Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contracting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

Vessel Fabrication Overview

LANL utilizes spherical vessels for numerous basic science, materials, and system performance experiments. These pressure vessels are designed and fabricated to meet the intent of ASME B&PV Section VIII, Division 3 and Code Case 2564. LANL has successfully contracted vessel construction in the past, utilizing HSLA-100 steel. As current vessel inventories approach design life, we are once again embarking upon a series of fabrication contracts to produce replacement components and vessel assemblies to support continued experiment cadence at LANL. LANL’s intent is to ramp up a continuous vessel supply chain for the DOE Complex.

42 ENGINEERING↗

Site Environmental Report for 2020, Sandia National Laboratories, California

Sandia National Laboratories, California (SNL/CA) is a Department of Energy (DOE) facility. The management and operations of the facility are under a contract with the DOE's National Nuclear Security Administration (NNSA). On May 1, 2017, the name of the management and operating contractor changed from Sandia Corporation to National Technology & Engineering Solutions of Sandia, LLC (NTESS). The DOE, NNSA, Sandia Field Office administers the contract and oversees contractor operations at the site. DOE and its management and operating contractor for Sandia are committed to safeguarding environmental protection, compliance, and sustainability and to ensuring the validity and accuracy of the monitoring data presented in this Annual Site Environmental Report. This Site Environmental Report for 2020 was prepared in accordance with DOE Order 231.1B, Environment, Safety and Health Reporting (DOE 2012). The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2020, unless noted otherwise. General site and environmental program information is also included.

54 ENVIRONMENTAL SCIENCES↗

DOE Environmental Management and Newport News Nuclear BWXT Briefing - LANL’s Campus Master Plan [Slides]

Triad proposed a robust integrated planning effort during the bidding process and began this effort soon after the LANL contract transition. Within months of Triad commencing this planning process, NA-LA delivered a Contracting Officer (CO) letter requiring: (1) Area Development Plan for the Pajarito Corridor delivered by end of FY19 (completed), and (2) The Campus Master Plan (CMP) to be delivered by end of FY21 (completed).

42 ENGINEERING↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2020

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Indefinite Delivery Indefinite Quantity (IDIQ) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal facilities. In formation was extracted from 195 measurement and verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CIO Cloud Strategy

The purpose of the Sandia CIO Cloud Strategy is to establish the strategic direction for the adoption of cloud services and technologies as the prevailing IT solution for Sandia National Laboratories. Sandia’s Chief Information Officer (CIO) will champion unified, site-wide adoption of cloud and will amplify business and mission impacts across the Labs. Sandia’s CIO Cloud Strategy aligns to the Federal Cloud Computing Strategy1 (Cloud Smart) and the Sandia Management and Operating Contract (Prime Contract).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Planning, Procuring, & Constructing on-site PV [Slides]

A developer will install a renewable energy system on DOE property. In exchange, DOE agrees to purchase the power generated by the system. These power purchase payments repay the developer over the contract term. The developer owns, operates, and maintains the system for the life of the contract.

14 SOLAR ENERGY↗

Residential Solar Adoption Timelines and Impacts from the COVID-19 Pandemic

In this study we evaluate PII and other PV adoption timelines from 2017-2021. We use project-level data collected by the National Renewable Energy Laboratory (NREL) for the Solar Time-Based Residential Analytics and Cycle Time Estimator (SolarTRACE). Additionally, we conducted a survey of 171 AHJs about their experiences, challenges, and process changes during the first 18 months of the COVID-19 pandemic. The survey findings were supplemented with follow up interviews with 5 AHJs from 4 states. We find that the pandemic moderately increased the duration and variability of pre-install timelines (contract signing to install), particularly in the permit review phase (permit submit to approval). In contrast, post-install timelines (install to final utility interconnection) continued to decline during the pandemic. The net result is that overall project timelines (contract signing to final interconnection) continued to decline during the pandemic. Our findings suggest that AHJs and installers faced challenges throughout the pandemic but ongoing improvements in PII processes - particularly post-install processes - more than offset these challenges. Furthermore, the pandemic may have catalyzed or accelerated a widespread adoption of online/electronic permitting, among other process efficiency improvements.

