Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WASHINGTON”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

Energy Modeling for the Artisan Food Center

The Artisan Food Center is a 6912 sq.ft food processing plant located in Dayton, Washington. PNNL was contacted by Strecker Engineering to assist with the building’s energy analysis as a part of the project’s U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) submittal requirements. The project is aiming for LEED Silver certification, one of the prerequisites to which is a whole building energy model to demonstrate compliance with American Society of Heating Refrigeration and Air Conditioning Engineers (ASHRAE) 90.1 2007 Appendix G, Performance Rating Method. The building incorporates a number of energy efficiency measures as part of its design and the energy analysis aimed at providing Strecker Engineering with the know-how of developing an energy model for the project as well as an estimate of energy savings of the proposed design over the baseline design, which could be used to document points in the LEED documentation. This report documents the ASHRAE 90.1 2007 baseline model design, the proposed model design, the modeling assumptions and procedures as well as the energy savings results in order to inform the Strecker Engineering team on a possible whole building energy model.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Supplemental Immobilization of Handford Low-Activity Waste: Cast Stone Screening Tests

The Hanford Site has approximately 56 million gallons of radioactive waste stored in 177 underground storage tanks. The Hanford Waste Treatment and Immobilization Plant (WTP) is being constructed to treat all of the high-level waste (HLW) in the tank farms but will not have sufficient capacity to treat all of the low-activity waste (LAW) within the anticipated time frame for completion of the waste treatment mission. The LAW vitrification facility will need to be supplemented with a second LAW vitrification facility or an alternate LAW immobilization technology. A cementitious waste form known as Cast Stone is being considered to provide the required additional LAW immobilization capacity. Hanford Tri-Party Agreement (TPA) milestone M-062-40ZZ requires the U.S. Department of Energy Office of River Protection (DOE/ORP) to submit a One-Time Hanford Tank Waste Supplemental Treatment Technologies Report by October 2014 if a technology other than a second LAW vitrification facility is proposed. The main purpose of the one-time report will be to describe the additional treatment facilities and technologies needed to treat all of Hanford’s LAW. The report must describe the technologies considered, quantity of waste to be processed, quantity of final waste forms, secondary wastes, waste form performance data, technical viability, and life-cycle cost and schedule estimates. The DOE/ORP and the Washington State Department of Ecology would then have six months (until April 2015) to complete negotiations to select a final technology, and to establish milestones to implement the technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DC Fast Charger Usage in the Pacific Northwest

This document will describe the use of a number of Direct Current Fast Charging Stations throughout Washington and Oregon as a part of of the West Coast Electric Highway. It will detail the usage frequency and location of the charging stations INL has data from. It will also include aggregated data from hundreds of privately owned vehicles that were enrolled in the EV Project regarding driving distance when using one of the West Coast Electric Highway fast chargers. This document is a white paper that will be published on the INL AVTA website.

33 ADVANCED PROPULSION SYSTEMS↗

Marine Sciences Laboratory Radionuclide Air Emissions Report for Calendar Year 2014

The U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest Site Office (PNSO) has oversight and stewardship duties associated with the Pacific Northwest National Laboratory (PNNL) Marine Sciences Laboratory (MSL) located on Battelle Land – Sequim.This report is prepared to document compliance with the Code of Federal Regulations (CFR), Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants (NESHAP), Subpart H, ''National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code (WAC) Chapter 246-247, “Radiation Protection–Air Emissions.'' The EDE to the MSL MEI due to routine operations in 2014 was 9E-05 mrem (9E-07 mSv). No non-routine emissions occurred in 2014. The MSL is in compliance with the federal and state 10 mrem/yr standard.

