Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “OPERATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

ATRIUM{sup TM} 11 operating experience

AREVA NP developed the ATRIUM{sup TM}11 BWR fuel assembly to address the industry need for substantial improvements in fuel reliability and economic performance. The product development effort initially consisted of analytical design assessments and out-of-pile testing of prototype fuel assemblies and components. An integral component of the development project is a comprehensive in-pile demonstration program designed to fully exercise the new fuel assembly under a variety of operating conditions and to provide performance measurements of new design features. Fuel vendors, reactor operators, and regulators have successfully relied upon irradiation feedback derived from in-pile demonstration programs to safely introduce new features in reload quantities. The primary ATRIUM{sup TM} 11 in-pile demonstration program consists of 40 lead fuel assemblies (LFA) operating among five BWR reactors globally, covering the range of operational regimes and licensing environments necessary to confirm reload applications for the product. Since the initial irradiation in 2012, multiple pool-side inspection examinations have been performed. The inspection activities primarily focused on the new design features; including the spacer, fuel rod array, upper tie plate and fuel channel. These inspections have resulted in the collection of a substantial set of visual images, dimensional measurements, and performance feedback that are of general interest to the industry. Results from the inspections are compared to the database for existing products and to predetermined acceptance criteria. This paper provides details of the global in-pile demonstration program and the characteristics of the LFAs. Results of the inspection campaigns will be presented, including a summary of the technical assessment of specific new design features and the overall performance of the ATRIUM{sup TM} 11 product. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Near-Term Operational Planning at the Hanford Tank Farms: Link to Execution - 17091

Washington River Protection Solutions, LLC uses an earned value management system to flow-down contractual requirements to operational activities. A Rolling Work Window Schedule Process is then used to plan and coordinate near-term operational activities at the Hanford tank farms for execution. This near-term operational planning process has been extended using a Multi-Year Operating Plan, underpinned with a dynamic simulation model, to better link execution of daily activities with mission objectives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Concept of Operations for the Spent Fuel Management System+ - 17134

The Nuclear Fuels Storage and Transportation Planning Project (NFST) within the US Department of Energy's Office of Nuclear Energy is tasked with identifying, planning, and conducting activities for developing interim storage and transportation capabilities in support of an integrated waste management system (IWMS). The IWMS is expected to transport Spent Nuclear Fuel (SNF) from a reactor and deliver it to a repository in a suitable container, with the possibility of interim storage. The system will be composed of multiple subsystems including possible interim storage facilities (ISFs), one or more repositories, facilities to package and/or repackage SNF, and transportation. The project team is analyzing options for an IWMS to identify viable options. To support analysis, the project team has developed a concept of operations framework for SNF related components of the potential integrated system and the interdependencies between those components. A goal of this work is to aid system analysts in developing consistent models across the project. The concept of operations framework will be updated periodically as new developments emerge. At a high level, SNF is expected to be transported from reactor sites to a repository. Initially, SNF is unloaded from reactors and placed in spent fuel pools (SFPs) for wet storage at utility sites. To maintain space in SFPs, SNF is placed in containers at reactor sites for storage and/or transportation only after the SNF has cooled enough to satisfy loading limits. Once transportation requirements are met, the SNF may be transported to an ISF, where it is stored until a repository is developed, or it is transported directly to a repository if one is available.While the high level operation of the system is straightforward, analysts must evaluate numerous alternatives, such as the number of ISFs (if any), ISF design, the stage at which SNF repackaging occurs (if needed), repackaging technology, types of containers used, repository design, component sizing, and timing of events. These alternatives arise due to technological, economic, or policy considerations. This paper provides an overview of the potential alternatives identified in the concept of operations framework at a conceptual level. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operator Evaluation of Mobile Robotic Systems for Inventory, Inspection, and Contamination Survey Tasks in D and D Environments - 17314

The Nuclear and Applied Robotics Group (NRG) has developed two mobile systems with simple, intuitive Human-Machine Interfaces (HMIs). Thus, the systems can be operated by operators who are not robotics experts to perform inventory, inspection and routine contamination surveys in areas where Special Nuclear Material (SNM) is stored and handled. This effort presents feedback collected from EM operators using the two systems at the Portsmouth Gaseous Diffusion Plant in Piketon, OH who used the robotic solutions to perform tasks on site and with minimal training. This approach has the potential to address issues related to ALARA, ergonomics, and reliably completing dull, repetitive tasks while maintaining domain-specific experts in the control loop. The two systems were shipped to - and demonstrated in - a DOE designated area and demonstrated completing contamination testing using a combination of real and surrogate sensors. This paper reviews the initial hardware development, demonstration requirements, and the modifications/improvements made to deploy the systems for this effort. It then summarizes the feedback garnered from EM operators who used the systems at the DOE facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparison of Exhibited Wear in Tefzel?, Kynar?, and UHMWPE Valve Seats Exposed to Cyclic Operations with Abrasive Slurry - 17519

