Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Decision Support System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

Opportunities for Renewable Energy, Storage, Vehicle Electrification, and Demand Response in Rajasthan's Power Sector

To support the government of Rajasthan and inform state policy makers, regulators, planners, and system operators on power system trends, NREL undertook a long-term capacity expansion planning study. We used NREL's flagship capacity expansion planning tool for the power sector called the Regional Energy Deployment System India (ReEDS-India) to understand the generation and transmission needs of Rajasthan through 2050. NREL's modeling framework includes co-optimized decisions about generation, energy storage, transmission, and reserves investments needed to meet future demand while maintaining reliable electricity supply. Scenario analysis was conducted to assess a range of potential future scenarios, providing insight for planning agencies, utilities, and local stakeholders about key trends and sources of uncertainty.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Dynamically Reconfigurable Data Readout of Pixel Detectors for Automatic Synchronization with Data Acquisition Systems

Reconfigurable detectors with dynamically selectable sensing and readout modes are highly desirable for implementing edge computing as well as enabling advanced imaging techniques such as foveation. The concept of a camera system capable of simultaneous passive imaging and dynamic ranging in different regions of the detector is presented. Such an adaptive-autonomous detector with both spatial and temporal control requires programmable window of exposure (time frames), ability to switch between readout modes such as full-frame imaging and zero-suppressed data, modification of the number of pixel data bits and independent programmability for distinct detector regions. In this work, a method is presented for seamlessly changing time frames and readout modes without data corruption while still ensuring that the data acquisition system (DAQ) does not need to stop and resynchronize at each change of setting, thus avoiding significant dead time. Data throughput is maximized by using a minimum unique data format, rather than lengthy frame headers, to differentiate between consecutive frames. A data control and transmitter (DCT) synchronizes data transfer from the pixel to the periphery, reconfigures the data to transmit it serially off-chip, while providing optimized decision support based on a DAQ definable mode. Measurements on a test structure demonstrate that the DCT can operate at 1 GHz in a 65 nm LP CMOS process.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Applications of fuzzy logic to control and decision making

Long range space missions will require high operational efficiency as well as autonomy to enhance the effectivity of performance. Fuzzy logic technology has been shown to be powerful and robust in interpreting imprecise measurements and generating appropriate control decisions for many space operations. Several applications are underway, studying the fuzzy logic approach to solving control and decision making problems. Fuzzy logic algorithms for relative motion and attitude control have been developed and demonstrated for proximity operations. Based on this experience, motion control algorithms that include obstacle avoidance were developed for a Mars Rover prototype for maneuvering during the sample collection process. A concept of an intelligent sensor system that can identify objects and track them continuously and learn from its environment is under development to support traffic management and proximity operations around the Space Station Freedom. For safe and reliable operation of Lunar/Mars based crew quarters, high speed controllers with ability to combine imprecise measurements from several sensors is required. A fuzzy logic approach that uses high speed fuzzy hardware chips is being studied.

Lea, Robert N.↗

Distributed semantic networks and CLIPS

Semantic networks of frames are commonly used as a method of reasoning in many problems. In most of these applications the semantic network exists as a single entity in a single process environment. Advances in workstation hardware provide support for more sophisticated applications involving multiple processes, interacting in a distributed environment. In these applications the semantic network may well be distributed over several concurrently executing tasks. This paper describes the design and implementation of a frame based, distributed semantic network in which frames are accessed both through C Language Integrated Production System (CLIPS) expert systems and procedural C++ language programs. The application area is a knowledge based, cooperative decision making model utilizing both rule based and procedural experts.