54 ENVIRONMENTAL SCIENCES↗

The Intersection of National Security and Climate Change

On June 4, 2014, the Henry M. Jackson Foundation and the Pacific Northwest National Laboratory hosted a groundbreaking symposium in Seattle, Washington, that brought together 36 leaders from federal agencies, state and local governments, NGOs, business, and academia. The participants examined approaches and tools to help decision makers make informed choices about the climate and security risks they face. The following executive summary is based on the day’s discussions and examines the problem of climate change and its impact on national security, the responses to date, and future considerations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Annual Report of Monitoring at Barnes, Kansas, in 2014

Barnes, Kansas, is a small rural community (population approximately 150) in Washington County, in north-central Kansas (Figure 1.1). Barnes is located in Section 9, Township 4 South, Range 5 East, at approximate latitude 39°43'0'' north and longitude 96°52'25'' west (USGS 1968). The city lies in a transition zone between the Flint Hills and the glaciated region. The area’s topography consists of gently sloping hills of Pleistocene loess (< 20 ft) overlying a shale unit and interbedded shale, limestone, and siltstone of the Permian Chase Group. Groundwater for the public water supply is obtained from wells PWS2 and PWS3 at reported depths of 155 ft and 160 ft below ground level (BGL), respectively, located in the northwestern portion of the city. The water is produced from the bedrock aquifer of the Chase Group. Section 2 summarizes the hydrogeologic conceptual site model. In 1986, low levels of carbon tetrachloride were detected in public supply wells PWS2 (2.1 µg/L) and PWS3 (0.5 µg/L), below the maximum contaminant level of 5.0 µg/L for carbon tetrachloride in drinking water. Multiple samplings of the wells in 1986-1996 found repeated sporadic detections of carbon tetrachloride at low concentrations. In 1996-1999, the Kansas Department of Health and Environment (KDHE) conducted two investigations to identify potential sources for the carbon tetrachloride in groundwater and to determine the extent of the contamination. This present report documents the results of monitoring conducted in 2014. Sampling of the approved monitoring well network and the two public water supply wells was conducted on September 24-26, 2014. The two public wells were also sampled on July 9, 2014, and resampled on October 9, 2014.

54 ENVIRONMENTAL SCIENCES↗

Secondary Waste Simulant Development for Cast Stone Formulation Testing

Washington River Protection Solutions, LLC (WRPS) funded Pacific Northwest National Laboratory (PNNL) to conduct a waste form testing program to implement aspects of the Secondary Liquid Waste Treatment Cast Stone Technology Development Plan (Ashley 2012) and the Hanford Site Secondary Waste Roadmap (PNNL 2009) related to the development and qualification of Cast Stone as a potential waste form for the solidification of aqueous wastes from the Hanford Site after the aqueous wastes are treated at the Effluent Treatment Facility (ETF). The current baseline is that the resultant Cast Stone (or grout) solid waste forms would be disposed at the Integrated Disposal Facility (IDF). Data and results of this testing program will be used in the upcoming performance assessment of the IDF and in the design and operation of a solidification treatment unit planned to be added to the ETF. The purpose of the work described in this report is to 1) develop simulants for the waste streams that are currently being fed and future WTP secondary waste streams also to be fed into the ETF and 2) prepare simulants to use for preparation of grout or Cast Stone solid waste forms for testing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation Approach for Plug-in Electric Vehicles at Joint Base Lewis McChord: Task 4

This study focused on Joint Base Lewis McChord (JBLM), which is located in Washington State. Task 1 consisted of a survey of the non-tactical fleet of vehicles at JBLM to begin the review of vehicle mission assignments and the types of vehicles in service. In Task 2, daily operational characteristics of select vehicles were identified and vehicle movements were recorded in data loggers in order to characterize the vehicles’ missions. In Task 3, the results of the data analysis and observations were provided. Individual observations of the selected vehicles provided the basis for recommendations related to PEV adoption (i.e., whether a battery electric vehicle or plug-in hybrid electric vehicle [collectively referred to as PEVs] can fulfill the mission requirements0, as well as the basis for recommendations related to placement of PEV charging infrastructure. This report focuses on an implementation plan for the near-term adoption of PEVs into the JBLM fleet.

