Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Engineer Shuttle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

Overview of the SLS Core Stage Thrust Vector Control System Design

The Space Launch System (SLS) Core Stage (CS) Thrust Vector Control (TVC) consists of four independent hydraulic systems. The SLS CS TVC system is comprised of 8 mechanical feedback Shuttle heritage Type III TVC actuators and four RS-25 engines, each attached to a Shuttle heritage gimbal block/bearing. Each hydraulic system nominally provides hydraulic power to one RS-25 engine and two actuators. Additionally, each system provides redundant control capability to one actuator on each of its neighboring systems. The RS-25 uses hydraulic power to control propellant valves, and the TVC actuators are used to move the engine in the pitch and yaw gimbal planes. The TVC system design leverages hardware from the Space Shuttle program as well as new hardware designed specifically for the Core Stage. The Space Shuttle heritage hardware directly reused on SLS includes the Orbiter TVC hydraulic servo-actuators (with two slight design modifications), the Orbiter hydraulic circulation pumps, the Orbiter gimbal block/bearing, and the Solid Rocket Booster hydraulic pumps. The Solid Rocket Booster APU turbines are powered by hot gas produced by a catalyzed hydrazine decomposition. The SLS Core Auxiliary Power Unit (CAPU) is derived from the Space Shuttle Orbiter Auxiliary Power Unit (APU); on the SLS Core Stage, the CAPU turbine is spun using cold gas tapped-off from the RS-25 to CS liquid hydrogen autogenous pressurization line. The remaining hardware in the TVC system (hydraulic Filter Manifold (FM), hydraulic Supply Accumulator (SA), hydraulic Return Accumulator (RA), Hydraulic Reservoir, Exhaust Gas Heat Exchanger (EGHE)) as well as the avionics providing control and telemetry (TVC Actuator Controller (TAC) and CAPU Controller (CAPUC) are new components developed for SLS. This paper is the first installment in a seven-paper series surveying the design, engineering, test validation, and flight performance of the Core Stage Thrust Vector Control system. In this paper, the overall design architecture of the CS TVC is presented, with a focus on the interfaces between the TVC actuators, the engines, their hydraulic power systems, and the avionics that provide commands from the SLS Vehicle Management (VM) software to effect stable and robust flight control for the integrated SLS launch vehicle.

Thrust Vector Control↗

Overview of the SLS Core Stage Thrust Vector Control System Design

The Space Launch System (SLS) Core Stage (CS) Thrust Vector Control (TVC) consists of four independent hydraulic systems. The SLS CS TVC system is comprised of 8 mechanical feedback Shuttle heritage Type III TVC actuators and four RS-25 engines, each attached to a Shuttle heritage gimbal block/bearing. Each hydraulic system nominally provides hydraulic power to one RS-25 engine and two actuators. Additionally, each system provides redundant control capability to one actuator on each of its neighboring systems. The RS-25 uses hydraulic power to control propellant valves, and the TVC actuators are used to move the engine in the pitch and yaw gimbal planes. The TVC system design leverages hardware from the Space Shuttle program as well as new hardware designed specifically for the Core Stage. The Space Shuttle heritage hardware directly reused on SLS includes the Orbiter TVC hydraulic servo-actuators (with two slight design modifications), the Orbiter hydraulic circulation pumps, the Orbiter gimbal block/bearing, and the Solid Rocket Booster hydraulic pumps. The Solid Rocket Booster APU turbines are powered by hot gas produced by a catalyzed hydrazine decomposition. The SLS Core Auxiliary Power Unit (CAPU) is derived from the Space Shuttle Orbiter Auxiliary Power Unit (APU); on the SLS Core Stage, the CAPU turbine is spun using cold gas tapped-off from the RS-25 to CS liquid hydrogen autogenous pressurization line. The remaining hardware in the TVC system (hydraulic Filter Manifold (FM), hydraulic Supply Accumulator (SA), hydraulic Return Accumulator (RA), Hydraulic Reservoir, Exhaust Gas Heat Exchanger (EGHE)) as well as the avionics providing control and telemetry (TVC Actuator Controller (TAC) and CAPU Controller (CAPUC) are new components developed for SLS. This paper is the first installment in a seven-paper series surveying the design, engineering, test validation, and flight performance of the Core Stage Thrust Vector Control system. In this paper, the overall design architecture of the CS TVC is presented, with a focus on the interfaces between the TVC actuators, the engines, their hydraulic power systems, and the avionics that provide commands from the SLS Vehicle Management (VM) software to effect stable and robust flight control for the integrated SLS launch vehicle.

