Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Launch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

Launch Vehicle Design Process: Characterization, Technical Integration, and Lessons Learned

Engineering design is a challenging activity for any product. Since launch vehicles are highly complex and interconnected and have extreme energy densities, their design represents a challenge of the highest order. The purpose of this document is to delineate and clarify the design process associated with the launch vehicle for space flight transportation. The goal is to define and characterize a baseline for the space transportation design process. This baseline can be used as a basis for improving effectiveness and efficiency of the design process. The baseline characterization is achieved via compartmentalization and technical integration of subsystems, design functions, and discipline functions. First, a global design process overview is provided in order to show responsibility, interactions, and connectivity of overall aspects of the design process. Then design essentials are delineated in order to emphasize necessary features of the design process that are sometimes overlooked. Finally the design process characterization is presented. This is accomplished by considering project technical framework, technical integration, process description (technical integration model, subsystem tree, design/discipline planes, decision gates, and tasks), and the design sequence. Also included in the document are a snapshot relating to process improvements, illustrations of the process, a survey of recommendations from experienced practitioners in aerospace, lessons learned, references, and a bibliography.

Blair, J. C.↗

GEOSAT Follow-on (GFO) Altimeter Document Series: GFO Altimeter Engineering Assessment Report: From Launch to Acceptance, 10 February 1998 to 29 November 2000 - Volume 1

The US Navy's Geosat Follow-On (GFO) Mission, launched on February 10, 1998, is the latest in a series of altimetric satellites which include Seasat, Geosat, ERS-1, and TOPEX/POSEIDON (T/P). The purpose of this report is to document the GFO altimeter performance determined from the analyses and results performed by the NASA/GSFC/Wallops altimeter calibration team. It is the first of an anticipated series of NASA/GSFC/Wallops' GFO performance documents, each of which will update assessment results. This report covers the performance from launch to instrument acceptance by the Navy on November 29, 2000. Data derived from GFO will lead to improvements in the knowledge of ocean circulation, ice sheet topography, and climate change. In order to capture the maximum amount of information from the GFO data, accurate altimeter calibrations are required for the civilian data set which NOAA will produce. Wallops Flight Facility has provided similar products for the Geosat and T/P missions and is doing the same for GFO.

Hancock, David W., III↗

Magnetic Launch Assist

The objectives of this program are to: (1) To develop a safe, reliable, inexpensive, and minimum operation launch assist system for sending payloads into orbit using ground powered, magnetic suspension and propulsion technologies; (2) Improve safety, reliability, operability for third generation Reusable Launch Vehicles (RLV); (3) Reduce vehicle weight and increase payload capacity; and (4) Support operational testing of Rocket Based Combine Cycle (RBCC) engines.

Perez, Jose↗

STS-105 Pre-Launch Press Conference

George Diller, NASA Public Affairs, introduces Bill Gerstenmaier, Deputy Manager of the ISS Program, Dave King, NASA Director of Shuttle Processing, and Judy Konecky, Staff Meteorologist, in this STS-105 press conference. An overview is given of the success of the Expedition 2 crew, the expectations of the Expedition 3 crew, the launch countdown status, and the weather forecast for the Shuttle launch. They then answer questions from the press.

Source record↗

Corrosion of Stainless-Steel Tubing in a Spacecraft Launch Environment

This is a report of exposure of various metal tubing to oceanfront launch environments. The objective is to examine various types of corrosion-resistant tubing for Space Shuttle launch sites. The metals were stainless steels (austenitic, low-carbon, Mo-alloy, superaustenitic, duplex, and superferritic), Ni-Cr-Mo alloy, Ni-Mo-Cr-Fe-W alloy, and austenitic Ni-base superalloy.

Barile, Ronald G.↗

Development of a Launch Vehicle Manufacturing Process

One of the goals of this chapter is to provide sufficient information so that you can develop a manufacturing process for a potential launch vehicle. With the variety of manufacturing options available, you might ask how this can possibly be done in the span of a single chapter. Actually, it will be quite simple because a basic manufacturing process is nothing more than a set of logical steps that are iterated until they produce a desired product. Although these statements seem simple and logical, don't let this simplicity fool you. Manufacturing problems with launch vehicles and their subassemblies have been the primary cause of project failures because the vehicle concept delivered to the manufacturing floor could not be built as designed.

