Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “data services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

Evaluation of Extreme Weather Impacts on Utility-scale Photovoltaic Plant Performance in the United States

The global energy system is undergoing significant changes, including a shift in energy generating technologies to more renewable energy sources. However, the dependence of renewable energy sources on local environmental conditions could also increase disruptions in service through exposures to compound, extreme weather events. By fusing three diverse datasets (operations and maintenance tickets, weather data, and production data), this analysis presents a novel methodology to identify and evaluate performance impacts arising from extreme weather events across diverse geographical regions. Text analysis of maintenance tickets identified snow, hurricanes, and storms as the leading extreme weather events affecting photovoltaic plants in the United States. Statistical techniques and machine learning were then implemented to identify the magnitude and variability of these extreme weather impacts on site performance. Impacts varied between event and non-event days, with snow events causing the greatest reductions in performance (54.5%), followed by hurricanes (12.6%) and storms (1.1%). Machine learning analysis identified key features in determining if a day is categorized as low performing, such as low irradiance, geographic location, weather features, and site size. The analysis improves our understanding of compound, extreme weather event impacts on photovoltaic systems, which can inform planning activities, especially as the industry continues to expand into new geographic and climatic regions around the world.

14 SOLAR ENERGY↗

Prevalence of Self-Reported Bothersome Tinnitus in U.S. Army Soldiers From January 1, 2015, Through September 30, 2019

Purpose: Tinnitus is a symptom of auditory dysfunction or injury and can be a precursor to permanent hearing loss. Tinnitus can interfere with communication, sleep, concentration, and mood; when this occurs, it is referred to as bothersome tinnitus. Annual hearing surveillance in the U.S. Army includes screening for bothersome tinnitus. Estimating the prevalence of self-reported bothersome tinnitus can facilitate prioritization of prevention and education efforts. The objective of this study was to examine Army hearing conservation data to estimate the prevalence of self-reported bothersome tinnitus as a function of age, hearing, sex, service component, and pay grade. Method: The study employed a cross-sectional, retrospective design. Records from 1,485,059 U.S. Army Soldiers retrieved from the Defense Occupational and Environmental Health Readiness System–Hearing Conservation were analyzed. Descriptive statistics and multinomial logistic regression analysis were used to estimate the prevalence of bothersome tinnitus and its associations with Soldiers' demographic characteristics. Results: The estimated prevalence of self-reported bothersome tinnitus was 17.1% between January 1, 2015, and September 30, 2019; 13.6% of the Soldiers reported “bothered a little” and 3.5% reported “bothered a lot.” Proportionally, the prevalence of self-reported bothersome tinnitus was higher for males, older Soldiers, and Reserve Component Soldiers. For every 1-year increase in age, the odds of self-reporting “bothered a little” tinnitus relative to “bothered not at all tinnitus” would be expected to increase by 2.2% (2.1%, 2.3%), and the odds of self-reporting “bothered a lot” tinnitus relative to “bothered not at all” tinnitus would be expected to increase by 3.6% (3.5%, 3.7%). Conclusions: The self-reported prevalence of bothersome tinnitus in the U.S. Army (17.1%) is substantially higher than that of the general population, where prevalence of bothersome tinnitus is estimated at 6.6%. Examination of bothersome tinnitus among Soldiers is an important step toward optimizing prevention, education, and intervention efforts.

Audiology & Speech-Language Pathology↗

A Data Exchange Interface for a Standards Based Data Integration Platform

The modern electrical grid is a complex and a data rich system, requiring several sub-systems to provide the capability and support needed to perform functions such as distributed energy resource management, outage management, and fault location and isolation, to name a few. There is a need to develop software solutions and platforms that provide an integrated infrastructure to allow interoperability between these subsystems, while leveraging the abundant data available from today’s grid. In this paper, we present the development and deployment of an application service to integrate GridAPPS-D which is an open source, standards-based software platform with SurvalentONE, a commonly used DNP3 based ADMS platform that allows operation, monitoring, analysis, restoration, and optimization of network operations. We present details of the integration architecture, including its implementation, and provide results from functional testing of the architecture on a 13 bus IEEE system. The results validate that the integration is successful and is able to provide a two-way exchange of communication and translation between different communication protocols.