Pacific Northwest National Laboratory (PNNL) conducted abrasive-wear testing of ball valves used for double valve isolation in nuclear waste process lines. The valve seat materials consisted of Kynar{sup R}, Tefzel{sup R}, and ultra-high-molecular-weight polyethylene (UHMWPE). Cycle testing was conducted for 1500 operating cycles for the Kynar{sup R} and Tefzel{sup R} valve seats and 5500 cycles for the UHMWPE valve seats. A valve operational cycle consisted of slurry flow, slurry gravity drain, flush water flow, and flush water gravity drain. Both two-way and three-way valves were evaluated, and valves were configured in simulated manifolds so the impact of serving various operational functions (e.g., slurry, flush, or drain control) could be evaluated as some valves are flushed prior to being cycled and others are not. Testing was conducted in PNNL's Multi-Phase Transport Evaluation Loop Facility using a performance-based simulant developed by PNNL specifically for this test program to emulate abrasive slurries for Hanford Tank Farms Waste Transfer System during single-shell tank retrieval and waste feed delivery to the Hanford Tank Waste Treatment and Immobilization Plant. Pre- and post-test valve tear-down evaluations were conducted to observe changes in the condition of internal components for the various seat materials. The various forms of physical wear observed for the different seat materials are presented. The wear results can be used to assess seat materials and valve configurations for application to waste transfer operations, and the observed wear mechanisms can provide insight into assessing valve service life. This information will be used to identify and select additional valve designs that should be evaluated for certification for future use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress toward cleanup of operable unit 1 groundwater at the US DOE0 Mound, Ohio, site: success of a phased-combined remedy - 15310

Industrial solvents (primarily trichloroethene) and other volatile organic compounds (VOCs) that originated from the former solid waste landfill contaminated the groundwater in the Buried Valley Aquifer beneath the Mound, Ohio, Site. The landfill was used from 1948 to 1974 for the disposal of trash, debris, and liquid waste. In 1977, much of the waste was relocated and encapsulated onsite. The landfill site and surrounding area (Operable Unit 1 [OU-1]) occupy approximately 1.6 hectares (4 acres) in the southwestern portion of the site. The historical pathway of concern consisted of leaching of contaminants from site soils or disposed wastes down into the groundwater, entrainment in the flowing groundwater, and migration toward former Mound site water-production wells. A groundwater pump-and-treat (P and T) system was initiated in 1996 to interdict the plume and a soil vapor extraction system was installed and operated from 1997 to 2003 to remove the bulk of the VOC sources from the vadose zone. Physical removal of the landfill waste and contaminated soil was performed between 2006 and 2010. Approximately 76,000 cubic meters (99,400 cubic yards) of material were removed from the OU-1 landfill area; the remaining soils in the OU-1 area meet the site cleanup objectives for future industrial or commercial use. Operation of the groundwater P and T system continued throughout this period. During the remediation time frame, groundwater monitoring and a number of innovative characterization campaigns were completed to assess the contaminant and biogeochemical conditions in the subsurface at OU-1. For example, in 2013 an integral pumping test was performed to characterize the amount (mass) of the low-level VOCs in groundwater. Soil and groundwater were also collected to obtain site-specific data to identify if geochemical conditions support natural attenuation reactions. Contaminant and hydrogeologic data collected from this test, as well as historical data, were evaluated to identify the distribution and potential sources of VOCs, refine the hydrogeologic description, update the conceptual model of VOC fate and transport, and determine if monitored natural attenuation remains a viable option to address VOCs in groundwater. To date, the performance of the phased-combined remedy has resulted in significant reductions in the concentrations of VOCs in the groundwater. For example, in 2013 the trichloroethene in all wells was less than 40 micrograms per liter, with a plurality of the wells near or below maximum contaminant levels. The generally observed declining concentration trends and the low concentrations for 2013 represent the net impact of source removal actions, P and T operation, and natural attenuation. In accordance with the current conditions, the joint US DOE and regulator Core Team is proceeding with a field demonstration of enhanced attenuation-an engineering and regulatory strategy that was recently developed by the Interstate Technology and Regulatory Council. Enhanced attenuation strategies focus on altering a target site in such a way that it can transition to natural attenuation. The combination of technologies to be deployed includes neat (pure) vegetable oil deployment in the deep vadose zone of the former landfill area and emulsified vegetable oil deployment within the footprint of the groundwater plume. In the first part of the deployment, neat oil spreads laterally and forms a thin layer on the water table beneath residual soil sources to intercept and reduce future VOC loading and to reduce oxygen inputs to the local groundwater. In the second part of the deployment, emulsified oil forms active bioremediation treatment zones within the plume footprint to degrade existing groundwater contaminants (via reductive dechlorination, co-metabolism, or both) and stimulates long-term attenuation capacity in the down-gradient plume (via co-metabolism). If the proposed activities are successful, they will accelerate the progress of the Mound OU-1 toward remedial goals and convert the current active P and T remedy into a passive attenuation-based remedy that represents a cost-effective final step in a phased remediation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Logistics Modeling of Emplacement Rate and Duration of Operations for Generic Geologic Repository Concepts - 16529

