Traffic Console (RMTC) for ramp manager functions of adjusting the priority flight list, and setting ramp status. The RTC/RMTC ramp tool are components of Airspace Technology Demonstration-2.

ATD-2 RMTC↗

NASA's Space Launch System and Deep-Space Opportunities for SmallSats

Designed to provide the significant capability required for human deep-space exploration, NASA's Space Launch System (SLS) also provides a unique opportunity for lower-cost deepspace science in the form of small-satellite secondary payloads. This opportunity will be leveraged beginning with the rocket's first flight; a launch of the SLS's Block 1 configuration, capable of delivering >26 metric tons (t) to Trans-Lunar Injection (TLI), which will see the Orion crew vehicle travel around the Moon and return to Earth. On that flight, SLS will also deploy 13 6U CubeSat-class payloads to multiple destinations including deep space. These secondary payloads will include not only NASA research, but also spacecraft from international partners, industry and academia. The payloads represent a variety of disciplines including, but not limited to, studies of the Moon, Earth, Sun, and asteroids, along with technology demonstrations that could pave the way for even more ambitious smallsat missions in the future. As the SLS Program is making significant progress toward that first launch, preparations are already under way for future missions, which will see the booster evolve to its more-capable Block 1 B configuration, able to deliver 40 metric tons to TLI. That configuration will have the capability to carry large payloads co-manifested with the Orion spacecraft, or to utilize an 8.4- meter (m) fairing to carry payloads several times larger than are currently possible. SLS will evolve to its full Block 2 configuration, with a TLI capability of >45 metric tons. Both the Block lB and Block 2 versions of SLS will be able to carry larger secondary payloads than the Block 1 configuration, creating even more opportunities for affordable scientific exploration of deep space. This lecture will provide a status of the SLS development and outline the progress being made toward flying smallsats on the first flight of SLS, and discuss future opportunities for smallsats on subsequent flights.

Bookout, Paul S.↗

NASA's Space Launch System: Unprecedented Payload Capabilities

As part of a renewed focus on deep space exploration, NASA and its private sector and international partners are building a new super heavy-lift launch vehicle, the Space Launch System (SLS), as well as the new Orion crew vehicle, and upgrading launch facilities at Kennedy Space Center. Progress made on the Block 1 vehicle, as well as its expected performance metrics and fiscal support from the U.S. administration and Congress, have opened up additional manifest possibilities that the Agency continues to evaluate. Offering a combination of power, payload capacity and departure energy unmatched in contemporary boosters, the SLS family of launch vehicles features the world's most-proven propulsion system: solid rocket boosters and RS-25 main engines with a modified existing cryogenic in-space stage. The initial SLS configuration, Block 1, will deliver at least 26 metric tons (t) of payload to trans-lunar injection (TLI). The vehicle's flexible architecture will enable the rocket to evolve over the next decade to meet the most demanding deep space mission requirements. The second configuration, Block 1B, will deliver at least 34 to 40 t to TLI, depending on whether the crewed or cargo variant is selected. Although designed to facilitate human exploration of deep space, the vehicle also provides game-changing benefits for large science payloads and even harnesses excess capacity to provide small satellites with affordable access to deep space. For the first integrated mission of SLS and Orion, launching from Kennedy Space Center in fiscal year 2020, SLS Block 1 will send Orion on a 25.5-day mission to a distant retrograde lunar orbit with the primary objective to test and validate new systems and procedures. That first mission, called Exploration Mission-1 (EM-1), also has 13 6U-class CubeSat payloads manifested. Those payloads, which will carry out a variety of scientific experiments and technology demonstrations, will deploy in several locations along the trajectory after Orion has separated from SLS. Contractors and suppliers have made significant progress since last year manufacturing the Block 1 vehicle for EM-1. The upper stage and adapters are complete as are the four RS-25 engines. All other major components are constructed and being outfitted for flight. In fact, hardware for the second flight is currently being manufactured at locations across the United States. This paper will outline hardware, avionics and testing progress toward the first and second flights of SLS. Manifest opportunities for primary, co-manifested and secondary payloads will be discussed. An in-depth look at payload utilization and integration will be provided, as well as lessons learned from installing a secondary payload deployment system for EM-1.

