Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

The applicability of remote sensing to Earth biological problems. Part 2: The potential of remote sensing in pest management

Five troublesome insect pest groups were chosen for study. These represent a broad spectrum of life cycles, ecological indicators, pest management strategies, and remote sensing requirements. Background data, and field study results for each of these subjects is discussed for each insect group. Specific groups studied include tsetse flies, locusts, western rangeland grasshoppers, range caterpillars, and mosquitoes. It is concluded that remote sensing methods are aplicable to the pest management of the insect groups studied.

Polhemus, J. T.↗

Air Traffic Management Response to Vertiport Closure

Increasing quantities of urban air mobility operations requires consideration of various contingencies associated with novel operational tempos and airspace management practices. This paper explores a contingency scenario in which a single vertiport closes unexpectedly during high tempo operations. Dynamic re-planning is explored as a function performed both by operators using common operating procedures and through emergency assistance from air traffic control. Implications for airspace capacity, infrastructure requirements, and vehicle energy reserves are discussed.

UAM↗

Specification of requirements for the virtual environment for reactor applications simulation environment

In 2010, the United States Dept. of Energy initiated a research and development effort to develop modern modeling and simulation methods that could utilize high performance computing capabilities to address issues important to nuclear power plant operation, safety and sustainability. To respond to this need, a consortium of national laboratories, academic institutions and industry partners (the Consortium for Advanced Simulation of Light Water Reactors - CASL) was formed to develop an integrated Virtual Environment for Reactor Applications (VERA) modeling and simulation capability. A critical element for the success of the CASL research and development effort was the development of an integrated set of overarching requirements that provides guidance in the planning, development, and management of the VERA modeling and simulation software. These requirements also provide a mechanism from which the needs of a broad array of external CASL stakeholders (e.g. reactor / fuel vendors, plant owner / operators, regulatory personnel, etc.) can be identified and integrated into the VERA development plans. This paper presents an overview of the initial set of requirements contained within the VERA Requirements Document (VRD) that currently is being used to govern development of the VERA software within the CASL program. The complex interdisciplinary nature of these requirements together with a multi-physics coupling approach to realize a core simulator capability pose a challenge to how the VRD should be derived and subsequently revised to accommodate the needs of different stakeholders. Thus, the VRD is viewed as an evolving document that will be updated periodically to reflect the changing needs of identified CASL stakeholders and lessons learned during the progress of the CASL modeling and simulation program. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Nevada National Security Site Radiological Control Manual

Please have this STIP assigned, documented, and recorded in OSTI as Report Number DOE/NV/03624--0257 Revision 1 and Author as Radiological Control Managers' Council. This manual contains the radiological control requirements to be used for all radiological activities conducted by programs under the purview of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO). (Activities conducted under the purview of the U.S. Department of Energy, Office of Environmental Management Nevada[(EM Nevada] may require additional approval authorities as described in the EM Nevada Prime Contractor’s implementation plan.) Compliance with these requirements will ensure compliance with Title 10 Code of Federal Regulations (CFR) Part 835, “Occupational Radiation Protection.” This manual represents policies, guidelines, and best practices for implementing the DOE/NV/03624--0082, “Nevada National Security Site Radiation Protection Program,” (NNSS RPP) according to the requirements of 10 CFR 835.

61 RADIATION PROTECTION AND DOSIMETRY↗

Introduction of the Adding and Doubling Method for Solving Bateman Equations for Nuclear Fuel Depletion

This paper introduces and evaluates the Adding and Doubling Method (ADM) for solving the Bateman equations for depletion systems with varying numbers of nuclides and compares it to the Chebyshev Rational Approximation Method (CRAM), both implemented in the reactor physics analysis application Griffin. ADM, when applied to the Crank-Nicolson Finite Difference method, can produce results comparable in accuracy and precision to CRAM with comparable run times for systems with 35 or 297 nuclides. For systems with more than 300 nuclides, the matrix-matrix operations required by ADM are significantly more costly than the matrix-vector operations required by CRAM, making CRAM the more efficient method for systems with large numbers of nuclides. ADM is an accurate method that maintains other advantages over CRAM in that it does not depend on pre-generated coefficients or require complex number operations. ADM also manages to outperform CRAM by a factor of more than 250 in terms of run time for depletion systems that require multiple Bateman solves while the depletion matrix and time step size remain constant over all depletion intervals.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced space power PEM fuel cell systems

A model showing mass and heat transfer in proton exchange membrane (PEM) single cells is presented. For space applications, stack operation requiring combined water and thermal management is needed. Advanced hardware designs able to combine these two techniques are available. Test results are shown for membrane materials which can operate with sufficiently fast diffusive water transport to sustain current densities of 300 ma per square centimeter. Higher power density levels are predicted to require active water removal.