This study (1) identifies 16 potential geologic repository concepts for disposal of commercial spent nuclear fuel (SNF) and (2) evaluates the achievable repository waste emplacement rate and time needed to complete disposal for these concepts. Total repository capacity is assumed to be 140,000 MTU of spent fuel. The results provide important input to rough-order-of-magnitude (ROM) cost estimates for SNF disposal alternatives. The disposal concepts cover three categories of host geologic media: crystalline, salt, and argillaceous rock. Four waste package sizes are considered: 4PWR/9BWR; 12PWR/21BWR; 21PWR/44BWR, and dual purpose canisters (DPCs) packaged for disposal. Each concept is associated with package thermal power limits for emplacement and repository closure (the same for some concepts). To estimate the repository emplacement rate and duration of operations, logistical simulations were performed using assumptions on interim SNF storage, disposition of SNF stored in DPCs, repository opening date, and throughput rates for storage and disposal facilities. The simulations demonstrate that all concepts and scenarios, with few exceptions, are similar with regard to achievable emplacement rate and duration of operations. Throughput of 3,000 MTU per year can be maintained during the first 44 years of repository operations. Most of the inventory (99%) can be emplaced within 54 years of repository operations (the remaining 1% could require additional aging or smaller packages). Estimating ROM disposal cost was not an objective of this analysis, however, an example of disposal cost is provided to demonstrate key differences between concepts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Retrieval and Inspection Operations in Hanford Tank 241-AY-102 - 18234

In August 2012, a periodic annulus inspection of tank 241-AY-102 (AY-102) identified a leak from the primary tank into the secondary containment. A pumping plan was developed in 2013 to provide a path forward for recommended remediation actions to be implemented as part of the AY-102 Recovery Project. On March 21, 2014, the Washington State Department of Ecology issued an Administrative Order requiring Washington River Protection Solutions and the United States Department of Energy to conduct actions related to and including the removal of waste from AY-102. The parties agreed to resolve the appeal of the Administrative Order through a Settlement Agreement which addressed the remaining requirements and implemented enforceable milestone dates, including completion of waste removal operations, and performance of an inspection aimed at determining the cause of the leak. The AY-102 Recovery Project was developed to address the Settlement Agreement requirements. While retrieval of waste from Single-Shell Tanks has been performed at Hanford for decades, retrieval from Double-Shell Tank AY-102 required adaptation of the existing technologies to a new environment on a larger scale than previously encountered. Despite countless challenges and obstacles encountered throughout, the project successfully completed system design, fabrication, installation, testing, and retrieval operations within a highly compressed, aggressive schedule. Waste removal activities in AY-102 completed in February 2017. Subsequent inspection activities were completed as part of a multi-step process aimed at determining the likely cause of failure and assessing the feasibility of repair. A variety of input data were used in evaluating the likely failure mechanism, such as video examinations that revealed numerous through-floor penetrations and significant degradation across the visible surface area. Based on the operational history of the tank, corrosion testing and analysis, and the visual appearance of the confirmed leak sites, service-induced pitting corrosion due to the historic waste composition and operating conditions appears to be the primary degradation mechanism leading to failure of the tank. The inspection data has demonstrated that repairing and returning AY-102 to service would likely introduce substantial technical, logistical, and financial challenges due to the extent of bottom-plate damage. As a result, tank AY-102 will ultimately be closed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3D Reconstruction, Augmented Reality, and Telerobotic Operation - 18297

