Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STORAGE RING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

TRANSIENT BEAM LOADING DUE TO THE BUNCH TRAIN GAP AND ITS COMPENSATION EXPERIMENTS AT BEPC-II AND ALS

Non-uniform bunch fill patterns in storage rings, driven by the need to provide gaps for beam aborting and ion clearing cause a large beam loading change in the RF cavities. The induced turn-periodic transient in the cavity voltage modulates longitudinal beam properties along the train, such as synchronous phase and bunch length. We have carried out beam based experiments on the BEPC-II at IHEP and on the ALS at LBNL, using bunch-by-bunch diagnostic capabilities of the coupled-bunch feedback systems to study this transient effect. A modulated bunch filling pattern with higher charge density around the gap has been demonstrated to be effective in partially compensating this transient modulation. Details of the experimental setups and the data analysis will be presented.

Wang, H.↗

Experimental Demonstration of Ion Beam Cooling with Pulsed Electron Beam

Cooling ion beams at high energy is presently considered for several ion colliders, in order to achieve high luminosities by enabling a significant reduction of emittance of hadron beams. Electron beam at cooling channel in a few to tens MeV can be accelerated by a RF/SRF linac, and thus using bunched electrons to cool bunched ions. To study such cooling process, the DC electron gun of EC35 cooler at the storage ring CSRm, IMP was modified by pulsing the grid voltage. A 0.07-3.5 micro-second pulse length with a repetition frequency of less than 250 kHz and synchronized with the ion revolution frequency was obtained. The first experimental demonstration of cooling of a coasting and bunched ion beam by a pulsed electron beam was carried out. Data analysis indicates the bunch length shrinkage and the momentum spread reduction of bunched 12C+6 ion beam as evidence of cooling. A longitudinal grouping effect of the coasting ion beam by the electron pulses has also been observed*. In this paper, we will present experimental results and comparison to the simulation modelling, particularly on the bunched electron cooling data after carefully analyzing the beam diagnostic signals.

Zhang, Yuhong↗

Commissioning the Muon g-2 Experiment Electrostatic Quadrupole System

The Fermilab Muon g-2 experiment aims to measure the muon anomaly with a precision of 140 parts-per-billion (ppb) - a fourfold improvement over the 540 ppb precision obtained by the BNL Muon g-2 experiment. These high precision experiments both require a very uniform muon storage ring magnetic field that precludes the use of vertical-focusing magnetic quadrupoles. The Fermilab Electrostatic Quadrupole System (EQS) is the refurbished and upgraded BNL EQS, where this overview describes the Fermilab EQS and its recent operations.

43 PARTICLE ACCELERATORS↗

Application of Quad-Scan Measurement Techniques to Muon Beams in the Muon g-2 Experiment

Determination of the properties of a beam during transport is a vital process for most accelerator-related experiments; for example Fermilab's Muon g-2 experiment requires large numbers of muons to be stored in a storage ring of 7 meter radius, and the transmission fraction has been shown to depend strongly on the properties of the beam, specifically the Twiss parameters. The current equipment in the muon campus beamlines allows only measurement of beam profiles which limits how well propagation can be predicted, however by using the well-studied quad-scan technique it is possible to obtain all of the Twiss parameters at a point using these profiles. Experimental quad-scans of muon beams have not yet been reported, this paper introduces the quad-scan technique and then goes on to discuss the analysis of one such experiment and the results obtained, showing that such a technique is applicable in the muon g-2 experiment to obtain the Twiss parameters without requiring installation of new equipment.

43 PARTICLE ACCELERATORS↗

Synchrotron Radiation Beam Diagnostics for the Integrable Optics Test Accelerator

The Integrable Optics Test Accelerator (IOTA) is a research electron and proton storage ring currently being commissioned at Fermilab's Accelerator Science and Technology (FAST) facility. An extensive beam physics research program is planned, including tests of novel techniques for improving beam intensity, stability, and emittance. A key part of IOTA beam diagnostics suite are synchrotron light beam monitors, mounted onto each dipole. In this paper, we present the hardware and software design of this system. Mechanical layout and actuator control electronics are described. High throughput image acquisition and analysis architecture is outlined, and its preliminary performance is explored. Integration of the system within accelerator control network and possible user applications, such as camera auto-focusing, are discussed.

43 PARTICLE ACCELERATORS↗

Experimental Demonstration of the Henon-Heiles Quasi-Integrable System at IOTA

The Integrable Optics Test Accelerator is a research electron and proton storage ring recently commissioned at the Fermilab Accelerator Science and Technology facility. Its research program is focused on testing novel techniques for improving beam stability and quality, notably the concept of non-linear integrable optics. In this paper, we report the first results of experimental investigation of a quasi-integrable transverse focusing system with one invariant of motion, a Henon-Heiles type system implemented with octupole magnets. Good agreement with simulations is demonstrated on key parameters of achievable tune spread and dynamic aperture preservation. Resilience to perturbations and imperfections in the lattice is explored. We conclude by outlining future research plans and discussing applicability to future high intensity accelerators.

