EMC Test Challenges for NASAs James Webb Space Telescope

This presentation describes the electromagnetic compatibility (EMC) tests performed on the Integrated Science Instrument Module (ISIM), the science payload of the James Webb Space Telescope (JWST), at NASAs Goddard Space Flight Center (GSFC) in August 2015. By its very nature of being an integrated payload, it could be treated as neither a unit level test nor an integrated spacecraft observatory test. Non-standard test criteria are described along with non-standard test methods that had to be developed in order to evaluate them. Results are presented to demonstrate that all test criteria were met in less than the time allocated.

Electromagnetics↗

Advanced Stirling Convertor Dual Convertor Controller Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

NASA Glenn Research Center (GRC) developed a non-nuclear representation of a Radioisotope Power System (RPS) consisting of a pair of Advanced Stirling Convertors (ASC), a Dual Convertor Controller (DCC) EM (engineering model) 2 & 3, and associated support equipment, which were tested in the Radioisotope Power Systems System Integration Laboratory (RSIL). The DCC was designed by the Johns Hopkins University/Applied Physics Laboratory (JHU/APL) to actively control a pair of Advanced Stirling Convertors (ASC). The first phase of testing included a Dual Advanced Stirling Convertor Simulator (DASCS) which was developed by JHU/APL and simulates the operation and electrical behavior of a pair of ASC's in real time via a combination of hardware and software. RSIL provides insight into the electrical interactions between a representative radioisotope power generator, its associated control schemes, and realistic electric system loads. The first phase of integration testing included the following spacecraft bus configurations: capacitive, battery, and supercapacitor. A load profile, created based on data from several missions, tested the RPS and RSIL ability to maintain operation during load demands above and below the power provided by the RPS. The integration testing also confirmed the DCC's ability to disconnect from the spacecraft when the bus voltage dipped below 22 V or exceeded 36 V. Once operation was verified with the DASCS, the tests were repeated with actual operating ASC's. The goal of this integration testing was to verify operation of the DCC when connected to a spacecraft and to verify the functionality of the newly designed RSIL. The results of these tests are presented in this paper.

systems integration↗

SHIIVER Assemby Thermal Model Prediction for Transient Test Conditions

An integrated thermal model of the Structure Heat Intercept, Insulation, and Vibration Evaluation Rig (SHIIVER) was built in Thermal Desktop/Sinda-Fluint and used to predict thermal performance of the system with the technologies being tested from the eCryo project. The technologies tested include the vapor cooling of the structure using the boil-off and multilayer insulation (MLI) on the hydrogen tank. The thermal model is used to 1) understand system transient behaviors; 2) perform trade studies of different vapor-cooling designs; 3) define the test operations matrix, test procedures, and conditions; and 4) address thermal-related questions at different phases of SHIIVER project. Details of the thermal model are herein described, and results corresponding to the test operations are presented for four different configurations at different fill levels. The thermal performance of each configuration is predicted with the thermal model regarding the heat reduction and boil-off reduction by using vapor cooling and/or MLI on the structures attached to the hydrogen tank.

thermal modeling↗

Operational Modal Analysis of the Artemis I Dynamic Rollout Test and Wet Dress Rehearsal

