Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REACTOR VESSELS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,582 records · Page 88

FARM supervisory capabilities for thermal energy storage

The FARM (Feasible Actuator Range Modifier) module is a component of the RAVEN-based FORCE framework for the analysis of Integrated Energy Systems (IES). FARM aids HERON in the solution of the power dispatch problem by evaluating feasible set-point signals to be issued to the control systems of the different IES unit components. Set-points need to satisfy limits on both production variables (i.e., the variables to be optimized such as the electrical power, etc.) and process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.). To enforce all these limits, a two-stage approach is adopted. First, the power dispatcher algorithm in HERON module estimates set-points that meet the constraints on the production variables, e.g., power levels and power ramp rate limits. These constraints are called explicit constraints. Then, if necessary, FARM adjusts these set-points to ensure the respect of the limits on the process variables of interest, given the knowledge of the system dynamics acquired through machine learning algorithms. These constraints are called implicit constraints. From this standpoint, FARM constitutes a bridge between the HERON power dispatcher that adopts a simplified description of the IES unit (low-resolution physics) and the HYBRID high-fidelity models (high-resolution physics). In this report, an overview of the major capabilities of the latest release of FARM is provided, along with a summary of the tool demonstration campaign conducted at the Dynamic Energy Technology and Integration Laboratory (DETAIL) facility. These results assess the performance of the control system architecture embedding FARM both as a Validator of the HERON power dispatcher and as a real time Supervisory control scheme. Additionally, the report outlines the areas that FARM might benefit from, along with proposed solutions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Integrated Lift- and Wall-Force Closures in Computational Fluid Dynamics (CMFD)

In this report, we provide the necessary background to put this work in context and for a more detailed background, the reader is referred to CASL 2013 report. Central constraints on the design of LWRs are thermal-structural limits, e.g., maximum fuel pin temperature and maximum allowable working pressure in a pressure vessel. In both of these cases, the knowledge of the spatially and temporally varying two-phase flow is required to make accurate predictions as the distribution of both the phases have an impact on heat extraction as well as neutron moderation. Engineered two-phase flow systems have complex geometry and often high Reynolds numbers which increase the computational cost of an analysis, and generally make direct numerical simulations of the flow field impossible even on the fastest computers today. Consequently, a number of models which seek to reduce this computational cost have been created over the years. One of these called the two-fluid model has become the standard in three dimensional CFD (Computational Fluid Dynamics) codes and is and is also referred to as CMFD (Computational Multiphase Fluid Dynamics). The two-fluid model splits each conserved quantity into two fields, one for each phase that is treated as interspersed continua. Splitting one field into two requires additional interfacial closure relationships. In the two-fluid model, the momentum flux between the phases is governed by a number of these closure relationships. Generally, the net force on the dispersed phase is decomposed into inertial, added mass, buoyancy, drag, lift, and wall forces. In addition, there is a time-dependent Basset force, as well as turbulent dispersion effects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Major safety and operational concerns for fuel debris criticality control

It can be seen from the criticality control viewpoint that the requirement divides the decommissioning work into two parts. One is the present condition where it is requested to prevent criticality and to monitor subcritical condition while the debris is untouched. The other is future work where the subcritical condition shall be ensured even if the debris condition is changed intentionally by raising water level, debris retrieval, etc. Repair of damages on the containment vessel (CV) walls is one of the most important objectives at present in the site. On completion of this task, it will become possible to raise water levels in the CVs and to shield the extremely high radiation emitted from the debris but there is a dilemma: raising the water level in the CVs implies to bring the debris closer to criticality because of the role of water for slowing down neutrons. This may be solved if the coolant water will start circulating in closed loops, and if a sufficient concentration of soluble neutron poison (borated water for instance) will be introduced in the loop. It should be still noted that this solution has a risk of worsening corrosion of the CV walls. Design of the retrieval operation of debris should be proposed as early as possible, which must include a neutron poison concentration required to ensure that the debris chunk is subcritical. In parallel, the development of the measurement system to monitor subcritical condition of the debris chunk should be conducted in case the borated water cannot be used continuously. The system would be based on a neutron counter with a high sensitivity and an appropriate shield for gamma-rays, and the adequate statistical signal processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal Hydraulic Experimental Test Article: Second Year of Testing with Secondary Sodium System (Fiscal Year 2025 Final Report)