Vickers, John↗

Sharp-B01: An Important Element of NASA's Launch Vehicle Development Program

Sharp body designs for future reusable launch vehicles offer a number of attractive features including allowing zero staging, enabling airbreathing and lofting ascents, and potentially providing global cross range re-entries with continuous communications. The Slender Hypersonic Aerothermodynamic Research Program (SHARP) was initiated by NASA Ames to demonstrate sharp, passive leading edge designs for hypersonic vehicles, incorporating new ultra-high temperature ceramics. This paper will discuss how SHARP will provide an important technology base for making sharp body hypersonic vehicle designs a reality, and how this activity fits into NASA's overall program for developing next generation reusable launch vehicles.

Rasky, Daniel J.↗

A Plan for Advanced Guidance and Control Technology for 2nd Generation Reusable Launch Vehicles

Advanced guidance and control (AG&C) technologies are critical for meeting safety/reliability and cost requirements for the next generation of reusable launch vehicle (RLV). This becomes clear upon examining the number of expendable launch vehicle failures in the recent past where AG&C technologies would have saved a RLV with the same failure mode, the additional vehicle problems where this technology applies, and the costs associated with mission design with or without all these failure issues. The state-of-the-art in guidance and control technology, as well as in computing technology, is at the point where we can took to the possibility of being able to safely return a RLV in any situation where it can physically be recovered. This paper outlines reasons for AG&C, current technology efforts, and the additional work needed for making this goal a reality.

Hanson, John M.↗

Estimating the Cost of NASA's Space Launch Initiative: How SLI Cost Stack Up Against the Shuttle

NASA is planning to replace the Space Shuttle with a new completely reusable Second Generation Launch System by approximately 2012. Numerous contracted and NASA in-house Space Transportation Architecture Studies and various technology maturation activities are proceeding and have resulted in scores of competing architecture configurations being proposed. Life cycle cost is a key discriminator between all these various concepts. However, the one obvious analogy for costing purposes remains the current Shuttle system. Are there credible reasons to believe that a second generation reusable launch system can be accomplished at less cost than the Shuttle? The need for a credible answer to this question is critical. This paper reviews the cost estimating approaches being used by the contractors and the government estimators to address this issue and explores the rationale behind the numbers.

Hamaker, Joseph H.↗

The Solar-Sail Launched Interstellar Probe: Pre-Perihelion Trajectories and Application of Holography

Design of missions beyond our solar system presents many challenges. Here, we consider certain aspects of the solar-sail launched interstellar probe (ISP), a spacecraft slated for launch in the 2010 time period that is planned to reach the heliopause, at 200 Astronomical Units (AU) from the Sun after a flight of about 20-years duration. The baseline mission under consideration by NASA / JPL has a sail radius of 200 m, a science payload of 25 kg, a spacecraft areal mass thickness of about two grams per square meter and is accelerated out of the solar system at about 14 AU per year after performing a perihelion pass of about 0.25 AU. In current plans, the sail is to be dropped near Jupiter's orbit (5.2 AU from the Sun) on the outbound trajectory leg. One aspect of this study is application of a realistic model of sail thermo-optics to sail kinematics that includes diffuse / specular reflectance and sail roughness. The effects of solar-wind degradation of sail material, based on recent measurements at the NASA MSFC (Marshall Space Flight Center) Space Environment Facility were incorporated in the kinematical model. After setting initial and final conditions for the spacecraft, trajectory was optimized using the provision of variable sail aspect angle. The second phase of the study included consideration of rainbow holography as a medium for a message plaque that would be carried aboard the ISP in the spirit of the message plaques aboard Pioneer 10 /11 and Voyager 1 /2. A prototype holographic message plaque was designed and created by artist C. Bangs with the assistance of Ana Maria Nicholson and Dan Schweitzer of the Center for Holographic Arts in Long Island City, NY. The piece was framed by Simon Liu Inc. of Brooklyn, NY. Concurrent to the creation of the prototype message plaque, we explored the potential of this medium to transmit large amounts of visual information to any extraterrestrial civilization that might detect and intercept ISP. It was also necessary to investigate possible degradation of holograms by the space environment. We developed a new way of characterizing the optical quality of holograms.