NASA has developed an expendable heavy lift launch vehicle capability, the Space Launch System (SLS), to support lunar and deep space exploration. The uncrewed Artemis I was the first flight of this new launch vehicle and tested critical systems for the upcoming crewed Artemis II flight to the moon. Accelerations were recorded at a multitude of locations on Artemis, the Mobile Launcher (ML), and the Crawler Transporter (CT)during the rollout of Artemis I from the Vehicle Assembly Building (VAB) to Launch Pad 39B March 2022 and is referred to as the Artemis I Dynamic Rollout Test (DRT). While Artemis I was at Launch Pad 39B, the Wet Dress Rehearsal (WDR) was performed to demonstrate launch readiness and acceleration measurements were also recorded. Finally, Artemis I rolled back from Launch Pad 39B to the VAB in April 2022, where acceleration measurements were also recorded and is referred to as the rollback portion of DRT. Because the forces during rollout and at the launch pad acting on Artemis I, the ML, and the CT are not directly measurable, Operational Modal Analysis (OMA) techniques, instead of traditional Experimental Modal Analysis (EMA) techniques, were used to identify modal characteristics. The OMA analysis of DRT and WDR directly builds upon the lessons learned from the OMA analysis of an earlier rollout of the ML from the VAB. DRT and WDR dynamic characteristics will be used to support SLS Integrated Modal Test finite element model correlation efforts and Exploration Ground System ML and CT finite element model verification and validation, which are part of the Building Block approach the Space Launch System program has implemented. The dynamic characteristics extracted from DRT as well as the rollout acceleration time histories themselves will be used in the development of generic rollout forcing functions that will provide refined estimates of the Artemis IV rollout forces, which will have the heavier and larger SLS Block 1B launch vehicle and Mobile Launcher 2 (ML-2). This paper briefly describes Artemis I, the ML, and the CT physical characteristics, DRT rollout/rollback and WDR data collection, the challenges in implementing OMA techniques due in part to the CT harmonics, and how these challenges were overcome to obtain the Artemis I DRT configuration and WDR configuration modal characteristics.

Apollo↗

Operational Modal Analysis of the Artemis I Dynamic Rollout Test and Wet Dress Rehearsal

NASA has developed an expendable heavy lift launch vehicle capability, the Space Launch System (SLS), to support lunar and deep space exploration. The uncrewed Artemis I was the first flight of this new launch vehicle and tested critical systems for the upcoming crewed Artemis II flight to the moon. Accelerations were recorded at a multitude of locations on Artemis, the Mobile Launcher (ML), and the Crawler Transporter (CT)during the rollout of Artemis I from the Vehicle Assembly Building (VAB) to Launch Pad 39B March 2022 and is referred to as the Artemis I Dynamic Rollout Test (DRT). While Artemis I was at Launch Pad 39B, the Wet Dress Rehearsal (WDR) was performed to demonstrate launch readiness and acceleration measurements were also recorded. Finally, Artemis I rolled back from Launch Pad 39B to the VAB in April 2022, where acceleration measurements were also recorded and is referred to as the rollback portion of DRT. Because the forces during rollout and at the launch pad acting on Artemis I, the ML, and the CT are not directly measurable, Operational Modal Analysis (OMA) techniques, instead of traditional Experimental Modal Analysis (EMA) techniques, were used to identify modal characteristics. The OMA analysis of DRT and WDR directly builds upon the lessons learned from the OMA analysis of an earlier rollout of the ML from the VAB. DRT and WDR dynamic characteristics will be used to support SLS Integrated Modal Test finite element model correlation efforts and Exploration Ground System ML and CT finite element model verification and validation, which are part of the Building Block approach the Space Launch System program has implemented. The dynamic characteristics extracted from DRT as well as the rollout acceleration time histories themselves will be used in the development of generic rollout forcing functions that will provide refined estimates of the Artemis IV rollout forces, which will have the heavier and larger SLS Block 1B launch vehicle and Mobile Launcher 2 (ML-2). This paper briefly describes Artemis I, the ML, and the CT physical characteristics, DRT rollout/rollback and WDR data collection, the challenges in implementing OMA techniques due in part to the CT harmonics, and how these challenges were overcome to obtain the Artemis I DRT configuration and WDR configuration modal characteristics.