The Thermal Hydraulic Experimental Test Article (THETA) is currently installed in the Mechanisms Engineering Test Loop (METL) 28” test vessel #4. Both the primary and secondary sodium systems remain online to facilitate continued testing. This fiscal year, work was performed using a COMSOL Multiphysics magnetohydrodynamic model to characterize flow more accurately in the secondary electromagnetic flowmeters. Experimental campaigns were then performed to study the thermal hydraulic differences between sodium and water as a surrogate fluid in the THETA geometry as well as a study to better characterize and understand temperature oscillations that exist at the outlet of the core to the hot pool. A peer-reviewed article was published in the ASME Journal of Nuclear Engineering and Radiation Science detailing the THETA facility and providing an overview of a test that was performed with the primary and secondary system online [1]. Work continues to develop a database to house experimental THETA data to better facilitate collaboration with industry and laboratory partners for their use of the data for code benchmarking/validation. THETA remains fully operational and is positioned for continued testing in fiscal year 2026.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

First results on disruption mitigation by massive gas injection in Korea Superconducting Tokamak Advanced Research

Massive gas injection (MGI) system was developed on Korea Superconducting Tokamak Advanced Research (KSTAR) in 2011 campaign for disruption studies. The MGI valve has a volume of 80 ml and maximum injection pressure of 50 bar, the diameter of valve orifice to vacuum vessel is 18.4 mm, the distance between MGI valve and plasma edge is {approx}3.4 m. The MGI power supply employs a large capacitor of 1 mF with the maximum voltage of 3 kV, the valve can be opened in less than 0.1 ms, and the amount of MGI can be controlled by the imposed voltage. During KSTAR 2011 campaign, MGI disruptions are carried out by triggering MGI during the flat top of circular and limiter discharges with plasma current 400 kA and magnetic field 2-3.5 T, deuterium injection pressure 39.7 bar, and imposed voltage 1.1-1.4 kV. The results show that MGI could mitigate the heat load and prevent runaway electrons with proper MGI amount, and MGI penetration is deeper under higher amount of MGI or lower magnetic field. However, plasma start-up is difficult after some of D{sub 2} MGI disruptions due to the high deuterium retention and consequently strong outgassing of deuterium in next shot, special effort should be made to get successful plasma start-up after deuterium MGI under the graphite first wall.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Waste Management Processing Projects in the PRC - 16551

EnergySolutions continues to provide waste treatment solutions in the Peoples Republic of China (PRC). In 2015 ES had completed installation of systems at two different Nuclear power sites (Haiyang, an AP-1000{sup TM} site and Yangjiang, a CPR1000 site). This paper discusses progress on these two projects, and provides new information regarding the operation of the systems. The Yangjiang project became operational in the fall of 2015 while the Haiyang project will be done is nearly done with commissioning and is waiting for reactor operations. Haiyang Project: In the Shandong Province on China's northeast coast, EnergySolutions, as part of a consortium with China Power Investment (CPI) and Yuanda Environmental Protection Engineering Company (a PRC state-owned company), has designed and constructed the site's Site Rad Waste Treatment Facility (SRTF). The SRTF provides solid waste processing services for up to 8 AP-1000s{sup TM}. The SRTF performs the following functions: 1. Five year storage for HICs containing spent resin and filters from the nuclear power plants' waste liquid systems (WLS); 2. Sorting and Compaction System for solid waste generated from Nuclear Power Plant (NPP) operations. This system implements: a) Real time radiography to screen 200 liter waste drums for prohibited items, b) Pre-compaction, c) High Resolution Gamma Spectrophotometry (HRGS) for waste characterization, d) Supercompaction, e) Solidification of compacted drums inside overpack drums which are filled with 60 MPa compressive strength grout, and f) Automatic drum lidding which crimps the drum lid to the drum body. 3. Laundry services for NPP anti-contamination clothing. 4. At the nuclear islands, EnergySolutions is providing mobile liquid waste processing systems that utilize EnergySolutions Advanced Liquid Processing System ALPS{sup TM}/Advanced Injection Method System AIM{sup TM} processing systems to supplement the NPP's WLS system when radionuclide concentrations exceed release criteria. The spent resins and filters from the nuclear power plants are placed in EnergySolutions supplied HICs, dewatered using EnergySolutions Self Engaging Dewatering System (SEDS{sup TM}), and then placed in EnergySolutions 8-120B Type B cask for the transport of the HIC between the NPP and the SRTF and, ultimately, to a disposal site once it is ready for operations Yangjiang Project: EnergySolutions is providing liquid waste treatment system (TEU) and solid waste treatment system (TES) for Yangjiang units 3 and 4 for the China Nuclear Power Engineering Company (CNPEC). The Yangjiang site is located approximately 300 kilometers west of Hong Kong. The TEU system processes floor drain, chemical drain, and process drain tanks liquids to achieve a release concentration less than 37 Bq/l. The TES system receives spent resin and filters into HIC containers which are dewatered and subsequently transported to the Yangjiang sites QT building where they are stored for a period of up to 5 years or until a disposal site are available. TEU (Liquid waste treatment) consists of the following unit operations: - ALPS{sup TM}/AIM{sup TM} system, which includes two separate 8 vessel water treatment systems that consist of granular activated carbon (GAC), cation, anion ion and mixed bed media ion exchange (IX) columns; and: - A reverse osmosis system for final polishing, - TES (solid waste system), - SEDS (Self Engaging Dewatering System), - Shielding for the loading and storage of HICs, - Shielded transport container for the transfer of HIC to the QT building for storage, - Shielded transfer bell for the transport of spent filters from the NPP operating area to HIC. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Numerical Assessment of the Diagnostic Capabilities of the Instrumented Calorimeter for SPIDER (STRIKE)