Snyder, James↗

Weather Research and Forecasting Model Sensitivity Comparisons for Warm Season Convective Initiation

Mesoscale weather conditions can significantly affect the space launch and landing operations at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS). During the summer months, land-sea interactions that occur across KSC and CCAFS lead to the formation of a sea breeze, which can then spawn deep convection. These convective processes often last 60 minutes or less and pose a significant challenge to the forecasters at the National Weather Service (NWS) Spaceflight Meteorology Group (SMG). The main challenge is that a "GO" forecast for thunderstorms and precipitation is required at the 90 minute deorbit decision for End Of Mission (EOM) and at the 30 minute Return To Launch Site (RTLS) decision at the Shuttle Landing Facility. Convective initiation, timing, and mode also present a forecast challenge for the NWS in Melbourne, FL (MLB). The NWS MLB issues such tactical forecast information as Terminal Aerodrome Forecasts (TAFs), Spot Forecasts for fire weather and hazardous materials incident support, and severe/hazardous weather Watches, Warnings, and Advisories. Lastly, these forecasting challenges can also affect the 45th Weather Squadron (45 WS), which provides comprehensive weather forecasts for shuttle launch, as well as ground operations, at KSC and CCAFS. The need for accurate mesoscale model forecasts to aid in their decision making is crucial. Both the SMG and the MLB are currently implementing the Weather Research and Forecasting Environmental Modeling System (WRF EMS) software into their operations. The WRF EMS software allows users to employ both dynamical cores - the Advanced Research WRF (ARW) and the Non-hydrostatic Mesoscale Model (NMM). There are also data assimilation analysis packages available for the initialization of the WRF model- the Local Analysis and Prediction System (LAPS) and the Advanced Regional Prediction System (ARPS) Data Analysis System (ADAS). Having a series of initialization options and WRF cores, as well as many options within each core, provides SMG and NWS MLB with a lot of flexibility. It also creates challenges, such as determining which configuration options are best to address specific forecast concerns. The goal of this project is to assess the different configurations available and to determine which configuration will best predict warm season convective initiation in East-Central Florida. Four different combinations of WRF initializations will be run (ADAS-ARW, ADAS-NMM, LAPS-ARW, and LAPS-NMM) at a 4-km resolution over the Florida peninsula and adjacent coastal waters. Five candidate convective initiation days using three different flow regimes over East-Central Florida will be examined, as well as two null cases (non-convection days). Each model run will be integrated 12 hours with three runs per day, at 0900, 1200, and 1500 UTe. ADAS analyses will be generated every 30 minutes using Level II Weather Surveillance Radar-1988 Doppler (WSR-88D) data from all Florida radars to verify the convection forecast. These analyses will be run on the same domain as the four model configurations. To quantify model performance, model output will be subjectively compared to the ADAS analyses of convection to determine forecast accuracy. In addition, a subjective comparison of the performance of the ARW using a high-resolution local grid with 2-way nesting, I-way nesting, and no nesting will be made for select convective initiation cases. The inner grid will cover the East-Central Florida region at a resolution of 1.33 km. The authors will summarize the relative skill of the various WRF configurations and how each configuration behaves relative to the others, as well as determine the best model configuration for predicting warm season convective initiation over East-Central Florida.

