Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

Initial Validation of a Simulation System for Studying Interoperability in Future Air Traffic Management Systems

Future air traffic management systems will need to accommodate large numbers of increasingly diverse air vehicles with different operating paradigms. To support this trend, they will digitally share copious amounts of information via a common communication architecture. Operators will deploy programs that create and negotiate flight plans via the architecture’s communication protocols. These programs will autonomously make decisions that must be arbitrated by the architecture and robust to uncertainty. To study interoperability in air traffic management, a new airspace simulation system was composed by integrating a legacy airspace simulation, an air traffic control model, and a new research communication architecture. It was used to evaluate air traffic management concepts by adapting it to handle congested arrival traffic at Newark Liberty International Airport and executing simulations. Results demonstrated the ability of the simulation system to model in detail strategic traffic flow management, predeparture flight planning, and air traffic control working in concert. Subsequent studies can use the simulation system to study interoperability, autonomy, digital communication, and uncertainty in future air traffic management systems.

air traffic control↗

Initial Validation of a Simulation System for Studying Interoperability in Future Air Traffic Management Systems

Future air traffic management systems will need to accommodate large numbers of increasingly diverse air vehicles with different operating paradigms. To support this trend, they will digitally share copious amounts of information via a common communication architecture. Operators will deploy programs that create and negotiate flight plans via the architecture’s communication protocols. These programs will autonomously make decisions that must be arbitrated by the architecture and robust to uncertainty. To study interoperability in air traffic management, a new airspace simulation system was composed by integrating a legacy airspace simulation, an air traffic control model, and a new research communication architecture. It was used to evaluate air traffic management concepts by adapting it to handle congested arrival traffic at Newark Liberty International Airport and executing simulations. Results demonstrated the ability of the simulation system to model in detail strategic traffic flow management, predeparture flight planning, and air traffic control working in concert. Subsequent studies can use the simulation system to study interoperability, autonomy, digital communication, and uncertainty in future air traffic management systems.

air traffic control↗

The Space Station program definition and preliminary systems design - Recent developments

It is pointed out that space stations represent a major vehicle for accomplishing many things mankind envisions for space activities. Thus, space stations have become necessary stepping-off points for deep-space expeditions, and it is expected that they will lead eventually to the permanent occupancy of another planet. The present paper provides a report regarding planning activities in the U.S. and in other countries which have made significant progress in making a permanent Space Station a reality. The Space Station will consist of a manned base and associated platforms, as well as collateral support equipment. The purpose of the program definition and preliminary design activities (Phase B) is to arrive at the baseline configuration before initiating actual hardware development. Details of the program plan are discussed along with user considerations in design, the commercialization of space, design issues, operations, and Space Station evolution.

Freitag, R. F.↗

NASA Standing Review Board Handbook

This handbook provides guidance based on best practices for the planning, preparation, review, reporting, and closeout of Standing Review Board (SRB) activities. Revision C updates the Revision B version of the SRB Handbook published in 2016 to incorporate updates to NASA Procedural Requirements (NPR) 7120.5F, NASA Space Flight Program and Project Management Requirements. These updates include: - Changing the Dissenting Opinion process to the Formal Dissent process, which retains the current process augmented with an expedited escalation path. - Updates to requirements for establishing an Agency Baseline Commitment (ABC) and for performing Joint Cost and Schedule Confidence Level (JCL) analyses for tightly coupled programs. - Additional requirements for performing a JCL analysis for single-project programs and projects over $1B Life-Cycle Cost (LCC). - Use of initial capability cost estimates instead of LCC estimates in specific, identified instances for single-project programs and projects that plan continuing operations and production, including integration of capability upgrades, with an unspecified Phase E end point. These single-project programs and projects define an initial capability during Phase A and develop an initial capability cost that establishes the ABC at Key Decision Point (KDP) C. Initial capability is the first operational mission flight (or as defined in the KDP B Review Plan) and is documented in the KDP B Decision Memorandum. Initial capability cost includes operations cost for the initial capability. The Phase E cost estimate for continuing operations and production is established separately as part of the Operational Readiness Review (ORR) and KDP E for the 5 years after initial capability and subsequently updated and documented annually for the next 5-year period. Upgrades during Phase E that meet the Agency criteria for a major project for external reporting are treated as projects for the purposes of establishing their own development ABC outside the Phase E cost estimate. The Phase E cost estimate is updated to include production and operations costs associated with these upgrades. Development, production, and operations costs of other (i.e., non-major) upgrades are included in the Phase E cost estimate. (See NPR 7120.5, Sections 2.4.1.5 and 2.4.1.6 and the NASA Space Flight Program and Project Management Handbook (PM Handbook), Section 5.5.4 for additional information.) The scope of the SRB’s assessment with respect to initial capability, Phase E cost estimate, and major upgrades for these single-project programs and projects is defined in the Terms of Reference (ToR).