An important feature of the ITER project is represented by additional heating via injection of neutral beams from accelerated negative ions. To study and optimise their production, the SPIDER test facility is under construction in Padova, with the aim of testing beam characteristics and to verify the source proper operation.STRIKE (Short-Time Retractable Instrumented Kalorimeter Experiment) is a diagnostic to characterise the SPIDER negative ion beam during short operation (several seconds). During long pulse operations, STRIKE is parked off-beam in the vacuum vessel. The most important measurements are beam uniformity, beamlet divergence and stripping losses. STRIKE is directly exposed to the beam and is formed of 16 tiles, one for each beamlet groups. The measurements are provided by thermal cameras, current sensors, thermocouples and electrostatic sensors. This paper presents the investigation of the influence on the response of STRIKE of: thermal characteristics of the tile material, exposure angle, features of some dedicated diagnostics. The uniformity of the beam will be studied by measurements of the current flowing through each tile and by thermal cameras. Simulations show that it will be possible to verify experimentally whether the beam meets the ITER requirement about the maximum allowed beam non-uniformity (below {+-}10%). In the simulations also the influence of the beam halo has been included; the effect of off-perveance conditions has been studied. To estimate the beamlet divergence, STRIKE can be moved along the beam direction at two different distances from the accelerator. The optimal positions have been defined taking into account design constraints. The effect of stripping on the comparison between currents and heat loads has been assessed; this will allow to obtain an experimental estimate of stripping. Electrostatic simulations have provided the suitable tile biasing voltage in order to reabsorb secondary particles into the same tile as the one where they were emitted from.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Energy Arbitrage: Comparison of Options for use with LWR Nuclear Power Plants

