Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Resource Reporting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

Aeronautics and space report of the President, 1982 activities

Achievements of the space program are summerized in the area of communication, Earth resources, environment, space sciences, transportation, aeronautics, and space energy. Space program activities of the various deprtments and agencies of the Federal Government are discussed in relation to the agencies' goals and policies. Records of U.S. and world spacecraft launchings, successful U.S. launches for 1982, U.S. launched applications and scientific satellites and space probes since 1975, U.S. and Soviet manned spaceflights since 1961, data on U.S. space launch vehicles, and budget summaries are provided. The national space policy and the aeronautical research and technology policy statements are included.

Source record↗

Wabash CarbonSAFE Subtask 7.1 – Pre-drilling Site Assessment Topical Report: DOE-FE0031626-1

The Wabash CarbonSAFE project will drill a stratigraphic test well at the Wabash Valley Resources facility near Terre Haute, Indiana. Lithologic, geomechanical, and geophysical data collected from samples testing and an extensive geophysical logging suite will be used to determine the feasibility for the geologic sequestration of 50 million metric tons or more of injected carbon dioxide. The primary target reservoir and caprock to be investigated for the Wabash CarbonSAFE project are the Mt. Simon Sandstone and Eau Claire Shale, respectively. The project team has assessed the planned Wabash #1 drilling site using subsurface geologic data and analyses from both Illinois and Indiana. These data were used to generate geologic structure and isopach thickness maps for target reservoir and caprock layers which were incorporated into a detailed discussion of the nature of the Illinois Basin’s Cambro-Ordovician carbon dioxide storage complex at the drilling site. Formation tops were prognosed for 19 lithologic units to aid drilling and coring procedures. Additional GIS analysis indicates that no known structural features will negatively impact the target storage reservoir or caprock, nor will protected and sensitive areas, groundwater resources, or existing resource development be negatively affected by Wabash #1 drilling activities. The Wabash #1 Geologic/Structure Test well drilling permit was awarded by Indiana Department of Natural Resources (IN-DNR) – Division of Oil and Gas on November 12th, 2019, and the well is expected to be drilled to a total depth of approximately 8,350 feet. Potential impacts on drilling progress include abandoned underground coal mines which mined the Springfield and Survant coals until 1964 and 1954, respectively, and a lost circulation zone in the Potosi Dolomite, which has been demonstrated to have intermittent cavernous porosity from karstification. This document also details the coring and sampling program, proposed logging suite, and well testing program, all of which will be dynamically reviewed as drilling progresses.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Environmental Restoration Operations: Consolidated Quarterly Report (Oct. - Dec 2014)

This Sandia National Laboratories, New Mexico Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) fulfills all quarterly reporting requirements set forth in the Hazardous and Solid Waste Amendments (HSWA) Module of the Resource Conservation and Recovery Act Permit, and the Compliance Order on Consent. The 33 sites in the Corrective Action regulatory process are listed in Table I-1. The 33 sites consist of 25 Solid Waste Management Units and 8 Areas of Concern (AOCs). A summary of post-closure care activities performed in accordance with the Chemical Waste Landfill Post-Closure Care Permit is also included in this document. The Burn Site Groundwater and Technical Area V Groundwater AOCs are not included on the current HSWA Permit, but have been added as AOCs to the revised Hazardous Waste Facility Permit, which is pending approval by the New Mexico Environment Department at this time, and are included within this Consolidated Quarterly Report for completeness. Suspect waste includes radionuclides, metals, organic compounds, and explosives.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site Integration and Regulatory Considerations for a Nuclear Power Plant Colocated with Industrial Facilities: Colocation Studies for a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 HYDROGEN↗

Site Integration and Regulatory Considerations for an NPP Colocated with a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 - HYDROGEN↗

Submittal of Solid Waste Management Units and Areas of Concern Annual Long-Term Monitoring and Maintenance Report for Calendar Year 2017

This SWMU and AOC Annual Long-Term Monitoring and Maintenance (LTMM) Report for Calendar Year 2017 (Annual LTMM Report) details the measures performed for 21 Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) at Sandia National Laboratories/New Mexico (SNL/NM) in accordance with the requirements of the “Long-Term Monitoring and Maintenance [LTMM] Plan for SWMUs and AOCs Granted Corrective Action Complete with Controls” in Attachment M of the Resource Conservation and Recovery Act Facility Operating Permit (Permit), which took effect February 26, 2015. This Annual LTMM Report does not present the measures for SWMU 76, Mixed Waste Landfill (MWL), as the applicable MWL reporting adheres to the approved MWL LTMM Plan, Section 4.8.1 and requires a separate annual report which will be submitted to the New Mexico Environment Department by June 30, 2018. Measures at these SWMUs and AOCs include surveillance of site conditions and maintenance of institutional controls. Conditions requiring maintenance or repair activities were identified at three of the inspected SWMUs and AOCs (SWMUs 45, 46, and 87) during the Permit-required annual site inspections. One SWMU identification sign located at SWMU 46 and two identification signs located at SWMU 87 were replaced due to weathered lettering. Evidence of erosion was observed at SWMU 45 during the annual site inspection; erosion controls will be implemented as needed to prevent the inadvertent exposure of hazardous wastes or hazardous waste constituents. SWMU 45 is located on the sloped border of Tijeras Arroyo south of Technical Area-IV. The erosion controls planned for the Tijeras Arroyo Escarpment will address not only SWMU 45, but also SWMUs 46 and 229 as a best management practice. SNL/NM personnel plan to complete this work in calendar year 2018. The status and progress of this project will be reported in the 2018 Annual SWMUs and AOCs Annual LTMM Report for Calendar Year 2018 to be submitted to the New Mexico Environment Department on March 31, 2019, as required by the Permit. Based upon the inspections performed and site conditions observed, the administrative and physical institutional controls in place at the SWMUs and AOCs are effectively providing continued protection of human health and the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