Vanderborgh, N. E.↗

Space power subsystem automation technology

The technology issues involved in power subsystem automation and the reasonable objectives to be sought in such a program were discussed. The complexities, uncertainties, and alternatives of power subsystem automation, along with the advantages from both an economic and a technological perspective were considered. Whereas most spacecraft power subsystems now use certain automated functions, the idea of complete autonomy for long periods of time is almost inconceivable. Thus, it seems prudent that the technology program for power subsystem automation be based upon a growth scenario which should provide a structured framework of deliberate steps to enable the evolution of space power subsystems from the current practice of limited autonomy to a greater use of automation with each step being justified on a cost/benefit basis. Each accomplishment should move toward the objectives of decreased requirement for ground control, increased system reliability through onboard management, and ultimately lower energy cost through longer life systems that require fewer resources to operate and maintain. This approach seems well-suited to the evolution of more sophisticated algorithms and eventually perhaps even the use of some sort of artificial intelligence. Multi-hundred kilowatt systems of the future will probably require an advanced level of autonomy if they are to be affordable and manageable.

Graves, J. R.↗

Advanced Data Acquisition Systems

Current and future requirements of the aerospace sensors and transducers field make it necessary for the design and development of new data acquisition devices and instrumentation systems. New designs are sought to incorporate self-health, self-calibrating, self-repair capabilities, allowing greater measurement reliability and extended calibration cycles. With the addition of power management schemes, state-of-the-art data acquisition systems allow data to be processed and presented to the users with increased efficiency and accuracy. The design architecture presented in this paper displays an innovative approach to data acquisition systems. The design incorporates: electronic health self-check, device/system self-calibration, electronics and function self-repair, failure detection and prediction, and power management (reduced power consumption). These requirements are driven by the aerospace industry need to reduce operations and maintenance costs, to accelerate processing time and to provide reliable hardware with minimum costs. The project's design architecture incorporates some commercially available components identified during the market research investigation like: Field Programmable Gate Arrays (FPGA) Programmable Analog Integrated Circuits (PAC IC) and Field Programmable Analog Arrays (FPAA); Digital Signal Processing (DSP) electronic/system control and investigation of specific characteristics found in technologies like: Electronic Component Mean Time Between Failure (MTBF); and Radiation Hardened Component Availability. There are three main sections discussed in the design architecture presented in this document. They are the following: (a) Analog Signal Module Section, (b) Digital Signal/Control Module Section and (c) Power Management Module Section. These sections are discussed in detail in the following pages. This approach to data acquisition systems has resulted in the assignment of patent rights to Kennedy Space Center under U.S. patent # 6,462,684. Furthermore, NASA KSC commercialization office has issued licensing rights to Circuit Avenue Netrepreneurs, LLC , a minority-owned business founded in 1999 located in Camden, NJ.

Perotti, J.↗

Principles and Tasks of the New Regulatory System for Radioactive Waste Management in the Russian Federation - 12020

This year the Federal Law 'On Radioactive Waste management' was adopted in the Russian Federation. The law significantly changes the existing radioactive waste management regulatory system and assigns a lot of new tasks in order to implement new principles and overcome inevitable respective difficulties. Nuclear Safety Institute was largely involved in the process of the development of the law as well as its further co-ordination among the stakeholders, during which some important initial provisions were excluded. In the paper special features of the Russian safety regulation system for radioactive waste management are analyzed. Most significant requirements adopted by the law as well as tasks and expected difficulties related to its implementation are discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Is there a Perfect D and D Plan - 20100

Problems with many Deactivation and Demolition (D and D) projects arise not necessarily from the technical difficulty of the actions required in a given facility, but rather from lack of integration of the stove piped planning efforts; engineering, operations, environmental, radiological, human resources, etc. This paper will cover Polestar Technical Service, Inc. (Polestar) systems engineering approach to D and D planning based on the company's experience over the past 27 years. This systematic, four-pronged approach to planning is applicable to any D and D project and addresses several diverse topics in a cohesive and integrated manner. The four areas to be discussed are project scope, requirements, facility end state, work force and base operations. This approach progresses a facility through the typical DOE life-cycle from operations, through deactivation, into surveillance and maintenance (S and M) and to eventual demolition and site remediation. To achieve a final end state the approach brings together the efforts associated with identifying and managing the right set of requirements, detailing the scope of work, establishing the baseline, redefining the work processes, aligning the workforce resources with the work processes, and maintaining the base operations activities as the project progresses through the various life-cycle stages. Getting these building blocks right provides a solid framework for executing any D and D project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Benchmark Problem Development for Testing Maturity of Intelligent Contingency Management Tools

Increasingly autonomous Advanced Air Mobility (AAM) vehicles will be required to handle diverse conditions with limited human intervention. Intelligent contingency management (iCM) approaches are under development to address how automated agents can handle unforeseen, unplanned, and unanticipated events. Benchmark scenario is needed to test the maturity of the developed iCM tools and techniques.