14 SOLAR ENERGY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY2021

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 193 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2021, between October 1, 2020 and September 30, 2021, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CLAS12 First Experiments and Hadron Structure

The new CLAS12 large acceptance spectrometer was recently installed in Hall B as part of the 12 GeV upgrade project at Jefferson Laboratory that served to double the maximum electron beam energy of the accelerator. The approved CLAS12 experimental physics program spans a broad scientific scope designed to address fundamental and critical issues in nuclear physics such as detailed spectroscopy of the excited baryon spectrum including a search for hybrid baryons where the glue serves as an active structural component, elucidation of the role of gluons in hadronic structure, studies of the implications of short range forces acting in nucleons and nuclei, and detailed investigations that serve to reveal the structure of ground and excited states including 3-D imaging of the ground state nucleons and exploration of the N --> N* form factors in the transition from the regimes of confinement to perturbative QCD. These studies will address questions on the nature of the mass of hadrons, quark-gluon confinement, and how such a diversity of hadrons emerges from QCD. The commissioning of the CLAS12 spectrometer was completed during an Engineering Run that took place in Dec. 2017 and Jan. 2018. This was followed by the first physics production running periods spanning 23 weeks in the spring and fall of 2018. This talk will review the initial CLAS12 physics program and highlight the current status of the ongoing physics analyses. *The Southeastern Universities Research Association (SURA) operates the Thomas Jefferson National Accelerator Facility for the United States Department of Energy under Contract No. DE-AC05-84ER40150. This material is based upon work supported by the US Department of Energy, Office of Science, Office of Nuclear Physics under Contract No DE-AC05-06OR23177.

Carman, Daniel↗

Idaho National Laboratory’s FY 2021 Greenhouse Gas Report

A greenhouse gas (GHG) inventory is a systematic approach to account for the production and release of certain gases generated by an institution from various emission sources. The gases of interest are those that climate science has identified as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during Fiscal Year (FY) 2021 by Idaho National Laboratory (INL)—a Department of Energy (DOE) sponsored entity located in southeastern Idaho. In recent years, concern has grown about the environmental impact of GHGs. This, together with a desire to decrease harmful environmental impacts, would be enough to encourage the calculation of an inventory of the total GHGs generated at INL. Additionally, INL has a desire to see how its emissions compare with similar institutions, including other DOE national laboratories. Executive Order 13834 requires that federal agencies and institutions track and report GHG emissions where required. INL’s GHG inventory was calculated according to methodologies identified in federal GHG guidance documents using operational control boundaries. It measures emissions generated in three scopes: (1) INL emissions produced directly by stationary or mobile combustion and by fugitive emissions, (2) the share of emissions generated by entities from which INL purchased electrical power, and (3) indirect or shared emissions generated by outsourced activities that benefit INL (occurring outside INL’s organizational boundaries but are a consequence of INL’s activities). This inventory found that INL generated 81,185.05 metric tons (MT) of CO 2 equivalent (CO 2 e) emissions during FY 2021. The following conclusions were made from looking at the results of the individual contributors to INL’s FY 2021 GHG inventory: Electricity (including the associated transmission and distribution losses) is the largest contributor to INL’s GHG inventory, with over 50% of the CO 2 e emissions; Other sources with high emissions were mobile combustion (fleet fuels), employee commuting, stationary combustion (facility fuels), and waste disposal (fugitive emissions from the onsite landfill); Sources with low emissions were waste disposal (contracted disposal), fugitive emissions from refrigerants, wastewater treatment (onsite and contracted), and business ground travel (in personal and rental vehicles). This report details the methods behind quantifying INL’s GHG inventory and discusses lessons learned on better practices by which information important to tracking GHGs can be tracked and recorded. It is important to note that because this report differentiates between those portions of INL that are managed and operated by Battelle Energy Alliance, LLC (BEA) and those managed by other contractors, it includes only INL’s activities overseen by BEA. It is assumed that other contractors will provide similar reporting for those activities they manage, where appropriate.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Idaho National Laboratory’s FY 22 Greenhouse Gas Report

