Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RESOURCES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

Cockpit resource management training

The 6th General Flight Crew Training Meeting held in Montreal in May, 1984 was for most IATA member airlines the first time they had been exposed to what was then a relatively new aspect of flight crew training-resource management training. In reviewing the results of this meeting the IATA Flight Crew Training SubCommittee (FCTSC), which had been responsible for the agenda and the meeting itself, concluded that because very few airlines had implemented a program or even appeared to understand the term resource management, a member airline survey should be conducted and the results analyzed. This presentation shows the results of that survey in a form which can be related to the topics of the workshop.

White, Lawson C.↗

The resource envelope as a basis for space station management system scheduling

The Platform Management System (PMS) Resource Envelope Scheduling System (PRESS) expert system prototype developed for space station scheduling is described. The purpose of developing the prototype was too investigate the resource envelope concept in a practical scheduling application, using a commercially available expert system shell. PRESS is being developed on an IBM PC/AT using Teknowledge, Inc.'s M.1 expert system shell.

Bush, Joy↗

A scheduling and resource management system for space applications

Every spacecraft, whether in orbit around the earth or an a deep space flight, has at its disposal limited amounts of the resources for it to accomplish its mission. Activity scheduling is currently a costly, human intensive task which requires a great deal of expertise. It belongs to a class of problems whose complexity increases exponentially with the number of operations. NASA has in the past accomplished this task by using a great deal of manpower, a large number of negotiating sessions, interminable bouts of phone tag, and mountains of paperwork. Lately the situation has improved with the introduction of automated scheduling techniques, but these to date still require expert involvement and fall short in some important ways. A prototype activity scheduler, MAESTRO, is introduced which is capable of meeting the needs of many NASA missions, eventually to include the Space Station. The approach to resource constrained scheduling is first discussed, then the intended domain for MAESTRO is described along with its design and current capabilities. A description of planned enhancements and revisions to the systems is also presented.

Britt, Daniel L.↗

NASA's Earth Resources Laboratory - Seventeen years of using remotely sensed satellite data in land applications

The activities of the Earth Resources Laboratoy (ERL) for the past seventeen years are reviewed with particular reference to four typical applications demonstrating the use of remotely sensed data in a geobased information system context. The applications discussed are: a fire control model for the Olympic National Park; wildlife habitat modeling; a resource inventory system including a potential soil erosion model; and a corridor analysis model for locating routes between geographical locations. Some future applications are also discussed.

Cashion, Kenneth D.↗

Scheduling Nonconsumable Resources

Users manual describes computer program SWITCH that schedules use of resources - by appliances switched on and off and use resources while they are on. Plans schedules according to predetermined goals; revises schedules when new goals imposed. Program works by depth-first searching with strict chronological back-tracking. Proceeds to evaluate alternatives as necessary, sometimes interacting with user.

Porta, Harry J.↗

Resource Allocation Planning Helper (RALPH): Lessons learned

The current task of Resource Allocation Process includes the planning and apportionment of JPL's Ground Data System composed of the Deep Space Network and Mission Control and Computing Center facilities. The addition of the data driven, rule based planning system, RALPH, has expanded the planning horizon from 8 weeks to 10 years and has resulted in large labor savings. Use of the system has also resulted in important improvements in science return through enhanced resource utilization. In addition, RALPH has been instrumental in supporting rapid turn around for an increased volume of special what if studies. The status of RALPH is briefly reviewed and important lessons learned from the creation of an highly functional design team are focused on through an evolutionary design and implementation period in which an AI shell was selected, prototyped, and ultimately abandoned, and through the fundamental changes to the very process that spawned the tool kit. Principal topics include proper integration of software tools within the planning environment, transition from prototype to delivered to delivered software, changes in the planning methodology as a result of evolving software capabilities and creation of the ability to develop and process generic requirements to allow planning flexibility.

Durham, Ralph↗

Optimal dynamic control of resources in a distributed system

The authors quantitatively formulate the problem of controlling resources in a distributed system so as to optimize a reward function and derive optimal control strategies using Markov decision theory. The control variables treated are quite general; they could be control decisions related to system configuration, repair, diagnostics, files, or data. Two algorithms for resource control in distributed systems are derived for time-invariant and periodic environments, respectively. A detailed example to demonstrate the power and usefulness of the approach is provided.

Shin, Kang G.↗

Vacuum resource provision for Space Station Freedom

The use of vacuum resources is integral to a number of proposed concepts for gas disposal from Space Staton Freedom. These include both direct overboard venting and onboard collection and storage of waste gases. A methodology is presented for determining flowrates through proposed vacuum lines. The flowrates through overboard vents are used to calculate number column densities, which are compared with current Freedom program requirements. The results are combined with discussions about the relative merits of some proposed and alternate concepts for providing vacuum resources.

Laskey, Kenneth J.↗

EnviroNET - A space environment data resource

This paper reviews the features of EnviroNET that make it a valuable space data resource. This computerized data base provides rapid access to the latest information on space debris and other space environments and spacecraft interactions of importance to the space community. Although originally conceived as an information resource for Space Shuttle users, EnviroNET has expanded into other areas including space debris and the near-earth environments of potential interest to the conference attendees.