Watson, Leela R.↗

Circular Economy for Photovoltaics in Service of Energy Transition

The challenge of energy transition is immediate and immense; current projections target 75 TW of photovoltaics (PV) capacity by 2050. While any transition to renewable energy technology is preferable to the current fossil-based system, it is ideal to improve the sustainability of PV to minimize negative environmental and social impacts. Circular economy (CE) has been proposed as a method to improve the sustainability of PV, especially for emerging materials like perovskites. CE is a set of actions, principles, and systems which aim to design out waste and keep products and materials in use, to reduce environmental impacts and enable sustainable development. At the most basic level, CE is "reduce, reuse, recycle", the R-actions, in ranked order. CE of a PV technology can be metricized in a variety of ways, such as the Material Circularity Indicator (Smith and Jones, Ellen MacArthur Foundation, 2019) or recycling rates. Unfortunately, standard CE metrics have several shortcomings for measuring renewable energy technologies in the context of deployment for energy transition (Figge 2018, Saidani 2019): 1) Only measure mass flows; 2) De-prioritization of the use phase in favor of mass circularity when scoring; and 3) Tight focus on a single product scale The use phase and energy flows of PV are key to energy transition, and therefore need to be quantified. Additionally, correlating product-scale to system-scale is necessary for quantifying the environmental impacts of energy transition. Life Cycle Assessment (LCA) can address some of these concerns, but also focuses on a single product scale and has trouble capturing the dynamics of system-scale energy transition, such as the interaction of module lifetime with manufacturing demands for energy transition deployment schedules. Therefore, we developed an open-source Python-based system dynamics model to quantify the mass, energy and carbon impacts of CE R-actions for PV technologies in the energy transition; PV in the CE (PV ICE) (Ovaitt & Mirletz 2021). The tool captures supply chains from material extraction through end of life, incorporating 5 circular end of life pathways. PV ICE takes in any evolving bill of materials, module properties and deployment schedule to support researchers and decision makers with data-backed insights. In this work, we quantify and compare proposed CE sustainable PV module designs and lifecycle management strategies, spanning currently commercialized technologies, government and industry technology targets, and several low Technology Readiness Level (TRL) emerging PV technologies, including perovskites. Our analyses capture the projected evolutions of lifetime, efficiency and material circularity of these PV technologies, as well as their material supply chains. Our analyses emphasize the importance of examining a suite of metrics to identify priorities and tradeoffs, and inform design or lifecycle management decisions holistically. Previous analyses have demonstrated the central importance of PV module lifetime to support energy transition while minimizing impacts. High levels of material circularity (>90%) enable minimizing lifecycle wastes, can reduce virgin material demands if paired with improving efficiency, but demonstrate tradeoffs in energy return on investment. In the fervor of new material and technology development, it is important to remember that CE is not the end goal; decarbonization and energy transition are the end goal. CE should be used in service to improve the sustainability of PV, and R-actions evaluated for their usefulness and efficacy to this end.

carbon↗

Scalable foundation models for numerical simulations on HPC platforms

In recent years, foundation models (FMs) have begun to reshape numerical simulations on high-performance computing (HPC) platforms. These large, pre-trained AI models enable rapid predictions across a broad range of physical domains, including Earth system modeling, fluid dynamics, materials science, as well as complex multi-modal simulations in aerospace engineering and fusion research. By training on diverse datasets, FMs learn intricate relationships and underlying physical behavior while also enabling the quantification of uncertainty in their predictions. This capability allows simulations that once required days of numerical calculation to be completed in minutes (FM inference), supporting real-time design optimization, uncertainty-aware decision making, and more comprehensive exploration of complex scenarios.

AI↗

Probabilistic risk assessment of the Space Shuttle. Phase 3: A study of the potential of losing the vehicle during nominal operation, volume 1

This document is the Executive Summary of a technical report on a probabilistic risk assessment (PRA) of the Space Shuttle vehicle performed under the sponsorship of the Office of Space Flight of the US National Aeronautics and Space Administration. It briefly summarizes the methodology and results of the Shuttle PRA. The primary objective of this project was to support management and engineering decision-making with respect to the Shuttle program by producing (1) a quantitative probabilistic risk model of the Space Shuttle during flight, (2) a quantitative assessment of in-flight safety risk, (3) an identification and prioritization of the design and operations that principally contribute to in-flight safety risk, and (4) a mechanism for risk-based evaluation proposed modifications to the Shuttle System. Secondary objectives were to provide a vehicle for introducing and transferring PRA technology to the NASA community, and to demonstrate the value of PRA by applying it beneficially to a real program of great international importance.