For nuclear facility decommissioning and waste cleanup, it is necessary to deploy simple and robust robots in remote sites performing precise and dexterous manipulation under teleoperation. To meet the challenge, this paper presents a new remote operation method based on augmented reality for intuitive and efficient teleoperation. The enhanced teleoperation system incorporates three technology components - 3D sensing and reconstruction, augmented reality, and teleoperation. The 3D reconstruction technology utilizes 3D cameras and constructs a 3D geometric model of the environment. Compared to the state-of-the- art technology, the presented 3D reconstruction has greater spatial precision and dynamic object tracking capability, which enhances the precision of manipulation tasks in a dynamic environment. The augmented reality technology entails generation of virtual surfaces of various geometries and dynamic characteristics, as well as consistent perceptual overlay in camera, robot and operator hand control spaces. Teleoperation is demonstrated with a dual-arm robot system operated under Robot Operating System (ROS). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operational Safety Analysis for Disposal Period of the Future Belgian Geological Disposal Facility - 19249

For more than 40 years, ONDRAF/NIRAS (the federal agency responsible for managing radioactive waste and enriched fissile materials in Belgium) has been studying the concept of a geological disposal facility (GDF) in poorly indurated clays as an option for the long-term management of both category B waste (low-level and intermediate-level long-lived waste - LILW-LL) and category C waste (high-level waste - HLW and spent fuel). In the absence of a policy decision, the proposed Belgian reference option for disposal of such waste is a GDF in poorly indurated clays, located at a depth between 200 m and 600 m. ONDRAF/NIRAS has developed a reference disposal concept for research, development and demonstration (RD and D) purposes. At the current stage of this program, the primary objective of ONDRAF/NIRAS is to establish the safety and feasibility of constructing, operating and closing a Geological Disposal Facility (GDF) at the conceptual design level, without any presumption about the exact location of the facility. This will be evaluated in a first version of the safety and feasibility case (SFC-1 V1) for the geological disposal of category B and C radioactive wastes. Analysis of the operational safety is an important part of the SFC-1 V1. ONDRAF/NIRAS, supported by BGE Technology GmbH, has prepared an operational safety analysis of the current GDF reference design and the processes occurring during the operation and closure period. A SWIFT methodology (Structured What If Technique) is used to identify risks and the measures required to mitigate their consequences. In parallel to this SWIFT analysis, specific attention is also given to fire risk, especially in the blind-ending disposal galleries (DG). Based on understanding of fire risk analysis, recommendations suggest using exclusively electrically driven equipment to reduce fire loads and minimize the fire hazard. In addition, strict working procedures could prevent the presence of workers between the DG dead end and equipment presenting significant fire load. The use of mobile refuge chambers should also be part of the safety concept. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparing Ecological Risk between D and D Facilities and Operating Facilities at the Hanford Site - 19531

Many countries are faced with a large remediation task resulting from World War II, the Cold War, and subsequent industrial development. In the U.S. the Department of Energy (DOE) faces the largest hazardous waste remediation tasks, with a commitment to protect human health and the environment during and following remediation. DoE's biggest challenge is remediation of the many remaining cleanup areas at the Hanford Site, Washington. Some Hanford sites have extensive ecological resources and ecosystems that require protection or restoration. We briefly 1) describe a rapid evaluation method for ecological resources on units slated for cleanup that allows comparison among the different areas at the Hanford Site, 2) examine some D4 (deactivation, decommissioning, decontamination and demolition) facilities and Operating facilities that require remediation, 3) describe potential ecological harm to resources on these sites, and 4) compare how risks from potential harm vary at the Hanford Site. The ecological evaluation includes three phases: 1) general steps (identify resource categories, identify cleanup areas), 2) ecological descriptions (describe resources on the site to be cleaned up), and 3) ecological ratings (rate the value of the resources on a scale that can be applied across remediation sites). After completion of these steps for the sites requiring cleanup, a comparison of potential risks can be made among types of facilities (e.g. D4 facilities, legacy waste sites, operating facilities). D4 facilities are those slated for deactivation, decommissioning, decontamination and demolition, while operating facilities at Hanford include waste treatment plants, sludge basins, waste trenches, Central Waste Complex, storage facilities, and disposal facilities, among others required to support the D4 and other remediation activities, before they too are remediated. Currently the potential harm to ecological (and eco-cultural) resources on the Hanford Site for remediation at D4 facilities is very low, but increases to very high (for reactors) during remediation when there is physical disruption, increased traffic and personnel, and possible increased contamination. Following remediation, the potential harm to ecological resources is low, and the value may increase due to restoration of native vegetation on sites that were largely industrial prior to remediation. In contrast, the potential harm to ecological resources at Operating Facilities was higher currently than for D4 facilities, but was low to medium following cleanup. The higher harm (risk) at D4 facilities partly derives from the location of the reactors near the Columbia River, a resource extremely important to Tribal Nations and to other peoples in the Northwestern United States, as well as for the iconic and threatened salmon populations. Methods described in this paper provide Congress, DOE managers, regulators, Tribes, and the general public with assurance that ecological and eco-cultural resources and the environment are being protected during and following remediation. The analysis of specific sites provides managers, regulators and the public with information to make cost-effective decisions about remediation that continues to enhance ecological value while protecting human health. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 117: Panel: Operational Excellence Through a Strong Safety Culture (R9.1)

