Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

A Technology Maturation Plan for the Development of Nuclear Electric Propulsion

Over the last two years NASA’s Space Nuclear Propulsion (SNP) Project formulated a Technology Maturation Plan (TMP) for development of the sub-systems needed for a MW-class Nuclear Electric Propulsion (NEP) system which, combined with a high thrust chemical propulsion stage, would be suitable for human missions to Mars. Two recent assessments, independently conducted by the National Academies for Science, Engineering, and Medicine and the NASA Engineering & Safety Center, concluded that the technologies required for a high-power NEP system are immature and the attendant risks insufficiently quantified to justify initiating a flight project. For NEP to be available as a viable option to meet flight opportunities in the late 2030s / 2040s time frame, development of the key sub-systems must begin now. SNP has subdivided the NEP system into five Critical Technology Elements (CTE): the nuclear reactor, power conversion, power management and distribution, electric propulsion sub-system, and the primary heat rejection system. Development plans for each of these CTEs have been drafted which will serve as the template for a focused milestone-driven research and development campaign intended to advance each CTE to Technology Readiness Level (TRL) 5. This will be accomplished by building and testing hardware at relevant power levels (~ 1 MW) and for relevant durations (2,500 hours, ~10% of the required operational lifetime) and conducting numerical modeling of the CTEs anchored by the accumulated test data to predict system performance and reliability. Concurrent with this work, high-level coupled system/mission modeling will be carried out to refine the key performance parameters that the various CTEs must achieve. Non-advocate reviews will be held at milestone points to assess progress and inform down-select decisions. The strategy for formulating the TMP was described previously; this paper describes ongoing progress on the drafting and baselining of the plan, including key specific details.

Space Nuclear Propulsion↗

A Technology Maturation Plan for the Development of Nuclear Electric Propulsion

Over the last two years NASA’s Space Nuclear Propulsion (SNP) Project formulated a Technology Maturation Plan (TMP) for development of the sub-systems needed for a MW-class Nuclear Electric Propulsion (NEP) system which, combined with a high thrust chemical propulsion stage, would be suitable for human missions to Mars. Two recent assessments, independently conducted by the National Academies for Science, Engineering, and Medicine and the NASA Engineering & Safety Center, concluded that the technologies required for a high-power NEP system are immature and the attendant risks insufficiently quantified to justify initiating a flight project. For NEP to be available as a viable option to meet flight opportunities in the late 2030s / 2040s time frame, development of the key sub-systems must begin now. SNP has subdivided the NEP system into five Critical Technology Elements (CTE): the nuclear reactor, power conversion, power management and distribution, electric propulsion sub-system, and the primary heat rejection system. Development plans for each of these CTEs have been drafted which will serve as the template for a focused milestone-driven research and development campaign intended to advance each CTE to Technology Readiness Level (TRL) 5. This will be accomplished by building and testing hardware at relevant power levels (~ 1 MW) and for relevant durations (2,500 hours, ~10% of the required operational lifetime) and conducting numerical modeling of the CTEs anchored by the accumulated test data to predict system performance and reliability. Concurrent with this work, high-level coupled system/mission modeling will be carried out to refine the key performance parameters that the various CTEs must achieve. Non-advocate reviews will be held at milestone points to assess progress and inform down-select decisions. The strategy for formulating the TMP was described previously*; this paper describes ongoing progress on the drafting and baselining of the plan, including key specific details. * “Strategy for Developing Technologies for Megawatt-class Nuclear Electric Propulsion Systems”, K.A. Polzin, et. al., International Electric Propulsion Conference IEPC 2022, IEPC-2022-155

Nuclear Electric Propulsion↗

RH-LLW Disposal Facility Project CD-2/3 to Design/Build Proposal Reconciliation Report

A reconciliation plan was developed and implemented to address potential gaps and responses to gaps between the design/build vendor proposals and the Critical Decision-2/3 approval request package for the Remote-Handled Low Level Waste Disposal Facility Project. The plan and results of the plan implementation included development of a reconciliation team comprised of subject matter experts from Battelle Energy Alliance and the Department of Energy Idaho Operations Office, identification of reconciliation questions, reconciliation by the team, identification of unresolved/remaining issues, and identification of follow-up actions and subsequent approvals of responses.