Jon Holbrook↗

Alaskan North Slope Oil & Gas Transportation Support

North Slope oil and gas resources are a critical part of US energy supplies and their development is facing a period of new growth to meet increasing national energy needs. While this growth is taking place in areas active in development for more than 20 years, there are many increasing environmental challenges facing industry and management agencies. A majority of all exploration and development activities, pipeline maintenance and other field support activities take place in the middle of winter, when the fragile tundra surface is more stable. The window for the critical oil and gas winter operational season has been steadily decreasing over the last 25 years. The number of companies working on the North Slope is increasing. Many of these companies are smaller and working with fewer resources than the current major companies. The winter operations season starts with the tundra-travel opening, which requires 15 cm of snow on the land surface in the coastal management areas and 23 cm in the foothills management areas. All state managed areas require -5°C soil temperatures at a soil depth of 30 cm. Currently there are no methods to forecast this opening date, so field mobilization efforts are dependent on agency personnel visiting field sites to measure snow and soil temperature conditions. Weeks can be easily lost in the winter operating season due to delays in field verification of tundra conditions and the resulting mobilization. After the season is open, a significant percentage of exploration, construction, and maintenance do not proceed until ice roads and pads can be built. This effort is dependent on access to lake ice and under-ice water. Ice chipping is a common ice-road construction technique used to build faster and stronger ice roads. Seasonal variability in water availability and permitting approaches are a constant constraint to industry. At the end of the winter season, projects reliant on ice-road networks are often faced with ending operations early or risk being caught on ice roads with flooded stream crossings, or unusable sections of ice road due to local melt. These challenges result in higher oil and gas field exploration and operational costs. Much of the scientific understanding to address transportation issues for oil and gas development on the North Slope exists, but has not been placed into a set of tools and data sets useful for industry and management agencies. Optimizing North Slope transportation networks during winter operation seasons is critical in managing increasing resource development and will provide a framework for environmentally-responsive development. Understanding the physical environment (such as snow, water, ice, soils) is necessary to ensure protection of fisheries and other natural resources on the sensitive tundra landscape. Solutions also have to do more than just describe current conditions, they need the ability to forecast short-term conditions. This will allow management agencies to respond to future variability in snow cover, soil temperature, and water availability more effectively. In turn, industry will then have more time to plan the significant mobilization taking place every winter season.

02 PETROLEUM↗

Summary of Consolidated Interim Storage Advantages and Disadvantages from an Integrated Systems Perspective from Prior Reports and Studies

The question of whether centralized storage of civilian spent nuclear fuel (SNF) should be part of the federal waste management system as an intermediate step before permanent disposal has been debated for more than four decades. Centralized storage facilities were included as a potential component of the U.S. spent fuel management system in the Nuclear Waste Policy Act of 1982 (NWPA), but these facilities were not identified as being essential. When the NWPA was passed, it was expected that a permanent repository would be available around the turn of the century to meet the commitments that were made to start accepting waste by that time. For a number of reasons, a permanent repository was not available at that stage. This report summarizes the advantages and disadvantages of including an ISF as part of an integrated waste management system that have been identified in numerous analyses of the impacts of a consolidated interim storage facility (ISF), previously discussed as monitored retrievable storage, the form of ISF authorized in the NWPA) by the U.S. Department of Energy (DOE) and independent groups. Storing SNF before disposal is a functional requirement for an integrated waste management system. As described below, the studies reviewed in this report have identified a range of benefits that could be obtained by adding a consolidated ISF to the waste management system, including (1) earlier acceptance of fuel by the federal government, (2) reduction in the number of unintended long-term storage sites, (3) added system flexibility and opportunity for better integration, and (4) near-term development and demonstration of institutional and technical infrastructures for large-scale management of SNF. At the same time, these studies have identified potential drawbacks to deployment of an ISF, including (1) potential adverse impacts on development of a repository, (2) additional transportation of SNF, and (3) a large upfront economic investment to establish the consolidated storage capability. In general, the studies that have considered the positive and negative impacts of consolidated storage most comprehensively have concluded that in light of these considerations, the benefits of including an ISF as part of an integrated waste management system can outweigh any real or perceived disadvantages.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Strategic Conflict Management Approaches as Applied to Simulated UAM Operations

