Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Feasibility Study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

Repository Drift Backfilling Demonstrator

The 'Backfilling Demonstrator' is one of the technological demonstrators developed by ANDRA in the framework of the feasibility studies for a geological repository for high-level long-lived (HL-LL waste) within a clay formation. The demonstrator concerns the standard and supporting backfills as defined in Andra's 2005 design. The standard backfill is intended to fill up almost all drifts of the underground repository in order to limit any deformation of the rock after the degradation of the drift lining. The supporting backfill only concerns a small portion of the volume to be backfilled in order to counter the swelling pressure of the swelling clay contained in the sealing structures. The first objective of the demonstrator was to show the possibility of manufacturing a satisfactory backfill, in spite of the exiguity of the underground structures, and of reusing as much as possible the argillite muck. For the purpose of this experiment, the argillite muck was collected on Andra's work-site for the implementation of an underground research laboratory. Still ongoing, the second objective is to follow up the long-term evolution of the backfill. Approximately 200 m{sup 3} of compacted backfill material have been gathered in a large concrete tube simulating a repository drift. The standard backfill was manufactured exclusively with argillite. The supporting backfill was made by forming a mixture of argillite and sand. Operations were carried out mostly at Richwiller, close to Mulhouse, France. The objectives of the demonstrator were met: an application method was tested and proven satisfactory. The resulting dry densities are relatively high, although the moduli of deformation do not always reach the set goal. The selected objective for the demonstrator was a dry density corresponding to a relatively high compaction level (95% of the standard Proctor optimum [SPO]), for both pure argillite and the argillite-sand mixture. The plate-percussion compaction technique was used and proved satisfactory. The measured dry densities are higher than the 95%-SPO objective. The implementation rates remain very low due to the experimental conditions involved. The metal supply mode would need to be revised before any industrial application is contemplated. The Demonstrator Program started in August 2004 and is followed up today over the long term. With that objective in mind, sensors and a water-saturation system have been installed. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from a Complex FUSRAP Site - Sylvania Corning FUSRAP Site - 12269

Since its addition to the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 2005, the Sylvania Corning FUSRAP Site (the Site) in Hicksville, New York, has provided challenges and opportunities from which to gain lessons learned for conducting investigation work at a complex multi-contaminant FUSRAP Site. The United States Army Corps of Engineers (USACE) and its contractors conducted a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation (RI) and are currently in the Feasibility Study (FS) phase at the Site. This paper presents the planning, execution, and reporting lessons learned by USACE during the RI/FS. The Site, operated from 1952 to 1967 for the research, development, and fabrication of nuclear elements under the Atomic Energy Commission, and other government and commercial contracts. Previous investigations performed by the New York State Department of Environmental Conservation (NYSDEC) and the current property owner have identified uranium, thorium, nickel, and chlorinated solvents, as Site contaminants [1]. The property owner is currently under two separate voluntary agreements with NYSDEC to investigate and remediate the Site. USACE's work at the site has been independent of this voluntary agreement and has moved on a parallel path with any work the property owner has completed. The project at the Site is complex because of the radiological and chemical concerns in both soils and groundwater, high hydraulically conductive soils, lack of a shallow aquiclude/aquitard, and a principal water table aquifer underlying the site. Contaminants are migrating from the Site and may potentially impact local drinking water supplies (municipal wells). During the RI/FS process the project team has encountered many issues and has thus developed many resolutions. The issues are organized into three categories: Planning and Contracting, Execution, and Reporting. Planning and Contracting lessons learned include: how to incorporate an overwhelming volume of historical data; how to manage a complex team of three prime contractors innovatively, and how to implement a project under an Award Fee task order. Execution lessons learned include: characterization of investigation derived wastes, and proper approach to radiological scanning of direct-push borings and soil cores. Reporting lessons learned include: coordinating multiple phase (iterative) reporting, large dataset presentation, and the National Priorities List (NPL) designation. The goal of this paper is to provide a resource for other project delivery teams that encounter similar situations on their projects to optimize cost savings, realization of efficiency, shorten schedules, or simply ensure higher quality deliverables. Each FUSRAP project is unique but there are many lessons we can apply to each site to gain efficiency and work more effectively. The Sylvania Corning FUSRAP site is a complex site with both soils and groundwater contamination, contamination to depths of 182 meters, and a highly politically charged environment of PRP involvement. Many of the lessons the project team has learned during the life of the project to date are being shared with others as well as being applied back to this project for future work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feasibility of Tidal and Ocean Current Energy in False Pass, Aleutian Islands, Alaska final report