99 GENERAL AND MISCELLANEOUS↗

Qualitative Decision and Risk Assessment Approaches for Managing Nuclear Materials

Qualitative approaches to performing decision analyses and risk assessments have recently been developed at ORNL with the goal of providing simple tools to help manage complex projects that have a variety of drivers, constraints, or both. Many of the DOE’s nuclear materials management projects involve making “keep-or-dispose” decisions for nuclear materials and then developing projects to manage or dispose of the materials. ORNL uses decision analysis tools to identify and rank options for accomplishing nuclear materials management projects, and risk assessment tools to evaluate the preferred option(s) to identify risks and prioritize mitigation actions to reduce risks during implementation. This paper focuses on application of the decision analysis and risk-based planning tool(s) to guide management of projects during the planning and start-up phases when only preliminary project information is likely to be available. Such an analysis seeks to reduce risks, lower costs, and improve chances of project success. Examples showing the use of the tools in nuclear waste management scenarios are provided.

Jubin, Robert↗

Systematic Analysis of Drivers and Barriers of Cross-Sectorial Learning Between Nuclear and Oil and Gas Decommissioning Projects - 20139

Project and megaproject management in the energy sector have historically focused on the planning and delivery of the construction of infrastructure. Therefore, policies are predominantly oriented to support the construction of infrastructure rather than its decommissioning. However, globally, several facilities have reached (or will soon reach) their end-of-life and need to be decommissioned. These facilities span across the energy sector, including nuclear power plants and oil and gas rigs, whose decommissioning present unprecedented techno-socio-economic challenges. Moreover, globally, their decommissioning cost is estimated to reach hundreds of billions of US dollars and this budget keeps increasing, with limited knowledge-transfer across industries to mitigate the spiraling increase of this figure. Cross-sectorial knowledge-transfer is a way to tackle this matter and improve the planning and delivery of decommissioning and waste management projects. The aim of this research is to build a road-map based on cross-sectorial industrial experience, designed to promote the sharing of good practices between projects both within and across industries dealing with major decommissioning and waste management challenges. To reach this aim, the tacit knowledge of senior practitioners on several large scale nuclear and oil and gas decommissioning projects is made explicit by the means of semi-structured interviews, systematically analyzed through directed content analysis. The results of this analysis include a list of good practices that could and should be transferred to nuclear decommissioning projects, including the need to promote the adoption of incentives explicitly linked to the project deliverables, and to develop long-term plans to support smooth transition from operations to decommissioning. Suggestions about how the knowledge-transfer can be promoted within and across organizations are also discussed. In this way, this research provides practical guidance for project managers and policymakers on how to support the planning and delivery of projects with improved performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Long-term Safety Assessment for the Planned LLW Disposal Facility at Al-Tuwaitha, Iraq - 18142

Before 1991, Iraq had a significant nuclear program which encompassed ten nuclear sites spread out across the country. The largest nuclear site was located at the Al-Tuwaitha site near Baghdad where 18 nuclear facilities were concentrated. During the first Gulf War in 1991, all sites suffered significant damage from bombing and subsequent looting. Currently, the Ministry of Science and Technology is responsible for the ten heavily damaged nuclear sites and for the management of radioactive waste in Iraq in general. The task of decommissioning the damaged nuclear facilities and managing the resulting waste is being supported by the International Atomic Energy Agency (IAEA), the European Commission (EC), and the United States (US). In the framework of its Instrument for Nuclear Safety Cooperation (INSC), the EC has launched a cooperation project to support the planned construction of an engineered repository for short-lived low- and intermediate level waste for the safe disposal of radioactive waste resulting from the decommissioning activities, as well as for waste from the continuing use of radioisotopes in medicine and the oil and gas industry in the country. The main objectives of this project, which was awarded to a Consortium led by NUKEM Technologies Engineering Services GmbH and joined by DBE Technology GmbH of Germany and JAVYS a.s. of Slovakia, are the development of an initial conceptual level basic design and preliminary safety assessment report (PSAR) and the subsequent detailed engineering design and supporting pre-construction safety assessment report (PCSAR). The current paper focuses on the development of the PSAR. Special focus is given to the long-term calculations and difficulties associated with the limited data base in regard to site characterization as well as the expected inventory for the future repository. Because of the ongoing security concerns in Iraq, the Ministry of Science and Technology had already selected the Al-Tuwaitha Site as the best suited location for the planned surface repository at the start of the project. Although some site characterization work had already been carried out prior to the start of the project, certain data for modelling the geology and hydrology of the site are still lacking. Missing data have been compensated by conservative assumptions and the assessment of alternative scenarios. Consequently, for the development of the simplified GoldSim{sup R} computer model used to carry out the long-term calculations supporting the PSAR, existing site information was used and, as appropriate, amended or replaced by conservative assumptions. Due to the nature of the waste, data on the expected inventory are associated with large uncertainties. Although certain estimates related to the future volume of the waste exist, little to no information is available on the expected radionuclide vector and respective activities. Therefore, the long-term calculations were carried out for a generic inventory including a broad range of radionuclides that are to be expected as being important considering the kind of waste to be disposed of in the facility. Based on the results of these calculations, the maximum total capacity of the facility was estimated and converted into activity limits for individual radionuclides that will be integrated into the existing general WAC for the facility. Compliance with these WAC will then guarantee the safety of the repository in regard to potential radionuclide releases via the groundwater pathway. In parallel to the determination of activity limits for the WAC, long-term calculations were carried using different estimates for the expected total activity to determine the general suitability of the proposed technical solution of the repository for receiving the total amount of Iraqi radioactive waste principally acceptable for surface disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