Gregory L. Matloff↗

A Quantitative Reliability, Maintainability and Supportability Approach for NASA's Second Generation Reusable Launch Vehicle

The United States National Aeronautics and Space Administration (NASA) is in the midst of a 10-year Second Generation Reusable Launch Vehicle (RLV) program to improve its space transportation capabilities for both cargo and crewed missions. The objectives of the program are to: significantly increase safety and reliability, reduce the cost of accessing low-earth orbit, attempt to leverage commercial launch capabilities, and provide a growth path for manned space exploration. The safety, reliability and life cycle cost of the next generation vehicles are major concerns, and NASA aims to achieve orders of magnitude improvement in these areas. To get these significant improvements, requires a rigorous process that addresses Reliability, Maintainability and Supportability (RMS) and safety through all the phases of the life cycle of the program. This paper discusses the RMS process being implemented for the Second Generation RLV program.

Fayssal M. Safie↗

Launch Vehicle/Carrier Interaction, Improving the Analytical Integration Process

A goal of the aerospace industry is to reduce the cost of space transportation by a significant within the next decade. The present cost of launching a space transportation system which includes propulsion system, vehicle, carrier, and payload integrated together to form a system, encompasses much more than the design of the propulsion system and vehicle. The total cost includes the recurring cost of the process of integrating carriers, and payloads into the vehicle for each flight. The recurring cost of the integration of carrier/payloads systems is driven by the interaction of the vehicle. If the interaction can be well characterized and made to be very predictable for a range of payloads, or if it can be minimized then the cost of integrating a payload can be reduced significantly from today's levels. The Space Shuttle is very interactive with the payload. The interaction has been well characterized through finite element modeling and is reasonably predictable for a specific payload. Experience has shown, however, that the interaction is very manifest dependent, and small changes in one portion of a payload complement can change the interaction significantly in another portion. That is the affects of one on the other are such that if one or the other is changed slightly the environment at the interfaces can change significantly. To date the Shuttle has made in excess of one hundred flights. For each of these flights several iterations of dynamic analyses have been required in the development of each vehicle/carrier/payload system. The iterative analyses are needed because of the sensitivity of the interaction of the launch vehicle to the attached carrier/payload. The Multi Purpose Logistics Module (MPLM) is a carrier designed for flight in the Space Shuttle carrying a wide variation of cargo, supplies, and experiments to and from Space Station. Its integration process provides a unique area for improvement in the template in use today for transporting items to space. Discussion of the present MPLM integration analysis requirements and possible areas for improvement of the process are provided in the subject paper. Special emphasis is placed on reduction of requirements based on similarity of items being transported, and the use of carrier hardware for protection of the Shuttle Orbiter.

Shariett, Charles A.↗

Improved Re-Configurable Sliding Mode Controller for Reusable Launch Vehicle of Second Generation Addressing Aerodynamic Surface Failures and Thrust Deficiencies

In this report we present a time-varying sliding mode control (TV-SMC) technique for reusable launch vehicle (RLV) attitude control in ascent and entry flight phases. In ascent flight the guidance commands Euler roll, pitch and yaw angles, and in entry flight it commands the aerodynamic angles of bank, attack and sideslip. The controller employs a body rate inner loop and the attitude outer loop, which are separated in time-scale by the singular perturbation principle. The novelty of the TVSMC is that both the sliding surface and the boundary layer dynamics can be varied in real time using the PD-eigenvalue assignment technique. This salient feature is used to cope with control command saturation and integrator windup in the presence of severe disturbance or control effector failure, which enhances the robustness and fault tolerance of the controller. The TV-SMC is developed and tuned up for the X-33 sub-orbital technology demonstration vehicle in launch and re-entry modes. A variety of nominal, dispersion and failure scenarios have tested via high fidelity 6DOF simulations using MAVERIC/SLIM simulation software.