Arbitrage is the opportunistic buying and selling of a commodity during local pricing valleys and peaks respectively to maximize economic value. This report evaluates options for energy arbitrage integrated with existing light water reactor (LWR) nuclear power plants (NPPs) where nuclear energy could be stored in a variety of forms and later recovered to generate electrical power during periods when grid electricity demand and pricing are high. The forms of energy storage examined in this report include the potential value of batteries, hydrogen, and thermal energy storage for coupling with nuclear power. Various large demand response options are also analyzed, including the production of liquid nitrogen via air separation and liquefaction, liquefaction of hydrogen, compressed hydrogen, and the cryogenic capture of CO2. Demand response refers to dispatchable loads that can cycle up or down depending on-grid electricity demand to aid in balancing the grid. Large demand response options could dispatch to aid nuclear power stations in avoiding power turndowns by providing an alternate disposition for electrical energy by producing marketable products (e.g., liquid nitrogen, hydrogen, or captured CO2). Static conditions were chosen and analyzed in this report for each option. Dynamic operation or optimization of energy arbitrage or demand response are out of scope for this report. The analysis is based on storage systems with discharge capacities of 500 MW for which various durations of storage and costs of charging (electricity cost) are examined. While the value of thermal energy to an industrial user for flexible plant operations has been previously proven as a business case, this report evaluates costs of hydrogen energy storage and leading thermal energy storage options, and large demand response loads that could be integrated with LWRs in comparison to utility-scale battery storage for use of off-peak nuclear energy. Compilation of this information will be used by the Idaho National Laboratory (INL) RAVEN/HERON systems integration and economics tool to evaluate thermal energy dispatch to industrial users. Relative ranking of energy storage options was done using a levelized cost of storage (LCOS) metric which calculates a rough breakeven cost for the system, taking into account the capital and operating costs as well as the revenue from arbitrage. Table ES1 below shows the LCOS for each of the energy storage options considered. First, in the table, lithium iron (Fe) phosphate batteries are listed as the base case for comparison against the other options. Next is hydrogen storage where most of the hydrogen analyses assumed the hydrogen to be produced using solid oxide electrolytic cell (SOEC) high temperature steam electrolysis (HTSE). The others used existing models of polymer electrolyte membrane (PEM) low temperature electrolysis to produce hydrogen. HTSE performance parameters and costs were taken from existing INL models. Various means were assumed to convert the hydrogen to electricity, including PEM fuel cells (FCs) and a gas turbine mixed in a 30 vol% mixture with natural gas. Physical storage (pressure vessels) and geological storage (natural underground features) were used to store the hydrogen as noted. Geological storage is more economical, but the locations are limited because of the requirement for pre-existing geological formations that will support storage. Thermal energy storage (TES) options were also analyzed including electro-thermal energy storage (ETES) and four different liquid sensible heat TES storage media as noted (Hitec, Hitec XL, Therminol-66, and Dowtherm A). The ETES process considered was modified using existing public documentation on an Echogen process and uses a separate supercritical CO2 charge and discharge cycle with sand as the heat storage media.

25 ENERGY STORAGE↗

EFFECTS OF GRAPHITE SURFACE ROUGHNESS ON BYPASS FLOW COMPUTATIONS FOR AN HTGR

Bypass flow in a prismatic high temperature gas reactor (HTGR) occurs between graphite blocks as they sit side by side in the core. Bypass flow is not intentionally designed to occur in the reactor, but is present because of tolerances in manufacture, imperfect installation and expansion and shrinkage of the blocks from heating and irradiation. It is desired to increase the knowledge of the effects of such flow, which has been estimated to be as much as 20% of the total helium coolant flow. Computational fluid dynamic (CFD) simulations can provide estimates of the scale and impacts of bypass flow. Previous CFD calculations have examined the effects of bypass gap width, level and distribution of heat generation and effects of shrinkage. The present contribution examines the effects of graphite surface roughness on the bypass flow for different relative roughness factors on three gap widths. Such calculations should be validated using specific bypass flow measurements. While such experiments are currently underway for the specific reference prismatic HTGR design for the next generation nuclear plant (NGNP) program of the U. S. Dept. of Energy, the data are not yet available. To enhance confidence in the present calculations, wall shear stress and heat transfer results for several turbulence models and their associated wall treatments are first compared for flow in a single tube that is representative of a coolant channel in the prismatic HTGR core. The results are compared to published correlations for wall shear stress and Nusselt number in turbulent pipe flow. Turbulence models that perform well are then used to make bypass flow calculations in a symmetric onetwelfth sector of a prismatic block that includes bypass flow. The comparison of shear stress and Nusselt number results with published correlations constitutes a partial validation of the CFD model. Calculations are also compared to ones made previously using a different CFD code. Results indicate that increasing surface roughness increases the maximum fuel and helium temperatures as do increases in gap width. However, maximum coolant temperature variation due to increased gap width is not changed by surface roughness.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Innovative Process for Comprehensive Treatment of Liquid Radioactive Waste - 12551

