Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “security operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

Design Considerations for Secure Wireless Sensor Communication Systems in Harsh Electromagnetic Environments of Nuclear Reactor Facilities

Wireless sensors can potentially play a significant role in safety, efficiency, and reliability of the instrumentation and control process in current and next generation nuclear power reactors. While conventional narrowband wireless sensors have shown a certain level of success in some nuclear power plants (NPPs), the radio frequency (RF) propagation challenges posed by the heavy metallic and cluttered environment of NPPs has prevented their widespread use in such operations. Furthermore, these challenges include RF wave propagation in harsh (reflective, absorptive, cluttered) environments, data security issues, and RF interference to and from other devices in the vicinity of a nuclear reactor core. In this paper, first we address how ultrawideband (UWB) RF technology can complement the narrowband (i.e., WiFi) solutions that have been used in some NPPs by providing an alternative solution in addressing the signal propagation issues in such electromagnetically harsh environments. Second, we discuss and present the UWB software simulation results on multipath harsh environments, and then address the data security issues. In the final sections of the paper, we present the experimental results of using UWB signaling in a representative harsh environment conducted at the Massachusetts Institute of Technology research reactor site. We plan to develop the UWB communications hardware based on the results of this paper and report on its performance in the field with emphasis on the security aspects of the system in a subsequent paper.

42 ENGINEERING↗

Techno-Economic Analysis of Lithium Extraction from Geothermal Brines

The United States has a large, domestic source of lithium in geothermal fluids, especially at the Salton Sea region of southern California, where estimates of lithium pass-through at geothermal plants exceed 24,000 metric tons per year, based on 2019 geothermal plant operations. Lithium extraction from geothermal brines offers the potential to provide the United States with a secure, domestic supply of lithium to meet the increasing demands of electric vehicles, grid energy storage, portable electronics, and other end-use applications. Additionally, the use of direct extraction technologies allows for a more sustainable lithium supply relative to current evaporative brine and hardrock mining operations in terms of land use, water use, time to market with lithium products, and carbon intensity of operations. This report is part of an effort to assess geothermal brines as a source of commercial lithium supply for the United States. In this study, the National Renewable Energy Laboratory (NREL) reviews and summarizes public technoeconomic analyses of lithium extraction technologies. The work was coordinated with the Critical Minerals Institute at the Colorado School of Mines who focused on supply chain analysis of lithium.

15 GEOTHERMAL ENERGY↗

Advanced Transmission Technologies – GETs and HPCs Session 2: Advanced Power Flow Control and Transmission Topology Optimization

The INL TADA GETs Cohort Session 2, held on November 7, 2025, conducted in collaboration with ScottMadden, focused on two core Advanced Transmission Technologies (ATTs): Advanced Power Flow Control (APFC) and Transmission Topology Optimization (TTO). These technologies are pivotal in enhancing grid flexibility, reliability, and cybersecurity resilience. APFC, particularly through modular FACTS devices like Modular Static Synchronous Series Compensators (M-SSSCs), enables dynamic voltage injection to reroute power flows. The session highlighted the deployment benefits of APFC, such as rapid installation, minimal civil works, and re-deployability. Regulatory drivers like FERC Order 2023 mandate the inclusion of Grid-Enhancing Technologies (GETs) in interconnection studies. Case studies from Central Hudson, CAISO, and National Grid (UK) demonstrated APFC’s effectiveness in congestion relief and cost savings. The session also addressed cybersecurity concerns, including firmware vulnerabilities, SCADA integration risks, and supply chain dependencies. Participants engaged in interactive exercises to rank cybersecurity and supply chain risks, emphasizing the need for robust digital assurance strategies. TTO involves software-based reconfiguration of transmission networks to optimize power flow without new infrastructure. The session showcased its operational value, with examples from SPP, PJM, and MISO showing significant congestion cost reductions. Cybersecurity vulnerabilities were discussed, particularly in API security and software supply chains, referencing incidents like SolarWinds and attacks on Danish utilities. Digital assurance exercises explored worst-case scenarios, attack paths, and mitigation responsibilities between vendors and utilities. Reliability challenges such as algorithm stability, vendor dependency, and operator trust were also examined. Cross-cutting themes emphasized the importance of digital assurance tools, including Software Bills of Materials (SBOMs) and hardware-in-loop testing. Human performance, training, and operational confidence were identified as critical enablers of technology adoption. The session concluded with a preview of Session 3, which will focus on High Performance Conductors (HPCs) and risk-based cybersecurity tools. Session 2 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Risk Informed Timelines (RIT) v.1.0