This report presents the results of a comparison analysis of candidate Strategic Conflict Management (SCM) strategies as applied to Urban Air Mobility (UAM) operations. The SCM strategies investigated included: no SCM, resource scheduling (RS), resource flow rates (FR), area-based flow rates (AR), and conflict detection and resolution (CR). The study evaluated each strategy against the same 3 levels of flight demand in a representative airspace construct for the Dallas/Fort Worth region. The study also accounted for different levels of uncertainty in operational planning and equivalent levels of trajectory following error. In the analysis, we compared the SCM strategies’ effectiveness in reducing the need for the tactical conflict management layer to act and looked at the metrics of unmitigated losses-of-separation (LOS), flight delays imposed by strategic planning, and throughput of the overall airspace. The study results indicated that the CR strategy was the most effective at reducing LOS and percentage of flights with LOS, even in the presence of trajectory error when uncertainty is accounted for in planning. Thus, if the objective is to reduce the number of actions that the tactical conflict management layer will have to take, in terms of conflicts that may need to be resolved, CR is the strategy to use. The FR strategy was found to be the worst at reducing LOS and percentage of flights with LOS. Thus, it is not very effective at reducing the actions required by a tactical conflict management layer. In the airspace tested, the demand was high enough to produce unacceptable levels of flight delay and reductions of throughput when the SCM strategies were implemented. This was especially evident at the higher levels of trajectory uncertainty and error. The need to account for expected levels of uncertainty becomes more and more important as the demand level increases and as the level of trajectory error increases. This is because the likelihood of flights with LOS increases as the density of operations increases and as the level of trajectory error increases. Accounting for uncertainty in the SCM strategies improves the strategy effectiveness with respect to LOS but increases delays and reduces throughput. Thus, there is a tradeoff between scalability and allowable levels of uncertainty. That is, we can implement an air traffic management construct that allows high levels of uncertainty, but we can expect that same system to have limits on scalability that may be evident even at small demand levels, such as those used in this study. Therefore, the results in this study indicate that an air traffic system should attempt to implement mechanisms appropriate for reducing uncertainty where possible in order to increase the chances for scalability. And this increased level of predictability of operations needs to be balanced with mechanisms for ensuring flexibility when operational conditions and plans need to change, even though those types of changes should be the exception rather than the rule under normal conditions. The study also introduced a trade space that could serve as a mechanism for selecting the appropriate SCM strategy in a trade-off between uncertainty and error, mean flight delay, and the LOS metrics (which this study equates to the potential for tactical conflict management actions). The optimal solution for a given airspace, demand level, and other factors, could likely be a combination of SCM strategies, although this study only compared the use of a single SCM strategy at a time. The CR strategy appeared to have the best opportunity for scalability by limiting the number of potential tactical actions to nearly zero.

Strategic Conflict Management↗

Technical Basis and Implementation of Groundwater Pathway Models Used for INL’s RH LLW Disposal Facility Performance Assessment

The Idaho National Laboratory’s (INL’s) Remote-Handled Low-Level Waste (RH LLW) Disposal Facility has been designed and constructed to receive waste generated on INL in support of the Office of Nuclear Energy (NE) and Naval Reactors (NR) missions. RH LLW is generated on the INL site from spent nuclear fuel handling and operations at the Naval Reactors Facility (NRF), the Advanced Test Reactor (ATR), and at the Material and Fuels Complex (MFC) in addition to other miscellaneous research activities. The facility has been designed to receive RH LLW currently in storage at INL facilities and new waste generated by nuclear research programs. RH LLW received at the facility is solid waste consisting of surface contaminated debris, ion exchange resins used to purify cooling water, and activated metals generated during reactor core change outs, Naval spent fuel management, and nuclear R&D. The facility has been designed to meet the requirements of DOE Order 435.1, Radioactive Waste Management [1] for all-pathways including groundwater and air, radon emissions limits, and inadvertent intrusion limits. The facility design includes a vault system incorporating robust concrete vaults oriented vertically in close-packed arrays, a hydraulic drainage system designed to limit water contact with the stainless steel waste canisters/liners and concrete vaults, and a robust monitoring system. Per the environmental assessment (EA) [2], all waste will be disposed of in stainless steel waste canisters/liners. During facility design and construction, site-specific data was collected to provide laboratory and field scale performance characteristics for the concrete vault and hydraulic drainage systems. Field-scale infiltration tests were conducted and monitored and the data was interpreted using numerical simulation. Based on interpretation of the observed laboratory and field test data, the facility performance assessment (PA) was developed. The PA groundwater pathway source release model differentially credits release from surface contaminated debris, ion exchange resins, and activated metals. It also credits failure of the steel waste canisters/liners with failure rates based on actual corrosion data. Once released, transport through the vadose zone and aquifer to downgradient receptor locations was simulated in the PA using a one-dimensional modeling approach based on historical three-dimensional modeling of historically-contaminated INL sites. This paper provides an overview of the groundwater pathway source release models and their technical implementation in the PA. It also describes the one-dimensional transport model used for the vadose zone and multi-dimensional model used for the aquifer.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cities Topology - Curbs and Parking