This paper presents the results of research activities aimed at creation of a principally new LRW distilling treatment method. The new process is based on the instantaneous evaporation method widely used in distillation units. The main difference of the proposed process is that the vapor condensation is conducted without using heat exchangers in practically ideal mode by way of direct contacting in a vapor-liquid system. This process is conducted in a specially designed ejector unit in supersonic mode. Further recuperation of excess heat of vaporization is carried out in a standard heat exchanger. Such an arrangement of the process, together with use of the barometric height principle, allows to carry out LRW evaporation under low temperatures, which enables to use excess heat from NPS for heating initial LRW. Thermal calculations and model experiments have revealed that, in this case, the expenditure of energy for LRW treatment by distilling will not exceed 3 kilowatt-hour/m{sup 3}, which is comparable with the reverse-osmosis desalination method. Besides, the proposed devices are 4 to 5 times less metal-intensive than standard evaporation units. These devices are also characterized by versatility. Experiments have revealed that the new method can be used for evaporation of practically any types of LRW, including those containing a considerable amount of oil products. Owing to arrangement of the evaporation process at low temperatures, the new devices are not sensitive to 'scale formation'. This is why, they can be used for concentrating brines of up to 500-600 g/l. New types of such evaporating devices can be required both for LRW treatment processes at nuclear-power plants under design and for treating 'non-standard' LRW with complex physicochemical and radionuclide composition resulting from the disaster at the Fukushima I Nuclear Power Plant.) As a result of accidents at nuclear energy objects, as it has recently happened at NPP 'Fukushima-1', personnel faces the necessity to take emergency measures and to use marine water for cooling of reactor zone in contravention of the technological regulations. In these cases significant amount of liquid radioactive wastes of complex physicochemical composition is being generated, the purification of which by traditional methods is close to impossible. According to the practice of elimination of the accident after-effects at NPP 'Fukushima' there are still no technical means for the efficient purification of liquid radioactive wastes of complex composition like marine water from radionuclides. Therefore development of state-of-the-art highly efficient facilities capable of fast and safe purification of big amounts of liquid radioactive wastes of complex physicochemical composition from radionuclides turns to be utterly topical problem. Cesium radionuclides, being extremely dangerous for the environment, present over 90% of total radioactivity contained in liquid radioactive wastes left as a result of accidents at nuclear power objects. For the purpose of radiation accidents aftereffects liquidation VNIIHT proposes to create a plant for LRW reprocessing, consisting of 4 major technological modules: Module of LRW pretreatment to remove mechanical and organic impurities including oil products; Module of sorption purification of LWR by means of selective inorganic sorbents; Module of reverse osmotic purification and desalination; Module of deep evaporation of LRW concentrates. The first free modules are based on completed technological and designing concepts implemented by VNIIHT in the framework of LLRW Project in the period of 2000-2001 in Russia for comprehensive treatment of LWR of atomic fleet. These industrial plants proved to be highly efficient and secure during their long operation life. Module of deep evaporation is a new technological development. It will ensure conduction of evaporation and purification of LRW of different physicochemical composition, including those containing hardness salts, resulted in generation of LRW concentrate 300-600 g/l. The method is based on utilization of supersonic ejector for intensification of thermal physic processes and performance of evaporation in brine recycling mode. All proposed technological solutions are totally based on patented Russian developments. Proposed work will allow to construct modular plants, which will be totally prepared for efficient purification of any types of liquid radioactive wastes from radionuclides in case of force majeure. According to proposed scheme concentration level of cesium radionuclides in safe-for-storage form will make up not less than 5000. With respect to purification from cesium radionuclides of liquid radioactive wastes stored at NPP 'Fukushima' about 10 t of inorganic sorbents, loaded in 160 protective filter-containers, will be required for solving this problem. The amount of secondary wastes will be reduced approximately in 5 times in comparison with traditional schemes, applied in purification of secondary LRW of Fukushima-1 by Areva (France) and Kurion (USA) companies. All units of modular plants will be constructed and manufactured as totally automated, providing their twenty-four-hour safe operation. Modular design will ensure efficiency and let optimize the costs of secondary LRW treatment. In order to ensure off-line operation in emergency conditions the plant should be equipped with auxiliary modules: energy and ventilation ones. Under normal conditions these modules can be stored in 'mothballed' condition at special warehouses under the authority of federal bodies. It will be reasonable to choose required transport facilities, the most suitable for transportation of modules to target destination beforehand, using vessel classification list.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual design study for heat exhaust management in the ARC fusion pilot plant