Kevin Michael Gilligan↗

Advanced space system concepts and their orbital support needs (1980 - 2000). Volume 1: Executive summary

The likely system concepts which might be representative of NASA and DoD space programs in the 1980-2000 time period were studied along with the programs' likely needs for major space transportation vehicles, orbital support vehicles, and technology developments which could be shared by the military and civilian space establishments in that time period. Such needs could then be used by NASA as an input in determining the nature of its long-range development plan. The approach used was to develop a list of possible space system concepts (initiatives) in parallel with a list of needs based on consideration of the likely environments and goals of the future. The two lists thus obtained represented what could be done, regardless of need; and what should be done, regardless of capability, respectively. A set of development program plans for space application concepts was then assembled, matching needs against capabilities, and the requirements of the space concepts for support vehicles, transportation, and technology were extracted. The process was pursued in parallel for likely military and civilian programs, and the common support needs thus identified.

Bekey, I.↗

United States Weather Research Program (USWRP)

After more than a decade of development by a broad cross-section of the U.S. atmospheric research community involved in planning for the National STORM Program, the Subcommittee on Atmospheric Research (SAR) of the Committee on Earth and Environmental Science (CEES) led the development of a strategic plan to realize the objectives of STORM so as to improve our nation's capability to provide accurate short-term forecasts of weather. This strategic plan will guide the planning and implementation of what is now called the United States Weather Research Program (USWRP). The USWRP is charged with achieving operational atmospheric prediction based on mesoscale observations and model results and establishing the scientific and technological basis for global atmospheric mesoscale prediction by the year 2000. The key scientific questions that are addressed under USWRP are discussed.

Bhumralkar, Chandrakant↗

Factors Affecting Bait Site Visitation: Area of Influence of Baits

Baiting is a fundamental strategy for the global management of wild pigs (Sus scrofa); however, little information exists on how anthropogenic bait affects wild pig movements on a landscape. We investigated factors that are important in determining the spatial area of attraction for wild pigs to bait (‘area of influence’ of a bait site) using data from Global Positioning System (GPS) collars and locations of bait sites. We monitored movements of wild pigs in 2 distinct study areas in the United States from February to September 2016 and used locational data using GPS collars to analyze the influence of habitat quality (dependent on site), home range size, number of bait sites in the home range, distance to a bait site, and sex in relation to movement in time and space. We determined the average area of influence by calculating the area of a circle with the radius as the average maximum distance travelled by wild pigs to reach a bait site. The average area of influence for our bait sites was 6.7 km 2 (or a radius of approximately 1.5 km), suggesting a bait spacing of approximately 1.5 km would be adequate to capture visitation by most wild pigs and a spacing of 3 km could allow substantial visitation while minimizing redundant effort depending on the spatial structure of the populations. Eighty percent of wild pigs first visited bait sites within 8.9 days after bait deployment; and they visited earlier when their home range size was larger. As the number of bait sites in an individual's home range increased, individual pigs visited more bait sites, and the probability of a visit increased dramatically up to approximately 5 bait sites and much less thereafter. Wild pigs travelled farther distances to visit bait sites in lower quality habitat. Our results support the hypothesis that habitat quality can mediate the efficacy of baiting programs for wildlife by influencing their movement patterns and motivation to use anthropogenic resources. Our results suggest wild pigs will travel extensively within their home range to visit bait sites, and that in lower quality habitat, most animals will find bait sites more quickly. Determining the area of influence of bait sites can increase the efficacy of planning and monitoring management programs. Overall, our study provides new information to help managers plan baiting designs to attract the greatest number of pigs.