Fragola, Joseph R.↗

Project Final Report

The initial focus of this GSRP project was to model and develop systems for optimized use of the Microwave lamp for use in bioregenerative life support systems (BLSS). The microwave lamp, which has been developed for use in BLSS as part of a NASA small business innovation research (SBIR) grant, exhibits a number of characteristics that make it an excellent candidate for use in BLSS. However, we decided to shift the focus of the project, after discussions with scientists at KSC, to a broader question. Specifically, we decided to investigate the possibility of developing a decision tool for characterizing overall fighting system effectiveness in a plant growth system. It seemed pointless to optimize a microwave lamp for BLSS when there was no good way to decide what exactly an optimized system would look like. The problem is a complex one, involving multiple, conflicting objectives with irreconcilable units, significant constraints, and a wide range of relative importance among the objectives. The project would involve not only characterizing this complex decision process, but also would require some investigations into the physical properties of the lighting systems being considered. Thus, we turned to the field of Decision Modeling as a means of meeting this objective. After a thorough investigation of the literature, a technique was chosen and carefully developed. Implementation and analysis of the system are still in progress, and should be completed during the summer of 1999. Ancillary studies, which were conducted in the course of the project, have also been conducted, and are summarized below.

Ciolkosz, Daniel↗

NASA's M and S Accreditation Process Plan and Specification for Space Exploration

NASA's Exploration Systems Mission Directorate (ESMD) is implementing a management approach for modeling and simulation (M&S) that will provide decision-makers information on the model's fidelity, credibility, and quality. This information will allow the decision-maker to understand the risks involved in using a model's results in the decision-making process. This presentation will discuss NASA's overall approach to achieving formal accreditation of its models or simulations supporting space exploration. The development of a formal Accreditation Plan is a key component in the preliminary activities for modeling and simulation (M&S) assessment. This presentation will describe NASA's process for identifying risks associated with M&S use and the associated M&S assessments that will dictate the level of data certification and M&S verification and validation (V&V) activities required to support the decision-making process. The M&S Accreditation Plan and Report templates for ESMD will also be illustrated.

O'Neil, David↗

A Concept and Implementation of Optimized Operations of Airport Surface Traffic

This paper presents a new concept of optimized surface operations at busy airports to improve the efficiency of taxi operations, as well as reduce environmental impacts. The suggested system architecture consists of the integration of two decoupled optimization algorithms. The Spot Release Planner provides sequence and timing advisories to tower controllers for releasing departure aircraft into the movement area to reduce taxi delay while achieving maximum throughput. The Runway Scheduler provides take-off sequence and arrival runway crossing sequence to the controllers to maximize the runway usage. The description of a prototype implementation of this integrated decision support tool for the airport control tower controllers is also provided. The prototype decision support tool was evaluated through a human-in-the-loop experiment, where both the Spot Release Planner and Runway Scheduler provided advisories to the Ground and Local Controllers. Initial results indicate the average number of stops made by each departure aircraft in the departure runway queue was reduced by more than half when the controllers were using the advisories, which resulted in reduced taxi times in the departure queue.

Jung, Yoon C.↗

Nonlinear Dynamic Analyses of STS-1 Forward RCS Oxidizer Tank Structural Failure

At liftoff of the first Space Shuttle mission, a strong ignition overpressure pulse excited the stack. The frequency of the experienced pressure wave exceeded pre-launch predictions, and resulted in high, alternating normal accelerations along the length of the vehicle. As result of this unexpected loading, an oxidizer tank support strut in the orbiter’s forward reaction control system module failed in buckling under axial compression, which could have led to loss of the mission, crew, and vehicle. This incident is investigated in more detail using linear and nonlinear finite element analyses, complementing previous analyses with classical structural mechanics. The results of these analyses are examined to provide additional insight into the accident and to better inform future design decisions for modern space vehicle systems and structures.

Space Shuttle↗

Nonlinear Dynamic Analyses of STS-1 Forward RCS Oxidizer Tank Structural Failure

At liftoff of the first Space Shuttle mission, a strong ignition overpressure pulse excited the stack. The frequency of the experienced pressure wave exceeded pre-launch predictions, and resulted in high, alternating normal accelerations along the length of the vehicle. As result of this unexpected loading, an oxidizer tank support strut in the orbiter’s forward reaction control system module failed in buckling under axial compression, which could have led to loss of the mission, crew, and vehicle. This incident is investigated in more detail using linear and nonlinear finite element analyses, complementing previous analyses with classical structural mechanics. The results of these analyses are examined to provide additional insight into the accident and to better inform future design decisions for modern space vehicle systems and structures.