A greenhouse gas (GHG) inventory is a systematic approach to account for the production and release of certain gases generated by an institution from various emission sources. The gases of interest are those that climate science has identified as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during fiscal year (FY) 2022 by Idaho National Laboratory (INL)—a Department of Energy (DOE) sponsored entity located in southeastern Idaho. In recent years, concern has grown about the environmental impact of GHGs. This, together with a desire to decrease harmful environmental impacts, would be enough to encourage the calculation of an inventory of the total GHGs generated at INL. Additionally, INL has a desire to see how its emissions compare with similar institutions, including other DOE national laboratories. Executive Order 14057 requires that federal agencies and institutions track and report GHG emissions where required. INL’s GHG inventory was calculated according to methodologies identified in federal GHG guidance documents using operational control boundaries. It measures emissions generated in three scopes: (1) INL emissions produced directly by stationary or mobile combustion and by fugitive emissions, (2) the share of emissions generated by entities from which INL purchased electrical power, and (3) indirect or shared emissions generated by outsourced activities that benefit INL (occurring outside INL’s organizational boundaries, but are a consequence of INL’s activities). This inventory found that INL generated 75,572.42 metric tons (MT) of CO2 equivalent (CO2e) emissions during FY 2022. The following conclusions were made from looking at the results of the individual contributors to INL’s FY 2022 GHG inventory: • Electricity (including the associated transmission and distribution losses) is the largest contributor to INL’s GHG inventory, with over 50% of the CO2e emissions. • Other sources with high emissions were mobile combustion (fleet fuels), employee commuting, stationary combustion (facility fuels), and waste disposal (fugitive emissions from the onsite landfill). • Sources with low emissions were waste disposal (contracted disposal), fugitive emissions from refrigerants, wastewater treatment (onsite and contracted), and business ground travel (in personal and rental vehicles). This report details the methods behind quantifying INL’s GHG inventory and discusses lessons learned on better practices by which information important to tracking GHGs can be tracked and recorded. It is important to note that because this report differentiates between those portions of INL that are managed and operated by Battelle Energy Alliance, LLC (BEA) and those managed by other contractors, it includes only INL’s activities overseen by BEA. It is assumed that other contractors will provide similar reporting for those activities they manage, where appropriate.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2022

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 190 measurement and verification (M&V) reports covering 182 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2021, between October 1, 2021 and September 30, 2022, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Procurement Options for Low Temperature Geothermal Technologies at Federal Facilities

Federal agencies are moving towards more efficient and resilient facilities by increasingly implementing energy projects in an effort to meet federally mandated goals, agency needs, and administration priorities. Low temperature geothermal technologies, which include geothermal heat pumps (GHP) and district heating systems, can contribute to meeting these goals. These technologies provide facilities with heating and cooling while reducing facility energy use and improving resilience. However, in order to implement these solutions, federal facilities must identify and execute a strategy for the procurement of these technologies. Federal facilities have successfully completed energy efficiency projects using a variety of procurement options. The purpose of this document is to provide federal agencies with a comprehensive overview of the procurement options available for low temperature geothermal technologies and other energy efficiency projects. The procurement options discussed include third-party financing mechanisms such as energy saving performance contracts (ESPCs), ESPC energy sales agreements (ESPC ESAs), and utility energy service contracts (UESCs), as well as dedicated funds in the form of federal grants and appropriated funds.