Shtessel, Yuri B.↗

An Overview of Research Activity at the Launch Systems Testbed

This paper summarizes the acoustic testing and analysis activities at the Launch System Testbed (LST) of Kennedy Space Center (KSC). A major goal is to develop passive methods of mitigation of sound from rocket exhaust jets with ducted systems devoid of traditional water injection. Current testing efforts are concerned with the launch-induced vibroacoustic behavior of scaled exhaust jets. Numerical simulations are also developed to study the sound propagation from supersonic jets in free air and through enclosed ducts. Scaling laws accounting for the effects of important parameters such as jet Mach number, jet velocity, and jet temperature on the far-field noise are investigated in order to deduce full-scale environment from small-scale tests.

Vu, Bruce↗

STS-96 Meal - Suit Up - Depart O and C C7 Discovery Launch - On Orbit - Landing - Isos

Footage of various stages of the STS-96 (Commander Kent Rominger; Pilot Rick Husband; Mission Specialist 1 Tamara Jernigan; Mission Specialist 2 Ellen Ochoa; Mission Specialist 3 Daniel Barry; Mission Specialist 4 Julie Payette; Mission Specialist 5 Valery Tokarev) Discovery launch is shown, including shots of the crew at breakfast, getting suited up, and departing to board the Orbiter. The launch and the landing are seen from many vantage points. On-board activities shown include: the approach and docking with the International Space Station, the payload transfer, the entering of the International Space Station Unity module, and the undocking of the Discovery from the International Space Station.

Source record↗

An Overview of the Process for Pre-Launch Checkout and Transition Activities in Support of the International Space Station (ISS) Payload Operations Integration Center

The objective of this paper is to provide future ISS scientists and/or engineers with an overview of the coordination process for the preparation and implementation of the pre-launch checkout and transition activities as observed from the Marshall Control Flight Center (MSFC) Payload Operations Integration Center perspective. This includes 4 major phases: (1) Verification and validation of the new command and telemetry databases that are needed for new payload experiments and new onboard formats; (2) Integration testing of the new ground control software and hardware; (3) Final internal and external pre-launch checkouts with cadre and experiment teams; (4) Performance of the actual synchronized transition between MSFC, Johnson Space Center (JSC), and ISS onboard configuration to new onboard software, ground software, and databases.

Digesu, Sam↗

Stage Separation Wind Tunnel Tests of a Generic Two-Stage-to-Orbit Launch Vehicle

In support of NASA s Space Launch Initiative Program, stage separation wind tunnel tests of a generic two-stage-to-orbit (TSTO) launch vehicle were conducted to determine the interference aerodynamic forces and moments and to determine the proximity flow environment. The tests were conducted in the NASA Marshall Space Flight Center s Aerodynamic Research Facility using a manual separation fixture for a Mach number range of 2.74 to 4.96 and separation distances up to 80 percent and 35 percent of the body length in the vehicle X and Z coordinates, respectively. For the TSTO bimese, winged-body vehicle configuration, both wing-to-wing and wing-to-fuselage configurations were tested. Individual-body force and moment, schlieren, and surface pressure data were acquired. The results showed that the proximity aerodynamics were dominated by complex bow shock interactions, and that he booster was statically unstable at several separation positions. As compared to the isolated body, the proximity normal force change with pitch angle was found to be nearly the same, and the proximity axial force increased, in general, by 3% for both bodies.

Bordelon, Wayne J., Jr.↗

Selection of Lockheed Martin's Preferred TSTO Configurations for the Space Launch Initiative

Lockheed Martin is developing concepts for safe, affordable Two Stage to Orbit (TSTO) reusable launch vehicles as part of NASA s Space Launch Initiaiive. This paper discusses the options considered for the design of the TSTO, the impact of each of these options on the vehicle configuration, the criteria used for selection of preferred configurations, and the results of the selection process. More than twenty configurations were developed in detail in order to compare optioiis such as propellant choice, serial vs. parallel burn sequence, use of propellant crossfeed between stages, bimese or optimized stage designs, and high or low staging velocities. Each configuration was analyzed not only for performance and sizing, but also for cost and reliability. The study concluded that kerosene was the superior fuel for first stages, and that bimese vehicles were not attractive.

Hopkins, Joshua B.↗