Apollo↗

Pathfinder Technology Demonstrator (PTD) Status

This paper will provide the status of the NASA Small Spacecraft Technology (SST) program’s Pathfinder Technology Demonstrator (PTD) series. Details on the development, launch, and operations of the recently completed PTD-1, as well as the planned operations of the upcoming PTD-3 and PTD-4 flights will be presented. Significant advances in the capabilities of nano-spacecraft over the past 15 years, coupled with improved access to space for CubeSats, have created new opportunities for scientific exploration using these high-value platforms. Continued development and demonstration of key technologies are improving the performance of the 1-unit (U) and 3U class CubeSats while expanding the reach of nano-spacecraft technologies into larger platforms, such as the 12-kilogram class “6U” buses. NASA’s PTD series is demonstrating a variety of new technologies on-orbit, providing proof of the maturity of these significant new technologies, and enhancing the performance of future CubeSats. Each of the four PTD flights consists of one 6U CubeSat weighing approximately 12 kilograms and measuring approximately 36 centimeters x 25 centimeters x 10 centimeters. Each flight is planned to characterize its payload within 90 days of insertion into low-Earth orbit. The PTD flights will demonstrate key technologies such as novel nano-spacecraft compatible propulsion systems, which enable deep space and maneuverable CubeSat flights; optical communications systems to facilitate high data rate collection and communications; and highly integrated systems that combine power and communication system elements to enable high power generation and novel integrated communication systems. The first PTD spacecraft, PTD-1, was placed in orbit by a SpaceX Falcon 9 launch in January of 2021 and demonstrated the functionality of the HYDROS propulsion system, developed by Tethers Unlimited of Bothell, Washington, over a period of six months. The PTD-3 flight, scheduled for launch in summer 2022, will demonstrate the TeraByte InfraRed Delivery, or TBIRD, optical communications payload developed by Massachusetts Institute of Technology Lincoln Laboratory in Lexington. The PTD-4 flight will demonstrate the Lightweight Integrated Solar Array and anTenna, or LISA-T, a payload that consists of an integrated solar array and transceiver developed by NASA’s Marshall Spaceflight Center in Huntsville, Alabama. The PTD spacecraft bus, integration and test, and flight operations services are provided by Tyvak Nano-Satellite Systems, Inc. (“Tyvak”) of Irvine, California. NASA’s SST program within the agency’s Space Technology Mission Directorate funds the PTD demonstration flights. The SST program rapidly develops and demonstrates capabilities for small spacecraft applicable to exploration, science, and the commercial sector. The program is based at NASA’s Ames Research Center.

Small Spacecraft↗

Using an Advanced Distribution Management System Test Bed to Evaluate the Impact of Model Quality on Volt/VAR Optimization: Preprint

In this paper, we present a test bed for evaluating existing and future advanced distribution management system (ADMS) applications in a realistic laboratory setting, including other utility management systems and field equipment. We present an example of using it to evaluate the impact of the ADMS network model quality on a Volt/VAR optimization (VVO) application. The test bed integrates a commercial ADMS with a real-time simulation model of a utility distribution feeder. Representative power and controller hardware are integrated through hardware-in-the-loop (HIL) techniques. The performance of the ADMS VVO application is also evaluated for different levels of measurement density. Initial results indicate that a higher model quality achieves the highest possible energy savings while avoiding voltage violations, whereas a lower model quality results in increased energy savings but at the expense of more voltage violations.

ADMS↗

CASTOR: Cathode/Anode Satellite Thruster for Orbital Repositioning

The purpose of CASTOR (Cathode/Anode Satellite Thruster for Orbital Repositioning) satellite is to demonstrate in Low Earth Orbit (LEO) a nanosatellite that uses a Divergent Cusped Field Thruster (DCFT) to perform orbital maneuvers representative of an orbital transfer vehicle. Powered by semi-deployable solar arrays generating 165W of power, CASTOR will achieve nearly 1 km/s of velocity increment over one year. As a technology demonstration mission, success of CASTOR in LEO will pave the way for a low cost, high delta-V orbital transfer capability for small military and civilian payloads in support of Air Force and NASA missions. The educational objective is to engage graduate and undergraduate students in critical roles in the design, development, test, carrier integration and on-orbit operations of CASTOR as a supplement to their curricular activities. This program is laying the foundation for a long-term satellite construction program at MIT. The satellite is being designed as a part of AFRL's University Nanosatellite Program, which provides the funding and a framework in which student satellite teams compete for a launch to orbit. To this end, the satellite must fit within an envelope of 50cmx50cmx60cm, have a mass of less than 50kg, and meet stringent structural and other requirements. In this framework, the CASTOR team successfully completed PDR in August 2009 and CDR in April 2010 and will compete at FCR (Flight Competition Review) in January 2011. The complexity of the project requires implementation of many systems engineering techniques which allow for development of CASTOR from conception through FCR and encompass the full design, fabrication, and testing process.