America Saves! Energizing Main Street's Small Businesses

The America Saves! Energizing Main Street Small Businesses project engaged the 1,200-member National Main Street Center (NMSC) network of downtown organizations and other local, regional, and national partners to test a methodology for sharing customized energy efficiency information with owners of commercial buildings smaller than 50,000 square feet. Led by the National Trust for Historic Preservation’s Preservation Green Lab, the project marshalled local staff and volunteers to gather voluntarily-disclosed energy use information from participating businesses. This information was analyzed using a remote auditing tool (validated by the National Renewable Energy Lab) to assess energy savings opportunities and design retrofit strategies targeting seven building types (food service and sales, attached mixed-use, strip mall, retail, office, lodging, and schools). The original project design contemplated extensive leveraging of the Green Button protocol for sharing annualized utility data at a district scale. Due the lack of adoption of Green Button, the project partners developed customized approaches to data collection in each of twelve pilot communities. The project team encountered considerable challenges in gathering standardized annual utility data from local partners. After overcoming these issues, the data was uploaded to a data storehouse. Over 450 properties were benchmarked and the remote auditing tool was tested using full building profiles and utility records for more than 100 commercial properties in three of the pilot communities. The audit tool demonstrated potential for quickly capturing, analyzing, and communicating energy efficiency opportunities in small commercial buildings. However, the project team found that the unique physical characteristics and use patterns (partial vacancy, periodic intensive uses) of small commercial buildings required more trouble-shooting and data correction than was anticipated. In addition, the project revealed that remote technology alone (such as audits) is not sufficient to convince most owners of commercial buildings or businesses to invest in energy efficiency. Additional, one-on-one personal communication is critical. A combination of technology and well-planned direct contact is likely to produce the highest rate of energy efficiency implementation in the small commercial building market sector. Note that only two of the three planned phases of this project were completed. As a result, research and testing were not fully implemented and thus all results and conclusions from the America Saves! Energizing Main Street Small Businesses project should be considered preliminary. In addition to the National Main Street Center, local organizations, and regional utilities, the America Saves! project partners included the National Renewable Energy Laboratory, Energy Center of Wisconsin (Seventh Wave), Lend Lease, Building Energy, and Energy RM.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

PV Production - Conceptual Location Analysis

The purpose of a Conceptual Location Analysis is to identify potential project/building sites in the planning phase of a project. The analysis includes review and comment on the potential sites by relevant disciplines. Site criteria encompasses DOE and NNSA requirements pertaining to real property and environmental stewardship and additionally addresses SNL site planning objectives such as sustainability and efficiency. This analysis is intended to be used as a tool to provide a comprehensive perspective on siting decisions, and is not intended to supersede previous siting decisions or agreements. This conceptual location analysis is for the siting of PV for power production. The goal of this Conceptual Location Analysis is to weigh different sites, and come to a consensus on preferred sites for potential solar arrays through an Energy Savings Performance Contract (ESPC) or a Utility Energy Service Contract (UESC).

14 SOLAR ENERGY↗

Indexing NASA programs for technology transfer methods development and feasibility

This project was undertaken to evaluate the application of a previously developed indexing methodology to ongoing NASA programs. These programs are comprehended by the NASA Program Approval Documents (PADS). Each PAD contains a technical plan for the area it covers. It was proposed that these could be used to generate an index to the complete NASA program. To test this hypothesis two PADS were selected by the NASA Technology Utilization Office for trial indexing. Twenty-five individuals indexed the two PADS using NASA Thesaurus terms. The results demonstrated the feasibility of indexing ongoing NASA programs using PADS as the source of information. The same indexing methodology could be applied to other documents containing a brief description of the technical plan. Results of this project showed that over 85% of the concepts in the technology should be covered by the indexing. Also over 85% of the descriptors chosen would be accurate. This completeness and accuracy for the indexing is considered satisfactory for application in technology transfer.