This panel focused on the what the Department of Energy (DOE) and its contractors are doing to promote safety and excellence. The Integrated Safety Management System (ISMS) is crucial, but additional support provided by the Energy Facility Contractors Group (EFCOG), DOE, and environmental, safety, and health (ES and H) professionals in the field are equally imperative. The panelists discussed the importance of sharing lessons learned as well as are developing performance metrics to track operational and safety successes. This panel focused on current trends in building a strong operational safety culture and will include results from recent national workshops. Safety culture is the foundation of strong operational performance. Panel discussion included best practices from industry, DOE, and US NRC and also review tools being used to measure and evaluate safety culture programs. Panelists with presentations: Strong Safety Culture Promotes Operational Excellence (Kliss McNeel, Patricia Hughes); Safety Culture (Patricia Allen); DOE Safety Culture Improvement (Julie Goeckner); Supporting Safety Culture on the Front Line (Jan Preston); Interdependence of Safety Culture and Organizational Performance (Rizwan Shah)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Virtual and Augmented Realities to Support Development, Training, Deployment, and Operations of Remote Systems - 20516

Throughout the U.S. Department of Energy complex, there is a need to deploy new, unique equipment and systems for cleanup activities, waste processing, infrastructure repair, and decommissioning and demolition in radioactive and hazardous environments. The new equipment often consists of custom systems created by integrating and modifying commercial technologies. In addition, the systems are deployed in unique environments due to limited access, waste properties, and the presence of previously installed equipment or infrastructure that has been left in place. The deployment of custom systems that are 'turnkey' ready for first-time installation and application has its risks. Use of test platforms and mockups for cold (i.e., non-radioactive) testing is one method to mitigate that risk: however, full-scale test mockups for operations such as waste retrieval and tank inspection can be expensive and must be modified to incorporate the uniqueness of each application. An alternative to full-scale mockups is to use three-dimensional (3D) virtual environments and virtual reality (VR) technology to develop interactive virtual test beds. These can be used throughout the down-selection, development, system integration, operational planning, operator training, and mission execution phases of a task. Virtual test beds are readily reconfigured, can be used for multiple tasks, support multiple users in parallel, and can accommodate enhancements and changes not originally planned or conceived in the initial design. Virtual test beds also provide a platform for developing and testing augmented reality (AR) tools for improving operator efficiency. A VR experience has been generated for waste retrieval from a Hanford waste tank to present the potential applications of a virtual test bed. Features of the VR experience are presented, potential applications of VR and AR for remote applications are discussed, and development areas for improving future application are considered. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of simulation and control tools for extended operability of nuclear reactors - 183

The increasing penetration of Renewable Energy Sources (RES) requires the current power grid to be suitably improved. Because of the unsteady nature of RES, as long as energy storage facilities are not deployed and commercialized, an increased effort for the frequency regulation in order to ensure high reliability and performance is necessary. In such a scenario, nuclear units (traditionally deployed as baseload generating units) will be required to cooperate with intermittent RES-based power plants. Therefore, new reactors will need larger operational flexibility with respect to the capabilities of the currently operated units. Over the last few years, a comprehensive research program oriented at developing a suite of simulation tools and control system development capabilities was pursued at Argonne National Laboratory. In addition to the study of advanced reactor concepts (e.g. metal-fueled Sodium-cooled Fast Reactors) and technological innovations (such as S-CO{sub 2} Energy Conversion Cycles), new control approaches were developed to improve the operability of nuclear power plants. In particular, Model-based Predictive Control algorithm for Multiple Input Multiple Output control strategies and set-point definition algorithm based on Reference Governor were studied and applied to specific scenarios, providing with a range of novel capabilities able to meet the expected greater sets of requirements mentioned above. In this work, an overview of such tools and case studies is presented with particular focus on their impact on operability and economic competitiveness of nuclear energy. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Criticality hazard identification technique for development of safe operating limits and restrictions - 14367