Singh, Alka↗

Visualization at Supercomputing Centers: The Tale of Little Big Iron and the Three Skinny Guys

Supercomputing centers are unique resources that aim to enable scientific knowledge discovery by employing large computational resources - the 'Big Iron.' Design, acquisition, installation, and management of the Big Iron are carefully planned and monitored. Because these Big Iron systems produce a tsunami of data, it's natural to colocate the visualization and analysis infrastructure. This infrastructure consists of hardware (Little Iron) and staff (Skinny Guys). Our collective experience suggests that design, acquisition, installation, and management of the Little Iron and Skinny Guys doesn't receive the same level of treatment as that of the Big Iron. This article explores the following questions about the Little Iron: How should we size the Little Iron to adequately support visualization and analysis of data coming off the Big Iron? What sort of capabilities must it have? Related questions concern the size of visualization support staff: How big should a visualization program be - that is, how many Skinny Guys should it have? What should the staff do? How much of the visualization should be provided as a support service, and how much should applications scientists be expected to do on their own?

99 GENERAL AND MISCELLANEOUS↗

A research agenda for nonvascular photoautotrophs under climate change

Nonvascular photoautotrophs (NVP), including bryophytes, lichens, terrestrial algae, and cyanobacteria, are increasingly recognized as being essential to ecosystem functioning in many regions of the world. Current research suggests that climate change may pose a substantial threat to NVP, but the extent to which this will affect the associated ecosystem functions and services is highly uncertain. Here, we propose a research agenda to address this urgent question, focusing on physiological and ecological processes that link NVP to ecosystem functions while also taking into account the substantial taxonomic diversity across multiple ecosystem types. Accordingly, we developed a new categorization scheme, based on microclimatic gradients, which simplifies the high physiological and morphological diversity of NVP and world-wide distribution with respect to several broad habitat types. We found that habitat-specific ecosystem functions of NVP will likely be substantially affected by climate change, and more quantitative process understanding is required on (1) potential for acclimation, (2) response to elevated CO 2 , (3) role of the microbiome, and (4) feedback to (micro)climate. We suggest an integrative approach of innovative, multimethod laboratory and field experiments and ecophysiological modelling, for which sustained scientific collaboration on NVP research will be essential.

54 ENVIRONMENTAL SCIENCES↗

High-Mileage Courier Fleet Vehicle Laboratory Battery Pack Testing

For one of each of the AVTA's plug-in hybrid electric vehicles, battery electric vehicles, and some hybrid electric vehicles tested in high-mileage courier fleets, the high-voltage traction battery packs were removed from the vehicle and tested at the beginning and end of fleet testing. For some vehicles, batteries also were tested at periodic intervals during fleet testing. Standard reference performance tests were conducted to characterize battery degradation over time. This dataset contains results from two or more rounds of battery tests for 21 distinct year/make/model vehicles (see reference ["INL Advanced Vehicle Testing Activity: On-road Logger and Laboratory Battery Pack Testing Vehicle List"](https://avt.inl.gov/sites/default/files/pdf/reports/DatasetVehicleList.pdf) for full list of vehicles). Each round of battery testing included the "Static Capacity Test" and the "Hybrid Pulse Power Characterization (HPPC) Test", conducted according to test procedures published in the United States Advanced Battery Consortium ["Battery Test Manual For Power-Assist Hybrid Electric Vehicles"](https://www.uscar.org/commands/files_download.php?files_id=57), ["Battery Test Manual For Plug-In Hybrid Electric Vehicles"](https://www.uscar.org/commands/files_download.php?files_id=168), and ["Electric Vehicle Battery Test Procedures Manual"](https://www.uscar.org/commands/files_download.php?files_id=5) prior to the time of testing. These tests were performed by Intertek Testing Services, North America. This dataset is shared by API; a small sample of the vehicle battery and test data has been extracted and is also available for download.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Pathway Controlled Penetration (PcP) [Slides]

