At least 1,603 records · Page 89

Modeling Photovoltaic and Concentrating Solar Power Trough Performance, Cost, and Financing with Solar Advisor Model

A comprehensive solar technology systems analysis model, the Solar Advisor Model (SAM), has been developed to support the federal R&D community and the solar industry by staff at the National Renewable Energy Laboratory (NREL) and Sandia National Laboratory. This model is able to model the finances, incentives, and performance of flat-plate photovoltaic (PV), concentrating PV, and concentrating solar power (specifically, parabolic troughs). The primary function of the model is to allow users to investigate the impact of variations in performance, cost, and financial parameters to better understand their impact on key figures of merit. Figures of merit related to the cost and performance of these systems include, but aren't limited to, system output, system efficiencies, levelized cost of energy, return on investment, and system capital and O&M costs. SAM allows users to do complex system modeling with an intuitive graphical user interface (GUI). In fact, all tables and graphics for this paper are taken directly from the model GUI. This model has the capability to compare different solar technologies within the same interface, making use of similar cost and finance assumptions. Additionally, the ability to do parametric and sensitivity analysis is central to this model. There are several models within SAM to model the performance of photovoltaic modules and inverters. This paper presents an overview of each PV and inverter model, introduces a new generic model, and briefly discusses the concentrating solar power (CSP) parabolic trough model. A comparison of results using the different PV and inverter models is also presented.

14 SOLAR ENERGY↗

Materials and Modules for Low Cost, High Performance Fuel Cell Humidifiers (Final Report)

Over the past 20 years, great technical progress has been made in improving power density and durability of fuel cell stacks. Yet, operating durably at high performance levels under very dry conditions, e.g., < 20% RH at 80 °C or above, remains beyond even the best fuel cell membrane electrode assemblies. Thus, today it is essential to humidify the gases supplied to the fuel cell inlets. In this work, we have produced a new, inexpensive, composite membrane capable of very high water vapor transport and low air cross-over. The composite structure consists of a very thin ionomer layer (e.g., < 5 μm) sandwiched between two microporous polymer layers. The thin ionomer layer facilitates the rapid water transport and provides an impermeable layer to prevent gas cross-over. Such an approach reduces cost, but maintains performance. The microporous layer protects the thin ionomer layer from mechanical damage during handling; confers strength to the thin layer allowing it to be more durable during use; and allows it to withstand higher automotive pressures and temperatures. The composite structure will therefore allow lower total cost while still meeting automotive humidifier water transport and durability targets. Because the transport rates of these new materials are so high, existing planar membrane humidifier module designs available at the start of the program were incapable of efficiently utilizing the high rates. Therefore, the assembled team designed, tested and demonstrated an innovative, low-cost humidifier module with customized channel geometries that can take advantage of the high the water transport rates. Program Results: The objectives of the program have been fully met. The optimized membrane produced in the program has very high transport rates, nearly twice that of the closest competitive option, a homogeneous perfluorosulfonic acid (PFSA) membrane. Furthermore, the composite structure imparts significant durability advantages, allowing the membrane to remain gas impermeable during 20,000 relative humidity (RH) cycles, unlike the closest competitive options that fail very rapidly. It does suffer from a loss of performance with time at temperature because of inherent properties of the PFSA polymer, but this degradation is manageable through relatively simple system design changes. The final membrane of this program has been produced on manufacturing level equipment in a roll to roll form in the scale of hundreds of square meters. The process is readily scalable to automotive level volumes to allow production of a low-cost membrane required for this application. A full scale automotive air-to-air humidifier module has been designed, tested and built. The final module meets the design specifications required for automotive fuel cell use, and exceeds all the DOE 2017 targets for a cathode humidification module as determined in independent testing at Ford Motor Company. It has a small volume, less than 5 liters; a high water transfer rate, significantly greater than 5 g/s at the DOE specified conditions; acceptably low pressure drop; and is projected to maintain these properties over 5000 hours. Additionally, high volume cost projections suggest that the module can be produced for less than $100 per unit in a scale of 500,000 units per year.