Clingman, W. H.↗

High-resolution climate model datasets for energy infrastructure planning in a renewable-dependent future

Electrification and renewables deployment efforts are amplifying the interdependence of the climate and energy systems. Increases in climate model resolution, which is now approaching that of reanalysis datasets and operational weather forecast models, present a unique opportunity to use future climate projections for energy infrastructure planning. In this Perspective, we review recent developments in high-resolution climate modeling, which have been driven by increased computing power and advanced software tools. We then look ahead to discuss how high-resolution climate data can be used to plan for a renewable-dependent future, and envision a unified climate-energy model framework that captures the two-way feedbacks between these interdependent systems.

climate change↗

Large Divergence in Tropical Hydrological Projections Caused by Model Spread in Vegetation Responses to Elevated CO 2

Increasing atmospheric CO 2 and associated global warming are expected to alter the global hydrological cycle, thereby posing widespread threats to freshwater availability. However, future hydrological projections differ greatly between models, particularly over the tropical regions. The large difference between model projections directly limits policy planning efforts, and the responsible modeling processes remain unclear. Here, we identify the primary processes accounting for model differences in tropical hydrological changes using multiple CO 2 sensitivity experiments in the Coupled Model Intercomparison Project. We show that differences in projected changes to tropical evapotranspiration, precipitation, and surface water availability mainly arise from model representations of vegetation cover and stomatal conductance responses to elevated CO 2 and associated changes in atmospheric moisture and circulation. Atmospheric responses to sea surface warming contribute additionally to the divergence in hydrological projections. Given the importance of vegetation responses to elevated CO 2 and associated atmosphere feedbacks, our results underscore the need to improve representations of the vegetation physiological response to rising CO 2 and its coupling to the atmosphere, to provide reliable tropical hydrological projections.

54 ENVIRONMENTAL SCIENCES↗

The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L.96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). The UBNPMEP is coordinated with two Oregon Department of Fish and Wildlife (ODFW) research projects that also monitor and evaluate the success of the Umatilla Fisheries Restoration Plan. This project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 1990-005-00, Umatilla Hatchery M & E) and smolt outmigration (project No. 1989-024-01, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan, the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (CTUIR and ODFW 2006). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPCC 2004). The Umatilla Basin M&E plan developed along with efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha), coho salmon (O. kisutch), and enhance summer steelhead (O. mykiss). The need for restoration began with agricultural development in the early 1900's that extirpated salmon and reduced steelhead runs (Bureau of Reclamation, BOR 1988). The most notable development was the construction and operation of Three Mile Falls Dam (TMD) and other irrigation projects which dewatered the Umatilla River during salmon migrations. CTUIR and ODFW developed the Umatilla Hatchery Master Plan to restore fisheries to the basin. The plan was completed in 1990 and included the following objectives which were updated in 1999: (1) Establish hatchery and natural runs of Chinook and coho salmon. (2) Enhance existing summer steelhead populations through a hatchery program. (3) Provide sustainable tribal and non-tribal harvest of salmon and steelhead. (4) Maintain the genetic characteristics of salmonids in the Umatilla River Basin. (5) Increase annual returns to Three Mile Falls Dam to 31,500 adult salmon and steelhead. In the past the M&E project conducted long-term monitoring activities as well as two and three-year projects that address special needs for adaptive management. Examples of these projects include adult passage evaluations, habitat assessment surveys (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998), and genetic monitoring (Currens & Schreck 1995, Narum et al. 2004). The project's goal is to provide quality information to managers and researchers working to restore anadromous salmonids to the Umatilla River Basin. The status of completion of each of BPA's standardized work element was reported in 'Pisces'(March 2008) and is summarized.