The technical approach employs advanced computational simulation tools to demonstrate how current assets can destroy RWK-RFI-12-0001's HDBT, a tunnel complex with two portals built into the base of a granite mountain. The granite over layer is assumed to be 60 meters thick over both portals and 80 meters over the facility's mission space. Key S&T is the completed development of a highly innovative viscoplastic fracture material model, 3D parallel gas-fracture capabilities into FDEM, and a stochastic handling of the material properties. Phase I - Develop and validate code simulation tools: (1) develop, incorporate and validate AZ-Frac material model for granite; and (2) Develop and incorporate gas-driven-fracture modeling into LANL's FDEM MUNROU code; (3) Develop and incorporate stochastic features into FDEM modeling. Phase II - Conduct PcP analysis on above HDBT: (1) Acquire HDBT design data, develop simulation model; and (2) Evaluate and select most promising defeat alternative. Phase III - Deliver code, train Service target analysts, and conduct simulations against real world HDBTs. PcP uses advanced computer simulations to enhance HDBT functional defeat efforts. Newly developed material models that account for fractural energy coupled with the finite discrete element methodology (FDEM) will provide targeting packages that will create penetration avenues for current or future lethality options. This novel computational approach requires full 3D geologic and structure characterization as well as significant high performance computing capabilities. The goal is to distinctively alter the targeting paradigm by leveraging critical DoD assets along with insitu geologic strata. In other words, assets will utilize underground rock structure to their benefit by creating rubbilization zones that will allow pathway controlled penetration.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Noise Exposure Summary And Comparitive Analyses

This paper summarizes and compares facility Operations and Maintenance (O&M) noise Dosimetry data to industry wide construction data. Dosimetry data has been compiled from a noise exposure assessment at a DOE national research facility Maintenance, Utilities, and Service Department (MUSD). This facility is the Lawrence Livermore National Laboratory (LLNL). The laboratory consists of ten O&M craft and trade shops responsible for a fifty year old infrastructure including over 300 buildings, and a worker population of approximately 7,000. The facility includes an extensive variety of noise generating activities throughout a one square mile site.

99 GENERAL AND MISCELLANEOUS↗

AGR-2 Irradiation Test Final As-Run Report, Rev 2

This document presents the as-run analysis of the AGR-2 irradiation experiment. AGR-2 is the second of the planned irradiations for the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program. Funding for this program is provided by the U.S. Department of Energy as part of the Very High Temperature Reactor (VHTR) Technical Development Office (TDO) program. The objectives of the AGR-2 experiment are to: (a) Irradiate UCO (uranium oxycarbide) and UO 2 (uranium dioxide) fuel produced in a large coater. Fuel attributes are based on results obtained from the AGR-1 test and other project activities. (b) Provide irradiated fuel samples for post-irradiation experiment (PIE) and safety testing. (c) Support the development of an understanding of the relationship between fuel fabrication processes, fuel product properties, and irradiation performance. The primary objective of the test was to irradiate both UCO and UO 2 TRISO (tri-structural isotropic) fuel produced from prototypic scale equipment to obtain normal operation and accident condition fuel performance data. The UCO compacts were subjected to a range of burnups and temperatures typical of anticipated prismatic reactor service conditions in three capsules. The test train also includes compacts containing UO 2 particles produced independently by the United States, South Africa, and France in three separate capsules. The range of burnups and temperatures in these capsules were typical of anticipated pebble bed reactor service conditions. The results discussed in this report pertain only to U.S. produced fuel. In order to achieve the test objectives, the AGR-2 experiment was irradiated in the B-12 position of the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) for a total irradiation duration of 559.2 effective full power days (EFPD). Irradiation began on June 22, 2010, and ended on October 16, 2013, spanning 12 ATR power cycles and approximately three and a half calendar years. The test contained six independently controlled and monitored capsules. Each U.S. capsule contained 12 compacts of either UCO or UO2 AGR coated fuel. No fuel particles failed during the AGR-2 irradiation. Final burnup values on a per compact basis ranged from 7.26 to 13.15% FIMA (fissions per initial heavy-metal atom) for UCO fuel, and 9.01 to 10.69% FIMA for UO 2 fuel, while fast fluence values ranged from 1.94 to 3.47 x 10 25 n/m 2 (E >0.18 MeV) for UCO fuel, and from 3.05 to 3.53 x 10 25 n/m 2 (E >0.18 MeV) for UO 2 fuel. Time-average volume-average (TAVA) temperatures on a capsule basis at the end of irradiation ranged from 987°C in Capsule 6 to 1296°C in Capsule 2 for UCO, and from 996 to 1062°C in UO 2 -fueled Capsule 3. By the end of the irradiation, all of the installed thermocouples (TCs) had failed. Fission product release-to-birth (R/B) ratios were quite low. In the UCO capsules, R/B values during the first three cycles were below 10 -6 with the exception of the hotter Capsule 2, in which the R/Bs reached 2 x 10 -6 . In the UO 2 capsule (Capsule 3), the R/B values during the first three cycles were below 10 -7 . R/B values for all following cycles are not reliable due to gas flow and cross talk issues.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGR-2 Irradiation Test Final As-Run Report