15 GEOTHERMAL ENERGY↗

Turboexpander for Direct Cooling in Hydrogen Vehicle Fueling Infrastructure

Hydrogen fuel cell electric vehicles (FCEVs) have been identified as one of a few options for zero carbon emissions transportation. A major advantage of FCEVs is that they can fuel quickly and follow a familiar fueling behavior to hydrocarbon-fueled vehicles. Whether light duty or heavy duty, the goal for a hydrogen dispenser is to fuel a vehicle in the same amount of time as the fossil fuel equivalent. When hydrogen is dispensed into the vehicle storage system, however, the temperature rises due to the Joule-Thomson effect and the heat of compression. Typically, vehicles store the compressed hydrogen in composite overwrapped pressure vessels that have a polymer liner with an operational temperature limit of 85°C. This temperature limit can be exceeded during fast fueling if hydrogen is not precooled. Precooling allows for a dispenser to fuel a vehicle at a faster flow rate by preventing the storage tank on the vehicle from overheating. Fueling protocols and requirements are presented in SAE J2601 Fueling Protocols for Light Duty Gaseous Hydrogen Surface Vehicles [1]. A heavy-duty equivalent is under development with similar requirements for precooling. Currently, conventional precooling for light-duty vehicle refueling uses a heat exchanger and chiller to cool the hydrogen gas to -40°C before entering the vehicle. The precooling system represents a significant part of the station capital and operating costs, so if the cost of the precooling system can be reduced by improving its efficiency, the overall station capital and operating cost can be reduced. In this project, National Renewable Energy Laboratory (NREL) and Sandia National Laboratories (SNL) researchers teamed up to investigate the turboexpander precooling application. A turboexpander is a device that places a turbine in a flow path where a pressure differential can be attained. This expansion device will extract work and lower the temperature of the fluid as the pressure reduces. While initial calculations based on established principles showed potential for a turboexpander to generate cooled gas, much work needs to be done to prove the concept. Turboexpanders typically work best under steady state conditions, while the dispenser is a very dynamic flow system. Dynamic turboexpander systems have been proven, such as a turbocharger on a gasoline vehicle. The inlet pressure at a dispenser is also much higher than any other known turboexpander system but should behave similarly to higher density fluids at lower pressures. Having both performed initial calculations, NREL and SNL researchers teamed up to investigate the turboexpander precooling application further. A project was soon built around the idea with SNL performing system modeling using previously proven capabilities and NREL performing hardware characterization with established station capabilities. Creare LLC was contracted as the turbomachinery expert to design and build the concept device. Part way through the project, however, contracting issues with the funding partner caused the project to terminate early before building and characterizing the concept device. While the project could not continue, many key findings were already learned. This paper is a summary of those findings.

08 HYDROGEN↗

Idaho National Laboratory’s FY 2020 Greenhouse Gas Report

A greenhouse gas (GHG) inventory is a systematic approach to account for the production and release of certain gases generated by an institution from various emission sources. The gases of interest are those that climate science has identified as related to anthropogenic global climate change. This document presents an inventory of GHGs generated during fiscal year (FY) 2020 by Idaho National Laboratory (INL)—a Department of Energy (DOE) sponsored entity located in southeastern Idaho. In recent years, concern has grown about the environmental impact of GHGs. This, together with a desire to decrease harmful environmental impacts, would be enough to encourage the calculation of an inventory of the total GHGs generated at INL. Additionally, INL has a desire to see how its emissions compare with similar institutions, including other DOE national laboratories. Executive Order 13834 requires that federal agencies and institutions track and report GHG emissions where required. INL’s GHG inventory was calculated according to methodologies identified in federal GHG Guidance documents using operational control boundaries. It measures emissions generated in three scopes: (1) INL emissions produced directly by stationary or mobile combustion and by fugitive emissions, (2) the share of emissions generated by entities from which INL purchased electrical power, and (3) indirect or shared emissions generated by outsourced activities that benefit INL (occurring outside INL’s organizational boundaries, but are a consequence of INL’s activities). This inventory found that INL generated 76,494.12 metric tons (MT) of CO2 equivalent (CO 2 e) emissions during FY 2020. The following conclusions were made from looking at the results of the individual contributors to INL’s FY 2020 GHG inventory: (1) Electricity (including the associated transmission and distribution losses) is the largest contributor to INL’s GHG inventory, with over 50% of the CO 2 e emissions; (2) Other sources with high emissions were employee commuting, mobile combustion (fleet fuels), stationary combustion (facility fuels), and waste disposal (fugitive emissions from the onsite landfill); and (3) Sources with low emissions were waste disposal (contracted disposal), fugitive emissions from refrigerants, wastewater treatment (onsite and contracted), and business ground travel (in personal and rental vehicles). This report details the methods behind quantifying INL’s GHG inventory and discusses lessons learned on better practices by which information important to tracking GHGs can be tracked and recorded. It is important to note that because this report differentiates between those portions of INL that are managed and operated by Battelle Energy Alliance, LLC (BEA) and those managed by other contractors, it includes only INL’s activities overseen by BEA. It is assumed that other contractors will provide similar reporting for those activities they manage, where appropriate.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