33 ADVANCED PROPULSION SYSTEMS↗

Technical Approach for Determining Key Parameters Needed for Modeling the Performance of Cast Stone for the Integrated Disposal Facility Performance Assessment

Washington River Protection Solutions (WRPS) and its contractors at Pacific Northwest National Laboratory (PNNL) and Savannah River National Laboratory (SRNL) are conducting a development program to develop / refine the cementitious waste form for the wastes treated at the ETF and to provide the data needed to support the IDF PA. This technical approach document is intended to provide guidance to the cementitious waste form development program with respect to the waste form characterization and testing information needed to support the IDF PA. At the time of the preparation of this technical approach document, the IDF PA effort is just getting started and the approach to analyze the performance of the cementitious waste form has not been determined. Therefore, this document looks at a number of different approaches for evaluating the waste form performance and describes the testing needed to provide data for each approach. Though the approach addresses a cementitious secondary aqueous waste form, it is applicable to other waste forms such as Cast Stone for supplemental immobilization of Hanford LAW. The performance of Cast Stone as a physical and chemical barrier to the release of contaminants of concern (COCs) from solidification of Hanford liquid low activity waste (LAW) and secondary wastes processed through the Effluent Treatment Facility (ETF) is of critical importance to the Hanford Integrated Disposal Facility (IDF) total system performance assessment (TSPA). The effectiveness of cementitious waste forms as a barrier to COC release is expected to evolve with time. PA modeling must therefore anticipate and address processes, properties, and conditions that alter the physical and chemical controls on COC transport in the cementitious waste forms over time. Most organizations responsible for disposal facility operation and their regulators support an iterative hierarchical safety/performance assessment approach with a general philosophy that modeling provides the critical link between the short-term understanding from laboratory and field tests, and the prediction of repository performance over repository time frames and scales. One common recommendation is that experiments be designed to permit the appropriate scaling in the models. There is a large contrast in the physical and chemical properties between the Cast Stone waste package and the IDF backfill and surrounding sediments. Cast Stone exhibits low permeability, high tortuosity, low carbonate, high pH, and low Eh whereas the backfill and native sediments have high permeability, low tortuosity, high carbonate, circumneutral pH, and high Eh. These contrasts have important implications for flow, transport, and reactions across the Cast Stone – backfill interface. Over time with transport across the interface and subsequent reactions, the sharp geochemical contrast will blur and there will be a range of spatially-distributed conditions. In general, COC mobility and transport will be sensitive to these geochemical variations, which also include physical changes in porosity and permeability from mineral reactions. Therefore, PA modeling must address processes, properties, and conditions that alter the physical and chemical controls on COC transport in the cementitious waste forms over time. Section 2 of this document reviews past Hanford PAs and SRS Saltstone PAs, which to date have mostly relied on the lumped parameter COC release conceptual models for TSPA predictions, and provides some details on the chosen values for the lumped parameters. Section 3 provides more details on the hierarchical modeling strategy and processes and mechanisms that control COC release. Section 4 summarizes and lists the key parameters for which numerical values are needed to perform PAs. Section 5 provides brief summaries of the methods used to measure the needed parameters and references to get more details.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extended Leach Testing of Simulated LAW Cast Stone Monoliths