5G Securely Energized and Resilient: (5G-SER) (Final Report)

NREL's work on 5G integration with physical power systems (versus simulated systems demonstrated in task 3) under 5G-Securely Energized and Resilient (5G-SER) achieved a major milestone in with the completion of Task 4 activities. After many months (6+) of planning and development along with scaling challenges along the way, a full 5G end-to-end network with physical hardware components (physical inverter, physical power panel, physical battery, etc.) was deployed in a containerized environment. In parallel, a distributed controls architecture for a microgrid powering 5G resources was also successfully modified from its previous instantiation for a simulated environment to work with these physical components. These accomplishments set the stage to use newly setup 5G technology with physical microgrid components to test the feasibility of 5G wireless with physical systems to enable resilient communications between controls and distributed solar and storage resources while exploring ways to configure 5G components to survive power disturbances. The results detailed in the report below show that even utilizing physical components, 5G wireless systems were able to provide resilient results that were similar to the results from the simulated environment Task 3).

24 POWER TRANSMISSION AND DISTRIBUTION↗

CSP Plant Optimization Study for the California Power Market (“CalCSP”) (Final Technical Report)

Concentrating Solar Power (CSP) with thermal energy storage offers a unique and strategic opportunity to support California’s clean energy transition. Unlike photovoltaic (PV) systems, CSP with thermal storage can generate electricity after sunset and during periods of high demand, making it a valuable complement to intermittent renewable resources. CSP also provides synchronous, inertia-contributing generation, long-duration storage, and flexible dispatch—capabilities increasingly important as thermal plants retire. This report summarizes the findings of the CSP Plant Optimization Study for the California Power Market or “CalCSP study,” which evaluated the technical, economic, environmental, and policy factors that influence the deployment of CSP technologies in California. The CalCSP study was conducted to assess how CSP can contribute to California’s long-term decarbonization goals while enhancing grid reliability, supporting local economic development, and making efficient use of land and transmission resources. It draws on detailed modeling of CSP performance and costs, site suitability analysis, policy reviews, and stakeholder engagement across utilities, regulators, developers, and community organizations. The analysis focuses on mature molten-salt tower technology and incorporates lessons learned from the global CSP fleet, distinguishing today’s CSP from earlier first-of-a-kind projects in the U.S. The findings support a more prominent role for CSP in California’s evolving clean energy landscape. With strategic planning, targeted policy support, and continued cost improvements, CSP can complement PV and batteries to deliver reliable, around-the-clock clean electricity—especially in areas with high solar resource and constrained grid capacity.

14 SOLAR ENERGY↗

Water and Wastewater Systems as Potential Distributed Energy Resources for California - High-level Feasibility Assessment

Water systems in California are a major electricity user, and electricity costs represent a significant portion of water utilities’ operating costs. Water and wastewater utilities have the capacity to shift demand in response to grid needs or price signals and can generate power through biogas, hydropower or onsite renewable energy systems like solar panels and wind turbines. This report points to some of the most promising opportunity areas for water and wastewater utilities to implement distributed energy resources while also carefully laying out practical considerations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Gene Ontology resource: enriching a GOld mine

The Gene Ontology Consortium (GOC) provides the most comprehensive resource currently available for computable knowledge regarding the functions of genes and gene products. Here, we report the advances of the consortium over the past two years. The new GO-CAM annotation framework was notably improved, and we formalized the model with a computational schema to check and validate the rapidly increasing repository of 2838 GO-CAMs. In addition, we describe the impacts of several collaborations to refine GO and report a 10% increase in the number of GO annotations, a 25% increase in annotated gene products, and over 9,400 new scientific articles annotated. As the project matures, we continue our efforts to review older annotations in light of newer findings, and, to maintain consistency with other ontologies. As a result, 20,000 annotations derived from experimental data were reviewed, corresponding to 2.5% of experimental GO annotations. The website (http://geneontology.org) was redesigned for quick access to documentation, downloads and tools. To maintain an accurate resource and support traceability and reproducibility, we have made available a historical archive covering the past 15 years of GO data with a consistent format and file structure for both the ontology and annotations.

59 BASIC BIOLOGICAL SCIENCES↗