Creech, Steve↗

NASA's Space Launch System: Unprecedented Payload Capabilities

As NASA turns 60 and plans to transition the International Space Station (ISS) and other low-Earth orbit (LEO) activities to commercial enterprises, the Agency's human exploration program turns its focus to deep space. With missions planned to send astronauts back to the Moon and to construct a lunar orbiting Gateway for surface access as well as science experiments and technology demonstrations, NASA requires a vehicle with capabilities for launching more mass and volume than is currently commercially available. To that end, NASA and its private sector partners are building the Space Launch System (SLS) super heavy-lift launch vehicle, which will send the new Orion crew capsule, eventually with a complement of four astronauts, to cislunar space for the first time since the Apollo Program in the 1960s and 1970s. NASA Kennedy Space Center's (KSC's) Exploration Ground Systems (EGS) Program has upgraded and refurbished ground and launch facilities to process, assemble and launch NASA's new deep space exploration system, which is managed by the Exploration Systems Development (ESD) organization in the Human Exploration and Operations Mission Directorate (HEOMD). Offering an unmatched combination of power, payload capacity and departure energy, the evolvable SLS features the world's most proven propulsion system: solid rocket boosters and RS-25 main engines with a modified Delta Cryogenic Second Stage (DCSS) cryogenic upper stage. The initial SLS configuration, Block 1, will deliver at least 26 metric tons (t) to trans-lunar injection (TLI). The second variant, Block 1B, will deliver at least 34 t to TLI in its crew configuration and at least 40 t to TLI in its cargo configuration. The Block 1 cargo vehicle will fly with an industry-standard 5 m fairing while the Block 1B cargo configuration will accommodate 8 m-diameter fairings in varying lengths. The Block 2 vehicle will incorporate upgraded boosters and possibly larger fairings for launching Mars-class payloads to deep space. Although designed to enable human exploration of deep space, the vehicle also provides game-changing benefits for large science payloads and even harnesses excess capacity to provide small satellites with access to deep space. Three flights of the Block 1 vehicle are now planned; the first vehicle, being built for a test flight known as Exploration Mission-1 (EM-1), is nearing completion at NASA and contractor sites across the United States. In fact, hardware for the second mission has also been built. This paper will provide an overview of the SLS vehicle, with a focus on its payload accommodations and the missions enabled by the unprecedented payload volume and departure energy of SLS. This paper also describes the status of the manufacturing and integration for first flight and beyond.

Exploration Mission-1↗

Fundamental Study into Rotor Outwash and Dust Kick-up under Mars-like Conditions

Humans have reached a limit to how much information can be collected from a purely ground-based rover exploration mission on Mars. Therefore, an airborne mission would broaden our knowledge of this planet and at the same time it would allow for a different approach to scientific research. Thus, the Mars Helicopter Scout (MHS) Project was founded. However, as this is only a technology demonstrator, its first and short-term goal is to fly in the vicinity of the Mars Rover and assess where the rover can go. This would reduce the risk of damage to the rover and allow for minimum transit times on the Martian surface. The main objective of the project is conducting small-scale hover testing of a coaxial rotor system in- and out-of-ground effect to study both rotor downwash/outwash and to examine the conditions under which dust kick-up and brownout does or does not occur under Mars-like conditions, with potential application to Mars Helicopter development. Given the exploratory nature of this project, it is limited to a proof of concept of testing techniques that may eventually be used on the full scale MHS. These future tests will help determine whether or not dust kick-up can pose a problem on the performance of the MHSs altimeter.

Saltation↗

Resource Prospector (RP): A Cost-Effective Lunar Resource Pathfinder

Resource Prospector (RP) is an in-situ resource utilization (ISRU) technology demonstration mission under study by the NASA Human Exploration and Operations Mission Directorates (HEOMD). This clever mission is currently planned to launch in 2020 and will demonstrate extraction of oxygen, water and other volatiles, as well measure mineralogical content such as silicon and light metals, like aluminum and titanium, from lunar regolith. Expanding human presence beyond low-Earth orbit to asteroids and Mars will require the maximum possible use of local materials, so-called in-situ resources, and the moon presents a unique destination to conduct robotic investigations that advance ISRU capabilities, as well as providing significant exploration and science value. This mission is equally important; however, for how it executes as a risk-tolerant, cost-effective mission. RP follows on the path-finding approaches of the Lunar Crater Observation and Sensing Satellite (LCROSS) mission. The LCROSS mission confirmed the presence of water-ice on the moon, but also established a new lightweight-approach to project and mission execution which was considerably cheaper and faster than traditional NASA missions. RP has been designated as a Class D mission, just as LCROSS. This mission classification is the most risk-tolerant class of mission within the NASA risk framework and as such, is given more latitude to accept higher-levels of residual risk. The intention is that by saving monies normally spent attempting to assure a single missions success, more missions can be funded. A well-designed portfolio can accept occasional mission failure, as it still gets more done for the same investment of resources. This classification enables tailoring the NASA Policy Requirements (NPRs) to lighter-weight approaches to mission management and execution. RP is also studying both international and commercial partnerships as a means to maximize return on the investment. International partnerships provide both capabilities synergies and cost-sharing opportunities, while the evolving new space commercial options are revealing new approaches to acquiring cost-effective services, including the benefits of bundling services. Even the world of launch vehicles is changing, offering much less expensive access to space, especially if NASA is able to be flexible in how it approaches mission assurance. Finally, leveraging investments being made elsewhere within a program portfolio, can enable cost-savings by enabling two applications with one investment. RP will be the next pathfinder mission to both enable exploration capabilities for future missions, and continue to evolve cost-effective approaches for NASA.