Space Shuttle↗

The Processing of Airspace Concept Evaluations Using FASTE-CNS as a Pre- or Post-Simulation CNS Analysis Tool

As NASA speculates on and explores the future of aviation, the technological and physical aspects of our environment increasing become hurdles that must be overcome for success. Research into methods for overcoming some of these selected hurdles have been purposed by several NASA research partners as concepts. The task of establishing a common evaluation environment was placed on NASA's Virtual Airspace Simulation Technologies (VAST) project (sub-project of VAMS), and they responded with the development of the Airspace Concept Evaluation System (ACES). As one examines the ACES environment from a communication, navigation or surveillance (CNS) perspective, the simulation parameters are built with assumed perfection in the transactions associated with CNS. To truly evaluate these concepts in a realistic sense, the contributions/effects of CNS must be part of the ACES. NASA Glenn Research Center (GRC) has supported the Virtual Airspace Modeling and Simulation (VAMS) project through the continued development of CNS models and analysis capabilities which supports the ACES environment. NASA GRC initiated the development a communications traffic loading analysis tool, called the Future Aeronautical Sub-network Traffic Emulator for Communications, Navigation and Surveillance (FASTE-CNS), as part of this support. This tool allows for forecasting of communications load with the understanding that, there is no single, common source for loading models used to evaluate the existing and planned communications channels; and that, consensus and accuracy in the traffic load models is a very important input to the decisions being made on the acceptability of communication techniques used to fulfill the aeronautical requirements. Leveraging off the existing capabilities of the FASTE-CNS tool, GRC has called for FASTE-CNS to have the functionality to pre- and post-process the simulation runs of ACES to report on instances when traffic density, frequency congestion or aircraft spacing/distance violations have occurred. The integration of these functions require that the CNS models used to characterize these avionic system be of higher fidelity and better consistency then is present in FASTE-CNS system. This presentation will explore the capabilities of FASTE-CNS with renewed emphasis on the enhancements being added to perform these processing functions; the fidelity and reliability of CNS models necessary to make the enhancements work; and the benchmarking of FASTE-CNS results to improve confidence for the results of the new processing capabilities.

Mainger, Steve↗

GO/NO-GO - When is medical hazard mitigation acceptable for launch?

Medical support of spaceflight missions is composed of complex tasks and decisions that dedicated to maintaining the health and performance of the crew and the completion of mission objectives. Spacecraft represent one of the most complex vehicles built by humans, and are built to very rigorous design specifications. In the course of a Flight Readiness Review (FRR) or a mission itself, the flight surgeon must be able to understand the impact of hazards and risks that may not be completely mitigated by design alone. Some hazards are not mitigated because they are never actually identified. When a hazard is identified, it must be reduced or waivered. Hazards that cannot be designed out of the vehicle or mission, are usually mitigated through other means to bring the residual risk to an acceptable level. This is possible in most engineered systems because failure modes are usually predictable and analysis can include taking these systems to failure. Medical support of space missions is complicated by the inability of flight surgeons to provide "exact" hazard and risk numbers to the NASA engineering community. Taking humans to failure is not an option. Furthermore, medical dogma is mostly comprised of "medical prevention" strategies that mitigate risk by examining the behaviour of a cohort of humans similar to astronauts. Unfortunately, this approach does not lend itself well for predicting the effect of a hazard in the unique environment of space. This presentation will discuss how Medical Operations uses an evidence-based approach to decide if hazard mitigation strategies are adequate to reduce mission risk to acceptable levels. Case studies to be discussed will include: 1. Risk of electrocution risk during EVA 2. Risk of cardiac event risk during long and short duration missions 3. Degraded cabin environmental monitoring on the ISS. Learning Objectives 1.) The audience will understand the challenges of mitigating medical risk caused by nominal and off-nominal mission events. 2.) The audience will understand the process by which medical hazards are identified and mitigated before launch. 3.) The audience will understand the roles and responsibilities of all the other flight control positions in participating in the process of reducing hazards and reducing medical risk to an acceptable level.