Risk Informed Timelines (RIT) is a more modern and holistic method for understanding how access delay timelines are developed and utilized in physical security system evaluations. The software utilizes Bayesian methods to combine subject matter expert judgement and small performance test datasets in a consistent and defensible way. It allows a more holistic view of delay performance that provides distributions of task times and task success probabilities to account for tasks that, if failed, would result in failure of the attack. The RIT methodology is meant to enable security risk managers to begin the transition into more comprehensive delay timeline analysis. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525. SAND2021-8294 O

Noel, ToddG.↗

Cybersecurity Information Technology

As technology and security measures improve, hackers keep looking for new techniques and vulnerabilities that allow them to gain access to sensitive data. This includes but is not limited to: user accounts, personal information, databases, operating systems, developmental and testing systems, and operational systems. A hacker is an individual that uses technology such as computers, tablets, and phones for unauthorized access to data. As technology becomes more robust at preventing known attacks, new vulnerabilities always exists. These vulnerabilities usually go unnoticed by developers and could potentially be exploited by an attacker. To prevent hackers from stealing sensitive and potentially harmful information, we must protect our systems and data against these criminals by developing new methods to mitigate the damage caused by these vulnerabilities and prevent them from occurring in the first place. An excellent way to discover how hackers compromise systems is by identifying and analyzing existing vulnerabilities and patching them. The National Aeronautics and Space Administration (NASA) is one of the many federal agencies that operates under a constant threat by hackers. NASA puts a tremendous amount of effort to maintain and improve their security measures, protect critical systems, and secure sensitive information from attackers who would attempt to use it against our nation's interests.

Hackers↗

Toward digital design at the exascale: An overview of project ICECap

High performance computing has entered the Exascale Age. Capable of performing over 1018 floating point operations per second, exascale computers, such as El Capitan, the National Nuclear Security Administration's first, have the potential to revolutionize the detailed in-depth study of highly complex science and engineering systems. However, in addition to these kind of whole machine “hero” simulations, exascale systems could also enable new paradigms in digital design by making petascale hero runs routine. Currently, untenable problems in complex system design, optimization, model exploration, and scientific discovery could all become possible. Motivated by the challenge of uncovering the next generation of robust high-yield inertial confinement fusion (ICF) designs, project ICECap (Inertial Confinement on El Capitan) attempts to integrate multiple advances in machine learning (ML), scientific workflows, high performance computing, GPU-acceleration, and numerical optimization to prototype such a future. Built on a general framework, ICECap is exploring how these technologies could broadly accelerate scientific discovery on El Capitan. In addition to our requirements, system-level design, and challenges, we describe some of the key technologies in ICECap, including ML replacements for multiphysics packages, tools for human-machine teaming, and algorithms for multifidelity design optimization under uncertainty. As a test of our prototype pre-El Capitan system, we advance the state-of-the art for ICF hohlraum design by demonstrating the optimization of a 17-parameter National Ignition Facility experiment and show that our ML-assisted workflow makes design choices that are consistent with physics intuition, but in an automated, efficient, and mathematically rigorous fashion.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

HIPPO Unit Commitment Version 1

Developed for the Midcontinent Independent System Operator, Inc. (MISO), HIPPO-Unit Commitment Version 1 is for solving security constrained unit commitment problem. The model was developed to solve MISO's cases. This version of codes includes I/O module to read in MISO's csv files, modules to create a state-based mixed integer programming formulation for solving MIP, and modules to test basic procedures to solve MIP via HPC.

Source record↗

Termination of Safeguards for Accountable Nuclear Materials at the Idaho National Laboratory

Termination of safeguards ends requirements of Nuclear Material Control and Accountability (MC&A) and thereby removes the safeguards basis for applying physical protection requirements for theft and diversion of nuclear material, providing termination requirements are met as described. Department of Energy (DOE) M 470.4 6 (Nuclear Material Control and Accountability [8/26/05]) stipulates: 1. Section A, Chapter I (1)( q) (1): Safeguards can be terminated on nuclear materials provided the following conditions are met: (a) 'If the material is special nuclear material (SNM) or protected as SNM, it must be attractiveness level E and have a measured value.' (b) 'The material has been determined by DOE line management to be of no programmatic value to DOE.' (c) 'The material is transferred to the control of a waste management organization where the material is accounted for and protected in accordance with waste management regulations. The material must not be collocated with other accountable nuclear materials.' Requirements for safeguards termination depend on the safeguards attractiveness levels of the material. For attractiveness level E, approval has been granted from the DOE Idaho Operations Office (DOE ID) to Battelle Energy Alliance, LLC (BEA) Safeguards and Security (S&S). In some cases, it may be necessary to dispose of nuclear materials of attractiveness level D or higher. Termination of safeguards for such materials must be approved by the Departmental Element (this is the DOE Headquarters Office of Nuclear Energy) after consultation with the Office of Security.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monte Carlo Simulation Tool Installation and Operation Guide