08 HYDROGEN↗

Development of ITM Oxygen Technology for Low-cost and Low-emission Gasification and Other Industrial Applications

Air Products is carrying out a scope of work under DOE Award No. DE-FE0012065 “Development of ITM Oxygen Technology for Low-cost and Low-emission Gasification and Other Industrial Applications.” The Statement of Project Objectives (SOPO) includes a Task 4f in which a Decision Point shall be reached, necessitating a review of Tasks 2-5 with an emphasis on Task 4f. This Topical Report constitutes the Decision Point Application pertaining to Task 4f. The SOPO under DOE Award No. DE-FE0012065 is aimed at furthering the development of the Ion Transport Membrane (ITM) Oxygen production process toward a demonstration scale facility known as the Oxygen Development Facility (ODF). It is anticipated that the completion of the current SOPO will advance the technology significantly along a pathway towards enabling the design and construction of the ODF. Development progress on several fronts is critical before an ODF project can commence; this Topical Report serves as an early update on the progress in critical development areas. Progress was made under all tasks, including Materials Development, Ceramic Processing Development, Engineering Development, and Performance Testing. Under Task 4f, Air Products carried out a cost and performance study in which several process design and cost parameters were varied and assessed with a process model and budgetary costing exercise. The results show that the major variables include ceramic module reliability, ITM operating temperature, module production yield, and heat addition strategy. High-temperature compact heat exchangers are shown to contribute significant cost benefits, while directly firing into the feed stream to an ITM are even a mild improvement on the high-temperature recuperation approach. Based on the findings to-date, Air Products recommends no changes to the content or emphasis in the current SOPO and recommends its completion prior to another formal assessment of these factors.

Armstrong, Phillip↗

Energy Cost Impact of Non-Residential Energy Code Requirements

The 2012 International Energy Conservation Code contains 396 separate requirements applicable to non-residential buildings; however, there is no systematic analysis of the energy cost impact of each requirement. Consequently, limited code department budgets for plan review, inspection, and training cannot be focused on the most impactful items. An inventory and ranking of code requirements based on their potential energy cost impact is under development. The initial phase focuses on office buildings with simple HVAC systems in climate zone 4C. Prototype building simulations were used to estimate the energy cost impact of varying levels of non-compliance. A preliminary estimate of the probability of occurrence of each level of non-compliance was combined with the estimated lost savings for each level to rank the requirements according to expected savings impact. The methodology to develop and refine further energy cost impacts, specific to building type, system type, and climate location is demonstrated. As results are developed, an innovative alternative method for compliance verification can focus efforts so only the most impactful requirements from an energy cost perspective are verified for every building and a subset of the less impactful requirements are verified on a random basis across a building population. The results can be further applied in prioritizing training material development and specific areas of building official training.

code compliance↗

Cost optimization for buildings with hybrid ventilation systems

A method including: computing a total cost for a first zone in a building, wherein the total cost is equal to an actual energy cost of the first zone plus a thermal discomfort cost of the first zone; and heuristically optimizing the total cost to identify temperature setpoints for a mechanical heating/cooling system and a start time and an end time of the mechanical heating/cooling system, based on external weather data and occupancy data of the first zone.

42 ENGINEERING↗

Energy Cost Impact of Non-Residential Energy Code Requirements

The 2012 International Energy Conservation Code contains 396 separate requirements applicable to non-residential buildings; however, there is no systematic analysis of the energy cost impact of each requirement. Consequently, limited code department budgets for plan review, inspection, and training cannot be focused on the most impactful items. An inventory and ranking of code requirements based on their potential energy cost impact is under development. The initial phase focuses on office buildings with simple HVAC systems in climate zone 4C. Prototype building simulations were used to estimate the energy cost impact of varying levels of non-compliance. A preliminary estimate of the probability of occurrence of each level of non-compliance was combined with the estimated lost savings for each level to rank the requirements according to expected savings impact. The methodology to develop and refine further energy cost impacts, specific to building type, system type, and climate location is demonstrated. As results are developed, an innovative alternative method for compliance verification can focus efforts so only the most impactful requirements from an energy cost perspective are verified for every building and a subset of the less impactful requirements are verified on a random basis across a building population. The results can be further applied in prioritizing training material development and specific areas of building official training.