Mruphy, Gloria A.↗

Space Technology 5: Changing the Mission Design without Changing the Hardware

The Space Technology 5 (ST-5) Project is part of NASA's New Millennium Program. The validation objectives are to demonstrate the research-quality science capability of the ST-5 spacecraft; to operate the three spacecraft as a constellation; and to design, develop, test and flight-validate three capable micro-satellites with new technologies. A three-month flight demonstration phase is planned, beginning in March 2006. This year, the mission was re-planned for a Pegasus XL dedicated launch into an elliptical polar orbit (instead of the Originally-planned Geosynchronous Transfer Orbit.) The re-plan allows the mission to achieve the same high-level technology validation objectives with a different launch vehicle. The new mission design involves a revised science validation strategy, a new orbit and different communication strategy, while minimizing changes to the ST-5 spacecraft itself. The constellation operations concepts have also been refined. While the system engineers, orbit analysts, and operations teams were re-planning the mission, the implementation team continued to make progress on the flight hardware. Most components have been delivered, and the first spacecraft is well into integration and test.

Carlisle, Candace C.↗

Raven: An On-Orbit Relative Navigation Demonstration Using International Space Station Visiting Vehicles

Since the last Hubble Servicing Mission five years ago, the Satellite Servicing Capabilities Office (SSCO) at the NASA Goddard Space Flight Center (GSFC) has been focusing on maturing the technologies necessary to robotically service orbiting legacy assets-spacecraft not necessarily designed for in-flight service. Raven, SSCO's next orbital experiment to the International Space Station (ISS), is a real-time autonomous non-cooperative relative navigation system that will mature the estimation algorithms required for rendezvous and proximity operations for a satellite-servicing mission. Raven will fly as a hosted payload as part of the Space Test Program's STP-H5 mission, which will be mounted on an external ExPRESS Logistics Carrier (ELC) and will image the many visiting vehicles arriving and departing from the ISS as targets for observation. Raven will host multiple sensors: a visible camera with a variable field of view lens, a long-wave infrared camera, and a short-wave flash lidar. This sensor suite can be pointed via a two-axis gimbal to provide a wide field of regard to track the visiting vehicles as they make their approach. Various real-time vision processing algorithms will produce range, bearing, and six degree of freedom pose measurements that will be processed in a relative navigation filter to produce an optimal relative state estimate. In this overview paper, we will cover top-level requirements, experimental concept of operations, system design, and the status of Raven integration and test activities.

Rendezvous↗

UAS Integration in the NAS Project: Overview of Flight Test Series 6

The National Aeronautics and Space Administration (NASA) Unmanned Aircraft Systems Integration in the National Airspace System (UAS-NAS) Project has conducted a series of flight test campaigns intended to support the reduction of barriers that prevent unmanned aircraft from flying without the required waivers from the Federal Aviation Administration (FAA). The 2019 Flight Test Series 6 (FT6) campaign furthered this path and supported three test configurations: 1) Radar Characterization, 2) Scripted Encounters and 3) Full Mission. Radar Characterization assessed the performance of Honeywell’s low size, weight, and power (low SWaP) radar system; Scripted Encounters investigated the timing of Detect and Avoid (DAA) alerting thresholds using a Department of Defense (DoD) Group 3 unmanned aircraft system (UAS) equipped with low SWaP sensors and three different live intruder aircraft flown at varying encounter geometries; and Full Mission validated human-in-the-loop simulations by collecting pilot performance data from a ground control station while controlling a live unmanned aircraft on a mission in both virtual and live air traffic controlled airspace. The subject pilot observed a research display that presented DAA advisories to maintain separation from live and virtual aircraft. The test was conducted over a twenty-week period within the R-2508 special use airspace located near Edwards Air Force Base (EAFB), CA. Over 240 encounters were flown during the test series and FT6 proved to be invaluable for the purposes of planning, managing, and executing this type of integrated flight test in both live and virtual environments. Data collected from FT6 was provided to the RTCA Special Committee 228 (SC-228) to help inform the Phase 2 Minimum Operational Performance Standards (MOPS). FT6 was the final test series for the UAS-NAS project that began in 2012. This paper provides an overview of FT6 and its success can be directly attributed to the diligent work of the men and women who supported this effort.