Hamilton, Douglas R.↗

Assessing the Needs of NASA's Near Real-Time Earth Observation Products

"The 2017-2027 Decadal Survey for Earth Science and Applications from Space stated that NASA's Earth Science with planned implementation of applications provides sustained earth observations for societal benefits [1]. The Decadal Survey indicated that data latency is invaluable for time-sensitive applications including disaster risk reduction, wildland fire carbon emissions quantification, real-time measurements of the state of the hydrologic systems and many more. Data latency refers to the time between earth observation and data products available to users. During the past 13 years, NASA's Land, Atmosphere Near Real-Time Capability for Earth Observing Systems (LANCE) continues to provide free access to earth observation products that are made available much quicker than routine processing allows. The latency of most LANCE data products is Near Real-time (NRT) which is defined as less than three hours from satellite observations [2]. LANCE is managed by the Earth Science Data and Information System (ESDIS) Project at NASA Goddard Space Flight Center [3], and a User Working Group (UWG) is responsible for providing guidance to LANCE. LANCE data are used by direct users and brokers who add value to the data [4]. NASA Earth Applied Sciences Program (ASP) is one of the primary users of LANCE, which collaborates with partner organizations and provides support to scientists to solve problems in applications of earth observations. ASP promotes the use of LANCE NRT data products to demonstrate applications in decision making, facilitates end-user feedback to the science team to improve data products, and provides information on future demands for research. LANCE supports applications that need a rapid response including detecting wildland fires and volcanic eruptions, tracking smoke, ash and dust plumes, monitoring air quality and tracking extreme weather events such as hurricanes, landslides, and floods. To gather feedback regarding the availability, accessibility and actionability of NASA's NRT data products for societal benefit, three surveys and a few discussions with experts involved in the topic within ASP were conducted from the perspective of users. Feedback has been collected from users who are interested in using low latency NASA data within application communities of agriculture, disasters, water resources, health and air quality, ecological conservation, wildland fires and capacity building. Analysis-ready NRT data products in a variety of formats have been mentioned many times in the collected feedback, especially for applied users with little to no experience using research-grade earth observation products. Users prefer to have products that can be easily integrated into their existing workflows and take their analysis to the data. HDF5 is a commonly used data format for research, but typically requires some conversion to a more friendly format for applications and regular use in decision-making. Users prefer the GeoTIFF data format that can be directly ingested into a GIS mapping software and platform for data analysis and visualization. For example, LANCE’s fire, flood, SO2 and Black Marble Nighttime Blue/Yellow Composite data products have been integrated into NASA Disasters Mapping Portal, which is an GIS-based open data portal, for users in the disaster management community. There are 291 LANCE NRT layers available through GIBS and Worldview, where users can download a snapshot in GeoTIFF format. Operational users expect data to be processed as close to the user as possible. The collected feedback indicates that LANCE fire products within 3 hours latency would meet the needs of the wildland fire community. The ideal latency for volcanic application is 10-15 minutes. Users in Volcanic Ash Advisory Centers (VAAC) reported that the first forecast volcanic product should be issued within 75 minutes from the volcano eruption [5]. Overall, for disaster applications, data latency within 3 hours is useful while latency greater than 12 hours is not timely enough for operational use. Capacity building and training are critical for users to be able to access, interpret and use data products and tools for their decision making, especially for applied users with limited experience using earth observation products. LANCE data products have been used in a number of capacity building projects domestically and internationally [6]. As LANCE continues to bring new products into the system, users request training to utilize LANCE new and upcoming data products and capabilities in their applications. Due to the limitation of bandwidth and downstream flow paths, users in some developing countries need tools to select and download data for a specific area of interest instead of bulk downloads. The collected feedback also shows the lack of available SAR satellite low latency data products. The advantages of SAR to monitor conditions and changes on the ground through darkness, clouds, volcanic ash, and other atmospheric conditions, are appealing to low latency users. For example, terabytes of low latency but cloudy optical images are not helpful in rapidly identifying the extent of flood or fire impacts. LANCE could be complemented with low latency measurements via the upcoming NASA-ISRO Synthetic Aperture Radar (NISAR) mission [7]. Requests for higher spatial resolution products are expressed. A user from the wildland fire management community reported that products with 30-m spatial resolution could be used to detect small fires. The 30-m Landsat OLI fire data is now part of NASA’s Fire Information for Resource Management System (FIRMS) US/Canada [8]. Within the open and free NASA resources, LANCE disseminates NRT data products in a manner that allows them to be accessible and understandable to both scientific and applied users. In many application areas, latency plays an important or even decisive role where low latency earth observations help people to observe areas of interest, detect and track changes in the environment and make timely decisions. NASA’s Earth Applied Sciences Program promotes the use of LANCE NRT products and builds a bridge between application users and research teams. The collected feedback indicates data latency within 3 hours is useful for most of the applications, and shows the needs of user-friendly, analysis-ready products, and requests training on LANCE’s new and upcoming data products. User feedback has been provided to LANCE UWG for guidance and recommendations, and for translating findings into something actionable.