Energy Codes, code compliance↗

Plant Water Profiler: A Tool for Understanding Water Use, Cost and Savings Potential for Manufacturing Plants

In the 1746 Poor Richard’s Almanack, Benjamin Franklin published “When the well’s dry, we know the worth of water” (Franklin, 1746); industrial water users have begun to see the truth in these words as they examine the potential and reality of water scarcity becoming a significant business risk. Through the authors’ interactions with manufacturers via the U.S. Department of Energy’s Better Plants program and Strategic Analysis projects, they realized that manufacturing facilities often do not fully understand the risks to the water supply and the consequential risks to their business. The authors’ also noticed that many facilities do not know how their water is used (baselining), how they compare with their peers (benchmarking), the actual cost impacts of water use (true cost of water), and potential areas for water savings. This results in a lack of motivation and ability to identify and implement effective water-efficiency measures.The Plant Water Profiler Tool (PWP) was created to help manufacturing plant management address these issues by identifying and accounting for water use in manufacturing operations, helping determine the true cost of water, and providing some high-level estimates for peer comparison. The PWP uses a water mass balance and common engineering equations to estimate water use by each of the facility’s systems (e.g., differentiating process water use from cooling and restroom water use), even when no submetering data is available. This new tool also helps users identify possible areas for water savings and associated water and energy cost savings, making it a potentially useful resource for corporations conducting water assessments. Additionally, governments and private organizations can use the methodology behind this tool to design a survey to help build a database of industrial water use. This paper and corresponding presentation provide an overview of current industrial water use practices and tools, as well as the value of determining the true cost of water. It also briefly describes the methodology behind the tool, then focuses on its functionality through an industrial case study and lessons learned from implementing the case study.

Armstrong, Kristina O.↗

Seamlessly Fuel Flexible Heat Pump with Optimal Model-based Control Strategies to Reduce Peak Demand, Utility Cost and CO2 Emission

This research develops a novel hybrid fuel heat pump system for space heating of residential and small commercial buildings with built-in optimization and control. Whereas conventional dual fuel systems either run on gas or electricity at any given moment, the proposed seamlessly fuel flexible heat pump (SFFHP) simultaneously consumes gas and electricity and continuously optimizes the proportion of each. The building air flows across the heat pump condenser first and then flows across the furnace coil, and this reduces the heat pump temperature lift. The SFFHP delivers energy savings by allowing each subsystem (gas furnace and electric heat pump) to operate where it performs best to improve energy efficiency, minimize energy cost, and minimize carbon footprint. The capacities of the electric heat pump and gas furnace are continuously adjusted based on ambient conditions, utility price signals, and marginal grid emission signals. An optimal model predictive control strategy was developed with the goal of minimizing utility cost and minimizing CO2 emission. Two case studies were conducted to simulate the performance of SFFHP during the heating season in Chicago and Los Angeles, respectively. Compared with a conventional electric heat pump, SFFHP yields 33% utility cost reduction and 49% CO2 emission reduction in Chicago. Similarly, it achieves 23% utility cost reduction and 17% CO2 emission reduction in Los Angeles. Case studies demonstrate that SFFHP can deliver significant reductions in peak demand, utility cost, and CO2 emission. Due to the hybrid fuel nature of this novel equipment, user comfort will always be maintained. The fuel flexibility makes it an attractive option for demand response programs.