UAS in the NAS↗

Real-Time Rocket/Vehicle System Integrated Health Management Laboratory For Development and Testing of Health Monitoring/Management Systems

Pratt & Whitney Rocketdyne has developed a real-time engine/vehicle system integrated health management laboratory, or testbed, for developing and testing health management system concepts. This laboratory simulates components of an integrated system such as the rocket engine, rocket engine controller, vehicle or test controller, as well as a health management computer on separate general purpose computers. These general purpose computers can be replaced with more realistic components such as actual electronic controllers and valve actuators for hardware-in-the-loop simulation. Various engine configurations and propellant combinations are available. Fault or failure insertion capability on-the-fly using direct memory insertion from a user console is used to test system detection and response. The laboratory is currently capable of simulating the flow-path of a single rocket engine but work is underway to include structural and multiengine simulation capability as well as a dedicated data acquisition system. The ultimate goal is to simulate as accurately and realistically as possible the environment in which the health management system will operate including noise, dynamic response of the engine/engine controller, sensor time delays, and asynchronous operation of the various components. The rationale for the laboratory is also discussed including limited alternatives for demonstrating the effectiveness and safety of a flight system.

Aguilar, R.↗

Proposed Longitudinal Profile Diagnostics for Optical Stochastic Cooling of Stored Electrons in the IOTA Ring

One of the predicted signatures of successful optical stochastic cooling (OSC) in the Fermilab Integrable Optics Test Accelerator (IOTA) ring is reduction of the bunch length. The IOTA OSC experiment is designed for a low nominal beam current (~0.1 microAmps of 100-MeV electrons) to reduce intrabeam scattering (IBS), and during cooling, OSC is expected to reduce the bunch length from ~200 ps to ~130 ps*. These equilibrium bunch lengths can be measured using a streak camera and the optical synchrotron radiation (OSR) generated in a ring dipole by the circulating beam. A similar measurement was previously performed at the Advanced Photon Source with a Hamamatsu C5680 synchroscan streak camera operating at 117.3 MHz**. In this case, synchronous summing of OSR resulted in a bunch length measurement of 276 ± 30 ps using only 57 electrons circulating at 425 MeV. At IOTA, an existing streak camera has been modified to operate at the 11th harmonic of the ring’s revolution frequency of 7.50 MHz and has been installed on an OSR port in support of the OSC experiments. The integrated system will have sufficient sensitivity and resolution for measuring the evolution and equilibrium values of the bunch length during OSC experiments.

Lumpkin, Alex H.↗

Modelling and analysis of nuclear reactor system coupled with a liquid metal battery

Traditionally, nuclear power plants in the U.S. provide baseload power to the power grid because they have less flexibility for ramping their output power than natural gas peaking plants. However, achieving climate goals to reduce the consumption of fossil‐based natural gas places pressure on nuclear power plants and other power generators to ramp up their power output to balance grid generation with demand. This paper presents the modelling and performance analysis of a nuclear reactor system (NRS) coupled to a liquid‐metal battery (LMB) to improve its dynamic response and enable its black start capability. The NRS and LMB thermal behaviour are modelled in Dymola, while the electrical dynamics of the LMB and power grid are modelled in RTDS‐RSCAD. Both simulation platforms are coupled and share their thermal and electrical data using a Transmission Control Protocol/Internet Protocol (TCP/IP) communication protocol. The dynamic performance of the NRS‐LMB integration is tested on the IEEE 9 bus, which demonstrates its ability to respond and provide frequency and voltage regulation. The black start capability of the NRS‐LMB is also evaluated by simulating a grid outage and using the LMB to supply the auxiliary loads required to bring the NRS back online as soon as possible. The results show that coupling an NRS to an LMB improves the system dynamic performance and enables it to black start after being disconnected from the grid for several days.