Personal vehicles, buses, freight, emerging services (e.g., ride-hailing), and other modes impose several combinations of competing demands for curb space. Therefore, research is needed to better understand impacts and prioritize space allocation - parking, pick-up/drops or PUDOs, commercial zones, bus stops, etc. - to optimize mobility and energy use. This study aims to develop an optimization model to allocate and manage curb space by interviewing experts, analyzing responses to understand curb space key requirements and priorities, link such curb-management practices to mobility and energy productivity, and provide methods suitable for micro-scale analysis.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Mission Adaptive UAS Platform for Earth Science Resource Assessment

NASA Ames Research Center has led a number of important Earth science remote sensing missions including several directed at the assessment of natural resources. A key asset for accessing high risk airspace has been the 180 kg class SIERRA UAS platform, providing mission durations of up to 8 hrs at altitudes up to 3 km. Recent improvements to this mission capability are embodied in the incipient SIERRA-B variant. Two resource mapping problems having unusual mission characteristics requiring a mission adaptive capability are explored here. One example involves the requirement for careful control over solar angle geometry for passive reflectance measurements. This challenges the management of resources in the coastal ocean where solar angle combines with sea state to produce surface glint that can obscure the ocean color signal. Furthermore, as for all scanning imager applications, the primary flight control priority to fly the UAS directly to the next waypoint should compromise with the requirement to minimize roll and crab effects in the imagery. A second example involves the mapping of natural resources in the Earth's crust using precision magnetometry. In this case the vehicle flight path must be oriented to optimize magnetic flux gradients over a spatial domain having continually emerging features, while optimizing the efficiency of the spatial mapping task. These requirements were highlighted in several recent Earth Science missions including the October 2013 OCEANIA mission directed at improving the capability for hyperspectral reflectance measurements in the coastal ocean, and the Surprise Valley Mission directed at mapping sub-surface mineral composition and faults, using high-sensitivity magentometry. This paper reports the development of specific aircraft control approaches to incorporate the unusual and demanding requirements to manage solar angle, aircraft attitude and flight path orientation, and efficient (directly geo-rectified) surface and sub-surface mapping, including the near-time optimization of these sometimes conflicting requirements. *

Flight Control↗

Initiating the 2002 Mars Science Laboratory (MSL) Focused Technology Program

The Mars Science Laboratory (MSL) Project is an aggressive mission launching in 2009 to deliver a new generation of rover safely to the surface of Mars and conduct comprehensive in situ investigations using a new generation of instruments. This system will be designed to land with precision and be capable of operating over a large percentage on the surface of Mars. It will have capabilities that will support NASA's scientific goals into the next decade of exphation. The MSL Technology program is developing a wide-range of technologies needed for this Mission and potentially other space missions. The MSL Technology Program reports to both the MSL Project and the Mars Technology Program (MTP). The dual reporting process creates a challenging management situation, but ensures the new technology meets both the specific MSL requirements and the broader Mars Program requirements. MTP is a NASA-wide technology development program managed by the Jet Propulsion Laboratory (JPL) and is divided into a Focused Program and a Base Program. The Focused Technology Program addresses technologies that are specific and critical to near-term missions, while the Base Technology Program addresses those technologies that are applicable to multiple missions and which can be characterized as longer term, higher risk, and high payoff technologies. The MSL Technology Program is under the Focused Program and is tightly coupled to MSL's mission milestones and deliverables. The technology budget is separate from the flight Project budget, but the technology s requirements and the development process are tightly coordinated with the Project. The Technology Program combines proven management techniques of flight projects with commercial and academic technology management strategies, to create a technology management program that meets the near-term requirements of MSL and the long-term requirements of MTP. This paper examines the initiation of 2002 MSL Technology program. Some of the areas discussed in this paper include technology definition, task selection, technology management, and technology assessment.

Caffrey, Robert T.↗