Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PAST”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

ABF Past Accomplishments - TEA/LCA

The Integrated Analysis task in the Agile BioFoundry (ABF) conducts techno-economic analysis (TEA) and life cycle assessment (LCA) to quantify the economics and environmental impacts of bioprocesses under development. The team from Argonne National Laboratory (ANL) and the National Renewable Energy Laboratory (NREL) develops TEA and LCA models of selected compound targets and hosts of interest to the ABF in an effort to provide an analysis-based foundation to the R&D. To date, the Integrated Analysis task has performed process modeling and analyses on multiple pairings of bioproducts and hosts, centered around major metabolic "beachheads" and "exemplar" molecules chosen for each of the metabolic pathways of interest. This presentation provides an overview of the approach used for TEA and LCA in the ABF and of the progress, outcomes, and impacts of TEA and LCA to support ABF goals, with a focus towards developing bio-based products that are both environmentally and economically viable.

BIOMASS FUELS,INORGANIC, ORGANIC, PHYSICAL, AND AN↗

Hanford Site Beryllium Program: Past, Present, and Future - 12428

The U.S. Department of Energy (DOE) has a long history of beryllium use because of the element's broad application to many nuclear operations and processes. At the Hanford Site beryllium alloy was used to fabricate parts for reactors, including fuel rods for the N-Reactor during plutonium production. Because of continued confirmed cases of chronic beryllium disease (CBD), and data suggesting CBD occurs at exposures to low-level concentrations, the DOE decided to issue a rule to further protect federal and contractor workers from hazards associated with exposure to beryllium. When the beryllium rule was issued in 1999, each of the Hanford Site contractors developed a Chronic Beryllium Disease Prevention Program (CBDPP) and initial site wide beryllium inventories. A new site-wide CBDPP, applicable to all Hanford contractors, was issued in May, 2009. In the spring of 2010 the DOE Headquarters Office of Health, Safety, and Security (HSS) conducted an independent inspection to evaluate the status of implementation of the Hanford Site Chronic Beryllium Disease Prevention Program (CBDPP). The report identified four Findings and 12 cross-cutting Opportunities for Improvement (OFIs). A corrective action plan (CAP) was developed to address the Findings and crosscutting OFIs. The DOE directed affected site contractors to identify dedicated resources to participate in development of the CAP, along with involving stakeholders. The CAP included general and contractor-specific recommendations. Following initiation of actions to implement the approved CAP, it became apparent that additional definition of product deliverables was necessary to assure that expectations were adequately addressed and CAP actions could be closed. Consequently, a supplement to the original CAP was prepared and transmitted to DOE-HQ for approval. Development of the supplemental CAP was an eight month effort. From the onset a core group of CAP development members were identified to develop a mechanism for assuring that consensus was achieved on products developed as part of the CAP and the closure process. The original CAP was developed based on a large number of actions developed from the HSS report. This was essentially a 'bottoms up' approach. The revised CAP development team concluded that a more holistic, process-based approach was appropriate to assure that the resulting deliverable resulted in a best-in-class product. Consequently, issues and recommendations contained in the HSS report were grouped into 11 program areas, specific product deliverables were identified within each of the program areas, and a work breakdown structure (WBS) was logically applied to number the groupings. While the revised approach to product development utilizes a more holistic, 'top down' approach, the intent was still to incorporate specific recommendations and address specific issues contained in the HSS report. Through implementation of this new approach, a collaborative team has been established that works together using a consensus process for ensuring product completion. Benefits of the new approach include building a level of trust amongst all parties, quality of the products have improved, and acceptance by all parties of what action will truly meet the intent of the deficiency and make the beryllium program stronger. Open dialogue occurs amongst the core Be CAP team members, Hanford contractors, and DOE. It has been a learning process and will continue to be one, but everyone shares the common goal of reducing worker exposure to beryllium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Local Parameters of PERC Solar Cells Metallized with Screen Printed Cu-Paste

For 40 TW of PV required to transition our planet to 100% renewables, the silver (Ag) should disappear from PV production. Advantages of copper (Cu) over silver (Ag) include: 1) bulk Cu has a similar conductivity to Ag (1.7 one millionth O-cm for Cu, 1.6 one millionth O-cm for Ag, and 2) Cu is -100 times cheaper than Ag, making it an excellent potential replacement. Problems associated with copper contacts include: 1) easy oxidation, and 2) diffusion into the Si cell and recombination activity. To summarize: 1) Rs map shows some regions with very high Rs, indicating no contact in those areas; 2) the histogram shows the peak Rs -5 ohm.cm2, which explains the high FF loss due to Rs; and 3) DLIT indicates non-uniformity in J01 and J02.