25 ENERGY STORAGE↗

Stirling Convertor Controller Development at NASA Glenn Research Center

For nearly two decades, NASA Glenn Research Center (GRC) has been supporting the development of Radioisotope Power Systems (RPS). NASA desires higher conversion efficiency RPS options that are reliable and robust with long life design. Dynamic conversion, such as Stirling and Brayton, offer the potential for higher conversion efficiencies than current RPS but have yet to be demonstrated in a flight application. The RPS program sent out a solicitation to investigate options for dynamic conversion technologies. As a result of this solicitation, four dynamic power convertor (DPC) technologies were selected for design and three are proceeding to the fabrication phase of prototype dynamic convertors. One lesson learned from the Advanced Stirling Radioisotope Generator (ASRG) project is that controller development should be coordinated with the development of a dynamic convertor. As a result of this, NASA GRC has been utilizing hardware from past Stirling convertor projects including that of the ASRG to support controller development for the DPC's. NASA GRC has developed a strong knowledge base on both analog and digital Stirling dynamic power convertor controllers and will continue to expand and apply that knowledge to the DPC's. Over the past 15 years, controllers were developed at GRC, at Lockheed Martin (LM) and by the Johns Hopkins University/Applied Physics Laboratory (JHU/APL). Various generations of the controllers have been developed as lessons were learned through various component and system level tests. Some of the tests performed were fault tolerance, flight acceptance vibration, electromagnetic interference (EMI), spacecraft integration, and extended operation. The fault tolerance test characterized the controller's ability to handle various fault conditions, including high or low bus power consumptions, total open load or short circuit, and replacing a failed controller card while the backup maintains control of the Stirling convertor. The vibration test confirms the controller's ability to control an ASC during launch. The EMI test characterized the AC and DC magnetic and electric fields emitted by the single ASC and if the controller has an impact on the radiated EMI. Spacecraft integration testing in the Radioisotope Power Systems System Integration Laboratory (RSIL) provided insight into the electrical interactions between the representative RPS, its associated control schemes, and realistic electric system loads. The extended operation test allows data to be collected over a period of thousands of hours to obtain long term performance data of the system. This paper describes the history of controller development at NASA GRC, tests performed on these controllers, and lessons learned.

Dugala, Gina M.↗

Development of a Forced Oscillation System for Measuring Dynamic Derivatives of Fluidic Vehicles

A new Forced Oscillation System (FOS) has been designed and built at NASA Langley Research Center that provides new capabilities for aerodynamic researchers to investigate the dynamic derivatives of vehicle configurations. Test vehicles may include high performance and general aviation aircraft, re-entry spacecraft, submarines and other fluidic vehicles. The measured data from forced oscillation testing is used in damping characteristic studies and in simulation databases for control algorithm development and performance analyses. The newly developed FOS hardware provides new flexibility for conducting dynamic derivative studies. The design is based on a tracking principle where a desired motion profile is achieved via a fast closed-loop positional controller. The motion profile for the tracking system is numerically generated and thus not limited to sinusoidal motion. This approach permits non-traditional profiles such as constant velocity and Schroeder sweeps. Also, the new system permits changes in profile parameters including nominal offset angle, waveform, and associated parameters such as amplitude and frequency. Most importantly, the changes may be made remotely without halting the FOS and the tunnel. System requirements, system analysis, and the resulting design are addressed for a new FOS in the 12-Foot Low-Speed Wind Tunnel (LSWT). The overall system including mechanical, electrical, and control subsystems is described. The design is complete, and the FOS has been built and installed in the 12-Foot LSWT. System integration and testing have verified design intent and safe operation. Currently it is being validated for wind-tunnel operations and aerodynamic testing. The system is a potential major enhancement to forced oscillation studies. The productivity gain from the motion profile automation will shorten the testing cycles needed for control surface and aircraft control algorithm development. The new motion capabilities also will serve as a test bed for researchers to study and to improve and/or alter future forced oscillation testing techniques.