43 PARTICLE ACCELERATORS↗

An Improved eRHIC Interaction Region Design without High Field Nb3sn Magnets

The Electron-Ion Collider (EIC) is envisioned as the next DOE Nuclear Physics facility. BNL is proposing eRHIC, a facility based on the existing RHIC complex as a cost effective realization of the EIC project with a peak luminosity of 1034 cm-2sec-1. An electron storage ring with an energy range from 5 to 18 GeV will be added in the existing RHIC tunnel. The beams will collide in up to two Interaction Regions (IRs). Balancing conflicting experimental physics and machine accelerator physics demands with realistic eRHIC IR magnet designs requires new concepts and careful attention to detail. We review recent work aimed at reducing IR magnet cost and at avoiding risk associated with using a high-field Nb3Sn actively shielded quadrupole that was present in an earlier design.

43 PARTICLE ACCELERATORS↗

eRHIC Design Overview

The Electron-Ion Collider (EIC) is being envisioned as the next facility to be constructed by the DOE Nuclear Physics program. Brookhaven National Laboratory is proposing eRHIC, a facility based on the existing RHIC complex as a cost effective realization of the EIC project with a peak luminosity of 10³⁴ cm⁻² sec⁻¹. An electron storage ring with an energy range from 5 to 18 GeV will be added in the existing RHIC tunnel. A spin-transparent rapid-cycling synchrotron (RCS) will serve as a full-energy polarized electron injector. Recent design improvements include reduction of the IR magnet strengths to avoid the necessity for Nb₃Sn magnets, and a novel hadron injection scheme to maximize the integrated luminosity. We will provide an overview of this proposed project and present the current design status.

43 PARTICLE ACCELERATORS↗

Synchrotron Radiation Beam Diagnostics at IOTA - Commissioning Performance and Upgrade Efforts

The Integrable Optics Test Accelerator is a research electron and proton storage ring recently commissioned at the Fermilab Accelerator Science and Technology facility. A key part of its beam diagnostics suite are synchrotron radiation monitors, used for measuring transverse beam profile, position, and intensity. In this paper, we report on the performance and uses of this system during the year 1 run. We demonstrate sub-100nm statistical beam position uncertainty and high dynamic range from 10⁹ electrons down to a single electron. Commissioning challenges and operational issues are discussed. We conclude by outlining current upgrade efforts, including improved modularity, small emittance measurements, and a multi-anode photomultiplier system for turn-by-turn acquisition.

43 PARTICLE ACCELERATORS↗

Higher Multipoles in 3rd Integer Resonance Extraction

The efficiency of slow extraction is becoming a limiting factor, as the demand for delivered beam power is constantly growing. New methods for improving extraction efficiency include folding the extraction separatrix using the higher multipoles. In this report we discuss a simple and effective approach to determine an optimal placement of those multipoles in the storage ring. This allows reduction of the beam losses and therefore, the level of prompt and residual radioactivity in the accelerator components and surrounding buildings by as much as 40% or more. We also explore here manipulating the higher order effects produced in the pure sextupole configurations for the same purpose and demonstrate that similar results can be achieved by only rearranging the sextupole magnets in the lattice.

43 PARTICLE ACCELERATORS↗

nuSTORM Accelerator Challenges and Opportunities

The nuSTORM facility uses a stored muon beam to generate a neutrino source. Muons are captured and stored in a storage ring using stochastic injection. The facility will aim to measure neutrino-nucleus scattering cross-sections with uniquely well-characterized neutrino beams; to facilitate the search for sterile neutrino and other Beyond Standard Model processes with exquisite sensitivity, and to provide a muon source that makes an excellent technology test-bed required for the development of muon beams capable of serving as a multi-TeV collider. In this paper, we describe the latest status of the development of nuSTORM, the R&D needs, and the potential for nuSTORM as a Muon Collider test facility.

43 PARTICLE ACCELERATORS↗

Detector Solenoid Compensation for the Electron-Ion Collider

The central detector in the present EIC design includes a 4 m long solenoid with an integrated strength of up to 12 Tm. The electron beam passes on-axis through the solenoid, but the hadron beam has an angle of 25 mrad. Thus the solenoid couples horizontal and vertical betatron motion in both electron and hadron storage rings, and causes a vertical closed orbit excursion in the hadron ring. The solenoid also couples the transverse and longitudinal motions of both beams, when crab cavities are also considered. In this paper, we present schemes for closed orbit correction and coupling compensation at the IP, including crabbing.