The ARC pilot plant conceptual design study has been extended beyond its initial scope to explore options for managing ∼525 MW of fusion power generated in a compact, high field (B 0 = 9.2 T) tokamak that is approximately the size of JET (R 0 = 3.3 m). Taking advantage of ARC’s novel design – demountable high temperature superconductor toroidal field (TF) magnets, poloidal magnetic field coils located inside the TF, and vacuum vessel (VV) immersed in molten salt FLiBe blanket – this follow-on study has identified innovative and potentially robust power exhaust management solutions. The superconducting poloidal field coil set has been reconfigured to produce double-null plasma equilibria with a long-leg X-point target divertor geometry. Here this design choice is motivated by recent modeling which indicates that such configurations enhance power handling and may attain a passively-stable detachment front that stays in the divertor leg over a wide power exhaust window. A modified VV accommodates the divertor legs while retaining the original core plasma volume and TF magnet size. The molten salt FLiBe blanket adequately shields all superconductors, functions as an efficient tritium breeder, and, with augmented forced flow loops, serves as an effective single-phase, low-pressure coolant for the divertor, VV, and breeding blanket. Advanced neutron transport calculations (MCNP) indicate a tritium breeding ratio of ∼1.08. The neutron damage rate (DPA/year) of the remote divertor targets is ∼3–30 times lower than that of the first wall. The entire VV (including divertor and first wall) can tolerate high damage rates since the demountable TF magnets allow the VV to be replaced every 1–2 years as a single unit, employing a vertical maintenance scheme. A tungsten swirl tube FLiBe coolant channel design, similar in geometry to that used by ITER, is considered for the divertor heat removal and shown capable of exhausting divertor heat flux levels of up to 12 MW/m 2 . Several novel, neutron tolerant diagnostics are explored for sensing power exhaust and for providing feedback control of divertor conditions over long time scales. These include measurement of Cherenkov radiation emitted in FLiBe to infer DT fusion reaction rate, measurement of divertor detachment front locations in the divertor legs with microwave interferometry, and monitoring “hotspots” on the divertor chamber walls via IR imaging through the FLiBe blanket.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

FIFTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE

A series of experiments to monitor the aging performance of Viton{reg_sign} GLT O-rings used in the Model 9975 package has been ongoing for six years at the Savannah River National Laboratory. Sixty-seven mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested at nominal six month intervals to determine if they meet the criterion of leaktightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 36 GLT O-ring fixtures at 200-350 F. Room temperature leak test failures have been experienced in 6 of the GLT O-ring fixtures aging at 300 and 350 F, and in all 3 of the GLT O-ring fixtures aging at higher temperatures. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 30-48 months, which is still bounding to O-ring temperatures during storage in KAMS. High temperature aging continues for 6 GLT-S O-ring fixtures at 200-300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 or 300 F for 19 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the Orings displayed a compression set ranging from 51-95%. This is significantly greater than seen to date for packages inspected during KAMS field surveillance (23% average). For GLT O-rings, service life based on the room temperature leak rate criterion is comparable to that predicted by compression stress relaxation (CSR) data at higher temperatures (350-400 F). While there are no comparable failure data yet at aging temperatures below 300 F, extrapolations of the data for GLT O-rings suggests the CSR model predictions provide a conservative prediction of service life relative to the leak rate criterion. Failure data at lower temperatures are needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining fixtures.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Corrosion Assessment of Candidate Materials for the SHINE Subcritical Assembly Vessel and Components—FY14 Report

