At least 1,603 records · Page 89

A Novel Power-Hardware-in-the-Loop Interface Method for Grid-forming Inverter Systems: Preprint

Power Hardware-in-the-Loop (PHIL) simulation of grid-forming (GFM) inverter systems facilitates the testing of drastic scenarios like on-grid to off-grid transition, islanded microgrid operation without stiff grid etc. To the authors best knowledge, most of studies in literature are focused on PHIL simulation for grid-following inverter systems and only few studies are focused on GFM inverters and those are challenging and problematic especially for high-power applications. In this article, a novel PHIL simulation platform is proposed that enables interfacing of high-power GFM inverter systems. It proposes the concept of a virtual GFM inverter as a part of the proposed PHIL interface for GFM inverter. This addition of virtual GFM inverter in the PHIL interface expands the conventional Ideal Transformer Model (ITM) method and enables it to overcome the issues of instability of existing ITM methods. In the validation stage, a PHIL experiment is conducted on a 3-phase 480 V, 125 kVA GFM inverter system with proposed interfacing method. The results corroborates the fact that the proposed PHIL simulation method performs well and stable for GFM inverter system.

grid-forming inverters↗

Novel Power-Hardware-in-the-Loop Interface Method for Grid-Forming Inverter Systems

Power-hardware-in-the-loop (PHIL) simulations of grid-forming (GFM) inverter systems facilitate the testing of drastic scenarios, such as on-grid to off-grid transitions and islanded microgrid operations without a stiff grid. To the authors’ best knowledge, most studies in the literature focus on PHIL simulations for grid-following inverter systems. Only a few studies focus on GFM inverters, and those are challenging and problematic, especially for high-power applications. This article proposes a novel PHIL simulation platform that enables interfacing high-power GFM inverter systems. The paper proposes the concept of a virtual GFM inverter as a part of the proposed PHIL interface. This addition of a virtual GFM inverter in the PHIL interface expands the conventional ideal transformer model (ITM) method and enables it to overcome the issues of instability of existing ITM methods. In the validation stage, a PHIL experiment is conducted on a three-phase, 480-V, 125-kVA GFM inverter system with the proposed interfacing method. The results corroborate that the proposed PHIL simulation method performs well and is stable for GFM inverter systems.

droop control↗

Power System Operational Impacts of Electric Vehicle Dynamic Wireless Charging

The electrification of the transportation sector poses an opportunity for reducing greenhouse gas (GHG) emissions from passenger vehicles. Electric vehicle (EV) charging through dynamic wireless power transfer (DWPT), known as roadway electrification, could shift EV demand profiles to better coincide with renewable electricity generation. However, this would be a very large new load and few studies evaluate the regional impacts of DWPT charging in a power transmission system. This paper defines methods that address dataset generation for passenger vehicle trips and models to evaluate regional impacts for this emerging technology. Household vehicle miles traveled (VMT) data form localized EV demand profiles through discrete-event simulation. This data serves as exogenous inputs for a Production Cost Model (PCM) of a synthetic transmission system based on the Electric Reliability Council of Texas's (ERCOT) network. EV charging methods are compared for both a 2018 baseline generation mixture and a high-renewable generation case incorporating 20 GW of installed solar photovoltaic (PV) capacity. The PCM employs unit commitment and economic dispatch (UC&ED) models to compare financial, environmental, and grid reliability impacts from EV charging across passenger EV adoption levels. In-transit charging could reduce grid operational costs by as much as 1.49%, with up to $13.7B saved in annual vehicle operational costs for consumers compared to gas-powered vehicles. Health impacts analysis from power plant and vehicle tailpipe emissions from this study show net health benefits increase by 40% for in-transit charging coupled with high renewable generation. Renewable resources provide an avenue for cost-effective in-transit charging with reduced emissions. The combination of dataset generation and open-source power system modeling establish a foundation for the holistic evaluation of regional DWPT impacts.

dynamic wireless power transfer↗

Comparison of Distributive Consensus Algorithms for AnomalyDetection on the Power-Grid