13 HYDRO ENERGY↗

Development of a national center for hydrogen technology. A summary report of activities completed at the national center hydrogen technology from 2005 to 2010

The Energy & Environmental Research Center (EERC) located in Grand Forks, North Dakota, has operated the National Center for Hydrogen Technology® (NCHT®) since 2005 under a Cooperative Agreement with the U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL). The EERC has a long history of hydrogen generation and utilization from fossil fuels, and under the NCHT Program, the EERC has accelerated its research of hydrogen generation and utilization topics. Since the NCHT's inception, the EERC has received more than $65 million in funding of hydrogen-related projects ($20 million for the NCHT project which includes federal and corporate development partner funds) involving more than 85 partners (27 with the NCHT). The NCHT project's 19 activities span a broad range of technologies that align well with the Advanced Fuels Program goals and, specifically, those described in the Hydrogen from Coal Program research, development, and demonstration (RD&D) plan. A number of projects have been completed which range from technical feasibility of several hydrogen generation and utilization technologies to public and technical education and outreach tools. Projects under the NCHT have produced hydrogen from natural gas, coal, liquid hydrocarbons, and biomass. The hydrogen or syngas generated by these processes has also been purified to transportation-grade quality in many of these instances or burned directly for power generation. Also, several activities are still undergoing research, development, demonstration, and commercialization at the NCHT. This report provides a summary overview of the projects completed in the first 5 years of the NCHT. Individual activity reports are referenced as a source of detailed information on each activity.

08 HYDROGEN↗

Session 3: Agrivoltaics Pathways [Slides]

This presentation was developed for a webinar series for the USAID's South Asia Group for Energy (SAGE) and South Asia Regional Energy Partnership (SAREP). The presentation includes insights into agrivoltaic site assessment planning, including what is needed for a farm assessment, solar panel system design from the agricultural perspective, variables that go into crop selection, and environmental impact, sustainability, and agritourism, technical parameters for developing an agrivoltaics project, including what makes up a PV feasibility study, understanding variables that go into technology and equipment selection, agrivoltaic installation and agricultural integration, and monitoring and maintenance throughout the life of the project, and agrivoltaic financial planning, risk mitigation, and debt equity issues.

14 SOLAR ENERGY↗

A Day in the Life of the Laser Communications Relay Demonstration (LCRD) Project.

This presentation provides an overview of the planned concept of operations for the Laser Communications Relay Demonstration Project (LCRD), a joint project among NASA's Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory, California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MITLL). LCRD will provide at least two years of bi-directional optical communications at user data rates of up to 1.244 Gbps in an operational environment. The project lays the ground work for establishing communications architecture and protocols, and developing the communications hardware and support infrastructure, concluding in a demonstration of optical communications potential to meet NASAs growing need for higher data rates for future science and exploration missions. A pair of flight optical communications terminals will reside on a single commercial communications satellite in geostationary orbit; the two ground optical communications terminals will be located in Southern California and Hawaii. This paper summarizes the current LCRD architecture and key systems for the demonstration, focusing on what it will take to operate an optical communications relay that can support space-to-space, space-to-air, and space-to-ground optical links.

Optical↗

A Day in the Life of the Laser Communications Relay Demonstration Project

This paper provides an overview of the planned concept of operations for the Laser Communications Relay Demonstration Project (LCRD), a joint project among NASA's Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory, California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MIT/LL). LCRD will provide at least two years of bi-directional optical communications at user data rates of up to 1.244 Gbps in an operational environment. The project lays the groundwork for establishing communications architecture and protocols, and developing the communications hardware and support infrastructure, concluding in a demonstration of optical communications' potential to meet NASA's growing need for higher data rates for future science and exploration missions. A pair of flight optical communications terminals will reside on a single commercial communications satellite in geostationary orbit; the two ground optical communications terminals will be located in Southern California and Hawaii. This paper summarizes the current LCRD architecture and key systems for the demonstration, focusing on what it will take to operate an optical communications relay that can support space-to-space, space-to-air, and space-to-ground optical links.

Communications↗

Current Status of NASA's NEXT-C Ion Propulsion System Development Project

NASA's Evolutionary Xenon Thruster (NEXT) is a 7-kW class gridded ion thruster-based propulsion system that was initially developed from 2002 to 2012 under NASAs In-Space Propulsion Technology Program to meet future science mission requirements. In 2015, a contract was awarded to Aerojet Rocketdyne, with subcontractor ZIN Technologies, to design, build and test two NEXT flight thrusters and two power processing units that would be available for use on future NASA science missions. Because an additional goal of this contract is to take steps towards offering NEXT as a commercialized system, it is called the NEXT-Commercial project, or NEXT-C. This paper reviews the capabilities of the NEXT-C system, status of the NEXT-C project, and the forward plan to build, test, and deliver flight hardware in support of future NASA and commercial applications. It also briefly addresses some of the potential applications that could utilize the hardware developed and built by the project.

Shastry, Rohit↗

NASA Work Breakdown Structure (WBS) Handbook

The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule and budget development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.

Planning↗