Laboratory corrosion testing of candidate alloys—including Zr-4 and Zr-2.5Nb representing the target solution vessel, and 316L, 2304, 304L, and 17-4 PH stainless steels representing process piping and balance-of-plant components—was performed in support of the proposed SHINE process to produce 99 Mo from low-enriched uranium. The test solutions used depleted uranyl sulfate in various concentrations and incorporated a range of temperatures, excess sulfuric acid concentrations, nitric acid additions (to simulate radiolysis product generation), and iodine additions. Testing involved static immersion of coupons in solution and in the vapor above the solution, and was extended to include planned-interval tests to examine details associated with stainless steel corrosion in environments containing iodine species. A large number of galvanic tests featuring couples between a stainless steel and a zirconium-based alloy were performed, and limited vibratory horn testing was incorporated to explore potential erosion/corrosion features of compatibility. In all cases, corrosion of the zirconium alloys was observed to be minimal, with corrosion rates based on weight loss calculated to be less than 0.1 mil/year with no change in surface roughness. The resulting passive film appeared to be ZrO 2 with variations in thickness that influence apparent coloration (toward light brown for thicker films). Galvanic coupling with various stainless steels in selected exposures had no discernable effect on appearance, surface roughness, or corrosion rate. Erosion/corrosion behavior was the same for zirconium alloys in uranyl sulfate solutions and in sodium sulfate solutions adjusted to a similar pH, suggesting there was no negative effect of uranium resulting from fluid dynamic conditions aggressive to the passive film. Corrosion of the candidate stainless steels was similarly modest across the entire range of exposures. However, some sensitivity to corrosion of the stainless steels was observed in solutions with 50 wppm iodine (the actual SHINE process expects 0.1–1 wppm) with the highest corrosion rates (up to ~6 mil/year) observed on specimens exposed in the vapor phase. Lower concentrations of iodine species (5 or 28 wppm) proved much less corrosive, and the planned-interval data indicated that metal corrodibility decreased with time for all immersed exposures and, with one minor exception, all vapor exposures. Little change in susceptibility to corrosion was observed as a result of nitric acid additions to the test environment (simulating radiolysis products). The trend toward reduced corrosion (immersion and vapor phase) with decreasing iodine concentration suggests that, at the expected conditions in the SHINE process, it is unlikely that iodine species will generate a general corrosion concern for the candidate stainless steels.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SIXTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE

A series of experiments to monitor the aging performance of Viton{reg_sign} GLT O-rings used in the Model 9975 package has been ongoing for seven years at the Savannah River National Laboratory. Seventy tests using mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested periodically to determine if they meet the criterion of leak-tightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 33 GLT O-ring fixtures at 200-300 F. Room temperature leak test failures have been experienced in all of the GLT O-ring fixtures aging at 350 F and higher temperatures, and in 7 fixtures aging at 300 F. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 41-60 months, which is still bounding to O-ring temperatures during storage in K-Area Complex (KAC). Based on expectations that the fixtures aging at 200 F will remain leak-tight for a significant period yet to come, 2 additional fixtures began aging within the past year at an intermediate temperature of 270 F, with hopes that they may leak before the 200 F fixtures. High temperature aging continues for 6 GLT-S O-ring fixtures at 200-300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200-300 F for up to 26 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the Orings displayed a compression set ranging from 51-96%. This is greater than seen to date for packages inspected during KAC field surveillance (24% average). For GLT O-rings, separate service life estimates have been made based on the O-ring fixture leak test data and based on compression stress relaxation (CSR) data. These two predictive models show reasonable agreement at higher temperatures (350-400 F). However, at 300 F, the room temperature leak test failures to date experienced longer aging times than predicted by the CSR-based model. This suggests that extrapolations of the CSR model predictions to temperatures below 300 F will provide a conservative prediction of service life relative to the leak rate criterion. Leak test failure data at lower temperatures are needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining fixtures.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Technical Review Report for the Mound 1KW Package Safety Analysis Report for Packaging Waiver for the Use of Modified Primary Containment Vessel (PCV)