This report describes the results from long-term laboratory leach tests performed at Pacific Northwest National Laboratory (PNNL) for Washington River Protection Solutions (WRPS) to evaluate the release of key constituents from monoliths of Cast Stone prepared with four simulated low-activity waste (LAW) liquid waste streams. Specific objectives of the Cast Stone long-term leach tests described in this report focused on four activities: 1. Extending the leaching times for selected ongoing EPA-1315 tests on monoliths made with LAW simulants beyond the conventional 63-day time period up to 609 days reported herein (with some tests continuing that will be documented later) in an effort to evaluate long-term leaching properties of Cast Stone to support future performance assessment activities. 2. Starting new EPA-1315 leach tests on archived Cast Stone monoliths made with four LAW simulants using two leachants (deionized water [DIW] and simulated Hanford Integrated Disposal Facility (IDF) Site vadose zone pore water [VZP]). 3. Evaluating the impacts of varying the iodide loading (starting iodide concentrations) in one LAW simulant (7.8 M Na Hanford Tank Waste Operations Simulator (HTWOS) Average) by manufacturing new Cast Stone monoliths and repeating the EPA-1315 leach tests using DIW and the VZP leachants. 4. Evaluating the impacts of using a non-pertechnetate form of Tc that is present in some Hanford tanks. In this activity one LAW simulant (7.8 M Na HTWOS Average) was spiked with a Tc(I)-tricarbonyl gluconate species and then solidified into Cast Stone monoliths. Cured monoliths were leached using the EPA-1315 leach protocol with DIW and VZP. The leach results for the Tc-Gluconate Cast Stone monoliths were compared to Cast Stone monoliths pertechnetate.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preserving Envelope Efficiency in Performance Based Code Compliance

The City of Seattle 2012 Energy Code (Seattle 2014), one of the most progressive in the country, is under revision for its 2015 edition. Additionally, city personnel participate in the development of the next generation of the Washington State Energy Code and the International Energy Code. Seattle has pledged carbon neutrality by 2050 including buildings, transportation and other sectors. The United States Department of Energy (DOE), through Pacific Northwest National Laboratory (PNNL) provided technical assistance to Seattle in order to understand the implications of one potential direction for its code development, limiting trade-offs of long-lived building envelope components less stringent than the prescriptive code envelope requirements by using better-than-code but shorter-lived lighting and heating, ventilation, and air-conditioning (HVAC) components through the total building performance modeled energy compliance path. Weaker building envelopes can permanently limit building energy performance even as lighting and HVAC components are upgraded over time, because retrofitting the envelope is less likely and more expensive. Weaker building envelopes may also increase the required size, cost and complexity of HVAC systems and may adversely affect occupant comfort. This report presents the results of this technical assistance. The use of modeled energy code compliance to trade-off envelope components with shorter-lived building components is not unique to Seattle and the lessons and possible solutions described in this report have implications for other jurisdictions and energy codes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Data Analysis Center for Electromagnetic and Hadronic Interaction. Products of the DAC members

The Data Analysis Center (DAC) of the Center for Nuclear Studies (CNS) at the George Washington University (GW) has made significant progress in its program to enhance and expand the partial-wave (and multipole) analyses of fundamental two- and three-body reactions (such as pion-nucleon, photon-nucleon, and nucleon-nucleon scattering) by maintaining and augmenting the analysis codes and databases associated with these reactions. These efforts provide guidance to experimental groups at the international level, forming an important link between theory and experiment. A renaissance in light hadron spectroscopy is underway as a continuous stream of polarization data issues from existing precision electromagnetic facilities and the coming Jefferson Lab 12 GeV Upgrade. Our principal goals have been focused on supporting the national N* resonance physics program. We have also continued to study topics more generally related to the problems associated with partial-wave analysis. On the Experimental side of the CNS DAC. Its primary goal is the enhancement of the body of data necessary for our analyses of fundamental γ - N reactions. We perform experiments that study the dynamics responsible for the internal structure of the nucleon and its excitations. Our principal focus is on the N* programs at JLab and MAMI. At JLab we study spin-polarization observables using polarized photons, protons and neutrons and yielding charged final states. Similarly at MAMI we study neutral meson photoproduction off polarized protons and neutrons. We use the Crystal Ball and TAPS spectrometers (CBT) to detect photons and neutrons to measure the photoproduction of π0, η, 2π0, π0η, and K0 off the neutron. The CBT program complements our program at JLab, which studies reactions resulting in charged final states. We are also involved in a renewed effort to make neutral pion photoproduction measurements close to threshold at Mainz. In addition to the programs underway, we are contributing to the future by participation in preparations for the coming JLab 12 GeV Upgrade. GW students are involved in tests of the detectors proposed to be used with CLAS12, i.e., for the CentralTime-of-Flight Barrel (CTOF). WJB is heavily involved in the MUSE quest at PSI to solve the Proton Radius Puzzle.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Admiralty Inlet Pilot Tidal Project Final Technical Report