Li, Zhenning↗

Waste Management Strategy for Dismantling Waste to Reduce Costs for Power Plant Decommissioning - 13543

Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named 'ndcon' to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle-necks in the process causes increased space requirements and will have negative impact on the project schedule, which increases not only the cost but also the dose exposure to personnel. For these reasons it is critical to create a process that transfers material into conditioned waste ready for disposal as quickly as possible. To a certain extent the decommissioning program should be led by the waste management process. With the objective to reduce time for handling of dismantled material at site and to efficiently and environmental-friendly use waste management methods (clearance for re-use followed by clearance for recycling), the costs for the plant decommissioning could be reduced as well as time needed for performing the decommissioning project. Also, risks for delays would be reduced with a well-defined handling scheme which limits surprises. Delays are a major cost driver for decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing Decommissioning Cost Estimating Relationships and the Decommissioning Estimate Analysis Library Estimating System - 20423

DOE-EM's Consolidated Business Center (EM-CBC) Office of Cost Estimating has developed a system of Decommissioning Cost Estimating Relationships (CERs) and Models to improve the reliability and efficiency of its estimates. The development builds on the multi-year process of collecting and organizing historical cost data from DOEEMs decommissioning projects and estimate model development to support project and program-level decommissioning estimates. The latest work has extended these models down to project scope element and component building area levels, allowing the actual costs of work for these estimate components to be assembled into estimates that reflect specific projects. The CERs have been incorporated into two estimator-friendly products - as cost libraries in the MII estimating program and as an MS Excel-based model, and are available for DOE federal staff use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Cost of (In-) Accurate Waste Characterization in the U.S. Nuclear Power Industry - 20066

Proper disposal of waste has never been a human priority. Our history is full of examples of throwing away things with minimal effort or thought to consequence. That is until disease or toxicity become apparent and we realize we need to change. Unfortunately, we almost never have all the information we need at the time we make decisions. In addition to the technical and scientific issues, profits and politics are also factors. Newton's third law also applies to politics and so for every policy (action) put in place, there will be (opposite reaction) forces in play to push back against it. These forces are seldom balanced and so the reaction to the discovery of harm is to over-correct and destroy the benefit to be had. This of course causes those who want the benefit, or profit from it, to work to undermine or repeal those measures put in place to eliminate the harm. The issue is exacerbated when the problem to be solved is highly technical and at the edge of our science so that the harm and benefit cannot be easily or accurately quantified. At these times, reason often goes out the window and our decision makers are influenced by either greed or fear as these emotions are much easier to stoke. Those of us in the middle, with the charge to 'do the right thing for the least cost', are therefore frequently constrained and forced into actions that are neither technically the right thing to do and not cost effective. The cost of radioactive waste disposal is based on the concentrations of various radioisotopes in the waste. Some of these isotopes are relatively easy to quantify and some are not. Most laboratory methods for quantification are limited in the amount of activity that can be present during the measurement process. Current nuclear plants were not designed with the idea that taking truly representative waste samples would be important. The limits used to define waste class and therefore cost are precisely defined but the methods for determining those concentrations are far less precise. Improving the accuracy of radioactivity concentrations in waste and having consistent and reasonable oversight can reduce waste costs through active management of the process. So what can we do about it? Science may provide an answer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

14 Steps to Creating Value in Cost and Schedule Resources for Nuclear Waste Management - 20188

While Waste Management budgets are shrinking, DOE required cost and schedule controls are becoming increasingly stringent. At the same time, there is a scarcity of adept, qualified, and competent projects controls staff who both understand nuclear waste management and are capable of addressing today's cost and schedule challenges. In response, we have developed a systematic approach to training and mentoring project controls staff. The approach is based on the observations and lessons learned on projects, both successful and unsuccessful, over the past 20 years. During that time, we evaluated staff development and used that experience to design a program that progresses the maturity, knowledge and experience of the individual. The program is based on the unique needs of cost and schedule specialists while incorporating the best leadership and managerial applications. The system is not limited to developing individual software skills, which is a primary focus of many project controls training programs. Instead, our system develops an individual's soft and hard skill sets. The system develops the user's skill, talent, attitude, and drive to do the best job possible. It focuses on all aspects of becoming a more productive technical team while accepting responsibility for individual growth. It also enhances the project controls team by setting up checks and balances that everyone is aware of and participates in. The system is based on 14 steps of increasing complexity in knowledge and application. The system clarifies roles, responsibilities and expectations. It helps eliminate uncertainty and reduces stress on staff and managers. It contains everyday routine actions and is simple to implement. It allows the development of a consistent rhythm to staff growth and development. Mastering the steps will allow the user to achieve excellence in cost and schedule control. The 14 steps are: 1 - Key Performance Objectives, 2 - Check Lists, 3 - Desktop Guides, 4 - System Description, 5 - Procedures, 6 - Software and On the Job Training (OTJ), 7 - Traceability Checks, 8 - Surveillances, 9 - 32 Criteria, 10 - The Contract, 11 - Customer/Government Guidance, 12 - Training and Mentoring Others, 13 - Master your weekly and daily schedules, 14 - Improving your interpersonal skills. Application and mastery of this system will produce better cost and schedule control results. Your project controls staff will write better reports, analyze data better, make better use of their time, and be more valuable to decision makers. If followed rigorously, our system will produce a great project controls team, which is invaluable to the success of each project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