43 PARTICLE ACCELERATORS↗

Demonstration of Electron Cooling using a Pulsed Beam from an Electrostatic Electron Cooler

Electron cooling continues to be an invaluable technique to reduce and maintain the emittance in hadron storage rings in cases where stochastic cooling is inefficient and radiative cooling is negligible. Extending the energy range of electron coolers beyond what is feasible with the conventional, electrostatic approach necessitates the use of RF fields for acceleration and, thus, a bunched electron beam. To experimentally investigate how the relative time structure of the two beams affects the cooling properties, we have set up a pulsed-beam cooling device by adding a synchronized pulsing circuit to the conventional electron source of the CSRm cooler at Institute of Modern Physics *. We show the effect of the electron bunch length and longitudinal ion focusing strength on the temporal evolution of the longitudinal and transverse ion beam profile and demonstrate the detrimental effect of timing jitter as predicted by theory and simulations. Compared to actual RF-based coolers, the simplicity and flexibility of our setup will facilitate further investigations of specific aspects of bunched cooling such as synchro-betatron coupling and phase dithering.

Bruker, M. W.↗

IOTA Run 2 Beam Dynamics Studies in Nonlinear Integrable Systems

Nonlinear integrable optics is a promising design approach for suppressing fast collective instabilities. To study it experimentally, a new storage ring, the Integrable Optics Test Accelerator (IOTA), was built at Fermilab. IOTA has recently completed its second scientific run, incorporating many hardware and instrumentation improvements. This report presents the results of the two integrable optics experiments - the quasi-integrable Henon-Heiles octupole system and the fully integrable Danilov-Nagaitsev system. We demonstrate tune spread and dynamic aperture in agreement with tracking simulations, and a stable crossing of the integer resonance. Based on recovered single-particle phase space dynamics, we show improved invariant jitter consistent with intended effective Hamiltonian. We conclude by outlining future plans and efforts towards proton studies and larger designs.

43 PARTICLE ACCELERATORS↗

Impact of Coherent Beam-Beam Interaction on the Collisionless Damping of the Transverse Coupled-Bunch Instability

In the EIC design, at high average-current operation, the transverse coupled-bunch instability (TCBI) induced by the long-range transverse resistive-wall wakefield in the electron storage ring (eSR) has a fast growth rate and requires efficient mitigation. A natural mitigation mechanism is provided by the beam-beam interaction at the interaction point (IP), which gives a strong Landau damping for the TCBI in the eSR. In this study, using a simplified simulation model, we investigate how this Landau damping from the beam-beam interaction behaves when the coherent beam-beam interaction at IP is considered. Our method and results will be presented in this paper.

Li, R.↗

ACCELERATOR CHALLENGES OF THE LHeC PROJECT

The LHeC project studies the design of a future electron-proton collider at CERN that will run in parallel to the standard LHC operation. For this purpose, the existing LHC storage ring will be combined with an Energy Recovery Linac (ERL), to accelerate electrons up to kinetic energy of 50 GeV. This concept - also applicable to the FCC-eh collider and studied at the PERLE project as prototype version - allows a peak luminosity of 10³⁴ cm⁻² s⁻¹. A sophisticated design of the RF structures, linacs, arcs, and interaction region is required. The electrons are accelerated and, after the interaction point, their energy is recovered through the same RF structures. While this energy recovery concept is a very promising approach, severe challenges are set by the layout of the interaction region, the beam separation concept and the design of the linac and arc lattice for the highest possible momentum acceptance. Emittance control and beam-beam effect of both, electron and proton beams, have been studied in front-to-end simulations and will be presented. We summarise the design principles of the ERL, the optimization of the arc lattice, and the main parameters of the project.

Holzer, B. J.↗

RF Harmonic Kicker R&D Demonstration and Its Application to the RCS Injection of the EIC

The Rapid Cycling Synchrotron (RCS) of the Electron-Ion Collider (EIC) at Brookhaven National Laboratory (BNL) is an accelerating component of the electron injection complex, which provides polarized electrons in electron-ion collisions in the main Electron Storage Ring (ESR). We present the injection scheme into the RCS based on an ultra-fast harmonic kicker, whose "five odd-harmonic modes" prototype was developed in the context of the Jefferson Lab EIC (JLEIC) conceptual design. In its early stage of R&D, the sharp (~3 ns width) waveform construction, beam dynamics, and pulsed power operation with short ramping time (~10 us) will be discussed together with the fabrication work of the JLEIC prototype.

Park, G. -T.↗

Characterization and Simulation of Optical Delay System for the Proof-of-Principle Experiment of Optical Stochastic Cooling at IOTA

The Optical Stochastic Cooling (OSC) experiment at Fermilab’s IOTA storage ring uses two undulators to cool the beam over many turns. The radiation emitted by electrons in the first undulator is delayed and imaged in the second undulator where it applies a corrective energy kick on the electrons. Imperfections in the manufacturing of the delay plates can lead to a source of error. This paper presents the experimental characterization of the absolute thickness of these delay plates using an interferometric technique. The measured "thickness maps" are implemented in the Synchrotron Radiation Workshop (SRW) program to assess their impact on the delayed radiation pulse.

43 PARTICLE ACCELERATORS↗