The Aleutian Pribilof Islands Association was awarded a U.S. Department of Energy Tribal Energy Program grant (DE-EE0005624) for the Feasibility of Tidal and Ocean Current Energy in False Pass, Aleutian Islands, Alaska (Project). The goal of the Project was to perform a feasibility study to determine if a tidal energy project would be a viable means to generate electricity and heat to meet long-term fossil fuel use reduction goals, specifically to produce at least 30% of the electrical and heating needs of the tribally-owned buildings in False Pass. The Project Team included the Aleut Region organizations comprised of the Aleutian Pribilof Island Association (APIA), and Aleutian Pribilof Island Community Development Association (APICDA); the University of Alaska Anchorage, ORPC Alaska a wholly-owned subsidiary of Ocean Renewable Power Company (ORPC), City of False Pass, Benthic GeoScience, and the National Renewable Energy Laboratory (NREL). The following Project objectives were completed: collected existing bathymetric, tidal, and ocean current data to develop a basic model of current circulation at False Pass, measured current velocities at two sites for a full lunar cycle to establish the viability of the current resource, collected data on transmission infrastructure, electrical loads, and electrical generation at False Pass, performed economic analysis based on current costs of energy and amount of energy anticipated from and costs associated with the tidal energy project conceptual design and scoped environmental issues. Utilizing circulation modeling, the Project Team identified two target sites with strong potential for robust tidal energy resources in Isanotski Strait and another nearer the City of False Pass. In addition, the Project Team completed a survey of the electrical infrastructure, which identified likely sites of interconnection and clarified required transmission distances from the tidal energy resources. Based on resource and electrical data, the Project Team developed a conceptual tidal energy project design utilizing ORPC’s TidGen® Power System. While the Project Team has not committed to ORPC technology for future development of a False Pass project, this conceptual design was critical to informing the Project’s economic analysis. The results showed that power from a tidal energy project could be provided to the City of False at a rate at or below the cost of diesel generated electricity and sold to commercial customers at rates competitive with current market rates, providing a stable, flat priced, environmentally sound alternative to the diesel generation currently utilized for energy in the community. The Project Team concluded that with additional grants and private investment a tidal energy project at False Pass is well-positioned to be the first tidal energy project to be developed in Alaska, and the first tidal energy project to be interconnected to an isolated micro grid in the world. A viable project will be a model for similar projects in coastal Alaska.

16 TIDAL AND WAVE POWER↗

Science Requirements and Conceptual Design for a Polarized Medium Energy Electron-Ion Collider at Jlab