This document provides information on software and procedures for Monte Carlo simulations based on the Geant4 toolkit, the ROOT data analysis software and the CRY cosmic ray library. These tools have been chosen for its application to shield design and activation studies as part of the simulation task for the Majorana Collaboration. This document includes instructions for installation, operation and modification of the simulation code in a high cyber-security computing environment, such as the Pacific Northwest National Laboratory network. It is intended as a living document, and will be periodically updated. It is a starting point for information collection by an experimenter, and is not the definitive source. Users should consult with one of the authors for guidance on how to find the most current information for their needs.

CRY↗

Consequence Prioritization Process for Potential High Consequence Events (HCE)

This document describes the process for Consequence Prioritization, the first phase of the Consequence-Driven Cyber-Informed Engineering (CCE) framework. The primary goal of Consequence Prioritization is to identify potential disruptive events that would significantly inhibit an organization’s ability to provide the critical services and functions deemed fundamental to their business mission. These disruptive events, defined as High Consequence Events (HCE), include both events that have occurred or could be realized through an attack of critical infrastructure owner assets. While other efforts have been initiated to identify and mitigate disruptive events at the national security level, such as Presidential Policy Directive 41 (PPD-41), this process is intended to be used by individual organizations to evaluate events that fall below the threshold for a national security. Described another way, Consequence Prioritization considers threats greater than those addressable by standard cyber-hygiene and includes the consideration of events that go beyond a traditional continuity of operations (COOP) perspective. Finally, Consequence Prioritization is most successful when organizations adopt a multi-disciplinary approach, engaging both cyber security and engineering expertise, as in-depth engineering perspectives are required to recognize and characterize and mitigate HCEs. Figure 1 provides a high-level overview of the prioritization process.

97 MATHEMATICS AND COMPUTING↗

MSGP Stormwater Pollution Prevention Plan for: TA-60-01 Heavy Equipment Shop, Triad National Security, LLC (Triad), Los Alamos National Laboratory, January 2019, Revision 0

This Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP) (U.S. EPA, June 2015) issued by EPA, and using the industry specific permit requirements for Sector P – Land Transportation & Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Tracing Number NMR050013 [Triad National Security, LLC (Triad)]. This SWPPP applies to discharges of stormwater from the operational areas of the TA-60-01 Heavy Equipment Shop at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Triad. Throughout this document, the term “facility” refers to the TA-60-01 Heavy Equipment Shop (HES). The current MSGP expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

MSGP Stormwater Pollution Prevention Plan for: TA-03-22 Power and Steam Plant, Triad National Security, LLC (Triad), Los Alamos National Laboratory, January 2019, Revision 0

This Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP) (U.S. EPA, June 2015) issued by EPA, and using the industry specific permit requirements for Sector O-Steam Electric Generating Facilities as a guide. The applicable stormwater discharge permit is EPA General Permit Tracing Number NMR050013 [Triad National Security, LLC (Triad)]. This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-22 Power and Steam Plant at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Triad. Throughout this document, the term “facility” refers to the TA-03-22 Power and Steam Plant (PSP). The current MSGP expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

MSGP Stormwater Pollution Prevention Plan for: TA-03-38 Carpentry and Metal Fabrication Shops, Triad National Security, LLC (Triad), Los Alamos National Laboratory, January 2019, Revision 0

This Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP) (U.S. EPA, June 2015) issued by EPA, and using the industry specific permit requirements for Sector A-Timber Products and Sector AA-Fabricated Metal Products as a guide. The applicable stormwater discharge permit is EPA General Permit Tracing Number NMR050013 [Triad National Security, LLC (Triad)]. This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-38 Carpentry and Metal Fabrication Shops (38 Shops) at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Triad. Throughout this document, the term “facility” refers to the TA-03-38 Carpentry Shop (CS) and/or the Metal Fabrication Shop (MFS). The current MSGP expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