fuel cycle cost analysis of Th/U MOX fuel in a block-type HTR - 18619

With a rapid development of nuclear energy in these years, the supply of nuclear fuel is becoming more and more important. Thorium regains attention because of its abundant reserves and excellent physical properties. As a next generation reactor, the high temperature reactor (HTR) is a promising choice for thorium utilization because of its deeper burnup, harder spectrum and better inherent safety. Therefore, a 600 MWth 108-column modular high temperature reactor (MHR) core model with 20%UO{sub 2}-80%ThO{sub 2}; MOX fuel is adapted. A traditional two-step calculation scheme, lattice calculation then core calculation, is used to get the neutronic performance of equilibrium cycle including uranium enrichment and mass of fuel. Using these data, the fuel cycle cost of HTR can be calculated by the levelized lifetime cost method. In order to take into account the variation of unit price, a well-established, standard statistical analysis technique is used by Monte Carlo simulation, (thus, the probability distribution of fuel cycle cost can be obtained. Furthermore, sensitivity calculations are made to analyze the impact on the fuel cycle cost of variations in the unit prices for each fuel cycle component. The result shows that the most influential parameters are unit price of natural uranium, enrichment and discount rate. Finally a comparison of fuel cycle cost between 100%UO{sub 2} and 20%UO{sub 2}-80%ThO{sub 2} MOX fuel is made. The latter is 11% cheaper than the former. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cost saving opportunities in emergency planning at nuclear power plants - 18819

This paper identifies generalized offsite emergency planning costs for 2014 covering twenty different commercial nuclear plant locations in the U.S. This information was analyzed to quantify the potential cost savings associated with reduction in offsite emergency planning zone size as a function of sixteen offsite emergency planning standards contained in 10 CFR 50.47(b). Mean annual operating and maintenance costs and startup costs for a typical offsite nuclear power plant emergency planning program were $2.25 M and $10 M, respectively. However, if a reactor design technical basis were developed that allowed for a reduction in offsite plume emergency planning zone (EPZ) size from the nominal 10 mile standard currently used, collocation of that EPZ with the site plant boundary could produce programmatic savings in excess of 90% over a typical 40 year plant life. Lesser, but still potentially significant savings, are possible if the plume EPZ were resized to five and two miles. Negligible potential cost savings were identified with reductions in the ingestion pathway EPZ size which has been typically set at 50 miles. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Framework for Assessing Economic and Environmental Trade-offs of Internalized Emission Costs in ERCOT Grid Planning