Lauriente, Michael↗

Resources - Supply and availability

Over the past several decades there have been shortage of strategic materials because of our near total import dependence on such metals as chromium, cobalt, and tantalum. In response to the continued vulnerability of U.S. superalloy producers to disruptions in resource supplies, NASA has undertaken a program to address alternatives to the super-alloys containing significant quantities of the strategic materials such as chromium, cobalt, niobium, and tantalum. The research program called Conservation of Strategic Aerospace Materials (COSAM) focuses on substitution, processing, and alternate materials to achieve its goals. In addition to NASA Lewis Research Center, universities and industry play an important role in the COSAM Program. This paper defines what is meant by strategic materials in the aerospace community, presents a strategic materials index, and reviews the resource supply and availability picture from the U.S. point of view. In addition, research results from the COSAM Program are highlighted and future directions for the use of low strategic material alloys or alternate materials are discussed.

Stephens, Joseph R.↗

A systems engineering management approach to resource management applications

The author presents a program management response to the following question: How can the traditional practice of systems engineering management, including requirements specification, be adapted, enhanced, or modified to build future planning and scheduling systems for effective operations? The systems engineering management process, as traditionally practiced, is examined. Extensible resource management systems are discussed. It is concluded that extensible systems are a partial solution to problems presented by requirements that are incomplete, partially immeasurable, and often dynamic. There are positive indications that resource management systems have been characterized and modeled sufficiently to allow their implementation as extensible systems.

Hornstein, Rhoda Shaller↗

Theoretical predictions of volatile bearing phases and volatile resources in some carbonaceous chondrites

Carbonaceous chondrites are usually believed to be the primary constituents of near-Earth asteroids and Phobos and Diemos, and are potential resources of fuels which may be exploited for future planetary missions. The nature and abundances are calculated of the major volatile bearing and other phases, including the vapor phase that should form in C1 and C2 type carbonaceous chondrites as functions of pressure and temperature. The results suggest that talc, antigorite plus or minus magnesite are the major volatile bearing phases and are stable below 400 C at 1 bar in these chondritic compositions. Simulated heating of a kilogram of C2 chondrite at fixed bulk composition between 400 and 800 C at 1 bar yields about 135 gm of volatile, which is made primarily of H2O, H2, CH4, CO2 and CO. The relative abundances of these volatile species change as functions of temperature, and on a molar basis, H2 becomes the most dominant species above 500 C. In contrast, Cl chondrites yield about 306 gm of volatile under the same condition, which consist almost completely of 60 wt percent H2O and 40 wt percent CO2. Preliminary kinetic considerations suggest that equilibrium dehydration of hydrous phyllosilicates should be attainable within a few hours at 600 C. These results provide the framework for further analyses of the volatile and economic resource potentials of carbonaceous chondrites.

Ganguly, Jibamitra↗

Extraterrestrial resources: Implications from terrestrial experience

Terrestrial mining experience indicates that the overwhelming criterion of a potentially economic deposit is its recoverable concentration of the desired mineral or element. Recovery can be based on contrast in physical and/or chemical properties, but processes based on physical properties are typically less expensive. As several processes generally are used in sequence, they have a profound effect on extraction costs. These criteria will also apply to extraterrestrial resources. Although the extreme cost of access to space makes even ordinary materials extremely valuable, this inaccessibility also makes capital and maintenance costs extremely high. The following four development stages will apply, especially with the additional unknowns of an extraterrestrial environment: (1) Exploration for the highest grade of the mineral or element desired (because the extraction plant must be simple, cheap, and rugged to minimize capital and maintenance costs, high grade is extremely important); (2) Laboratory testing of various physical and/or chemical separation techniques on the possible ore to determine if the material can indeed be recovered economically; (3) a pilot plant test, in which a large sample is dug from the deposit to determine excavation rates, power requirements, and equipment wear. (This sample is then run through a pilot mill designed on the basis of the laboratory testing. Pilot plant testing must be carried out at increasing scales, but several trials are generally necessary at each scale before the size of operations can be increased. Moreover, pilot testing is necessary for each new mineral deposit); and (4) Last is the full-scale mine and plant start-up. (New problems invariably occur at this point, but they can be kept to a minimum if the pilot plant tests were realistic). If such a development plan is followed rigorously, major cost overruns, with their potentially disastrous effects on resource developments, can be avoided.