This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

16 TIDAL AND WAVE POWER↗

Priority Research Areas to Accelerate the Development of Practical Ultra-conductive Copper Conductors

This report documents the findings at an Ultraconductive Copper Strategy Meeting held on March 11, 2015 in Washington DC. The aim of this meeting was to bring together researchers of ultraconductive copper in the U.S. to identify and prioritize critical non-proprietary research activities that will enhance the understanding in the material and accelerate its development into practical conductors. Every effort has been made to ensure that the discussion and findings are accurately reported in this document.

36 MATERIALS SCIENCE↗

WindFloat Feasibility Study Support. Cooperative Research and Development Final Report, CRADA Number CRD-11-419

This shared resource CRADA defines research collaborations between the National Renewable Energy Laboratory and Principle Power, Inc. and its subsidiaries (“Principle Power”). Under the terms and conditions described in this CRADA agreement, NREL and Principle Power will collaborate on the DEMOWFLOAT project, a full-scale 2-MW demonstration project of a novel floating support structure for large offshore wind turbines, called WindFloat. The purpose of the project is to demonstrate the longterm field performance of the WindFloat design, thus enabling the future commercialized deployment of floating deepwater offshore wind power plants. NREL is the leading U.S. Department of Energy (DOE) laboratory for the development and advancement of renewable energy and has a strong interest in offshore wind and the development of deepwater offshore wind systems. NREL will provide expertise and resources to the DEMOWFLOAT project in assessing the environmental impacts, independent technical performance validation, and engineering analysis. Principle Power is a Seattle, Washington-based renewable energy company that owns all the intellectual property associated with the WindFloat. In return for NREL’s support of the DEMOWFLOAT project, Principle Power will provide NREL with valuable test data from the project that will be used to validate the numerical tools developed by NREL for analyzing offshore wind turbines. In addition, NREL will gain experience and knowledge in offshore wind designs and testing methods through this collaboration. 2 This report is available at no cost from the National Renewable Energy Laboratory (NREL) at www.nrel.gov/publications. NREL and Principle Power will work together to advance floating offshore wind technology, and demonstrate its viability for supplying the world with a new clean energy source.

17 WIND ENERGY↗

2007 Annual Merit Review & Peer Evaluation

Each year hydrogen and fuel cell projects funded by DOE's Hydrogen Program are reviewed for their merit during an Annual Merit Review and Peer Evaluation Meeting. The 2007 Annual Merit Review, held May 15-18, 2007 in Washington, D.C., showcased approximately 300 projects. Hydrogen and fuel cell principal investigators representing the offices of Energy Efficiency and Renewable Energy, Fossil Energy, Nuclear Energy, and Science presented their project status and results in oral and poster presen

fuel cell↗

2007 Annual Merit Review Proceedings

Each year hydrogen and fuel cell projects funded by DOE's Hydrogen Program are reviewed for their merit during an Annual Merit Review and Peer Evaluation Meeting. The 2007 Annual Merit Review, held May 15-18, 2007 in Washington, D.C., showcased approximately 300 projects. Hydrogen and fuel cell principal investigators representing the offices of Energy Efficiency and Renewable Energy, Fossil Energy, Nuclear Energy, and Science presented their project status and results in oral and poster presen

fuel cell↗

Biomass Program 2007 Program Peer Review - Feedstock Platform Summary

This document discloses the comments provided by a review panel at the U.S. Department of Energy Office of the Biomass Program Peer Review held on November 15-16, 2007 in Baltimore, MD and the Feedstock Platform Portfolio Peer Review held on August 21st through 23rd in Washington D.C.

09 BIOMASS FUELS↗