Thrust Vector Control↗

A Return to Innovative Engineering Design, Critical Thinking and Systems Engineering

I believe we are facing a critical time where innovative engineering design is of paramount importance to the success of our aerospace industry. However, the very qualities and attributes necessary for enhancing, educating, and mentoring a creative spirit are in decline in important areas. The importance of creativity and innovation in this country was emphasized by a special edition of the Harvard Business Review OnPoint entitled: "The Creative Company" which compiled a series of past and present articles on the subject of creativity and innovation and stressed its importance to our national economy. There is also a recognition of a lack of engineering, critical thinking and problem-solving skills in our education systems and a trend toward trying to enhance those skills by developing K-12 educational programs such as Project Lead the Way, "Science for All Americans", Benchmarks 2061 , etc. In addition, with respect to spacecraft development, we have a growing need for young to mid-level engineers with appropriate experience and skills in spacecraft design, development, analysis, testing, and systems engineering. As the Director of Engineering at NASA's Johnson Space Center, I realized that sustaining engineering support of an operational human spacecraft such as the Space Shuttle is decidedly different than engineering design and development skills necessary for designing a new spacecraft such as the Crew Exploration Vehicle of the Constellation Program. We learned a very important lesson post Columbia in that the Space Shuttle is truly an experimental and not an operational vehicle and the strict adherence to developed rules and processes and chains of command of an inherently bureaucratic organizational structure will not protect us from a host of known unknowns let alone unknown unknowns. There are no strict rules, processes, or procedures for understanding anomalous results of an experiment, anomalies with an experimental spacecraft like Shuttle, or in the conceptual design of a spacecraft. Engineering design is as much an art as it is a science. The critical thinking skills necessary to uncover lurking problems in an experimental design and creatively develop solutions are some of the same skills necessary to design a new spacecraft. Thus, I believe engineers unfamiliar with or removed from design and development need time to transition and develop the required skill set to be effective spacecraft designers. I believe the creative process necessary in design can be enhanced and even taught as early as grades K-12 and should continue to be nurtured and developed at the university level and beyond. I am going to present a strategy for developing learning teams to address complex multidisciplinary problems and to creatively develop solutions to those problems rapidly at minimal cost. I will frame a real problem, the development of on-orbit thermal protection system repair of the Space Shuttle, and step through the series of skills necessary to enhance the creative process. The case study I will illustrate is based on a real project, the R&D Reinforced Carbon-Carbon (RCC) Repair Team's development of on-orbit repair concepts for damaged Space Shuttle RCC nose cap and/or leading edges.

Camarda, Charles J.↗

Advanced technology for Space Shuttle Auxiliary Propellant Valves.

Propellant shutoff valves required for the operation of the pulse modulated gaseous hydrogen/gaseous oxygen rocket engines for the Space Shuttle Auxiliary Propulsion System are specified to operate for one million cycles over a ten-year period with zero maintenance, very fast response, very low leakage, and over a wide temperature range. Based on an analytical leakage and wear model, sealing configurations were conceived, sized, and developed. Two prototype valves featuring different components were designed, built, and evaluated for 100,000 cycles. Design concepts and test results are presented.

Wichmann, H.↗

Development of the platelet micro-orifice injector

For some time to come, liquid rocket engines will continue to provide the primary means of propulsion for space transportation. The injector represents a key to the optimization of engine and system performance. The present investigation is concerned with a unique injector design and fabrication process which has demonstrated performance capabilities beyond that achieved with more conventional approaches. This process, which is called the 'platelet process', makes it feasible to fabricate injectors with a pattern an order of magnitude finer than that obtainable by drilling. The fine pattern leads to an achievement of high combustion efficiencies. Platelet injectors have been identified as one of the significant technology advances contributing to the feasibility of advanced dual-fuel booster engines. Platelet injectors are employed in the Space Shuttle Orbit Maneuvering System (OMS) engines. Attention is given to injector design theory as it relates to pattern fineness, a description of platelet injectors, and test data obtained with three different platelet injectors.

La Botz, R. J.↗

Designing the Ares I Crew Launch Vehicle Upper Stage Element and Integrating the Stack at NASA's Marshall Space Flight Center