Kuck, David L.↗

Enstatite chondrites and achondrites as asteroidal resources

The highly reduced nature of the enstatite meteorites (chondrites and achondrites) differs from that of all other types of stony meteorites. The silicates in the enstatite meteorites contain almost no FeO. In addition, many normally lithophile elements such as Na, Ca, Mg, Cr, and Ti display chalcophilic behavior. A study of the chemistry and mineralogy of the enstatite meteorites was undertaken to determine their resource potential. On average, about 99 percent of the volume of an enstatite achondrite, or aubrite, consists of only four silicate minerals: enstatite, Na-rich plagioclase, diopside, and forsterite, with enstatite being by far the most abundant mineral. The remaining one percent of the volume consists of troilite, kamacite, and trace amounts of oldhamite, daubreelite, ferromagnesian albandite, and schreibersite. Thus, the aubrites can be considered as a possible source for large quantities of Mg, Si, and O, but are of little interest as a source of anything else. The enstatite chondrites appear to be more promising candidates for resource utilization. The chondrites are generally divided into two groups: EH (high iron, fine-grained, with abundant chondrules); and EL (low iron, coarse-grained, with little or no evidence of chondrules). Metallic Ni-Fe makes up roughly 20-25 weight percent of each type of enstatite chondrite. These meteorites are also a good source of nitrogen. This is due in part to the presence of osbornite and sinoite. The latter mineral is restricted to EL chondrites, which typically have a higher bulk nitrogen content than the EH chondrites. Three valuable metals, Cr, Mn, and Ti, are concentrated in a few distinct sulfide phases in the enstatite chondrites. These sulfide phases are troilite and niningerite in EH chondrites and troilite, daubreelite, and ferroan alabandite in EL chondrites.

Hutson, M. L.↗

Physical and chemical properties of the Martian soil: Review of resources

The chemical and physical properties of Martian surface materials are reviewed from the perspective of using these resources to support human settlement. The resource potential of Martian sediments and soils can only be inferred from limited analyses performed by the Viking Landers (VL), from information derived from remote sensing, and from analysis of the SNC meteorites thought to be from Mars. Bulk elemental compositions by the VL inorganic chemical (x ray fluorescence) analysis experiments have been interpreted as evidence for clay minerals (possibly smectites) or mineraloids (palagonite) admixed with sulfate and chloride salts. The materials contained minerals bearing Fe, Ti, Al, Mg and Si. Martian surface materials may be used in many ways. Martian soil, with appropriate preconditioning, can probably be used as a plant growth medium, supplying mechanical support, nutrient elements, and water at optimal conditions to the plants. Loose Martian soils could be used to cover structures and provide radiation shielding for surface habitats. Martian soil could be wetted and formed into abode bricks used for construction. Duricrete bricks, with strength comparable to concrete, can probably be formed using compressed muds made from martian soil.

Stoker, C. R.↗

Comparative economics of space resource utilization

Physical economic factors such as mass payback ratio, total payback ratio, and capital payback time are discussed and used to compare the economics of using resources from the Moon, Mars and its moons, and near Earth asteroids to serve certain near term markets such as propellant in low Earth orbit or launched mass reduction for lunar and Martian exploration. Methods for accounting for the time cost of money in simple figures of merit such as MPRs are explored and applied to comparisons such as those between lunar, Martian, and asteroidal resources. Methods for trading off capital and operating costs to compare schemes with substantially different capital to operating cost ratio are presented and discussed. Areas where further research or engineering would be extremely useful in reducing economic uncertainty are identified, as are areas where economic merit is highly sensitive to engineering performance - as well as areas where such sensitivity is surprisingly low.

Cutler, Andrew Hall↗

Balancing antagonistic time and resource utilization constraints in over-subscribed scheduling problems

In this paper, we report work aimed at applying concepts of constraint-based problem structuring and multi-perspective scheduling to an over-subscribed scheduling problem. Previous research has demonstrated the utility of these concepts as a means for effectively balancing conflicting objectives in constraint-relaxable scheduling problems, and our goal here is to provide evidence of their similar potential in the context of HST observation scheduling. To this end, we define and experimentally assess the performance of two time-bounded heuristic scheduling strategies in balancing the tradeoff between resource setup time minimization and satisfaction of absolute time constraints. The first strategy considered is motivated by dispatch-based manufacturing scheduling research, and employs a problem decomposition that concentrates local search on minimizing resource idle time due to setup activities. The second is motivated by research in opportunistic scheduling and advocates a problem decomposition that focuses attention on the goal activities that have the tightest temporal constraints. Analysis of experimental results gives evidence of differential superiority on the part of each strategy in different problem solving circumstances. A composite strategy based on recognition of characteristics of the current problem solving state is then defined and tested to illustrate the potential benefits of constraint-based problem structuring and multi-perspective scheduling in over-subscribe scheduling problems.

Smith, Stephen F.↗

Electrolytic production of oxygen from lunar resources

Oxygen is a valuable commodity in space. Substantial savings have been projected for future missions if oxygen could be produced on the moon from local resources. Some of the most promising approaches to extract oxygen from lunar resources involve electrochemical oxygen generation. In a straight-forward concept called "magma electrolysis", suitable oxides (silicates) are molten at 1300-1500 °C and the melt electrolyzed. Residual melt can be discarded after partial electrolysis. Alternatively, lunar soil may be dissolved in a molten salt and electrolyzed. In this approach, temperatures are lower and melt conductances higher, but electrolyte constituents need to be preserved. Both possibilities are being studied in the laboratory. In a different approach, ilmenite is reduced by hydrogen and the resulting water electrolyzed (Carbotek Process TM). Although know-how from terrestrial technology can be applied, the process task is unconventional and requires many innovative solutions. Time and effort needed for successful development should not be underestimated.

Rudolf Keller↗