FY23 Update: Aerosol Sampling for the Canister Deposition Field Demonstration

This report describes the results of preliminary testing of aerosol monitoring equipment that will be used to continuously monitor the aerosol source term for the multi-year Canister Deposition Field Demonstration (CDFD). These data are required inputs for the development and validation of models for the deposition of dust and potentially corrosive salts on the surface of spent nuclear fuel (SNF) dry storage canisters. Surface salt loads correlate with the extent of corrosion damage on a metal surface, and potentially to the likelihood and timing of initiation of stress corrosion cracks. Aerosols will be monitored at the CDFD site using three instruments. A Dekati ® ELPI+ cascade impactor will be used for real-time monitoring of aerosol particle sizes. It will also collect dust in 14 size bins on impactor targets that can be chemically analyzed to determine the soluble salts present as a function of particle size. However, this instrument can only measure dried aerosols, with a diameter of <10 µm. The second instrument is a Topas laser particle size spectrometer, which provides real-time monitoring of aerosol particle sizes up to ~40 µm in size. It monitors both the ambient (potentially deliquesced) aerosol particle size distributions required for the dust deposition models and the distributions of the equivalent dried particles, allowing correlation with the Dekati ® data. However, it does not discriminate between inert dust particles and salt aerosols, and it does not retain samples of the different particle sizes for later analysis. The third instrument that will monitor aerosols at the CDFD site is a Clean Air Status and Trends Network (CASTNET) tower, which uses a multiple canister system to collect weekly samples for analysis to total suspended aerosol particle compositions and atmospheric gas concentrations. This status report describes work in FY23 to develop the capabilities for using these tools. In two training exercises, the cascade impactor and laser particle sizer were deployed in two different testing environments, one indoor and one outdoor. For the cascade impactor, the tests provided opportunities for the operators to familiarize themselves with impactor substrate preparation, and post-test sample removal and analysis. For the laser particle sizer, the tests were used to evaluate different instrument parameters, to determine the most appropriate settings for capturing transient events. Data and samples were collected for weeks to months for each test, and the results are presented here. In addition to the preliminary testing, contracts were developed with WSP Analytical Labs for sample preparation and analysis of the cascade impactor samples. The impactor tower from outdoor test was delivered to WSP and used to train the staff there in disassembly, sample extraction, sample analysis, and tower reassembly with new target substrates. These are tasks that WSP will be performing routinely for the CDFD project. The CASTNET system cannot be purchased or tested until an actual site has been selected for the CDFD test. Work for this FY has been restricted to preparation of contracts for purchasing the CASTNET tower, and for sample analysis, once the tower is in operation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of electro-optical quantum transducers based on three-dimensional superconducting cavities

Quantum transducers enable the conversion of quantum information and signals between different physical platforms. Based on the pioneering works in three-dimensional superconducting cavity technology developed at Fermilab, we are advancing the development of three-dimensional microwave-optical transducers and exploring their applications in quantum information processing and sensing. We present our progress in the design, fabrication, and characterization of three-dimensional microwave cavities integrated with bulk lithium niobate resonators. The material characterization using three-dimensional cavities based on a resonant-type method allows for understanding of complex permittivity and loss mechanism of electro-optic materials at cryogenic temperatures. We also evaluate the potential of the high-efficiency quantum transducers in enhancing the performance of quantum sensors for applications such as dark matter detection, compared to conventional homodyne detection approaches. This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC0207CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics. This work is funded by the DOE's Early Career Research Program. This research used resources of the U.S. Department of Energy, Office of Science, National Quantum Information Science Research Centers, Superconducting Quantum Materials and Systems Center (SQMS) under Contract No. DE-AC02-07CH11359.

Zorzetti, Silvia↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2023

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 191 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2023, between October 1, 2022 and September 30, 2023, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