59 BASIC BIOLOGICAL SCIENCES↗

Thermal barrier coatings issues in advanced land-based gas turbines

The Department of Energy's Advanced Turbine Systems (ATS) program is aimed at fostering the development of a new generation of land-based gas turbine systems with overall efficiencies significantly beyond those of current state-of-the-art machines, as well as greatly increased times between inspection and refurbishment, improved environmental impact, and decreased cost. The proposed duty cycle of ATS machines will emphasize different criteria in the selection of materials for the critical components. In particular, thermal barrier coatings (TBC's) will be an essential feature of the hot gas path components in these machines. In fact, the goals of the ATS will require significant improvements in TBC technology, since these turbines will be totally reliant on TBC's, which will be required to function on critical components such as the first stage vanes and blades for times considerably in excess of those experienced in current applications. Issues that assume increased importance are the mechanical and chemical stability of the ceramic layer and of the metallic bond coat; the thermal expansion characteristics and compliance of the ceramic layer; and the thermal conductivity across the thickness of the ceramic layer. Obviously, the ATS program provides a very challenging opportunity for TBC's, and involves some significant opportunities to extend this technology. A significant TBC development effort is planned in the ATS program which will address these key issues.

Parks, William P.↗

Surface Navigation Using Optimized Waypoints and Particle Swarm Optimization

The design priority for manned space exploration missions is almost always placed on human safety. Proposed manned surface exploration tasks (lunar, asteroid sample returns, Mars) have the possibility of astronauts traveling several kilometers away from a home base. Deviations from preplanned paths are expected while exploring. In a time-critical emergency situation, there is a need to develop an optimal home base return path. The return path may or may not be similar to the outbound path, and what defines optimal may change with, and even within, each mission. A novel path planning algorithm and prototype program was developed using biologically inspired particle swarm optimization (PSO) that generates an optimal path of traversal while avoiding obstacles. Applications include emergency path planning on lunar, Martian, and/or asteroid surfaces, generating multiple scenarios for outbound missions, Earth-based search and rescue, as well as human manual traversal and/or path integration into robotic control systems. The strategy allows for a changing environment, and can be re-tasked at will and run in real-time situations. Given a random extraterrestrial planetary or small body surface position, the goal was to find the fastest (or shortest) path to an arbitrary position such as a safe zone or geographic objective, subject to possibly varying constraints. The problem requires a workable solution 100% of the time, though it does not require the absolute theoretical optimum. Obstacles should be avoided, but if they cannot be, then the algorithm needs to be smart enough to recognize this and deal with it. With some modifications, it works with non-stationary error topologies as well.

Birge, Brian↗

LUNAR SURFACE GEOSCIENCE TRAINING FOR ASTRONAUTS

Geoscientists have been training and preparing astronauts to observe the Earth from space and explore other planetary surfaces with a legacy that reaches back to the early days of the space program. Continuing this legacy and critical function, a core NASA team has been closely coordinating with the Johnson Space Center (JSC) Flight Operations Directorate (FOD) as well as academic, research institutions, and other governmental partners to conduct a comprehensive geoscience training program that ranges from initial astronaut candidate training to preparing assigned crew for future lunar surface missions. Described below are the three program training phases (summarized in Figure 1), along with recent program highlights and forward planning. Given NASA’s increased planning and development efforts regarding near-term lunar surface science activities, we welcome ideas, concepts, capabilities, collaborations, and innovations to this astronaut training program.