Researchers have envisioned an electron-ion collider with ion species up to heavy ions, high polarization of electrons and light ions, and a well-matched center-of-mass energy range as an ideal gluon microscope to explore new frontiers of nuclear science. In its most recent Long Range Plan, the Nuclear Science Advisory Committee (NSAC) of the US Department of Energy and the National Science Foundation endorsed such a collider in the form of a 'half-recommendation.' As a response to this science need, Jefferson Lab and its user community have been engaged in feasibility studies of a medium energy polarized electron-ion collider (MEIC), cost-effectively utilizing Jefferson Lab's already existing Continuous Electron Beam Accelerator Facility (CEBAF). In close collaboration, this community of nuclear physicists and accelerator scientists has rigorously explored the science case and design concept for this envisioned grand instrument of science. An electron-ion collider embodies the vision of reaching the next frontier in Quantum Chromodynamics - understanding the behavior of hadrons as complex bound states of quarks and gluons. Whereas the 12 GeV Upgrade of CEBAF will map the valence-quark components of the nucleon and nuclear wave functions in detail, an electron-ion collider will determine the largely unknown role sea quarks play and for the first time study the glue that binds all atomic nuclei. The MEIC will allow nuclear scientists to map the spin and spatial structure of quarks and gluons in nucleons, to discover the collective effects of gluons in nuclei, and to understand the emergence of hadrons from quarks and gluons. The proposed electron-ion collider at Jefferson Lab will collide a highly polarized electron beam originating from the CEBAF recirculating superconducting radiofrequency (SRF) linear accelerator (linac) with highly polarized light-ion beams or unpolarized light- to heavy-ion beams from a new ion accelerator and storage complex. Since the very beginning, the design studies at Jefferson Lab have focused on achieving high collider performance, particularly ultrahigh luminosities up to 10{sup 34} cm{sup -2}s{sup -1} per detector with large acceptance, while maintaining high polarization for both the electron and light-ion beams. These are the two key performance requirements of a future electron-ion collider facility as articulated by the NSAC Long Range Plan. In MEIC, a new ion complex is designed specifically to deliver ion beams that match the high bunch repetition and highly polarized electron beam from CEBAF. During the last two years, both development of the science case and optimization of the machine design point toward a medium-energy electron-ion collider as the topmost goal for Jefferson Lab. The MEIC, with relatively compact collider rings, can deliver a luminosity above 10{sup 34} cm{sup -2}s{sup -1} at a center-of-mass energy up to 65 GeV. It offers an electron energy up to 11 GeV, a proton energy up to 100 GeV, and corresponding energies per nucleon for heavy ions with the same magnetic rigidity. This design choice balances the scope of the science program, collider capabilities, accelerator technology innovation, and total project cost. An energy upgrade could be implemented in the future by adding two large collider rings housed in another large tunnel to push the center-of-mass energy up to or exceeding 140 GeV. After careful consideration of an alternative electron energy recovery linac on ion storage ring approach, a ring-ring collider scenario at high bunch repetition frequency was found to offer fully competitive performance while eliminating the uncertainties of challenging R&D on ampere-class polarized electron sources and many-pass energy-recovery linacs (ERLs). The essential new elements of an MEIC facility at Jefferson Lab are an electron storage ring and an entirely new, modern ion acceleration and storage complex. For the high-current electron collider ring, the upgraded 12 GeV CEBAF SRF linac will serve as a full-energy injector, and, if needed, provide top-off refilling. The CEBAF fixed-target nuclear physics program can be simultaneously operated since the filling time of the electron ring is very short. The ion complex for MEIC consists of sources for polarized light ions and unpolarized light to heavy ions, an SRF ion linac with proton energy up to 280 MeV, a 3 GeV prebooster synchrotron, a large booster synchrotron for proton energy up to 20 GeV, and a medium-energy collider ring with energy up to 100 GeV. The ion complex can accelerate other species of ions with corresponding energies at each accelerating stage. There are three collision points planned for MEIC. Two of them are for collisions with medium-energy ions; the third is for low energy ion beams stored in a dedicated low-energy compact storage ring, as a possible follow-on project.

43 PARTICLE ACCELERATORS↗

An environmental friendly animal waste disposal process with ammonia recovery and energy production: Experimental study and economic analysis

Highlights: • An environmental friendly animal manure waste treatment scheme was proposed. • Ammonia was removed and recovered from manure waste in the form of struvite. • Horse manure waste gasification was successfully conducted in a 10 kW gasifier. • Gasifier produces comparable or higher heating value of syngas as other feedstocks. • The proposed scheme is financially superior to pure gasification and incineration. - Abstract: Animal manure waste is considered as an environmental challenge especially in farming areas mainly because of gaseous emission and water pollution. Among all the pollutants emitted from manure waste, ammonia is of greatest concern as it could contribute to formation of aerosols in the air and could hardly be controlled by traditional disposal methods like landfill or composting. On the other hand, manure waste is also a renewable source for energy production. In this work, an environmental friendly animal waste disposal process with combined ammonia recovery and energy production was proposed and investigated both experimentally and economically. Lab-scale feasibility study results showed that 70% of ammonia in the manure waste could be converted to struvite as fertilizer, while solid manure waste was successfully gasified in a 10 kW downdraft fixed-bed gasifier producing syngas with the higher heating value of 4.9 MJ/(N m{sup 3}). Based on experimental results, economic study for the system was carried out using a cost-benefit analysis to investigate the financial feasibility based on a Singapore case study. In addition, for comparison, schemes of gasification without ammonia removal and incineration were also studied for manure waste disposal. The results showed that the proposed gasification-based manure waste treatment process integrated with ammonia recovery was most financially viable.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The lunar space communications architecture from the KARI-NASA joint study