MSGP Stormwater Pollution Prevention Plan TA-60 Material Recycling Facility

This Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP) (U.S. EPA, June 2015) issued by EPA, and using the industry specific permit requirements for Sector N: Scrap Recycling and Waste Recycling Facilities as a guide. The applicable stormwater discharge permit is EPA General Permit Tracing Number NMR050013 [Triad National Security, LLC (Triad)]. This SWPPP applies to discharges of stormwater from the operational areas of the TA- 60 Material Recycling Facility at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Triad. Throughout this document, the term “facility” refers to the TA-60 Material Recycling Facility. The current MSGP expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

MSGP Stormwater Pollution Prevention Plan TA-60 Roads and Grounds Facility, Sigma Mesa Staging Areas, and Asphalt Batch Plant

This Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP) (U.S. EPA, June 2015) issued by EPA, and using the industry specific permit requirements for Sector P: Land Transportation and Warehousing and Sector D: Asphalt Paving and Roofing Material and Lubricant Manufacturing as a guides. The applicable stormwater discharge permit is EPA General Permit Tracing Number NMR050013 [Triad National Security, LLC (Triad)]. This SWPPP applies to discharges of stormwater from the operational areas of the TA-60 Roads and Grounds Facility, Sigma Mesa Staging Areas, and Asphalt Batch Plant at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Triad. Throughout this document, the term “facilities” refers to the TA-60 Roads and Grounds Facility, Sigma Mesa Staging Areas, and Asphalt Batch Plant. The current MSGP expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

Energy Information Systems: From the Basement to the Boardroom

A significant buildings energy reduction opportunity exists in the office sector, given that this market segment typically is an early adopter of new technology. There is a rising trend towards smart and connected offices through the internet of things (IoT) that provides new opportunities for operational efficiency and environmental sustainability practices. Leading commercial real estate companies have begun to shift from individual building automation systems (BAS) to partially integrated and automated systems such as energy information systems (EIS). In both the United States and India, organizations are seeking operational excellence, enhanced tenant relationships, and topline growth. Hence it is imperative to engage the executives with decision-making power, by tapping into their interest in sustainability, corporate social responsibility, and innovation. This expansion of interest can enable data-driven decisions, strong energy investments, and deeper energy benefits, and would drive innovation in this field. However, none of this would be possible without robust, consistent building energy information to provide visibility across all the levels of decision making, i.e. from the basement where the facilities staff take operational action to the boardroom where the executives make investment decisions. Price, security, and ease of use remain barriers to the adoption and pervasive use of promising EIS technologies in commercial office buildings. We believe that these barriers can be addressed through the development of ready, simplified, consistent, commercially available, low-cost EIS-in-a-box packages, that have a pre-defined set of hardware components and software features and functionality that are pertinent to a particular building sector. These simplified, sector-specific EIS packages can help to obviate the need for customization, and enhance ease of use, thereby enabling scale-up, in order to facilitate building energy savings. The EIS-in-a-box are adaptable in both U.S. and Indian office buildings, and potentially beyond these two countries.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of a Cloud-based Application to Enable a Scalable Risk-informed Predictive Maintenance Strategy at Nuclear Power Plants

Light-water reactor operations and maintenance (O&M) costs are prohibitively high, thus contributing to the premature decommissioning of nuclear power plants (NPPs). This is partly due to how the equipment is monitored. In recent years, cloud computing has emerged as a dominant technology by virtue of its low costs, computing and storage adaptability, and ability to host applications over numerous types of virtual infrastructures. Cloud computing can be a cost-effective alternative to onsite storage and diagnostics. This paper conducts a techno-economic assessment of a provisional cloud deployment architecture for a NPP predictive monitoring (PdM) system. The cloud-based monitoring system would enable maintenance and diagnostics (M&D) analysts and other authorized plant users to remotely monitor equipment functionality so as to enable PdM practices and early detection of faults. The Microsoft Azure cloud platform is included in the proposed cloud architecture to provide data processing and storage, sensor device networking, and database management; however, this analysis could be extended to other cloud computing service providers as well. For the techno-economic assessment, technical feasibility is measured in terms of network performance metrics such as response time, latency, and throughput, whereas economic feasibility is measured in terms of operational costs and capital expenditures. Finally, this report covers certain regulatory and security aspects that may concern licensees looking to implement cloud computing. The report focuses on the integration of sensor database storage, the application of cloud resources to PdM, and the identification of technological and economic hurdles associated with moving to a cloud-computing-based architecture.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