Tian Yao↗

Deployment and Evaluation of SciStream on OLCF's Advanced Computing Ecosystem (ACE)

The growing demand for real-time analysis, experimental steering, and decision-making in scientific workflows has created a need for tightly coupled integrations between experimental facilities and high-performance computing (HPC) systems. The Department of Energy’s Integrated Research Infrastructure (IRI) initiative highlights data streaming as a key capability for enabling memory-to-memory data transfers, bypassing the limitations of traditional store-and-forward models. SciStream is a toolkit developed by researchers at Argonne National Laboratory (ANL) to support such streaming by addressing cross-domain security, delegated authentication, and application transparency. We deployed and evaluated SciStream on the Oak Ridge Leadership Computing Facility’s (OLCF) Advanced Computing Ecosystem (ACE) infrastructure, leveraging the Olivine OpenShift cluster and its high-bandwidth Data Streaming Nodes (DSNs) as gateway nodes. Our evaluation included synthetic streaming workloads derived from IRI science workflows, a streaming simulator, and integration with RabbitMQ to handle low-level messaging. This report documents the deployment process, performance evaluation, and challenges encountered, along with opportunities for future improvements.

97 MATHEMATICS AND COMPUTING↗

Africa Battery Energy Storage Systems (BESS) Capacity Building Utility-Scale Storage: BESS Valuation, Tariffs, and Remuneration [Slides]

Utility-scale Battery Energy Storage Systems (BESS) are key to enhancing grid reliability, integrating renewable energy, and providing operational flexibility. Designing effective valuation, remuneration, and tariff frameworks is essential to ensure both system benefits and financial viability for developers. This presentation outlines a structured methodology for evaluating BESS projects, covering policy and legal considerations, cost and revenue analysis, benchmarking, financial sensitivity, and risk assessment, while ensuring alignment with public interest. It also explores valuation of multiple storage services - bulk energy, ancillary services, and infrastructure support - and monetization strategies through capacity payments, energy tariffs, tolling, arbitrage, and non-wires alternative payments. Technical factors, including round-trip efficiency, degradation, and storage duration, are integrated into financial and operational modeling to quantify both system-wide and project-level benefits. Through case studies and simulation-based approaches, this framework provides regulators, utilities, and developers with practical guidance for tariff design, payment structures, and investment decisions, maximizing the economic and societal value of BESS deployment.

25 ENERGY STORAGE↗