T. G. Graff↗

Recommendation of a More Effective Alternative to the NASA Launch Services Program Mission Integration Reporting System (MIRS) and Implementation of Updates to the Mission Plan

Over the course of my internship in the Flight Projects Office of NASA's Launch Services Program (LSP), I worked on two major projects, both of which dealt with updating current systems to make them more accurate and to allow them to operate more efficiently. The first project dealt with the Mission Integration Reporting System (MIRS), a web-accessible database application used to manage and provide mission status reporting for the LSP portfolio of awarded missions. MIRS had not gone through any major updates since its implementation in 2005, and it was my job to formulate a recommendation for the improvement of the system. The second project I worked on dealt with the Mission Plan, a document that contains an overview of the general life cycle that is followed by every LSP mission. My job on this project was to update the information currently in the mission plan and to add certain features in order to increase the accuracy and thoroughness of the document. The outcomes of these projects have implications in the orderly and efficient operation of the Flight Projects Office, and the process of Mission Management in the Launch Services Program as a whole.

recommendation↗

Space transportation presentation to SSTAC/ARTS Review Committee

Viewgraphs of the programs of the materials and structures division of the integrated technology plan for the civil space program is presented. The Department of Defense and NASA will jointly develop and jointly fund development of a new space launch system to meet civil and national space needs and will actively consider commercial space needs. The goals of the new launch program are to greatly improve national launch capability, reduce operating costs, improve reliability, responsiveness, and mission performance.

Venneri, Samuel L.↗

Demystifying Solar in WAP

Over the last two years, the National Renewable Energy Laboratory has identified the pathways for implementing solar in the Weatherization Assistance Program and Low Income Home Energy Assistance Program and practices for successful implementation. Learn about successful implementation models from around the network and the new resources that can give you a head start in planning solar into your program, including a demonstration of tools to help evaluate solar potential and cost-effectiveness at the household level, as well as a new tool from the U.S. Department of Energy National Community Solar Partnership to help connect households receiving LIHEAP assistance to community solar subscriptions that guarantee energy bill savings.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

Proceedings of the 2003 NASA/JPL Workshop on Fundamental Physics in Space

The 2003 Fundamental Physics workshop included presentations ranging from forces acting on RNA to properties of clouds of degenerate Fermi atoms, to techniques to probe for a added space-time dimensions, and to flight hardware for low temperature experiments, amongst others. Mark Lee from NASA Headquarters described the new strategic plan that NASA has developed under Administrator Sean O'Keefe's leadership. Mark explained that the Fundamental Physics community now needs to align its research program and the roadmap describing the long-term goals of the program with the NASA plan. Ulf Israelsson of JPL discussed how the rewrite of the roadmap will be implemented under the leadership of the Fundamental Physics Discipline Working Group (DWG). Nick Bigelow, chair of the DWG, outlined how investigators can contribute to the writing of the roadmap. Results of measurements on very cold clouds of Fermi atoms near a Feshbach resonance were described by three investigators. Also, new measurements relating to tests of Einstein equivalence were discussed. Investigators also described methods to test other aspects of Einstein's relativity theories.

Strayer, Don↗

International Space Station Payload Operations Integration Center (POIC) Overview

Objectives and Goals: Maintain and operate the POIC and support integrated Space Station command and control functions. Provide software and hardware systems to support ISS payloads and Shuttle for the POIF cadre, Payload Developers and International Partners. Provide design, development, independent verification &validation, configuration, operational product/system deliveries and maintenance of those systems for telemetry, commanding, database and planning. Provide Backup Control Center for MCC-H in case of shutdown. Provide certified personnel and systems to support 24x7 facility operations per ISS Program. Payloads CoFR Implementation Plan (SSP 52054) and MSFC Payload Operations CoFR Implementation Plan (POIF-1006).

Ijames, Gayleen N.↗