This document presents the as-run analysis of the AGR-2 irradiation experiment. AGR-2 is the second of the planned irradiations for the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program. Funding for this program is provided by the U.S. Department of Energy as part of the Very High Temperature Reactor (VHTR) Technical Development Office (TDO) program. The objectives of the AGR-2 experiment are to: (a) Irradiate UCO (uranium oxycarbide) and UO 2 (uranium dioxide) fuel produced in a large coater. Fuel attributes are based on results obtained from the AGR-1 test and other project activities. (b) Provide irradiated fuel samples for post-irradiation experiment (PIE) and safety testing. (c) Support the development of an understanding of the relationship between fuel fabrication processes, fuel product properties, and irradiation performance. The primary objective of the test was to irradiate both UCO and UO 2 TRISO (tri-structural isotropic) fuel produced from prototypic scale equipment to obtain normal operation and accident condition fuel performance data. The UCO compacts were subjected to a range of burnups and temperatures typical of anticipated prismatic reactor service conditions in three capsules. The test train also includes compacts containing UO 2 particles produced independently by the United States, South Africa, and France in three separate capsules. The range of burnups and temperatures in these capsules were typical of anticipated pebble bed reactor service conditions. The results discussed in this report pertain only to U.S. produced fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Implementation Approach for Plug-in Electric Vehicles at Joint Base Lewis McChord: Task 4

This study focused on Joint Base Lewis McChord (JBLM), which is located in Washington State. Task 1 consisted of a survey of the non-tactical fleet of vehicles at JBLM to begin the review of vehicle mission assignments and the types of vehicles in service. In Task 2, daily operational characteristics of select vehicles were identified and vehicle movements were recorded in data loggers in order to characterize the vehicles’ missions. In Task 3, the results of the data analysis and observations were provided. Individual observations of the selected vehicles provided the basis for recommendations related to PEV adoption (i.e., whether a battery electric vehicle or plug-in hybrid electric vehicle [collectively referred to as PEVs] can fulfill the mission requirements0, as well as the basis for recommendations related to placement of PEV charging infrastructure. This report focuses on an implementation plan for the near-term adoption of PEVs into the JBLM fleet.

33 ADVANCED PROPULSION SYSTEMS↗

Interstate Electrification Improvement Project

The Interstate Electrification Improvement Project, publicly known as the Shorepower Truck Electrification Project (STEP), started in May 2011 and ended in March 2015. The project grant was awarded by the Department of Energy’s Vehicles Technology Office in the amount of $22.2 million. It had three overarching missions: 1. Reduce the idling of Class 8 tractors when parked at truck stops, to reduce diesel fuel consumption and thus U.S. dependence on foreign petroleum; 2. Stimulate job creation and economic activity as part of the American Reinvestment and Recovery Act of 2009; 3. Reduce greenhouse gas emissions (GHG) from diesel combustion and the carbon footprint of the truck transportation industry. The project design was straightforward. First, build fifty Truck Stop Electrification (TSE) facilities in truck stop parking lots across the country so trucks could plug-in to 110V, 220V, or 480VAC, and shut down the engine instead of idling. These facilities were strategically located at fifty truck stops along major U.S. Interstates with heavy truck traffic. Approximately 1,350 connection points were installed, including 150 high-voltage electric standby Transport Refrigeration Unit (eTRU) plugs--eTRUs are capable of plugging in to shore power1 to cool the refrigerated trailer for loads such as produce, meats and ice cream. Second, the project provided financial incentives on idle reduction equipment to 5,000 trucks in the form of rebates, to install equipment compatible with shore power. This equipment enables drivers to shut down the main engine when parked, to heat or cool their cab, charge batteries, or use other household appliances without idling—a common practice that uses approximately 1 gallon of diesel per hour. The rebate recipients were intended to be the first fleets to plug into Shorepower to save diesel fuel and ensure there is significant population of shore power capable trucks. This two part project was designed to complement each other by providing: 1) the infrastructure to plug into and 2) the on-board equipment capable of plugging into the infrastructure. This project generated the largest dataset to date on shore power TSE utilization and use patterns, providing: insight into driver behavior and acceptance; evidence of cost savings; experience with system operations and management; and data for guiding future development of shore power, whether as a private enterprise or a publicly-subsidized service for meeting air quality goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Assessment of Charging Infrastructure for Plug-in Electric Vehicles at Naval Air Station Whidbey Island: Task 3