This paper covers the lunar space communications architecture defined by the feasibility study jointly conducted by the KARI and NASA during October 2014 – April 2015. From the KARI perspective, a formalized space communications architecture, while crucial to its first lunar mission, the Korea Pathfinder Lunar Orbiter (KPLO), has many long-term ramifications to the entire lunar exploration program that the KARI will undertake during the next decade. To NASA, in spite of its multitude of lunar missions, past and present, taking another new, fresh look at the architecture with a newcomer, who can bring new ideas and concept, is a precious opportunity to address some important issues for the future lunar exploration.

Rew, Dong Young↗

Toward a clinical application of ex situ boron neutron capture therapy for lung tumors at the RA-3 reactor in Argentina

Purpose: Many types of lung tumors have a very poor prognosis due to their spread in the whole organ volume. The fact that boron neutron capture therapy (BNCT) would allow for selective targeting of all the nodules regardless of their position, prompted a preclinical feasibility study of ex situ BNCT at the thermal neutron facility of RA-3 reactor in the province of Buenos Aires, Argentina. (L)-4p-dihydroxy-borylphenylalanine fructose complex (BPA-F) biodistribution studies in an adult sheep model and computational dosimetry for a human explanted lung were performed to evaluate the feasibility and the therapeutic potential of ex situ BNCT. Methods: Two kinds of boron biodistribution studies were carried out in the healthy sheep: a set of pharmacokinetic studies without lung excision, and a set that consisted of evaluation of boron concentration in the explanted and perfused lung. In order to assess the feasibility of the clinical application of ex situ BNCT at RA-3, a case of multiple lung metastases was analyzed. A detailed computational representation of the geometry of the lung was built based on a real collapsed human lung. Dosimetric calculations and dose limiting considerations were based on the experimental results from the adult sheep, and on the most suitable information published in the literature. In addition, a workable treatment plan was considered to assess the clinical application in a realistic scenario. Results: Concentration-time profiles for the normal sheep showed that the boron kinetics in blood, lung, and skin would adequately represent the boron behavior and absolute uptake expected in human tissues. Results strongly suggest that the distribution of the boron compound is spatially homogeneous in the lung. A constant lung-to-blood ratio of 1.3 ± 0.1 was observed from 80 min after the end of BPA-F infusion. The fact that this ratio remains constant during time would allow the blood boron concentration to be used as a surrogate and indirect quantification of the estimated value in the explanted healthy lung. The proposed preclinical animal model allowed for the study of the explanted lung. As expected, the boron concentration values fell as a result of the application of the preservation protocol required to preserve the lung function. The distribution of the boron concentration retention factor was obtained for healthy lung, with a mean value of 0.46 ± 0.14 consistent with that reported for metastatic colon carcinoma model in rat perfused lung. Considering the human lung model and suitable tumor control probability for lung cancer, a promising average fraction of controlled lesions higher than 85% was obtained even for a low tumor-to-normal boron concentration ratio of 2. Conclusions: This work reports for the first time data supporting the validity of the ovine model as an adequate human surrogate in terms of boron kinetics and uptake in clinically relevant tissues. Collectively, the results and analysis presented would strongly suggest that ex situ whole lung BNCT irradiation is a feasible and highly promising technique that could greatly contribute to the treatment of metastatic lung disease in those patients without extrapulmonary spread, increasing not only the expected overall survival but also the resulting quality of life.