copper↗

Creative destruction: dismantling our past to build a better future - 15072

Innovation Economics hypothesizes that a firm's innovative capacity, stimulated by appropriable knowledge and technological externalities, has a greater impact on economic growth rather than the neoclassical view of capital accumulation. Under this theory, creative destruction is defined as the constant process of industrial evolution that cannibalizes older markets to create new enterprise. Economic momentum is stimulated through the creation of new markets based on demand for consumer goods and the resulting innovations for production and transportation. For firms currently engaged in the management of radioactive waste, listening to the 'Stakeholder's Voice' improves the product and service realization, leading to a competitive advantage in the marketplace. To illustrate the potential for economic development, a case study is provided on how a 'Recycle and Reuse' business strategy provides the tools to leverage unique resources to ensure a firm's survival and market prominence. As a concept, creative destruction serves to educate the reader on the mutual gains to the private and public sector fuelled by improvements in our ecosystem's capacity and capabilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Searching for science in the past and present discussion on commingling policy in the US - 15083

Since 1985, the policy in the United States for disposing of nuclear waste has included commingling defense and civilian spent nuclear fuel (SNF) and high-level radioactive waste (HLW) in a mined geologic repository. Commingling policy is under discussion again because of developments over the last several years in the nuclear waste management and disposal program. The authors reviewed the extent to which scientific and technical information was involved in considerations of commingling from the 1950's to the present. Evaluations undertaken by the US Department of Energy (US DOE) in 1985 and April 2014 are compared and the technical issues of health and safety, transportation, and national security are addressed in both evaluations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wastewater Treatment at the Fernald Preserve-Past, Present, and Future - 19555

Industrial wastewater treatment at the Fernald Preserve, Ohio, Site has been ongoing since a uranium metals refinery was constructed there at the beginning of the Cold War in 1951. Initially, the primary purpose of treatment was to recover uranium for reuse. Later, when cleanup of the site was progressing in the 1990's, wastewater treatment efforts greatly expanded. Large treatment facilities were constructed to handle contaminated surface water, groundwater, remediation wastewater, and leachate from the on-site disposal facility. These new facilities were designed to reduce uranium concentration to meet the US Environmental Protection Agency (EPA) drinking water standard and not generate large quantities of contaminated waste. Anion-exchange resin was chosen as the treatment media. The centerpiece of these facilities was the Advanced Wastewater Treatment facility, which had a treatment capacity of 10,978 liters per minute (lpm) (2900 gallons per minute [gpm]). Forecasts estimated that with the exception of groundwater the site's remediation would be completed in 2006. In 2003, the US Department of Energy (DOE) Office of Environmental Management began negotiations with the EPA and Ohio Environmental Protection Agency to reduce wastewater treatment capacity at the Fernald Environmental Management Project. These negotiations resulted in the site's treatment capacity being reduced to 6814 lpm (1800 gpm) via the Converted Advanced Wastewater Treatment facility (CAWWT). By 2010, the uranium concentration in the groundwater being pumped had been reduced to the degree that only intermittent treatment for uranium removal was needed. As a result, the CAWWT was considerably oversized. Increased maintenance on the aging CAWWT equipment led the DOE Office of Legacy Management (LM) to commission an assessment of the facility, which was completed in early 2015. The condition assessment identified numerous components at or near the end of their design life. Based on the assessment's findings and the fact that the current facility's treatment capacity was substantially greater than needed, LM began looking at options for an appropriately sized treatment system to handle the site's needs until the groundwater remediation was completed (currently projected for 2039). Options were evaluated in the spring of 2015, and LM presented the recommended changes to regulators and stakeholders. Approvals for a new, smaller system with a 189 lpm (50 gpm) capacity were obtained through a series of meetings in the summer of 2015. After more detailed planning in the fall of 2015, LM initiated the project in 2016. The project comprises the following four phases: (1) Removal and disposal of used media, piping, and tanks to make room for the new system in the existing building (completed in January 2017); (2) design of the new system (completed in April 2017); (3) construction, installation, and startup of the new system (completed in May 2018); and (4) backwash basin refurbishment (yet to be completed). In the late 2030's, when groundwater remediation is projected to be completed at the site, it is anticipated that the only remaining wastewater treatment need will be for small quantities of leachate from the on-site disposal facility. Results of leachate treatment testing in 2003 indicate it may be feasible to utilize a small passive treatment system for this leachate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