Several U.S. Department of Defense base studies have been conducted to identify potential U.S. Department of Defense transportation systems that are strong candidates for introduction or expansion of plug-in electric vehicles (PEVs). Task 1 consisted of a survey of the non-tactical fleet of vehicles at NASWI to begin the review of vehicle mission assignments and types of vehicles in service. Task 2 selected vehicles for further monitoring and involved identifying daily operational characteristics of these select vehicles. Data logging of vehicle movements was initiated in order to characterize the vehicle’s mission. The Task 3 Vehicle Utilization report provided the results of the data analysis and observations related to the replacement of current vehicles with PEVs. This report provides an assessment of charging infrastructure required to support the suggested PEV replacements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessment of Charging Infrastructure for Plug-in Electric Vehicles at Marine Corps Base Camp Lejeune. Task 3

Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s Idaho National Laboratory, is the lead laboratory for the U.S. Department of Energy’s advanced vehicle testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America (Intertek) to conduct several U.S. Department of Defense-based studies to identify potential U.S. Department of Defense transportation systems that are strong candidates for introduction or expansion of plug-in electric vehicles (PEVs). Task 1 consisted of a survey of the non-tactical fleet of vehicles at Marine Corps Base Camp Lejeune to begin the review of vehicle mission assignments and types of vehicles in service. Task 2 selected vehicles for further monitoring and involved identifying daily operational characteristics of these select vehicles. Data logging of vehicle movements was initiated in order to characterize the vehicle’s mission. The Task 3 vehicle utilization report provided results of the data analysis and observations related to the replacement of current vehicles with PEVs. Finally, this report provides an assessment of charging infrastructure required to support the suggested PEV replacements. Intertek acknowledges the support of Idaho National Laboratory, Marine Corps headquarters, and Marine Corps Base Camp Lejeune Fleet management and personnel for participation in this study. Intertek is pleased to provide this report and is encouraged by enthusiasm and support from Marine Corps Base Camp Lejeune personnel.

33 ADVANCED PROPULSION SYSTEMS↗

Capturing the Sun: A Roadmap for Navigating Data-Access Challenges and Auto-Populating Solar Home Sales Listings

Capturing the Sun: A Roadmap for Navigating Data-Access Challenges and Auto-Populating Solar Home Sales Listings supports a vision of solar photovoltaic (PV) advocates and real estate advocates evolving together to make information about solar homes more accessible to home buyers and sellers and to simplify the process when these homes are resold. The Roadmap is based on a concept in the real estate industry known as automatic population of fields. Auto-population (also called auto-pop in the industry) is the technology that allows data aggregated by an outside industry to be matched automatically with home sale listings in a multiple listing service (MLS).

14 SOLAR ENERGY↗

Addressing Electric Aviation Infrastructure Cybersecurity Implementation

This technical report evaluates key considerations of cybersecurity systems in preparation for the electrification of both legacy and new aviation services. The objectives are to consider the landscape of components and interconnections, review sensitivities and the criticality of data and operations, and aim to understand the applicability of existing best practices or the need for new ones associated with the cybersecurity of electric charging systems for the aviation sector. Given the early stages of electric aviation deployment, developers have the opportunity to plan and integrate cybersecurity strategies into the complete electric aviation system during the initial stages of design and procurement and will benefit from employing a framework for continuous cybersecurity monitoring. This paper presents initial considerations of key cybersecurity strategies and their application to forthcoming electric aviation systems.

airports↗

Pushing the Limits of Micro battery Capacity and Energy

Micro battery with higher energy density will extend the service life of the miniature sensors so that the scientists and engineers could be able to collect more data along with the time in ecological and environmental vectors, such as animal tracking. Within this project, a completely new cell design (Gen2) for micro batteries to further increase their cell capacity and energy is developed. The new cell design directly packages the active material in a hard aluminum case, decreasing the percentage of non-active components. The manufacturing process to improve wetting ability is studied and the trial run is finally given to evaluate the feasibility of the proposed technology. It’s found that both the capacity and energy with same battery size could be increased by 30% comparing with Gen1 micro battery technology previously developed by PNNL. The yield of Gen2 micro batteries is still lower due to the high degree of manual operation, especially for drilling process where more precise position control is needed. More effort is still required to improve the capability of automatic manufacturing processes. The new battery technology will support the development of smaller and lighter miniature sensors at PNNL and could potentially contribute to the large-scale manufacturing capabilities of micro batteries in US with reliable performances and long-term shelf life.

25 ENERGY STORAGE↗