Fielding an integrated launch vehicle system entails many challenges, not the least of which is the fact that it has been over 30 years since the United States has developed a human-rated vehicle - the venerable Space Shuttle. Over time, whole generations of rocket scientists have passed through the aerospace community without the opportunity to perform such exacting, demanding, and rewarding work. However, with almost 50 years of experience leading the design, development, and end-to-end systems engineering and integration of complex launch vehicles, NASA's Marshall Space Flight Center offers the in-house talent - both junior- and senior-level personnel - to shape a new national asset to meet the requirements for safe, reliable, and affordable space exploration solutions.' These personnel are housed primarily in Marshall's Engineering Directorate and are matrixed into the programs and projects that reside at the rocket center. Fortunately, many Apollo era and Shuttle engineers, as well as those who gained valuable hands-on experience in the 1990s by conducting technology demonstrator projects such as the Delta-Clipper Experimental Advanced, X-33, X-34, and X-37, as well as the short-lived Orbital Space Plane, work closely with industry partners to advance the nation's strategic capability for human access to space. Currently, only three spacefaring nations have this distinction, including the United States, Russia, and, more recently, China. The U.S. National Space Policy of2006 directs that NASA provide the means to travel to space, and the NASA Appropriations Act of2005 provided the initial funding to begin in earnest to replace the Shuttle after the International Space Station construction is complete in 20 IO? These and other strategic goals and objectives are documented in NASA's 2006 Strategic Plan.3 In 2005, a team of NASA aerospace experts conducted the Exploration Systems Architecture Study, which recommended a two-vehicle approach to America's next space transportation system for missions to the International Space Station in the next decade and to explore the Moon and establish an outpost around the 2020 timeframe.4 Based on this extensive study, NASA selected the Ares I crew launch vehicle configuration and the heavy-lift Ares V cargo launch vehicle (fig 1). This paper will give an overview of NASA's approach to integrating the Ares I vehicle stack using capabilities and assets that are resident in Marshall's Engineering Directorate, working in partnership with other NASA Centers and the U.S. aerospace industry. It also will provide top-level details on the progress of the in-house design of the Ares I vehicle's upper stage element.

Lyles, Garry↗

RS-25 for the NASA Crew Launch Vehicle: The Evolution of SSME for Space Exploration

As a first step towards the fulfillment of the National Vision for Space Exploration, NASA has begun development of the Crew Launch Vehicle (CLV). The CLV will act, in conjunction with the Crew Exploration Vehicle, as the next generation human launch system to first support missions to the International Space Station (ISS), then later to support the lunar return missions, and then after that to exploration missions to Mars and beyond. The CLV is a two-stage launch vehicle with the first stage based upon the Space Shuttle solid rocket booster. The newly designed, expendable second stage is powered by a single RS-25 liquid hydrogen/liquid oxygen rocket engine. The RS-25 is essentially the Space Shuttle Main Engine (SSME) evolved for a new mission, new environments, and new conditions. The CLV Upper-Stage Engine (USE) office has been established to develop the RS-25 in support of the CLV Project. This paper presents an outline and discussion of the risks associated with this endeavor of transforming the SSME into the upper-stage, altitude-start RS-25 and the plans being undertaken to understand and mitigate these risks. In addition, to meet the long-term requirements of the CLV launch manifest, it will be necessary to redevelop the RS-25, with its long history as the reusable SSME for the Space Shuttle Program, as an expendable engine. While the first flights of CLV will be using heritage SSME hardware, beyond that a new version of RS-25 as an expendable engine is being pursued by the CLV USE element. The goals of this work include the need to make the hardware more producible while maintaining the inherent and inherited reliability of the basic design. This paper will also discuss the risks and present the plans for developing both this next generation version of the RS-25 and for developing the manufacturing capacity necessary to support the CLV Project.

Kynard, Michael H.↗

Task 12 data dump (phase 2) OME integrated thrust chamber test report

The characteristics and performance of the orbit maneuvering engine for the space shuttle are discussed. Emphasis is placed on the regeneratively cooled thrust chamber of the engine. Tests were conducted to determine engine operating parameters during the start, shutdown, and restart. Characteristics of the integrated thrust chamber and the performance and thermal conditions for blowdown operation without supplementary boundary layer cooling were investigated. The results of the test program are presented.

Tobin, R. D.↗

Designing the Ares I Crew Launch Vehicle Upper Stage Element and Integrating the Stack at NASA's Marshall Space Flight Center

Fielding an integrated launch vehicle system entails many challenges, not the least of which is the fact that it has been over 30 years since the United States has developed a human-rated vehicle - the venerable Space Shuttle. Over time, whole generations of rocket scientists have passed through the aerospace community without the opportunity to perform such exacting, demanding, and rewarding work. However, with almost 50 years of experience leading the design, development, and end-to-end systems engineering and integration of complex launch vehicles, the National Aeronautics and Space Administration's (NASA's) Marshall Space Flight Center offers the in-house talent - both junior- and senior-level personnel - to shape a new national asset to meet the requirements for safe, reliable, and affordable space exploration solutions. The technical personnel are housed primarily in Marshall's Engineering Directorate and are matrixed into the programs and projects that reside at the rocket center. Fortunately, many Apollo-era and Shuttle engineers, as well as those who gained valuable hands-on experience in the 1990s by conducting technology demonstrator projects such as the Delta-Clipper Experimental Advanced, X-33, X-34, and X-37, as well as the short-lived Orbital Space Plane, work closely with industry partners to advance the nation's strategic capability for human access to space. The Ares Projects Office, resident at Marshall, is managing the design and development of America's new space fleet, including the Ares I, which will loft the Orion crew capsule for its first test flight in the 2013 timeframe, as well as the heavy-lift Ares V, which will round out the capability to leave low-Earth orbit once again, when it delivers the Altair lunar lander to orbit late next decade. This paper provides information about the approach to integrating the Ares I stack and designing the upper stage in house, using unique facilities and an expert workforce to revitalize the nation's space exploration resources.