Canadian Nuclear Laboratories' (CNL) National Research Universal (NRU) reactor located at Chalk River Laboratories (CRL) first attained criticality in 1957. Outside of the reactor core, the safe handling and storage of fissile material including experimental fuel components is required to support NRU's ongoing missions of research and medical isotope production [1]. Management of this fissionable material relies heavily on experienced operating staff, who perform work in accordance with a defined set of limits and restrictions as laid out in a Criticality Safety Document (CSD). Historically, the development of CSDs has relied heavily upon criticality safety analysts to gain sufficient knowledge about the facility. This has resulted in significant labor costs due to heavy use of computational methods. This paper describes a new approach for CNL to identify potential criticality scenarios, a 'Criticality Hazard Identification' (CHI) technique, developed from traditional process-oriented hazard and operability analysis, to identify and define operating conditions, identify limits and restrictions for the handling of fissionable materials outside of the core. The approach permits thorough evaluation of potential criticality hazards, for both well-understood historical and proposed future activities, by better leveraging the knowledge of operations personnel as well as other subject matter experts. The resulting document provides a detailed record of the various scenarios that were considered. These improvements to the CSD development and documentation process provide an additional benefit in terms of ease of modification to include new or changed activities within the limits and conditions. (authors)

42 ENGINEERING↗

Learning the boundary-to-domain mapping using Lifting Product Fourier Neural Operators for partial differential equations

Neural operators such as the Fourier Neural Operator (FNO) have been shown to provide resolution-independent deep learning models that can learn mappings between function spaces. For example, an initial condition can be mapped to the solution of a partial differential equation (PDE) at a future time-step using a neural operator. Despite the popularity of neural operators, their use to predict solution functions over a domain given only data over the boundary (such as a spatially varying Dirichlet boundary condition) remains unexplored. In this paper, we refer to such problems as boundary-to-domain problems; they have a wide range of applications in areas such as fluid mechanics, solid mechanics, heat transfer etc. We present a novel FNO-based architecture, named Lifting Product FNO (or LP-FNO) which can map arbitrary boundary functions defined on the lower-dimensional boundary to a solution in the entire domain. Specifically, two FNOs defined on the lower-dimensional boundary are lifted into the higher dimensional domain using our proposed lifting product layer. We demonstrate the efficacy and resolution independence of the proposed LP-FNO for the 2D Poisson equation.

Kashi, Aditya↗

Operation and Security Considerations for Heat Pipe Cooled Microreactors

Microreactors and small modular reactors (SMRs) are anticipated to be key elements in the United States' carbon-free energy portfolio, serving as reliable power sources for remote communities, disaster relief zones, extraterrestrial deployments, and backup power needs. Microreactors employ technologies that are substantially more advanced and recent compared to conventional reactors. Furthermore, they are of a drastically smaller scale and are designed to be operated in a diverse set of locations, offering operational flexibility and mobility. In addition, the autonomous or semi-autonomous operation of microreactors with minimal or no on-site staff is anticipated. These factors give rise to specific challenges with regards to their safety and security. The present work investigates considerations related to heat pipe operation, reactor transport, and cyber/cyberphysical security to ensure the indirect and direct consequences of nefarious actors’ actions are understood and can be mitigated by design or through physical security measures. In addition, future directions are proposed for consideration by both HPMR designers and for regulators.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Interregional Transmission Operational Coordination

This presentation will discuss challenges and opportunities on interregional coordination in the areas of interchange transaction, congestion management, reserve sharing and deliverability across multi-stage operational processes. It will then provide an overview of the interregional transmission operational coordination (IRTOC) project that currently focuses on congestion management, including Inter-regional transmission coordination in real time operations and operational planning, HVDC optimization (intra- and interregional), ancillary service deliverability (intra- and interregional). In addition, it will discuss the Sienna-Decomposition tool development to systematically study interregional coordination methods.

congestion management↗