As an increasing number of devices in the power-grid rely on high-precision clocks to measure electrical properties and time stamp data, GPS receivers have become a vulnerability on the power-grid. GPS spoofing attacks, in which a fake signal is transmitted, can cause sensor measurement errors that can misinform protective equipment and grid operators for both the transmission and distribution grid. The technology being developed to secure precision clocks in the transmission grid are not appropriate for the distribution grid. Thus, there is a need to developed anomaly detection algorithms that are suitable for the hardware available on the distribution grid. Traditionally, a distributed detection framework is comprised of spatially distributed nodes which acquire observations about a quantity of interest and sends the data to the fusion center, where a global decision is made. Instead the distribution grid has low-power devices, such as smart inverters and microPMUs, that could be used to perform highly parallelized calculations. Having on node calculations is beneficial since it is more network and computation efficient, as the more calculations can be performed where the data is being captured instead of communicating across a slow network to a centralized fusion center. Instead, we could employ an alternate peer-to-peer type of information exchange on the distribution grid that can still reach a global decision. A decentralized approach to anomaly detection makes efficient use of the computational and network bandwidth that exists, and it also lacks the single point of failure of a centralized approach. Thus, a decentralized local information exchange and/or inference is preferred. Lastly, the unreliability of the distribution grid network connections and potential noise or error in the measurements must be considered. In order to produce an effective detection tool, a Byzantine-fault tolerant and asynchronous algorithm must be developed. Thus, the first phase of our project is to develop a distributed, decentralized, asynchronous, Byzantine-fault tolerant, collaborative autonomy-based anomaly detection algorithm to collectively analyze clusters of data for signs of a malicious attack.

97 MATHEMATICS AND COMPUTING↗

Transforming the U.S. Market with a New Application of Ternary-Type Pumped-Storage Hydropower Technology: Preprint

As the deployment of wind and solar technologies increases at an unprecedented rate across the United States and in many world markets, the variability of power output from these technologies expands the need for increased power system flexibility. Energy storage can play an important role in the transition to a more flexible power system that can accommodate high penetrations of variable renewable technologies. This project focuses on how ternary pumped storage hydropower (T-PSH) coupled with dynamic transmission can help this transition by defining the system-wide benefits of deploying this technology in specific U.S. markets. T-PSH technology is the fastest responding pumped hydro technology equipment available today for grid services. T-PSH efficiencies are competitive with lithium-ion (Li-ion) batteries, and T-PSH can provide increased storage capacity with minimal degradation during a 50-year lifetime. This project evaluates T-PSH for grid services ranging from fast frequency response (FFR) for power system contingency events and enhanced power system stability to longer time periods for power system flexibility to accommodate ramping from wind and solar variability and energy arbitrage. In summary, this project: Compares power grid services and costs, including ancillary services and essential reliability services, for T-PSH and conventional pumped storage hydropower (PSH) - Evaluates the dynamic response of T-PSH and PSH technologies and their contribution to essential reliability services for grid stability by developing new power system model representations for T-PSH and performing simulations in the Western Interconnection - Evaluates production costs, operational impacts, and energy storage revenue streams for future power system scenarios with T-PSH focusing on time frames of 5 minutes and more - Assesses the electricity market-transforming capabilities of T-PSH technology coupled with transmission monitoring and dynamic control. This paper presents an overview of the methodology and initial, first-year preliminary findings of a 2-year in-depth study into how advanced PSH and dynamic transmission contribute to the transformation and modernization of the U.S. electric grid. This project is part of the HydroNEXT Initiative funded by the U.S. Department of Energy (DOE) that is focused on the development of innovative technologies to advance nonpowered dams and PSH. The project team consists of the National Renewable Energy Laboratory (project lead), Absaroka Energy, LLC (Montana-based PSH project developer), GE Renewable Energy (PSH pump/turbine equipment supplier), Grid Dynamics, and Auburn University (lead for NREL/Auburn dynamic modeling team).

13 HYDRO ENERGY↗

Queued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2023 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require projects seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. The amount of new electric capacity in these queues is growing dramatically, with nearly 2,600 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). However, most projects that apply for interconnection are ultimately withdrawn, and those that are built are taking longer on average to complete the required studies and become operational. Data from these queues nonetheless provide a general indicator for mid-term trends in developer interest.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Framework for Robust Long-Term Voltage Stability of Distribution Systems

Power injection uncertainties in distribution power grids, which are mostly induced by aggressive introduction of intermittent renewable sources, may drive the system away from normal operating regimes and potentially lead to the loss of long-term voltage stability (LTVS). Naturally, there is an ever increasing need for a tool for assessing the LTVS of a distribution system. This paper presents a fast and reliable tool for constructing inner approximations of LTVS regions in multidimensional injection space such that every point in our constructed region is guaranteed to be solvable. Numerical simulations demonstrate that our approach outperforms all existing inner approximation methods in most cases. Furthermore, the constructed regions are shown to cover substantial fractions of the true voltage stability region. In conclusion, the paper will later discuss a number of important applications of the proposed technique, including fast screening for viable injection changes, constructing an effective solvability index and rigorously certified loadability limits.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Substation-Level Grid Topology Optimization Using Bus Splitting: Preprint