Lunar↗

Assessing Tactical Scheduling Options for Time-Based Surface Metering

This paper presents a parametric analysis of the most recent tactical scheduler design for NASA’s Airspace Technology Demonstration 2 (ATD-2) sub-project, committed to demonstrating time-based surface metering at Charlotte Douglas International Airport (CLT). The tactical scheduler design is implemented in a fast-time simulation model of CLT using NASA’s Surface Operations Simulator and Scheduler. The tactical scheduler is supported by three basic functions: trajectory prediction, runway scheduling, and advisory generation. A key parameter of the advisory generation function is the taxi time delay buffer used when calculating target gate pushback times from runway schedule. Multiple simulations that varied the amount of taxi time delay buffer were analyzed to determine the effect on tactical scheduler performance. The results show an improvement in tactical scheduler performance when the buffer is made sufficiently large to release departures from their gates early enough to maintain scheduler predicted runway throughput.

Zelinski, Shannon↗

Evaluation of Usability and Workload Associated with Paper Strips as Compared to Virtual Flight Strips Used for Ramp Operations

This paper describes a study comparing the use of paper strips with virtual flight strips depicted on a new user interface, the Ramp Traffic Console (RTC), designed for use by ramp controllers to be used in place of paper strips. A Human-In-the-Loop (HITL) experiment was performed as the fifth in a series of six HITL simulation studies designed to evaluate a pushback Decision Support Tool (DST) concept for Charlotte Douglas International Airport (CLT). Workload and usability were assessed in post-run and post-study questionnaires. In the RTC virtual flight strip condition, post-run questionnaire results show lower workload ratings across all aspects of workload; additionally a trend is found toward increased usability ratings. Post-study questionnaire results indicate a preference for RTC over paper strips. Additional research is suggested with more training runs and a greater number of participants to increase statistical power. It is also suggested that this new technology be re-evaluated as a part of the ATD-2 (Airspace Technology Demonstration 2) field testing activities.

Human Factors↗

Simulation of Sweep-Jet Flow Control, Single Jet and Full Vertical Tail

This work is a simulation technology demonstrator, of sweep jets used to suppress boundary layer separation and increase maximum achievable load coefficients. A sweep jet is a discrete Coanda jet that oscillates in the plane parallel to an aerodynamic surface. It injects mass and momentum in the approximate stream wise direction. It also generate turbulent eddies at the oscillation frequency, which are typically large relative to boundary layer turbulence, and which augmenting mixing across the boundary layer to attack flow separation. Simulations of a fluidic oscillator, the sweep jet emerging from the oscillator, and the suppression of boundary layer separation by an array of sweep jets are performed. Simulation results are compared to data from a dedicated CFD validation experiment of a single oscillator and its sweep jet, and from a study of a full-scale Boeing 757 vertical tail augmented with an array of sweep jets.2, 20 A critical step in the work is the development of realistic time-dependent sweep-jet in flow boundary conditions, derived from the results of the single-oscillator simulations, which create the sweep jets in the full-tail simulations. Simulations were performed using the Over flow CFD solver, with high-order spatial discretization and a range of turbulence modeling. Good results were obtained for all flows simulated, when suitable turbulence modeling was used.

flow control↗

Comparison of Integrated Digital Radiometer with Concurrent Water Vapor Radiometer using the Alphasat Receivers in Milan, Italy

In June 2014, NASA Glenn Research Center (GRC) and the Politecnico di Milano (POLIMI) jointly deployed a pair of coherent 20 GHz and 40 GHz beacon receivers to the POLIMI campus in Milan, Italy to characterize the atmospheric channel at Ka- and Q-band within the framework of the Alphasat experiment. The Milan receivers observe the continuous-wave beacons broadcast over Europe by the Aldo Paraboni Technology Demonstration Payload (TDP #5), and, in September 2017, both channels were upgraded to incorporate a novel digital radiometer (DR) measurement which NASA has recently employed in other propagation measurement campaigns. In November 2016, a co-located water vapor radiometer (WVR) was also installed at POLIMI, and the concurrent data from both the WVR and DR thusly enables validation of this new DR technique against the established WVR. Herein, we preliminarily investigate the calibration of the DR measurements using the WVR data and also assess a calibration method that may be implemented where WVR data is not readily available.

Zemba, Michael J.↗