The power grid is on the cusp of a massive transition driven by three major areas: 1) the growth in demand for electricity, 2) efforts to decarbonize the United States economy, and 3) a desire to mitigate social disparities from the impact of electricity generation on local populations. However, most studies of the electricity sector do not include equity impacts in their models. This study seeks to do so by developing a comprehensive and generalizable model tailored to the Electric Reliability Council of Texas (ERCOT) grid, designed to incorporate the equity impacts of electricity generation in a decarbonized and resilient framework. To integrate equity into our research, we incorporate environmental externalities into our capacity expansion model of ERCOT. Specifically, we factor in intermediate-level local marginal damages of precursor pollutants (NH3, NOx, primary PM2.5, SO2, and VOC) and global pollutant CO2 into the cost of generating electricity. We do this by taking into account county population, county ambient pollution concentration, and generator emission rates. Leveraging open-source modeling tools, such as PowerGenome, pyGRETA, and GenX we construct a county-level model to account for these costs. We integrate these marginal damages into the variable operations and maintenance costs of generators, for both existing and potential future builds. This study’s findings suggest that the value of a dynamic social cost of carbon (SSC) will cover criteria pollutant marginal damages within the ERCOT grid and solar and wind is expected to increase out to 2035. Key metrics evaluated within this research include fuel mix distribution across technologies, transmission and grid infrastructure costs, CO2 emissions, local pollutants marginal damages, and the variation in generation capacity built by the model. These results and framework can be used to support grid decisions that explicitly include distributional and procedural equity within a decarbonized and sustainable grid framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cost of convenience in long-dwell public electric vehicle charging

This paper presents a comprehensive methodology for quantifying trade offs between the cost of charging at public Level-2 charging stations and the inconvenience of using those stations. The paper also includes a methodology for generating synthetic travel itineraries of tens of thousands of drivers and for sizing and placing charging infrastructure to support those itineraries. Inconvenience is quantified by a weighted sum of the time a driver spends traveling between their intended destination and the charging station; weights are derived from the activity interrupted by the driver’s need to move their car. We demonstrate a trade off between cost of charging and inconvenience by varying how far away from their destination drivers are willing to charge. Our results demonstrate the importance of access to stations and suggest that other methods for increasing access, such as increasing the spatial density of stations, could significantly impact charging cost and inconvenience. Moreover, average energy cost may be reduced by introducing managed charging, which also affects inconvenience. The framework presented here can be used to evaluate the overlapping effects of both access and charge management. Furthermore, the framework can be easily extended to include additional factors such as capital costs, enabling thorough evaluation and planning of regional Level-2 charging networks.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Material and energy recovery in integrated waste management systems: A life-cycle costing approach

Highlights: > The study aims at assessing economic performance of alternative scenarios of MSW. > The approach is the life-cycle costing (LCC). > Waste technologies must be considered as complementary into an integrated strategy. - Abstract: A critical assumption of studies assessing comparatively waste management options concerns the constant average cost for selective collection regardless the source separation level (SSL) reached, and the neglect of the mass constraint. The present study compares alternative waste management scenarios through the development of a desktop model that tries to remove the above assumption. Several alternative scenarios based on different combinations of energy and materials recovery are applied to two imaginary areas modelled in order to represent a typical Northern Italian setting. External costs and benefits implied by scenarios are also considered. Scenarios are compared on the base of the full cost for treating the total waste generated in the area. The model investigates the factors that influence the relative convenience of alternative scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An Analysis of the Potential and Cost of the U.S. Refinery Sector Decarbonization

In 2019, U.S. petroleum refineries emitted 196 million metric tons (MT) of CO 2 , while the well-to-gate and the full life cycle CO 2 emissions were significantly higher, reaching 419 and 2843 million MT of CO 2 , respectively. This analysis examines decarbonization opportunities for U.S. refineries and the cost to achieve both refinery level and complete life-cycle CO 2 emission reductions. Here, we used 2019 life-cycle CO 2 emissions from U.S. refineries as a baseline and identified three categories of decarbonization opportunity: (1) switching refinery energy inputs from fossil to renewable sources (e.g., switch hydrogen source); (2) carbon capture and storage of CO 2 from various refining units; and (3) changing the feedstock from petroleum crude to biocrude using various blending levels. While all three options can reduce CO 2 emissions from refineries, only the third can reduce emissions throughout the life cycle of refinery products, including the combustion of fuels (e.g., gasoline and diesel) during end use applications. A decarbonization approach that combines strategies 1, 2, and 3 can achieve negative life-cycle CO 2 emissions, with an average CO 2 avoidance cost of $\$113$ - $\$477$/MT CO 2 , or $\$54$ - $\$227$/bbl of processed crude; these costs are driven primarily by the high cost of biocrude feedstock.