60 APPLIED LIFE SCIENCES↗

Creating Feature Representations of Antibody-Antigen Complexes for Fast Binding Prediction with Machine Learning

Antibody-antigen interactions underlie the function of the immune system. Numerous computational tools exist that aim to predict important quantities associated with antibodyantigen interactions, such as binding energy. Efficient and accurate prediction of such quantities would greatly accelerate vaccine (antigen) and therapeutic antibody design. Current methods and tools, however, rely on varying degrees of computationally expensive steps that limit their use on problems that require many predictions, and moreover, no single method produces consistently accurate estimates. In this project, we determined the feasibility of creating feature representations that concisely describe interacting pairs of antibody and antigen as rapidly computable numerical vectors, given the antibody-antigen co-complex. Such a featurization will allow the use of a statistical machine learning model that jointly models the results of the disparate existing computational tools available. In turn, this will greatly enhance their combined predictive performance. We developed a feature representation consisting of 86 descriptors of the antigen-antibody interface which is then reduced into a lower dimensional representation using a neural network dimensionality reduction step. We have demonstrated that this feature representation serves its intended purpose of rapidly describing antigen-antibody pairs for the task of binding strength prediction. While this feasibility study has proven that such a feature representation is feasible, additional research is likely improve its ability to support various tasks, including binding strength prediction.

59 BASIC BIOLOGICAL SCIENCES↗

Establishment of the roadmap for chlorination process development for zirconium recovery and recycle

Process development studies are being conducted to recover, purify, and reuse the zirconium (about 98.5% by mass) in used nuclear fuel (UNF) zirconium alloy cladding. Feasibility studies began in FY 2010 using empty cladding hulls that were left after fuel dissolution or after oxidation to a finely divided oxide powder (voloxidation). In FY 2012, two industrial teams (AREVA and Shaw-Westinghouse) were contracted by the Department of Energy Office of Nuclear Energy (NE) to provide technical assistance to the project. In FY 2013, the NE Fuel Cycle Research and Development Program requested development of a technology development roadmap to guide future work. The first step in the roadmap development was to assess the starting point, that is, the current state of the technology and the end goal. Based on previous test results, future work is to be focused on first using chlorine as the chlorinating agent and secondly on the use of a process design that utilizes a chlorination reactor and dual ZrCl{sub 4} product salt condensers. The likely need for a secondary purification step was recognized. Completion of feasibility testing required an experiment on the chemical decladding flowsheet option. This was done during April 2013. The roadmap for process development will continue through process chemistry optimization studies, the chlorinated reactor design configuration, product salt condensers, and the off-gas trapping of tritium or other volatile fission products from the off-gas stream. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Preliminary Characterization and Evaluation on FFF Manufactured 316H and ODS Steels

The Advanced Materials and Manufacturing Technology (AMMT) program develops cross-cutting technologies in support of a broad range of nuclear reactor technologies and maintains U.S. leadership in materials and manufacturing technologies for nuclear energy applications. The overarching vision of AMMT is to accelerate the development, qualification, demonstration, and deployment of advanced materials and manufacturing technologies to enable reliable and economical nuclear energy. Solid-state advanced manufacturing techniques can overcome some of the challenges in liquid-based additive manufacturing (AM) processes and should therefore be considered in material design and manufacturing as well. The work presented in this report forms part of a study on solid-state AM techniques of 316 stainless steels (SS) and oxide dispersion strengthened (ODS) steel components and supports the vision and goals of the AMMT program relevant to accelerate the development and deployment of advanced manufacturing processes. Achieving this can provide a safety improvement through larger safety margins, economic benefit for higher efficiency during operation, and a cost reduction through more effective manufacturing processes and less waste. This study provides preliminary information on development of the fused-filament fabrication (FFF) process using different powder types to demonstrate the sensitivity, and therefore the characterization of these sample components. The full solid-state manufacturing feasibility study will be completed and reported in a final feasibility evaluation during 2025. The study investigation used two 14YWT ODS powder batches, which provided information and the effect of different powder morphologies on manufacturability. The two 316SS powders demonstrated the effect of powder size on the manufacturability using FFF. Two product forms, namely a honeycomb structure and flat samples, were manufactured to demonstrate the flexibility of product form.