Operations of substation circuit breakers are of high significance for performing system maintenance and topology optimization. Bus splitting is one type of topology changes where the two bus-bars at a substation become electrically disconnected after certain actions of circuit breakers. As these events involve detailed substation modeling, they are not typically considered in power system routine operation and control. In this paper, an improved substation-level topology optimization is developed by expanding traditional line switching with breaker-level bus splitting, which can further reduce grid congestion and generation costs. A tight McCormick relaxation is proposed to reformulate the bi-linear terms in the resultant topology optimization model. Thus, a tractable mixed-integer linear program formulation is presented which can be efficiently solved for real-time control. Numerical studies on the IEEE 14-bus and 118-bus systems demonstrate the performance and economic benefits of the proposed topology optimization approach.

bus split↗

SuperLab 2.0 Showcase: Connecting Five Labs to Tackle Grid Complexity and Unlock Unique Grid Asset Potential

SuperLab 2.0 (5-Lab Demo) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, PV, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactor (SMR), control centers, and gas turbines, across five DOE national laboratories-NLR, INL, NETL, LBNL, and SNL. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance U.S. Department of Energy's (DOE) network, and controlled via a centralized energy controller hosted at NLR's ARIES facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility. SuperLab 2.0 (5-Lab Demo) showcased a major advancement in federated national laboratory collaboration, enabling real-time, cross-laboratory experimentation to coordinate geographically dispersed distributed energy resources (DERs) using various communication protocols and networks. SuperLab 2.0 (5-Lab Demo) built on previous demonstrations conducted between NLR-PNNL and NLR-INL connecting diverse assets including distant protection devices, a SMR simulator, and a high temperature electrolyzer (HTE). Previous demos were based on a single connection between two labs with minimal coordination challenges. The 5-Lab demo with a centralized controller, distributed testbeds across different geographical locations, and use of protocols-based communication represents a scenario closer to real-world grid operations that coordinate resources across a region to meet system needs. This experiment studied how local DER controllers interact with a centralized energy controller during normal and abnormal events to maintain reliability. The SuperLab team across the five labs implemented a notional power system model equivalent of transmission and distribution lines, represented by the data networks interconnecting the labs. Each lab continuously exchanged local parameters (such as P and Q) from its Hardware-In-Loop (CHIL) and Power Hardware-In-Loop (PHIL) assets through centralized energy controller at NLR, enabling real-time interaction and coordination across sites. By leveraging ESnet as the communication backbone, the team successfully operated the distributed assets as a unified power system, with each bus represented by a different laboratory. This setup mirrors how assets interact in real-world power systems across dispersed locations with various protocols and latencies. At each lab site, assets were operated using their own local controllers which were coordinated through an overarching operation and control layer of centralized energy controller, equivalent to how an energy management system (EMS) orchestrates assets across a regional or national grid. SuperLab's federated connectivity utilized a Digital Real-Time Simulators (DRTS)-type gateway to connect Controller Hardware-In-Loop (CHIL) and PHIL assets between labs. To enable this federated connection through ESnet, a deterministic network was established where latency variations were consistent. This consistency allowed the development of digital filters for the power system assets across CHIL and PHIL interfaces to avoid unstable and unreliable grid conditions. This report provides an overview of the cross-laboratory configuration and offers insights into interconnecting geographically distributed research assets to test them as if they were co-located. This experiment represents a step toward linking nine DOE national laboratories, enabling nation-wide simulations that can address utility-driven challenges with grid resilience, flexibility, and modernization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

What Role Do Aggregators Play in Power System Security and Resilience? Preprint

Barriers to the participation of distributed energy resources (DERs) in wholesale electricity markets have limited the use of DERs for power system security and resilience. In September 2020, the Federal Energy Regulatory Commission (FERC) approved an order to reduce these barriers. FERC Order No. 2222 enables the participation of DER aggregators in wholesale electricity markets. DERs include renewable generation and technologies that support the integration of renewable generation by increasing grid flexibility and resilience. Requiring wholesale energy markets to allow DER aggregator participation provides a path for DERs to become competitive in these markets. As the contribution from aggregated DERs continues to increase, the aggregator's role in supporting grid security and resilience will become more critical. This paper reviews work that demonstrates how DER aggregators can provide resilience support through technical capabilities, operational strategies, and secure communication architectures. Socioeconomic influences and impacts of aggregators, including implications for social resilience, are presented. There is no one-size-fits-all approach to enhancing resilience in a power grid that includes a growing cohort of DER aggregators, but there are many options for aggregators to contribute to a more resilient and secure power grid.

aggregator↗

Voltage Regulation Using a Permanent Magnet Synchronous Generator with a Series Compensator: Preprint