This Technical Review Report (TRR) documents the review, performed by the Lawrence Livermore National Laboratory (LLNL) staff, at the request of the U.S. Department of Energy (DOE), on the Waiver for the Use of Modified Primary Containment Vessels (PCV). The waiver is to be used to support a limited number of shipments of fuel for the Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) Project in support of the National Aeronautics and Space Administration's (NASA's) Mars Science Laboratory (MSL) mission. Under the waiver, an inventory of existing national security PCVs will be converted to standard PCVs. Both types of PCVs are currently approved for use by the Office of Nuclear Energy. LLNL has previously reviewed the national security PCVs under Mound 1KW Package Safety Analysis Report for Packaging, Addendum No. 1, Revision c, dated June 2007 (Addendum 1). The safety analysis of the package is documented in the Safety Analysis Report for Packaging (SARP) for the Mound 1KW Package (i.e., the Mound 1KW SARP, or the SARP) where the standard PCVs have been reviewed by LLNL. The Mound 1KW Package is certified by DOE Certificate of Compliance (CoC) number USA/9516/B(U)F-85 for the transportation of Type B quantities of plutonium heat source material. The waiver requests an exemption, claiming safety equivalent to the requirements specified in 10 CFR 71.12, Specific Exemptions, and will lead to a letter amendment to the CoC. Under the waiver, the Office of Radioisotope Power Systems, NE-34, is seeking an exemption from 10 CFR 71.19(d)(1), Previously Approved Package,[5] which states: '(d) NRC will approve modifications to the design and authorized contents of a Type B package, or a fissile material package, previously approved by NRC, provided--(1) The modifications of a Type B package are not significant with respect to the design, operating characteristics, or safe performance of the containment system, when the package is subjected to the tests specified in {section}71.71 and 71.73.' The LLNL staff had previously reviewed a request from Idaho National Laboratory (INL) to reconfigure national security PCVs to standard PCVs. With a nominal 50% reduction in both the height and the volume, the LLNL staff initially deemed the modifications to be significant, which would not be allowed under the provisions of 10 CFR 71.19(d)(1)--see above. As a follow-up, the DOE requested additional clarification from the Nuclear Regulatory Commission (NRC). The NRC concluded that the reconfiguration would be a new fabrication, and that an exemption to the regulations would be required to allow its use, as per the requirements specified in 10 CFR 71.19(c)(1), Previously Approved Package: '(c) A Type B(U) package, a Type B(M) package, or a fissile material package previously approved by the NRC with the designation '-85' in the identification number of the NRC CoC, may be used under the general license of {section}71.17 with the following additional conditions: (1) Fabrication of the package must be satisfactorily completed by December 31, 2006, as demonstrated by application of its model number in accordance with 71.85(c).' Although the preferred approach toward the resolution of this issue would be for the applicant to submit an updated SARP, the applicant has stated that the process of updating the Model Mound 1KW Package SARP is a work that is in progress, but that the updated SARP is not yet ready for submittal. The applicant has to provide a submittal, proving that the package meets the '-96' requirements of International Atomic Energy Agency (IAEA) Safety Standards Series No. TS-R-1, in order to fabricate approved packagings after December 31, 2006. The applicant has further stated that all other packaging features, as described in the currently approved Model Mound 1KW Package SARP, remain unchanged. This report documents the LLNL review of the waiver request. The specific review for each SARP Chapter is documented.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Dust Studies in DIII-D and TEXTOR

Studies of naturally occurring and artificially introduced carbon dust are conducted in DIII-D and TEXTOR. In DIII-D, dust does not present operational concerns except immediately after entry vents. Submicron sized dust is routinely observed using Mie scattering from a Nd:Yag laser. The source is strongly correlated with the presence of Type I edge localized modes (ELMs). Larger size (0.005-1 mm diameter) dust is observed by optical imaging, showing elevated dust levels after entry vents. Inverse dependence of the dust velocity on the inferred dust size is found from the imaging data. Direct heating of the dust particles by the neutral beam injection (NBI) and acceleration of dust particles by the plasma flows are observed. Energetic plasma disruptions produce significant amounts of dust. Large flakes or debris falling into the plasma may result in a disruption. Migration of pre-characterized carbon dust is studied in DIII-D and TEXTOR by introducing micron-size dust in plasma discharges. In DIII-D, a sample holder filled with {approx}30 mg of dust is introduced in the lower divertor and exposed to high-power ELMing H-mode discharges with strike points swept across the divertor floor. After a brief exposure ({approx}0.1 s) at the outer strike point, part of the dust is injected into the plasma, raising the core carbon density by a factor of 2-3 and resulting in a twofold increase of the radiated power. In TEXTOR, instrumented dust holders with 1-45 mg of dust are exposed in the scrape-off layer 0-2 cm radially outside of the last closed flux surface in discharges heated with neutral beam injection (NBI) power of 1.4 MW. At the given configuration of the launch, the dust did not penetrate the core plasma and only moderately perturbed the edge plasma, as evidenced by an increase of the edge carbon content.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