36 MATERIALS SCIENCE↗

Small reactor power systems for manned planetary surface bases

A preliminary feasibility study of the potential application of small nuclear reactor space power systems to manned planetary surface base missions was conducted. The purpose of the study was to identify and assess the technology, performance, and safety issues associated with integration of reactor power systems with an evolutionary manned planetary surface exploration scenario. The requirements and characteristics of a variety of human-rated modular reactor power system configurations selected for a range of power levels from 25 kWe to hundreds of kilowatts is described. Trade-off analyses for reactor power systems utilizing both man-made and indigenous shielding materials are provided to examine performance, installation and operational safety feasibility issues. The results of this study have confirmed the preliminary feasibility of a wide variety of small reactor power plant configurations for growth oriented manned planetary surface exploration missions. The capability for power level growth with increasing manned presence, while maintaining safe radiation levels, was favorably assessed for nominal 25 to 100 kWe modular configurations. No feasibility limitations or technical barriers were identified and the use of both distance and indigenous planetary soil material for human rated radiation shielding were shown to be viable and attractive options.

Bloomfield, Harvey S.↗

Current Status of the FFA@CEBAF Energy Upgrade Study

This work will describe the current status of the FFA@CEBAF energy upgrade feasibility studies. Technical updates are given, but more specific details are left to separate contributions. Specifically, this work will discuss improvements to the FFA arcs, a new recirculating injector proposal, and numerous modifications to the current 12 GeV CEBAF which will be required, such as the spreaders and recombiners architecture, splitters (time-of-flight chicanes), the extraction system, and the hall lines.

Bodenstein, R. M.↗

Integrated Geologic Storage Prefeasibility Study Proximal to Dry Fork Power Station, Powder River Basin, Wyoming

The pre-feasibility study—funded by the Department of Energy CarbonSAFE program (DE-FE0029375)—is centred around Basin Electric’s Dry Fork Station (DFS) in Wyoming’s Powder River Basin. Dry Fork Station, completed in 2011, is a high efficient coal-fired power plant that emits 3.3 million tons of CO2 per annum. The DFS site also host’s the Wyoming Integrated Test Center (ITC) funded by a $15 million investment by the State of Wyoming. The ITC is a public-private partnership test bed for CCS technologies. Geologic storage sites are in immediate vicinity of the DFS providing significant opportunities for co-located source and saline storage. The Powder River Basin (PRB) of Wyoming and Montana, was identified by NETL (2010) as having a “high potential” for commercial-scale carbon sequestration. The basin contains as much as 17,000 feet of sedimentary rock and covers an area of approximately 24,000 square miles. The PRB has a long history of hydrocarbon production and remaining undiscovered reserves. Accumulations and production of hydrocarbons in the basin indicate the presence of reservoir formations with significant pore volumes and impermeable sealing formations. This attribute alone suggests the reservoir and seal characteristics of the formations provide significant opportunities for CO₂ storage in saline reservoirs. Four high quality potential reservoir and sealing complexes have been identified for geologic storage. These formations range in depth from 6,500-9,500 feet underneath DFS including: (1) the Pennsylvanian Minnelusa Formation reservoir and Permian Goose Egg Formation (Opeche Shale) seal; (2) the Jurassic Hulett and Canyon Springs Sandstones of the Sundance Formation sealed by the Late Jurassic Upper Sundance Member and Morrison Formation and (3) the Early Cretaceous Lakota and Dakota, and Muddy Formation reservoirs sealed by the Mowry Shale. The preliminary reservoir characterization results integrate data from petrophysical well logs, core measurements, faults/fractures analysis, artificial penetrations, and published literature to evaluate geologic storage capacity and potential risk, for the Powder River Basin. These reservoir and seal combinations reside within ideal depth constraints and show suitable reservoir and seal characteristics conducive to commercial-scale storage. Specifically, this paper presents 1) high level description of the geologic storage complex 2) a first order risk analysis associated with pre-existing oil and gas wells, and 3) preliminary storage capacity and Area of Review estimates.

Quillinan, Scott↗