A wind power plant (WPP) is often operated at unity power factor, and the utility host where the WPP connects prefers to regulate the voltage. Although this may not be an issue in a stiff grid, the connection to a weak grid can be a problematic. This paper explores the advantages of having voltage regulation capability via reactive power control. Another issue in wind power generation is that not all turbines are able to control their reactive power due to technical reasons or contractual obligations. A synchronous condenser (SC) using a permanent magnet synchronous generator (PMSG) is proposed to provide necessary reactive power for regulating voltage at a weak grid connection. A PMSG has the advantage of higher efficiency and reliability. Because of its lack of a field winding, a PMSG is typically controlled by a full-power converter, which can be costly. In the proposed system, the reactive power of the SC is controlled by a serially connected compensator operating in a closed-loop configuration. The compensator also damps the PMSG’s tendency to oscillate. The compensator’s VA rating is only a fraction of the rating of the SC and the PMSG. In this initial investigation, the proposed scheme is shown to be effective by computer simulations.

17 WIND ENERGY↗

Going to the Next Level: The Growth of Distributed Energy Resources [Guest Editorial]

The six articles in this special section focus on distributed energy resources (DERs). Since the first issue in this magazine on DER grid integration in the summer of 2009, DERs, specifically, solar PV-based systems, have evolved considerably to meet the needs of the power system from a planning and operations perspective. The result of this evolution is the theme of this issue: DERs play a major role in the power system. When relatively small numbers of PVs were first being installed, they were often showcases or demonstrations for the underlying technology, which was still quite expensive. The grid integration of these systems was a great research project, but many impacts we now see regularly simply did not exist at the earlier low-penetration levels. Now, nearly every distribution utility has experienced at least a few instances and challenges of DER integration within its service territory.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Artificially Intelligent Physical Model-Checking Approach to Detect Switching-Related Attacks on Power Systems

Decentralized and hierarchical microgrid control strategies have lain the groundwork for shaping the future smart grid. Such control approaches require the cooperation between microgrid operators in control centers, intelligent microcontrollers, and remote terminal units via secure and reliable communication networks. In order to enhance the security and complement the work of network intrusion detection systems, this paper presents an artificially intelligent physical model-checking that detects tampered-with circuit breaker switching control commands whether, due to a cyber-attack or human error. In this technique, distributed agents, which are monitoring sectionalized areas of a given microgrid, will be trained and continuously adapted to verify that incoming control commands do not violate the physical system operational standards and do not put the microgrid in an insecure state. The potential of this approach has been tested by deploying agents that monitor circuit breakers status commands on a 14-bus IEEE benchmark system. The results showed the accuracy of the proposed framework in characterizing the power system and successfully detecting malicious and/or erroneous control commands.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Small-Signal Stability Constrained Optimal Power Flow of Inverter-Dominated Power Systems with Flexible Operation Mode Selection

Given the intermittence and low inertia nature of inverter-based resources (IBRs), modern power systems with high penetration of IBRs challenge the conventional optimal power flow (OPF) analysis and the system may experience unexpected failures if stability constraints are not incorporated. This study proposes a small-signal stability-constrained OPF (SSSC-OPF) with flexible operation mode selection between grid-forming (GFM) and grid-following (GFL) modes for IBRs to address these challenges. The approach aims to maintain system stability with a sufficient stability margin while minimizing operation costs. The effectiveness of the proposed method is validated through extensive case studies on the IEEE 14-bus system. The results demonstrate that the proposed method is able to support system-level power flow analysis, reduce generation costs, and ensure stability under various disturbances.

grid-following↗

Island Power Systems With High Levels of Inverter-Based Resources: Stability and Reliability Challenges

As many island power systems seek to integrate high levels of renewable energy, they face new challenges on top of the existing difficulties of operating an isolated grid. With their drastically declining cost, variable renewables, such as wind and photovoltaics (PVs), are increasingly being integrated into island grids to reduce the use of imported fuels. These deployments of renewable energy are dominated by PV and wind generators, which bring unique challenges of their own.

IBRs↗

Scalable Stochastic Transmission Expansion: A Use Case for ExaSGD

The intermittent nature of renewable energy poses new challenges for power grids due to its variable and un- certain power output. These features of renewable generation are becoming more relevant to transmission planning as grids reach higher penetration levels of renewable energy. In this paper we present an approach for transmission planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using three-stage stochastic programming and the progressive hedging algorithm, we compute transmission expansion decisions on a modified RTS-GMLC test system. We augment the grid with large amounts of wind generation and consider many operational scenarios subject to wind uncertainty. This is an example of a possible use of the ExaSGD security constrained AC optimal power flow solver.