Otte, Neil E.↗

Development of a shuttle plasmid without host restriction sites for efficient transformation and heterologous gene expression in Clostridium cellulovorans

Clostridium cellulovorans capable of producing large amounts of acetate and butyrate from cellulose is a promising candidate for biofuels and biochemicals production from lignocellulosic biomass. However, the restriction modification (RM) systems of C. cellulovorans hindered the application of existing shuttle plasmids for metabolic engineering of this organism. To overcome the hurdle of plasmid digestion by host, a new shuttle plasmid (pYL001) was developed to remove all restriction sites of two major RM systems of C. cellulovorans , Cce 743 I and Cce 743 II. The pYL001 plasmid remained intact after challenge by C. cellulovorans cell extract. Post-electroporation treatments and culturing conditions were also modified to improve cell growth and colony formation on agar plates. With the improvements, the pYL001 plasmid, without in-vivo methylation, was readily transformed into C. cellulovorans with colonies of recombinant cells formed on agar plates within 24 h. Three pYL001-derived recombinant plasmids free of Cce 743 I/ Cce 743 II restriction sites, after synonymous mutation of the heterologous genes, were constructed and transformed into C. cellulovorans . Functional expression of these genes was confirmed with butanol and ethanol production from glucose in batch fermentations by the transformants. In conclusion, the pYL001 plasmid and improved transformation method can facilitate further metabolic engineering of C. cellulovorans for cellulosic butanol production.

09 BIOMASS FUELS↗

Space Shuttle

The design of the spacecraft is described. Focus is placed on the external tanks, the solid rocket boosters, the main engine, and the space shuttle orbiter. The logistics of the project were reviewed and included the management plan, the facilities involved in construction and testing of the space shuttle, and the benefits expected from the project.

Source record↗

Precursor SSF utilization: The MODE experiments

The MIT Space Engineering Research Center is the principal investigator for a series of experiments which utilize the Shuttle Middeck as an engineering dynamics laboratory. The first, which flew on STS-48 in Sep. 1991, was the Middeck O-gravity Dynamics Experiment (MODE). This experiment focused on the dynamics of a scaled deployable truss, similar to that of SSF, and contained liquids in tanks. MODE will be reflown in the fall of 1993. In mid-1994, the Middeck Active Control Experiment (MACE) will examine the issues associated with predicting and verifying the closed loop behavior of a controlled structure in zero gravity. The paper will present experiment background, planning, operational experience, results, and lessons learned from these experiments which are pertinent to SSF utilization.

Crawley, Edward F.↗

Actuation and system design and evaluation OMS engine shutoff valve, Volume 1

A technology program was conducted to identify and verify the optimum valve and actuation system concept for the Space Shuttle Orbit Maneuvering System engine. Of major importance to the valve and actuation system selection was the ten-year, 100-mission, 10,000-cycle life requirement, while maintaining high reliability, low leakage, and low weight. Valve and actuation system concepts were comparatively evaluated against past valve failure reports and potential failure modes due to the shuttle mission profile to aid in the selection of the most optimum concept for design, manufacture and verification testing. Two valve concepts were considered during the preliminary design stage; i.e., the moving seat and lifting ball. Two actuation systems were manufactured and tested. Test results demonstrate the viability of a lifting ball concept as well as the applicability of an ac motor actuation system to best meet the requirements of the shuttle mission.

Dunn, V. B.↗

Engineering support for the Space Processing Application Rocket /SPAR/ project - Preparation for effective Shuttle utilization

Sounding rockets are being used in the Space Processing Program to develop the scientific, engineering, and management expertise to effectively use the Shuttle. An extensive vehicle selection study was necessary to optimize the payload weight, cost factors, and low-g time. The vehicle and subsystem development for each of the flight vehicles is described along with analyses and programmatic considerations peculiar to the Space Processing Program. Several early Space Processing payloads are described along with available flight results.

Ott, R. H.↗

The space transportation system

Design features of the Space Shuttle orbiter vehicle, main engine, solid rocket booster, external tank, and inertial and spinning solid upper stages are presented. Space Shuttle facilities at Kennedy Space Center are discussed, together with the long duration exposure facility, a reusable, unmanned gravity-gradient stabilized, free-flying structure which can accomodate both active and passive experiments requiring long-term space exposure. Standard and optional Shuttle services are outlined, and preliminary flight assignments are described.

Hamon, W. J.↗